Areas of Experience
 Water pumping / boosting stations  Kearl lake phase 2
 Asphalt plant  Preparing turnover documentation
 Centrifuge waste separation plants  Meeting with engineers and customer representatives
 Polymer injection well  Running jobs and leading crews
Certification
 Red seal journeyman ticket  CSTS certificate
 H2S alive  Fall arrest
 AWP certification  Arc flash awareness
Experience
Water pumping station, Medicine Hat AB
 VFD programming (Allan Bradley)
 Verifying PLC programming
 Point to point checks
 Calibrating and installing instrumentation
 Troubleshooting
 Motor rotation checks
One of two electricians on commissioning team, leading me to have lots of responsibilities and learning opportunities. Problems during
construction of main piping led to delays of project.
Asphalt plant, Medicine Hat AB
 Instrument calibrations
 VFD programming (Toshiba)
 SLC system programming verification
 Air system verification
 Generator start up and testing
Set up and re-commission an old plant. Lots of trouble shooting and repair work involved.
Methanex plant, Medicine Hat AB
 Plant start up
 Instrument calibrations
 Motor start up and rotation checks
 Troubleshooting and repair
Lead position on the start up and repair project for an old plant that had been sitting dormant for about 10 years. Old systems had to be
brought back online and newly installed systems were tested and system compatibilities were tested.
Gas Plant, Ft. St john, BC
 Troubleshooting
 Final QA checks
 Instrument calibrations
 Hi-pot, meggar and point to point checks
Part of leadership team to organize and align work schedules and materials with other trades and companies on site. Using computer
tracking systems to help in these areas.
Centrifuge separator plant, Ft. Mcmurray AB
 VFD programming (Allan Bradley)
 PLC programming
 Troubleshooting
 Final QA checks
 Instrument calibrations
Lead electrician on commissioning team. Commissioning being completed as the plant was in operation. Part of growing company QA
strategies and methods by involvement with executive meetings.
Water pumping station, Strathmore AB
 Final QA checks
 VFD programming (Allan Bradley)
 Verifying PLC programming
 Instrument calibrations
 Generator start up and testing
Lead position, being there during construction gave me a better knowledge and understanding of the system’s operations.
Polymer injection well, Enchant AB
 Final QA checks
 VFD programming (Allan Bradley)
 Verifying PLC programming
 Hi-pot, meggar and point to point checks
 Instrument calibrations
 Live system tie ins and checks
Lead position, being there during construction gave a better knowledge and understanding of the system’s operations. Injection system
needed to be tied into the well after a certain stage in commissioning, and then all systems were tested live.
Kearl lake , Ft. Mcmurray AB
 Final QA checks
 Live system tie ins and checks
 Assisting other trades in commissioning process
 VFD programming
 Hi-pot, meggar and point to point checks
 Motor start up and rotation checks
Part of team commissioning one stage of phase 2, there from the start to the end. Taking part in final turnover walk downs
accepting from the construction contractor and handing over to operations representatives. Meeting with 3
rd
party vendors and
providing support for vendor supplied equipment. Meeting with engineers and managers to schedule work and compile needed
documentation.
Other Experiences and knowledge
 Years of work experience in oil and gas sector  University level math and science courses
 Heavy equipment operation experiences  Construction site leadership experiences
 QA/QC leadership experiences  Executive committee team member
 Trouble shooting and maintenance experience  Proficient with MS office and adobe

More Related Content

What's hot

INSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTORINSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTORRegu Mkc
 
VIJAYA PILLY.condensed_resume
VIJAYA PILLY.condensed_resumeVIJAYA PILLY.condensed_resume
VIJAYA PILLY.condensed_resumeVijay Pilly
 
Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq Ahmad
 
PetroSync - Pre-Commissioning, Commissioning and Start-Up
PetroSync - Pre-Commissioning, Commissioning and Start-UpPetroSync - Pre-Commissioning, Commissioning and Start-Up
PetroSync - Pre-Commissioning, Commissioning and Start-UpPetroSync
 
Replacing a Stack Gas Flow Hardware Device with PEMS
Replacing a Stack Gas Flow Hardware Device with PEMSReplacing a Stack Gas Flow Hardware Device with PEMS
Replacing a Stack Gas Flow Hardware Device with PEMSCTi Controltech
 
Mechanical completion
Mechanical completionMechanical completion
Mechanical completionRonie Chu
 
PetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for ServicePetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for ServicePetroSync
 
E&I QAQC Sup,Insp
E&I QAQC Sup,InspE&I QAQC Sup,Insp
E&I QAQC Sup,InspEZAZ ALAM
 
CV - Dayananda Hebbar 24-10-2016
CV - Dayananda Hebbar 24-10-2016CV - Dayananda Hebbar 24-10-2016
CV - Dayananda Hebbar 24-10-2016Dayananda Hebbar
 
Issam_CV 08-10-015 (Trainer)
Issam_CV 08-10-015 (Trainer)Issam_CV 08-10-015 (Trainer)
Issam_CV 08-10-015 (Trainer)Issam Khalil
 
Jim Proce - Utility Evaluation Presentation March 29 2012
Jim Proce - Utility Evaluation Presentation March 29 2012Jim Proce - Utility Evaluation Presentation March 29 2012
Jim Proce - Utility Evaluation Presentation March 29 2012Jim Proce
 
Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03Marcel Paul
 

What's hot (20)

MS CV May 2016
MS CV May 2016MS CV May 2016
MS CV May 2016
 
INSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTORINSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTOR
 
VIJAYA PILLY.condensed_resume
VIJAYA PILLY.condensed_resumeVIJAYA PILLY.condensed_resume
VIJAYA PILLY.condensed_resume
 
MARK P BOUVIER
MARK P BOUVIERMARK P BOUVIER
MARK P BOUVIER
 
Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)
 
Instrumentation Inspector
Instrumentation InspectorInstrumentation Inspector
Instrumentation Inspector
 
PetroSync - Pre-Commissioning, Commissioning and Start-Up
PetroSync - Pre-Commissioning, Commissioning and Start-UpPetroSync - Pre-Commissioning, Commissioning and Start-Up
PetroSync - Pre-Commissioning, Commissioning and Start-Up
 
Replacing a Stack Gas Flow Hardware Device with PEMS
Replacing a Stack Gas Flow Hardware Device with PEMSReplacing a Stack Gas Flow Hardware Device with PEMS
Replacing a Stack Gas Flow Hardware Device with PEMS
 
Gorga Silalahi (CV)
Gorga Silalahi (CV)Gorga Silalahi (CV)
Gorga Silalahi (CV)
 
Mechanical completion
Mechanical completionMechanical completion
Mechanical completion
 
PetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for ServicePetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for Service
 
E&I QAQC Sup,Insp
E&I QAQC Sup,InspE&I QAQC Sup,Insp
E&I QAQC Sup,Insp
 
CV - Dayananda Hebbar 24-10-2016
CV - Dayananda Hebbar 24-10-2016CV - Dayananda Hebbar 24-10-2016
CV - Dayananda Hebbar 24-10-2016
 
CV 15 Sep2016
CV 15 Sep2016CV 15 Sep2016
CV 15 Sep2016
 
SHASHANK CV
SHASHANK CVSHASHANK CV
SHASHANK CV
 
Issam_CV 08-10-015 (Trainer)
Issam_CV 08-10-015 (Trainer)Issam_CV 08-10-015 (Trainer)
Issam_CV 08-10-015 (Trainer)
 
Jim Proce - Utility Evaluation Presentation March 29 2012
Jim Proce - Utility Evaluation Presentation March 29 2012Jim Proce - Utility Evaluation Presentation March 29 2012
Jim Proce - Utility Evaluation Presentation March 29 2012
 
Instrument engineer CV
Instrument engineer CVInstrument engineer CV
Instrument engineer CV
 
Ffs assessment
Ffs assessmentFfs assessment
Ffs assessment
 
Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03
 

Similar to shawn.smithCV

Curriculum Vitae (2015)
Curriculum Vitae (2015)Curriculum Vitae (2015)
Curriculum Vitae (2015)Jay Arances
 
20 CV OCT 2015 - Copy
20 CV OCT 2015 - Copy20 CV OCT 2015 - Copy
20 CV OCT 2015 - CopyShabir nasir
 
Carmel Process Solutions Presentation
Carmel Process Solutions PresentationCarmel Process Solutions Presentation
Carmel Process Solutions PresentationDonaldAudia
 
Steven Watts Fixed Plant may 2015
Steven Watts Fixed Plant may 2015Steven Watts Fixed Plant may 2015
Steven Watts Fixed Plant may 2015steven watts
 
Saif Ali_original
Saif Ali_originalSaif Ali_original
Saif Ali_originalSaif Ali
 
Jamal_Ashraf -1 oil@gas
Jamal_Ashraf -1 oil@gasJamal_Ashraf -1 oil@gas
Jamal_Ashraf -1 oil@gasJAMAL ASHRAF
 
Process Certification Implementation Presentation
Process Certification Implementation PresentationProcess Certification Implementation Presentation
Process Certification Implementation Presentationmdmilward
 
Qa qc manager (1) new
Qa qc manager (1) newQa qc manager (1) new
Qa qc manager (1) newASHIQUE ZAFAR
 
jmeyercons10112016
jmeyercons10112016jmeyercons10112016
jmeyercons10112016John Meyer
 
Anthony Balaskas Resume
Anthony Balaskas ResumeAnthony Balaskas Resume
Anthony Balaskas ResumeTony Balaskas
 

Similar to shawn.smithCV (20)

ROHIT JOSHI JI
ROHIT JOSHI JIROHIT JOSHI JI
ROHIT JOSHI JI
 
Curriculum Vitae (2015)
Curriculum Vitae (2015)Curriculum Vitae (2015)
Curriculum Vitae (2015)
 
20 CV OCT 2015 - Copy
20 CV OCT 2015 - Copy20 CV OCT 2015 - Copy
20 CV OCT 2015 - Copy
 
Carmel Process Solutions Presentation
Carmel Process Solutions PresentationCarmel Process Solutions Presentation
Carmel Process Solutions Presentation
 
Lead Inspection Engineer CV
Lead Inspection Engineer CVLead Inspection Engineer CV
Lead Inspection Engineer CV
 
Steven Watts Fixed Plant may 2015
Steven Watts Fixed Plant may 2015Steven Watts Fixed Plant may 2015
Steven Watts Fixed Plant may 2015
 
Saif Ali_original
Saif Ali_originalSaif Ali_original
Saif Ali_original
 
DOUGLAS D 2
DOUGLAS D 2DOUGLAS D 2
DOUGLAS D 2
 
Apc 2
Apc 2Apc 2
Apc 2
 
Jamal_Ashraf -1 oil@gas
Jamal_Ashraf -1 oil@gasJamal_Ashraf -1 oil@gas
Jamal_Ashraf -1 oil@gas
 
Process Certification Implementation Presentation
Process Certification Implementation PresentationProcess Certification Implementation Presentation
Process Certification Implementation Presentation
 
Qa qc manager (1) new
Qa qc manager (1) newQa qc manager (1) new
Qa qc manager (1) new
 
Mangesh-Resume
Mangesh-ResumeMangesh-Resume
Mangesh-Resume
 
RESUME
RESUMERESUME
RESUME
 
cv Instrument Commissioning Engineer
cv Instrument Commissioning Engineercv Instrument Commissioning Engineer
cv Instrument Commissioning Engineer
 
Anish's CV
Anish's CV Anish's CV
Anish's CV
 
cv
cvcv
cv
 
jmeyercons10112016
jmeyercons10112016jmeyercons10112016
jmeyercons10112016
 
Cv of nilesh rk
Cv of nilesh rkCv of nilesh rk
Cv of nilesh rk
 
Anthony Balaskas Resume
Anthony Balaskas ResumeAnthony Balaskas Resume
Anthony Balaskas Resume
 

shawn.smithCV

  • 1. Shawn Smith Medicine Hat AB, Canada shawn.g.smith@live.ca Red Seal Journeyman Electrician Extensive oil and gas experience. Many opportunities for being a part of or leading commissioning teams. QA/QC leadership opportunities and other construction positions give knowledge of overall operation processes. Large variety of maintenance experiences. Areas of Experience  Water pumping / boosting stations  Kearl lake phase 2  Asphalt plant  Preparing turnover documentation  Centrifuge waste separation plants  Meeting with engineers and customer representatives  Polymer injection well  Running jobs and leading crews Certification  Red seal journeyman ticket  CSTS certificate  H2S alive  Fall arrest  AWP certification  Arc flash awareness Experience Water pumping station, Medicine Hat AB  VFD programming (Allan Bradley)  Verifying PLC programming  Point to point checks  Calibrating and installing instrumentation  Troubleshooting  Motor rotation checks One of two electricians on commissioning team, leading me to have lots of responsibilities and learning opportunities. Problems during construction of main piping led to delays of project. Asphalt plant, Medicine Hat AB  Instrument calibrations  VFD programming (Toshiba)  SLC system programming verification  Air system verification  Generator start up and testing Set up and re-commission an old plant. Lots of trouble shooting and repair work involved.
  • 2. Methanex plant, Medicine Hat AB  Plant start up  Instrument calibrations  Motor start up and rotation checks  Troubleshooting and repair Lead position on the start up and repair project for an old plant that had been sitting dormant for about 10 years. Old systems had to be brought back online and newly installed systems were tested and system compatibilities were tested. Gas Plant, Ft. St john, BC  Troubleshooting  Final QA checks  Instrument calibrations  Hi-pot, meggar and point to point checks Part of leadership team to organize and align work schedules and materials with other trades and companies on site. Using computer tracking systems to help in these areas. Centrifuge separator plant, Ft. Mcmurray AB  VFD programming (Allan Bradley)  PLC programming  Troubleshooting  Final QA checks  Instrument calibrations Lead electrician on commissioning team. Commissioning being completed as the plant was in operation. Part of growing company QA strategies and methods by involvement with executive meetings. Water pumping station, Strathmore AB  Final QA checks  VFD programming (Allan Bradley)  Verifying PLC programming  Instrument calibrations  Generator start up and testing Lead position, being there during construction gave me a better knowledge and understanding of the system’s operations. Polymer injection well, Enchant AB  Final QA checks  VFD programming (Allan Bradley)  Verifying PLC programming  Hi-pot, meggar and point to point checks  Instrument calibrations  Live system tie ins and checks Lead position, being there during construction gave a better knowledge and understanding of the system’s operations. Injection system needed to be tied into the well after a certain stage in commissioning, and then all systems were tested live.
  • 3. Kearl lake , Ft. Mcmurray AB  Final QA checks  Live system tie ins and checks  Assisting other trades in commissioning process  VFD programming  Hi-pot, meggar and point to point checks  Motor start up and rotation checks Part of team commissioning one stage of phase 2, there from the start to the end. Taking part in final turnover walk downs accepting from the construction contractor and handing over to operations representatives. Meeting with 3 rd party vendors and providing support for vendor supplied equipment. Meeting with engineers and managers to schedule work and compile needed documentation. Other Experiences and knowledge  Years of work experience in oil and gas sector  University level math and science courses  Heavy equipment operation experiences  Construction site leadership experiences  QA/QC leadership experiences  Executive committee team member  Trouble shooting and maintenance experience  Proficient with MS office and adobe