SlideShare a Scribd company logo
1 of 22
Structural Mill Operation
โ€ข The aim is to show the different individual
working area that integrate as functional units in
a specific sequence to form a Hot Rolling Mill.
โ€ข The functions of each working area will be stated
in brief to understand its role as a sub unit of the
Mill.
โ€ข Any functional area will be the assimilation of the
functions executed by their Local Control Stations
which cater to the basic needs and Main Control
Desk located inside a Control Pulpit
A.) Billet Yard
1. Billets are unloaded on selected Roller Table.
2. Billets are transferred on Roller Table in front
of the Elevator.
3. Billet is transferred by elevator to Roller Table
with pushers.
4. Billet length is measured with laser.
5. Billet is then passed to Roller Table with
weighing system and the following happens:
Weight is
OK
Emg. Discharging
Bench removes
the billet
No
Disappearing
Stopper Lowered
Billet enters
Furnace
Yes
Alarm to HMI
B.) Furnace (200 T/H Walking Beam)
โ€ข Charging cycle:
1. Once the stopper disappears the Furnace
Door opens and Charging RT receives the
billet.
2. The position of the billet is checked w.r.t.
loading diagram.
3. Charging door closes.
4. Aligning machine starts Fwd & Rev cycle.
โ€ข Discharging cycle:
1. Kick Off cycle starts.
2. Kick off moves the billet to discharging Roller
table.
3. Discharge side door opens which is followed
by the motion of discharging Roller tables.
4. When the tail of the billet leaves the
discharging door closes.
C.) Reheating Furnace Exit Area
1. This area is entered once Furnace is ready to
discharge and the disappearing stopper is down.
2. The entry of billet head at the descaler is
followed by a high pressure water delivery to
remove the scales and stops when the tail has
left the descaler.
3. The Pinch Roll (PR) and Roller Table (RT) first
slows down to bite speed and then is adjusted
with the speed of the 1st working Stand.
4. The cycle restarts by synchronizing the PR and
RT with RHF RT
D.) Mill Area
The Mill Area is classified into 3 zones:
1. Roughing Mill consisting of 7 stands and
Pendulum Shear and 1 Crop Shear.
2. Intermediate Mill consisting of 5 stands and 1
Shear
3. Finishing Mill consisting of 5 Stands and 1
Shear
4. Then comes the diverter that bifurcates the
Rolling Mill into 2 lines, Line-1 & 2.
Mill Area Operation Features
1. Speed Reference system to generate required
speed.
2. Single mode speed variation that controls the
speed of a single motor.
3. Cascade mode that controls the speed of a
particular motor and also the speed of all the
motors preceding that particular motor inorder
to bring the system to a synchronization.
4. Master control generates the reference for
speed reference system
Mill Area Operation Features
5. Lead Speed designed to improve the speed of
introduction of the material to a particular
Stand.
6. Material Tracking that is aimed to track the shift
in head or the tail of a material so that
subsequent functions like continuity control,
tension control and loop control can be
executed efficiently.
7. Continuity Control supervises the arising of
cobble and controls the cropping action of the
shears
Mill Area Operation Features
8. Tension Control applicable for large profiles only
that eliminates the tension between 2 stands.
9. Loop Control comes into play inorder to reduce
the tension between 2 stands especially when
the material is thin & deforming.
10. Excluded Stand Control which excludes some
specific stands from the process depending upon
the required material profile.
Mill Area Operation Features
11. Ready to Roll that performs the
management of all alrms and interlocks that
combine in specific sequence prior to giving
consent for rolling.
12. Ghost Rolling which simulates the process of
billet rolling inorder to identify the error in
any field sensors.
E.) Cooling Bed Area
1. Cooling Bed cycle sets up the movement of
the bars by initiating the Lining up RT.
2. Layer forming is started as Cleaning cycle
sends the bars proceed towards Cooling Bed
Exit RT.
3. The layer is moved to aligning bar so that an
uniform layer can be fed to the Straightener.
4. Straightener is not a mandatory component
and can be bypassed using a bypass RT.
F.) Straightener Area
1. The Multi strand Straightening machine rolls
and Pinch roll positioning is verified.
2. Straightening Line Control ensures that bars
are towards Straightener.
3. Bar Straightening takes place.
4. Straightening Line control ensures that the
bar travels from Straightener to downstream.
Details of Straightener
โ€ข Its main components are:
1. Main Motor Drive
2. Upper Roll Axial adjustment system
3. Lower Roll Vertical adjustment system
4. Roller changing tool.
5. Machine Lubrication system
6. Cobble detection system.
G.) Layer Preparation Area
1. It is the area between Cold Saw and Straightener
and includes the Tail Recovery System.
2. Bars are charged from Straightener exit RT by
Liftable Chain Transfer.
3. Layer formation takes place with the help of
entry and exit chain transfer & must be
compacted by pushers.
4. Once the layer is completed it is discharged
towards Saw Entry RT for Cold Cut.
Tail Recovery System
โ€ข This consists of the RT that carry the bars from
layer preparation area to the cold saw
โ€ข When the last cut to length has been
performed and the tail has been detected the
bar tails are discharged by a discharging table.
โ€ข These tails are collected at the pockets by a
set of discharging levers.
H.) Cut to Length Area
โ€ข During normal cutting cycle SAW-1 cuts the layer
at a length 3 times the final length. SAW-2 & 3
make the cutting together to obtain the final
length. Here SAW-2 is movable and SAW-3 is
fixed.
โ€ข There are 2 locking devices at the entry and exit
of the disc SAWS that allows the material to be
cut without movement.
โ€ข Booster pumps are provided to provide water at
correct pressure to provide accurate cutting.
Cut to Length Operation
1. Layer ready at Saw Entry RT โ€œLine Startโ€ is
initiated.
2. Layer aligning is checked first at disappearing
stopper and then at Wheeled stopper-1.
3. SAW-1 makes the cut & is followed by layer
aligning on Wheeled Stopper2.
4. SAW-2 & 3 makes the cut and layer is
transported to discharging are upto the stopper
where aligning is again checked.
5. Layer is the ready for extraction and discharging.
I.) Stacker & Forming Area
โ€ข This area has the following sub-divisions:
1. Entry area
2. Liftable chain transfer
3. Layer forming transfer
4. Turning and Deposit magnet heads
5. Forming pockets
6. Liftable chain transfer
Stacker and Forming Area Operation
1. The Entry area layer loading & discharging takes
place via Liftable chain transfer.
2. Then the layer moves to the Forming area 7
towards the magnets.
3. The magnet pick up the layer and discharge
them to the pockets.
4. Pockets are lowered and the process continues
till step by step stack formation gets completed.
5. When the stack is โ€œReadyโ€ pockets lower and
discharge them to RT. Pockets are the ready to
accept new stack.
J.) Tying & Collecting Area
The following functions are performed:
1. Weighing the product
2. Tying and strapping the product
3. Dispatch from Liftable transfer table by
Magnet cranes.
Videos
1. https://www.youtube.com/watch?v=voxln4lY
C0g
2. https://www.youtube.com/watch?v=AuuP8L-
WppI
3. https://www.youtube.com/watch?v=LWM6b
8P0r3E
4. https://www.youtube.com/watch?v=KRn73g
KQ2YU

More Related Content

What's hot

Vedanta Hindustan zinc training
Vedanta Hindustan zinc trainingVedanta Hindustan zinc training
Vedanta Hindustan zinc training
ravi kant
ย 
Internship report
Internship reportInternship report
Internship report
Smriti Tikoo
ย 

What's hot (20)

Final Presentation On Briquetting Of Coal
Final Presentation On Briquetting Of CoalFinal Presentation On Briquetting Of Coal
Final Presentation On Briquetting Of Coal
ย 
Project report on injection molding machine
Project report on injection molding machineProject report on injection molding machine
Project report on injection molding machine
ย 
Project Report on Industrial Summer Training at NTPC Simhadri
 Project Report on Industrial Summer Training at NTPC Simhadri Project Report on Industrial Summer Training at NTPC Simhadri
Project Report on Industrial Summer Training at NTPC Simhadri
ย 
Squeeze casting process
Squeeze casting processSqueeze casting process
Squeeze casting process
ย 
Vedanta Hindustan zinc training
Vedanta Hindustan zinc trainingVedanta Hindustan zinc training
Vedanta Hindustan zinc training
ย 
Accretion control in sponge iron production kiln using fuzzy logic
Accretion control in sponge iron production kiln using fuzzy logicAccretion control in sponge iron production kiln using fuzzy logic
Accretion control in sponge iron production kiln using fuzzy logic
ย 
Sintering plant at a glance
Sintering plant at a glanceSintering plant at a glance
Sintering plant at a glance
ย 
Hot rolling mills
Hot rolling millsHot rolling mills
Hot rolling mills
ย 
Steel melting shop (sms) - 2
Steel melting shop (sms) - 2Steel melting shop (sms) - 2
Steel melting shop (sms) - 2
ย 
Report on Steamt Turbines, BHEL HYDERABAD.
Report on Steamt Turbines, BHEL HYDERABAD.Report on Steamt Turbines, BHEL HYDERABAD.
Report on Steamt Turbines, BHEL HYDERABAD.
ย 
Industrial Training Report on Steel Melting Shop(SMS)
Industrial Training Report on Steel Melting Shop(SMS)Industrial Training Report on Steel Melting Shop(SMS)
Industrial Training Report on Steel Melting Shop(SMS)
ย 
Sponge iron making process
Sponge iron making processSponge iron making process
Sponge iron making process
ย 
Industrial Training Report on Direct Reduced Iron Plant(DRI)
Industrial Training Report on Direct Reduced Iron Plant(DRI)Industrial Training Report on Direct Reduced Iron Plant(DRI)
Industrial Training Report on Direct Reduced Iron Plant(DRI)
ย 
Moulding sand
Moulding sandMoulding sand
Moulding sand
ย 
WRM & BM
WRM & BMWRM & BM
WRM & BM
ย 
Fgm sanjay
Fgm sanjayFgm sanjay
Fgm sanjay
ย 
Sinter Plant,Lime & Dolo Plant industrial Training Report
Sinter Plant,Lime & Dolo Plant industrial Training ReportSinter Plant,Lime & Dolo Plant industrial Training Report
Sinter Plant,Lime & Dolo Plant industrial Training Report
ย 
Internship report
Internship reportInternship report
Internship report
ย 
Overview of bhilai steel plant
Overview of bhilai steel plantOverview of bhilai steel plant
Overview of bhilai steel plant
ย 
3.8 reheating furnace
3.8 reheating furnace3.8 reheating furnace
3.8 reheating furnace
ย 

Similar to Overiew of a hot rolling steel mill

BP[1] Copy
BP[1] CopyBP[1] Copy
BP[1] Copy
Mukherjee Jb
ย 
revised work history3.doc
revised work history3.docrevised work history3.doc
revised work history3.doc
Jim Oberle
ย 
Introduction to CNC programing manufacturing.pdf
Introduction to CNC programing manufacturing.pdfIntroduction to CNC programing manufacturing.pdf
Introduction to CNC programing manufacturing.pdf
PrabathDissanayake8
ย 
Comprehensive report on Tunneling @ Abu Hamour Project_Qatar
Comprehensive report on Tunneling @ Abu Hamour Project_QatarComprehensive report on Tunneling @ Abu Hamour Project_Qatar
Comprehensive report on Tunneling @ Abu Hamour Project_Qatar
Pallav Sharma
ย 

Similar to Overiew of a hot rolling steel mill (20)

ROBOT DRIVE SYSTEMS AND END EFFECTORS
ROBOT DRIVE SYSTEMS AND END EFFECTORSROBOT DRIVE SYSTEMS AND END EFFECTORS
ROBOT DRIVE SYSTEMS AND END EFFECTORS
ย 
Bhel presentation
 Bhel presentation Bhel presentation
Bhel presentation
ย 
small-hole-edm-manual.pdf
small-hole-edm-manual.pdfsmall-hole-edm-manual.pdf
small-hole-edm-manual.pdf
ย 
BP[1] Copy
BP[1] CopyBP[1] Copy
BP[1] Copy
ย 
IRJET- Design and Development of Library Management Robot: Part 2 Development...
IRJET- Design and Development of Library Management Robot: Part 2 Development...IRJET- Design and Development of Library Management Robot: Part 2 Development...
IRJET- Design and Development of Library Management Robot: Part 2 Development...
ย 
revised work history3.doc
revised work history3.docrevised work history3.doc
revised work history3.doc
ย 
General Extruder Audit Information
General Extruder Audit InformationGeneral Extruder Audit Information
General Extruder Audit Information
ย 
Introduction to CNC programing manufacturing.pdf
Introduction to CNC programing manufacturing.pdfIntroduction to CNC programing manufacturing.pdf
Introduction to CNC programing manufacturing.pdf
ย 
Rig types and components
Rig types and componentsRig types and components
Rig types and components
ย 
Comprehensive report on Tunneling @ Abu Hamour Project_Qatar
Comprehensive report on Tunneling @ Abu Hamour Project_QatarComprehensive report on Tunneling @ Abu Hamour Project_Qatar
Comprehensive report on Tunneling @ Abu Hamour Project_Qatar
ย 
Standard erection manual (pressure parts)
Standard erection manual (pressure parts)Standard erection manual (pressure parts)
Standard erection manual (pressure parts)
ย 
MFI Group-V.pptx
MFI Group-V.pptxMFI Group-V.pptx
MFI Group-V.pptx
ย 
176589.pptx.ppt
176589.pptx.ppt176589.pptx.ppt
176589.pptx.ppt
ย 
CS-1(Ch.1).pdf
CS-1(Ch.1).pdfCS-1(Ch.1).pdf
CS-1(Ch.1).pdf
ย 
Mc tyre
Mc tyreMc tyre
Mc tyre
ย 
Electrical overhead crane safety
Electrical overhead crane safetyElectrical overhead crane safety
Electrical overhead crane safety
ย 
Cube Assembly Pro Mechatronics system
Cube Assembly Pro Mechatronics systemCube Assembly Pro Mechatronics system
Cube Assembly Pro Mechatronics system
ย 
Reservoir Rock Properties Laboratory Manual Exp (#1)
Reservoir Rock Properties Laboratory Manual Exp (#1)Reservoir Rock Properties Laboratory Manual Exp (#1)
Reservoir Rock Properties Laboratory Manual Exp (#1)
ย 
Unit-II Turning Machines.pptx
Unit-II Turning Machines.pptxUnit-II Turning Machines.pptx
Unit-II Turning Machines.pptx
ย 
Carding (1)
Carding (1)Carding (1)
Carding (1)
ย 

More from Sayandeep Dasgupta (8)

Concession Agreement.pptx
Concession Agreement.pptxConcession Agreement.pptx
Concession Agreement.pptx
ย 
Force Majeure.pptx
Force Majeure.pptxForce Majeure.pptx
Force Majeure.pptx
ย 
Conditions Precedent.pptx
 Conditions Precedent.pptx Conditions Precedent.pptx
Conditions Precedent.pptx
ย 
Covid 19 & force majeure - power point presentation
Covid 19 & force majeure - power point presentationCovid 19 & force majeure - power point presentation
Covid 19 & force majeure - power point presentation
ย 
Switchgear & Switchboard- A comparative analysis
Switchgear & Switchboard- A comparative analysis Switchgear & Switchboard- A comparative analysis
Switchgear & Switchboard- A comparative analysis
ย 
Rated diversity factor of a switchboard
Rated diversity factor of a switchboardRated diversity factor of a switchboard
Rated diversity factor of a switchboard
ย 
Work breakdown structure & project life cycle
Work breakdown structure & project life cycleWork breakdown structure & project life cycle
Work breakdown structure & project life cycle
ย 
Metalclad switchgear
Metalclad switchgearMetalclad switchgear
Metalclad switchgear
ย 

Recently uploaded

VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
SUHANI PANDEY
ย 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
ย 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
ย 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
ย 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
ย 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
ย 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
sivaprakash250
ย 

Recently uploaded (20)

VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
ย 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
ย 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
ย 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
ย 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
ย 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
ย 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
ย 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ย 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
ย 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
ย 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
ย 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
ย 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
ย 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
ย 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
ย 
Top Rated Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
ย 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
ย 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
ย 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
ย 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
ย 

Overiew of a hot rolling steel mill

  • 1. Structural Mill Operation โ€ข The aim is to show the different individual working area that integrate as functional units in a specific sequence to form a Hot Rolling Mill. โ€ข The functions of each working area will be stated in brief to understand its role as a sub unit of the Mill. โ€ข Any functional area will be the assimilation of the functions executed by their Local Control Stations which cater to the basic needs and Main Control Desk located inside a Control Pulpit
  • 2. A.) Billet Yard 1. Billets are unloaded on selected Roller Table. 2. Billets are transferred on Roller Table in front of the Elevator. 3. Billet is transferred by elevator to Roller Table with pushers. 4. Billet length is measured with laser. 5. Billet is then passed to Roller Table with weighing system and the following happens:
  • 3. Weight is OK Emg. Discharging Bench removes the billet No Disappearing Stopper Lowered Billet enters Furnace Yes Alarm to HMI
  • 4. B.) Furnace (200 T/H Walking Beam) โ€ข Charging cycle: 1. Once the stopper disappears the Furnace Door opens and Charging RT receives the billet. 2. The position of the billet is checked w.r.t. loading diagram. 3. Charging door closes. 4. Aligning machine starts Fwd & Rev cycle.
  • 5. โ€ข Discharging cycle: 1. Kick Off cycle starts. 2. Kick off moves the billet to discharging Roller table. 3. Discharge side door opens which is followed by the motion of discharging Roller tables. 4. When the tail of the billet leaves the discharging door closes.
  • 6. C.) Reheating Furnace Exit Area 1. This area is entered once Furnace is ready to discharge and the disappearing stopper is down. 2. The entry of billet head at the descaler is followed by a high pressure water delivery to remove the scales and stops when the tail has left the descaler. 3. The Pinch Roll (PR) and Roller Table (RT) first slows down to bite speed and then is adjusted with the speed of the 1st working Stand. 4. The cycle restarts by synchronizing the PR and RT with RHF RT
  • 7. D.) Mill Area The Mill Area is classified into 3 zones: 1. Roughing Mill consisting of 7 stands and Pendulum Shear and 1 Crop Shear. 2. Intermediate Mill consisting of 5 stands and 1 Shear 3. Finishing Mill consisting of 5 Stands and 1 Shear 4. Then comes the diverter that bifurcates the Rolling Mill into 2 lines, Line-1 & 2.
  • 8. Mill Area Operation Features 1. Speed Reference system to generate required speed. 2. Single mode speed variation that controls the speed of a single motor. 3. Cascade mode that controls the speed of a particular motor and also the speed of all the motors preceding that particular motor inorder to bring the system to a synchronization. 4. Master control generates the reference for speed reference system
  • 9. Mill Area Operation Features 5. Lead Speed designed to improve the speed of introduction of the material to a particular Stand. 6. Material Tracking that is aimed to track the shift in head or the tail of a material so that subsequent functions like continuity control, tension control and loop control can be executed efficiently. 7. Continuity Control supervises the arising of cobble and controls the cropping action of the shears
  • 10. Mill Area Operation Features 8. Tension Control applicable for large profiles only that eliminates the tension between 2 stands. 9. Loop Control comes into play inorder to reduce the tension between 2 stands especially when the material is thin & deforming. 10. Excluded Stand Control which excludes some specific stands from the process depending upon the required material profile.
  • 11. Mill Area Operation Features 11. Ready to Roll that performs the management of all alrms and interlocks that combine in specific sequence prior to giving consent for rolling. 12. Ghost Rolling which simulates the process of billet rolling inorder to identify the error in any field sensors.
  • 12. E.) Cooling Bed Area 1. Cooling Bed cycle sets up the movement of the bars by initiating the Lining up RT. 2. Layer forming is started as Cleaning cycle sends the bars proceed towards Cooling Bed Exit RT. 3. The layer is moved to aligning bar so that an uniform layer can be fed to the Straightener. 4. Straightener is not a mandatory component and can be bypassed using a bypass RT.
  • 13. F.) Straightener Area 1. The Multi strand Straightening machine rolls and Pinch roll positioning is verified. 2. Straightening Line Control ensures that bars are towards Straightener. 3. Bar Straightening takes place. 4. Straightening Line control ensures that the bar travels from Straightener to downstream.
  • 14. Details of Straightener โ€ข Its main components are: 1. Main Motor Drive 2. Upper Roll Axial adjustment system 3. Lower Roll Vertical adjustment system 4. Roller changing tool. 5. Machine Lubrication system 6. Cobble detection system.
  • 15. G.) Layer Preparation Area 1. It is the area between Cold Saw and Straightener and includes the Tail Recovery System. 2. Bars are charged from Straightener exit RT by Liftable Chain Transfer. 3. Layer formation takes place with the help of entry and exit chain transfer & must be compacted by pushers. 4. Once the layer is completed it is discharged towards Saw Entry RT for Cold Cut.
  • 16. Tail Recovery System โ€ข This consists of the RT that carry the bars from layer preparation area to the cold saw โ€ข When the last cut to length has been performed and the tail has been detected the bar tails are discharged by a discharging table. โ€ข These tails are collected at the pockets by a set of discharging levers.
  • 17. H.) Cut to Length Area โ€ข During normal cutting cycle SAW-1 cuts the layer at a length 3 times the final length. SAW-2 & 3 make the cutting together to obtain the final length. Here SAW-2 is movable and SAW-3 is fixed. โ€ข There are 2 locking devices at the entry and exit of the disc SAWS that allows the material to be cut without movement. โ€ข Booster pumps are provided to provide water at correct pressure to provide accurate cutting.
  • 18. Cut to Length Operation 1. Layer ready at Saw Entry RT โ€œLine Startโ€ is initiated. 2. Layer aligning is checked first at disappearing stopper and then at Wheeled stopper-1. 3. SAW-1 makes the cut & is followed by layer aligning on Wheeled Stopper2. 4. SAW-2 & 3 makes the cut and layer is transported to discharging are upto the stopper where aligning is again checked. 5. Layer is the ready for extraction and discharging.
  • 19. I.) Stacker & Forming Area โ€ข This area has the following sub-divisions: 1. Entry area 2. Liftable chain transfer 3. Layer forming transfer 4. Turning and Deposit magnet heads 5. Forming pockets 6. Liftable chain transfer
  • 20. Stacker and Forming Area Operation 1. The Entry area layer loading & discharging takes place via Liftable chain transfer. 2. Then the layer moves to the Forming area 7 towards the magnets. 3. The magnet pick up the layer and discharge them to the pockets. 4. Pockets are lowered and the process continues till step by step stack formation gets completed. 5. When the stack is โ€œReadyโ€ pockets lower and discharge them to RT. Pockets are the ready to accept new stack.
  • 21. J.) Tying & Collecting Area The following functions are performed: 1. Weighing the product 2. Tying and strapping the product 3. Dispatch from Liftable transfer table by Magnet cranes.
  • 22. Videos 1. https://www.youtube.com/watch?v=voxln4lY C0g 2. https://www.youtube.com/watch?v=AuuP8L- WppI 3. https://www.youtube.com/watch?v=LWM6b 8P0r3E 4. https://www.youtube.com/watch?v=KRn73g KQ2YU