SAQIB IMRAN 0341-7549889 1
Assala mu alykum My Name is saqib imran and I am the
student of b.tech (civil) in sarhad univeristy of
science and technology peshawer.
I have written this notes by different websites and
some by self and prepare it for the student and also
for engineer who work on field to get some knowledge
from it.
I hope you all students may like it.
Remember me in your pray, allah bless me and all of
you friends.
If u have any confusion in this notes contact me on my
gmail id: Saqibimran43@gmail.com
or text me on 0341-7549889.
Saqib imran.
2 | P a g e
SAQIB IMRAN 0341-7549889 2
RAILWAY
WHY CRUSHED STONES ARE USED IN RAILWAY TRACK
WHY CRUSHED STONES ARE USED IN RAILWAY TRACK:
The technical term for these crushed stones is “Ballast or track ballast. Tamping
machine is used to pack the track ballast under railway tracks to make the tracks more
durable. Usually, a 25–30 cm thick ballast layer (crushed stone 30/60) below the bottom
face of sleeper is provided along the track. This thickness varies based on many
parameters and conditions.
Following are the reasons for using crushed stones in railway track:
1. To hold the sleepers in place, both laterally and longitudinally (as they in turn hold the
rails in place & help maintain gauge.
2. To distribute the load of entire moving cargo from rails into the sub-base/formation
(ground below the ballast.
3. To maintain support of and distance between the cross ties.
4. To restrain heat expansion & contraction (due to thermal stresses), and ground
movements.
3 | P a g e
SAQIB IMRAN 0341-7549889 3
5. To dampen the vibrations — as ballast provide cushioning effect (thus rendering
elastic property to the railway track).
6. To absorb vibrations — The air voids present between the stones absorb vibrations
and make it comfortable, not only for the traveling passengers but also for the residents
next to tracks.
7. To facilitate drainage & stop building up of precipitation from rough weather (which
can help — relieve frost heaves & maintain necessary shear stress in sub-base).
8. To overcome weed & plant growth from underneath.
9. To absorb much of the sounds & noises produced by train movements.
10. Minor adjustments can be made in the track as and when required.
SYSTEMS OF RAILWAY – SURFACE RAILWAY, ELEVATED RAILWAY,
UNDER GROUND RAILWAY, TUBE RAILWAY
SYSTEMS OF RAILWAY:
The railways can be provided above and below the ground surface suiting to the
topography of the area. Further, the railways below the ground surface can be
constructed just below the ground level or at greater depths.
There are four systems of railways:
1. Surface railways
2. Elevated railways
3. Underground railways
4. Tube railways.
1. SURFACE RAILWAY:
In this system, railways are provided over the ground. This is the most extensively used
and best rails throughout the world. In surface railways, various means like level
crossings, over bridge, under bridge etc are to be provided for crossing of the railway
and road traffic safely and efficiently.
2. ELEVATED RAILWAY:
In this system, the railways are provided at higher or elevated portion above the
surface. A continuous viaduct supported on piers, columns etc are constructed and the
track is carried on its steel deck. This system is very costly because stations, waiting
rooms, offices are to be constructed at higher levels requiring staircases, escalators
etc. This type of railways is proved in the heavily congested urban area where
underground railways cannot be constructed.
4 | P a g e
SAQIB IMRAN 0341-7549889 4
3. UNDERGROUND RAILWAY:
In this system, the railway is provided just below the ground level. Tunnels are
constructed for carrying tracks through them and an overbridge is necessary at every
road-crossing to carry the road traffic over the railway traffic. Due to ventilation problem
in tunnels, electricity is the only source of power for traction in underground railways.
This system is provided in the heavily congested area where the traffic intensity on
roads is heavy.
ADVANTAGES:
a) This system provides rapid and unobstructed transportation.
b) This system helps in reducing traffic congestion problems.
c) This system provides safety during aerial attack in war.
4 TUBE RAILWAY:
The railway provided underground at a greater depth of about 18 m or more(upto 52 m)
is called tube railway.
This system of railways is so called as the section of the underground tunnels, carrying
the track, is circular like a tube. The main purpose of providing tube railways is to avoid
the interference of the tracks with water and gas pipes, sewerage systems and oil or
drainage pipes etc.
Some important features of tube railways are given below:
1. The railway stations have to be of cylindrical form.
2. Escalators or moving staircases are to be constructed to reach the tube railways.
3. Only electric traction is to be used to avoid the smoke and ventilation problems.
4. Automatic signaling system is to be used.
5. Such a mechanism of the train is to be used that it cannot start until all the doors are
closed and it automatically stops, is the signal is at stop position.
5 | P a g e
SAQIB IMRAN 0341-7549889 5
TYPES OF LEVEL CROSSINGS USED IN RAILWAY – CLASSIFICATION OF
LEVEL CROSSING
WHAT IS LEVEL CROSSING?
The place where a railway line and a road cross each other is called level crossing.
TYPES OF LEVEL CROSSINGS:
The various types of level crossings may be classified depending upon the nature of the
ground, nature of the traffic on road and number of trains passing over the level
crossing.
1. Special class level crossing.
2. Class “A” level crossing.
3. Class “B” level crossing.
4. Class “C” level crossing.
5. Class “D” level crossing.
6 | P a g e
SAQIB IMRAN 0341-7549889 6
1. SPECIAL CLASS LEVEL CROSSING:
This type of level crossing is provided on very important through roads where the traffic
is exceptionally heavy, to suit the individual site conditions. The design of such a level
crossing is not according to the rules as given for other types of level crossings.
2. CLASS “A” LEVEL CROSSING.:
These crossings provided on G.T roads.
Requirements:
1. The roads meeting at these level crossings should be straight at least for 30 m on
either side of the railway line.
2. The angle of crossing should be 90° but in no case less than 45°.
3. The minimum radius of curvature for approaches on either side should be 45 m and
their maximum gradient be in 1 in 30.
4. A level length of at least 7.5 m to act as a platform for waiting of vehicles beyond
each gate should be provided.
5. The minimum gate width should be 7.3 m which are all paved.
6. The gates should be at angles to the center line of the road on either side.
7. No part of the gate should be within 2.1 m of distance from the centerline of the
adjacent track.
8. The view of level crossing should be clear from approach roads.
9. Minimum two watchmen should be deputed to take care of such level crossings.
10. The huts of watchmen should neither be on road formation nor should they obstruct
the clear view of level crossings. the nearest edge of the watchmen cabin should be
minimum 6m.
3. CLASS “B” LEVEL CROSSING:
The level crossings provided on metalled roads of district level are known as Class “B”
level crossings.
Requirements:
1. Minimum gate width should be 3.7 m.
2. Minimum radius for approach road on either side of the crossing should be 30 m.
3. Minimum one watchmen should be deputed to take care of this level crossing.
7 | P a g e
SAQIB IMRAN 0341-7549889 7
4. CLASS “C” LEVEL CROSSING:
The level crossings provided on unmetalled roads are called class “C” level crossing.
Requirements:
1 The minimum gate width should be 3.7 m.
2 A least a level road length of 7.5 m on either side of the crossing should be provided.
3 The road portion should be metalled up to 2.7 m beyond the position of gates on
either side of the crossing.
5. CLASS “D” LEVEL CROSSING:
The level crossings in the form of ramps provided at inlet into the railway fencing for
pedestrians and cattle to pass are called as class “D” level crossings.
Recommended Dimensions For Different Types Of level Crossings:
Serial No. Class Of Level
Crossing
Width Of
Gates In m
Minimum
Radius Of
Approach
Road in m
(Within 45m)
Maximum
Gradient Of
Approaches
1. Special Class 7.1 to 9.1 60 1 in 40
2. Class “A” 7.3 45 1 in 30
3. Class “B” 3.7 30 1 in 30
4. Class “C” 3.7 21 1 in 20
5. Class “D” 1.8 76 1 in 10
TYPES OF SLEEPERS USED IN RAILWAY – RAILWAY SLEEPER
TYPES OF SLEEPERS USED IN RAILWAY:
There are various types of sleepers used in railways, according to their suitability,
availability, economy, and design.
8 | P a g e
SAQIB IMRAN 0341-7549889 8
Based on the material used in the construction, the sleepers can be classified into the
following three categories:
1. Wooden sleepers.
2. Metal sleepers.
 Steel sleepers.
 Cast iron sleepers.
3. Concrete sleepers.
 Reinforced concrete sleepers.
 Prestressed concrete sleepers.
1. WOODEN SLEEPERS:
The sleepers made of timber are known as wooden sleepers. These sleepers were
widely used as the best type of sleepers as they fulfilled all the requirements of an ideal
sleeper. But these are now backdated and not used widely.
ADVANTAGES OF WOODEN SLEEPERS:
1. Timber is easily available.
2. The initial cost of wooden sleeper is low.
3. They require few fastenings which are also simple to design.
4. These sleepers are easy to handle.
5. Suitable for all types of ballast.
6. They can be used with every section of rails and for any gauge of track.
7. The extent of damage during accidents is less.
8. Best for track circuiting.
9. Easy renewal of the track.
DISADVANTAGES OF WOODEN SLEEPERS:
1. The life span of wooden sleepers is minimum (12 to 15 years) compared to other
types of sleepers.
9 | P a g e
SAQIB IMRAN 0341-7549889 9
2. They are liable to decay, attack of white ants, wear, spike killing, cracking, splitting,
rail cutting etc.
3. The lateral and longitudinal rigidity of the track is less as the connections between the
rails and the sleepers are not so strong.
4. Difficulty in maintaining gauge of the track.
5. High maintenance cost.
6. Low scrap value.
Wooden Sleepers
2. METAL SLEEPERS:
The sleepers usually made of cast iron or steel are known as metal sleepers. Due to
growing shortage of timber to be used for wooden sleepers, their high maintenance,
cast and short life, metal sleepers are now being widely used.
Metal sleepers are two types:
a) Steel Sleepers: The sleepers made of steel are known as steel sleepers. Steel
sleepers are extensively used with excellent results.
Types of steel sleepers:
 Key type steel sleepers
 Clip and bolt type steel sleepers.
b) Cast Iron Sleepers: The sleepers made of cast iron are known as cast iron sleepers.
These sleepers are extensively used in India than any other country in the world.
10 | P a g e
SAQIB IMRAN 0341-7549889 10
Types of cast iron sleepers:
 Pot or bowl sleeper.
 Plate sleeper.
 Box sleeper.
 CST-9 sleeper.
 Duplex sleeper.
ADVANTAGES OF METAL SLEEPERS:
1. Longer life span (35 to 50 years).
2. Uniform in strength and durability.
3. Gauge can be easily adjusted and maintained.
4. The lateral and longitudinal stability of the track is more.
5. Renewal is not frequent.
6 High scrap value.
DISADVANTAGES OF METAL SLEEPERS:
1. They require more fittings.
2. Metal is liable to rust.
3. Require more quantity of ballast.
4. These sleepers are not suitable for bridges, level crossing etc.
5. More damage during accident.
11 | P a g e
SAQIB IMRAN 0341-7549889 11
Metal Sleepers
3. CONCRETE SLEEPERS:
The sleepers made of reinforced or prestressed cement concrete are known as
concrete sleepers.
Types of concrete sleepers:
a) RCC sleepers: The concrete sleepers constructed of reinforced cement concrete are
called RCC sleepers.
RCC sleepers are the following two types:
 Mono-black sleeper,
 Two back sleeper.
b) Prestressed Concrete Sleepers: The concrete sleepers constructed of prestressed
cement concrete are known as prestressed concrete sleepers.
ADVANTAGES OF CONCRETE SLEEPERS:
1. Long life span ( 40 to 60 years).
2. Require fewer fittings.
3. Adjustment of gauge is simple and easy.
4. They provide strong connections between rail and sleeper.
5. The lateral and longitudinal stability of the track is more.
6. Track circuiting is possible.
7. More durable and not liable to decay.
8. Less creep in the track.
9. They can withstand the stresses induced by fast moving and heavy traffic.
10. Low maintenance cost.
DISADVANTAGES OF CONCRETE SLEEPERS:
1. Initial cost is high.
2. Liable to break under rough handling or due to improper design.
3. Renewal is little bit difficult.
4. The scrap value is nil.
12 | P a g e
SAQIB IMRAN 0341-7549889 12
Concrete Sleepers

More Related Content

What's hot

DMRC CC 66 training ppt
DMRC CC 66 training pptDMRC CC 66 training ppt
DMRC CC 66 training pptVikas Kumar
 
Jaipur metro rail corporation summer training report
Jaipur metro rail corporation summer training reportJaipur metro rail corporation summer training report
Jaipur metro rail corporation summer training reportRajendra Jhurawat
 
Cable stayed ppt acp
Cable stayed ppt acpCable stayed ppt acp
Cable stayed ppt acpJigar Shah
 
Cable stayed bridges of prestressed concrete.
Cable stayed bridges of prestressed concrete.Cable stayed bridges of prestressed concrete.
Cable stayed bridges of prestressed concrete.Franco Bontempi
 
Transmission tower
Transmission towerTransmission tower
Transmission towerKiran Hadiya
 
Construction of bukit berapit twin bore pipe arch tunnel
Construction of bukit berapit twin bore pipe arch tunnelConstruction of bukit berapit twin bore pipe arch tunnel
Construction of bukit berapit twin bore pipe arch tunnelMa Ma Neymus
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18Rajesh Prasad
 
Atal Rohtang Tunnel - construction process ,challenges and features
Atal Rohtang Tunnel - construction process ,challenges and featuresAtal Rohtang Tunnel - construction process ,challenges and features
Atal Rohtang Tunnel - construction process ,challenges and featuresBimenpreet Kaur
 
Haulage system in Mines
Haulage system in MinesHaulage system in Mines
Haulage system in Minesajeetkm
 
Mine transportation system
Mine transportation systemMine transportation system
Mine transportation systemajeetkm
 
Geometric design standards for rural (non urban)
Geometric design standards for rural (non urban)Geometric design standards for rural (non urban)
Geometric design standards for rural (non urban)Vipul jain
 
Mine machinery - Wire ropes
Mine machinery - Wire ropesMine machinery - Wire ropes
Mine machinery - Wire ropesajeetkm
 

What's hot (20)

MAYUKH PRESENTATION
MAYUKH PRESENTATIONMAYUKH PRESENTATION
MAYUKH PRESENTATION
 
DMRC CC 66 training ppt
DMRC CC 66 training pptDMRC CC 66 training ppt
DMRC CC 66 training ppt
 
Jaipur metro rail corporation summer training report
Jaipur metro rail corporation summer training reportJaipur metro rail corporation summer training report
Jaipur metro rail corporation summer training report
 
Rail System
Rail SystemRail System
Rail System
 
Metro Work
Metro WorkMetro Work
Metro Work
 
Cable stayed ppt acp
Cable stayed ppt acpCable stayed ppt acp
Cable stayed ppt acp
 
Tunnel’s
Tunnel’sTunnel’s
Tunnel’s
 
Cable stayed bridges of prestressed concrete.
Cable stayed bridges of prestressed concrete.Cable stayed bridges of prestressed concrete.
Cable stayed bridges of prestressed concrete.
 
Head gear (1)
Head gear (1)Head gear (1)
Head gear (1)
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Transmission tower
Transmission towerTransmission tower
Transmission tower
 
Construction of bukit berapit twin bore pipe arch tunnel
Construction of bukit berapit twin bore pipe arch tunnelConstruction of bukit berapit twin bore pipe arch tunnel
Construction of bukit berapit twin bore pipe arch tunnel
 
Tunneling
Tunneling Tunneling
Tunneling
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 
Atal Rohtang Tunnel - construction process ,challenges and features
Atal Rohtang Tunnel - construction process ,challenges and featuresAtal Rohtang Tunnel - construction process ,challenges and features
Atal Rohtang Tunnel - construction process ,challenges and features
 
Haulage system in Mines
Haulage system in MinesHaulage system in Mines
Haulage system in Mines
 
Mine transportation system
Mine transportation systemMine transportation system
Mine transportation system
 
Geometric design standards for rural (non urban)
Geometric design standards for rural (non urban)Geometric design standards for rural (non urban)
Geometric design standards for rural (non urban)
 
Ppt mine machinery
Ppt mine machineryPpt mine machinery
Ppt mine machinery
 
Mine machinery - Wire ropes
Mine machinery - Wire ropesMine machinery - Wire ropes
Mine machinery - Wire ropes
 

Similar to Railway pdf

Medians/Traffic separators , kerbs, Road margins
Medians/Traffic separators , kerbs, Road marginsMedians/Traffic separators , kerbs, Road margins
Medians/Traffic separators , kerbs, Road marginsRAMPRASAD KUMAWAT
 
BANGLADESH RAILWAY COMUNICATION
BANGLADESH RAILWAY COMUNICATIONBANGLADESH RAILWAY COMUNICATION
BANGLADESH RAILWAY COMUNICATIONMasudul Robin
 
Transportation system Transportation system consisting road, railway track, c...
Transportation system Transportation system consisting road, railway track, c...Transportation system Transportation system consisting road, railway track, c...
Transportation system Transportation system consisting road, railway track, c...RAMPRASAD KUMAWAT
 
Elements of a Typical Cross-section of Road and Highway drainage
Elements of a Typical Cross-section of Road and Highway drainageElements of a Typical Cross-section of Road and Highway drainage
Elements of a Typical Cross-section of Road and Highway drainagenslinkprecinctprojec
 
Level crossing Check rail Indian railways material
Level crossing Check rail Indian railways materialLevel crossing Check rail Indian railways material
Level crossing Check rail Indian railways materialsantro421
 
7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERINGVATSAL PATEL
 
Summer Internship Report.pptx
Summer Internship Report.pptxSummer Internship Report.pptx
Summer Internship Report.pptxDeepak37004
 
Modes of transportation
Modes of transportationModes of transportation
Modes of transportationJAYDEV PATEL
 
Introduction railway engineering
Introduction railway engineeringIntroduction railway engineering
Introduction railway engineeringDnyaneshwar More
 
Alignment of railway tracks
Alignment of railway tracksAlignment of railway tracks
Alignment of railway tracksGowtham G
 
Crossectional Elements of Road.pdf
Crossectional Elements of Road.pdfCrossectional Elements of Road.pdf
Crossectional Elements of Road.pdfTouqeer1
 
Transportation Engineering System
Transportation Engineering SystemTransportation Engineering System
Transportation Engineering SystemGaurav Maurya
 
Electric Traction Current Collection System.ppt
Electric Traction Current Collection System.pptElectric Traction Current Collection System.ppt
Electric Traction Current Collection System.pptDrAyyarKandasamy
 
Current collction system.pptx
Current collction system.pptxCurrent collction system.pptx
Current collction system.pptxssuserca5764
 
NMRC Civil Construction
NMRC Civil Construction NMRC Civil Construction
NMRC Civil Construction ajinkyaraj
 
Construction pdf
Construction pdfConstruction pdf
Construction pdfSaqib Imran
 
MODERN RAILWAYS.pptx
MODERN RAILWAYS.pptxMODERN RAILWAYS.pptx
MODERN RAILWAYS.pptxRishi Nath
 

Similar to Railway pdf (20)

Medians/Traffic separators , kerbs, Road margins
Medians/Traffic separators , kerbs, Road marginsMedians/Traffic separators , kerbs, Road margins
Medians/Traffic separators , kerbs, Road margins
 
BANGLADESH RAILWAY COMUNICATION
BANGLADESH RAILWAY COMUNICATIONBANGLADESH RAILWAY COMUNICATION
BANGLADESH RAILWAY COMUNICATION
 
Transportation system Transportation system consisting road, railway track, c...
Transportation system Transportation system consisting road, railway track, c...Transportation system Transportation system consisting road, railway track, c...
Transportation system Transportation system consisting road, railway track, c...
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Elements of a Typical Cross-section of Road and Highway drainage
Elements of a Typical Cross-section of Road and Highway drainageElements of a Typical Cross-section of Road and Highway drainage
Elements of a Typical Cross-section of Road and Highway drainage
 
Level crossing Check rail Indian railways material
Level crossing Check rail Indian railways materialLevel crossing Check rail Indian railways material
Level crossing Check rail Indian railways material
 
7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING
 
Summer Internship Report.pptx
Summer Internship Report.pptxSummer Internship Report.pptx
Summer Internship Report.pptx
 
Modes of transportation
Modes of transportationModes of transportation
Modes of transportation
 
Introduction railway engineering
Introduction railway engineeringIntroduction railway engineering
Introduction railway engineering
 
Alignment of railway tracks
Alignment of railway tracksAlignment of railway tracks
Alignment of railway tracks
 
Crossectional Elements of Road.pdf
Crossectional Elements of Road.pdfCrossectional Elements of Road.pdf
Crossectional Elements of Road.pdf
 
Transportation Engineering System
Transportation Engineering SystemTransportation Engineering System
Transportation Engineering System
 
Electric Traction Current Collection System.ppt
Electric Traction Current Collection System.pptElectric Traction Current Collection System.ppt
Electric Traction Current Collection System.ppt
 
Current collction system.pptx
Current collction system.pptxCurrent collction system.pptx
Current collction system.pptx
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Tram train
Tram trainTram train
Tram train
 
NMRC Civil Construction
NMRC Civil Construction NMRC Civil Construction
NMRC Civil Construction
 
Construction pdf
Construction pdfConstruction pdf
Construction pdf
 
MODERN RAILWAYS.pptx
MODERN RAILWAYS.pptxMODERN RAILWAYS.pptx
MODERN RAILWAYS.pptx
 

More from Saqib Imran

Engineering basic notes
Engineering basic notesEngineering basic notes
Engineering basic notesSaqib Imran
 
Misaali mard مثالی مرد
Misaali mard مثالی مردMisaali mard مثالی مرد
Misaali mard مثالی مردSaqib Imran
 
Khatm e nubuwwat lesson no 2
Khatm e nubuwwat lesson no 2Khatm e nubuwwat lesson no 2
Khatm e nubuwwat lesson no 2Saqib Imran
 
Khatm e nubuwwat lesson no 1
Khatm e nubuwwat lesson no 1Khatm e nubuwwat lesson no 1
Khatm e nubuwwat lesson no 1Saqib Imran
 
Khatm e nabuwat 4
Khatm e nabuwat 4Khatm e nabuwat 4
Khatm e nabuwat 4Saqib Imran
 
Khatm e nabuwat 3
Khatm e nabuwat 3Khatm e nabuwat 3
Khatm e nabuwat 3Saqib Imran
 
Khatm e nabuwat 2
Khatm e nabuwat 2Khatm e nabuwat 2
Khatm e nabuwat 2Saqib Imran
 
Khatm e nabuwat 1
Khatm e nabuwat 1Khatm e nabuwat 1
Khatm e nabuwat 1Saqib Imran
 
Khatm e nubuwwat lesson no 7
Khatm e nubuwwat lesson no 7Khatm e nubuwwat lesson no 7
Khatm e nubuwwat lesson no 7Saqib Imran
 
Khatm e nubuwwat lesson no 6
Khatm e nubuwwat lesson no 6Khatm e nubuwwat lesson no 6
Khatm e nubuwwat lesson no 6Saqib Imran
 
Khatm e nubuwwat lesson no 5
Khatm e nubuwwat lesson no 5Khatm e nubuwwat lesson no 5
Khatm e nubuwwat lesson no 5Saqib Imran
 
Khatm e nubuwwat lesson no 4
Khatm e nubuwwat lesson no 4Khatm e nubuwwat lesson no 4
Khatm e nubuwwat lesson no 4Saqib Imran
 
Khatm e nubuwwat lesson no 3
Khatm e nubuwwat lesson no 3Khatm e nubuwwat lesson no 3
Khatm e nubuwwat lesson no 3Saqib Imran
 
Khatm e nubuwwat 40 hadees
Khatm e nubuwwat 40 hadeesKhatm e nubuwwat 40 hadees
Khatm e nubuwwat 40 hadeesSaqib Imran
 
40 hadees in urdu
40 hadees in urdu40 hadees in urdu
40 hadees in urduSaqib Imran
 
40 hadees in urdu & english
40 hadees in urdu & english40 hadees in urdu & english
40 hadees in urdu & englishSaqib Imran
 
Engineering basic notes
Engineering basic notesEngineering basic notes
Engineering basic notesSaqib Imran
 
Pre stressed & pre-cast concrete technology - ce462
Pre stressed & pre-cast concrete technology - ce462Pre stressed & pre-cast concrete technology - ce462
Pre stressed & pre-cast concrete technology - ce462Saqib Imran
 
Foundations and pavements ce367
Foundations and pavements   ce367Foundations and pavements   ce367
Foundations and pavements ce367Saqib Imran
 
Design of hydraulic structures ce 413
Design of hydraulic structures ce 413Design of hydraulic structures ce 413
Design of hydraulic structures ce 413Saqib Imran
 

More from Saqib Imran (20)

Engineering basic notes
Engineering basic notesEngineering basic notes
Engineering basic notes
 
Misaali mard مثالی مرد
Misaali mard مثالی مردMisaali mard مثالی مرد
Misaali mard مثالی مرد
 
Khatm e nubuwwat lesson no 2
Khatm e nubuwwat lesson no 2Khatm e nubuwwat lesson no 2
Khatm e nubuwwat lesson no 2
 
Khatm e nubuwwat lesson no 1
Khatm e nubuwwat lesson no 1Khatm e nubuwwat lesson no 1
Khatm e nubuwwat lesson no 1
 
Khatm e nabuwat 4
Khatm e nabuwat 4Khatm e nabuwat 4
Khatm e nabuwat 4
 
Khatm e nabuwat 3
Khatm e nabuwat 3Khatm e nabuwat 3
Khatm e nabuwat 3
 
Khatm e nabuwat 2
Khatm e nabuwat 2Khatm e nabuwat 2
Khatm e nabuwat 2
 
Khatm e nabuwat 1
Khatm e nabuwat 1Khatm e nabuwat 1
Khatm e nabuwat 1
 
Khatm e nubuwwat lesson no 7
Khatm e nubuwwat lesson no 7Khatm e nubuwwat lesson no 7
Khatm e nubuwwat lesson no 7
 
Khatm e nubuwwat lesson no 6
Khatm e nubuwwat lesson no 6Khatm e nubuwwat lesson no 6
Khatm e nubuwwat lesson no 6
 
Khatm e nubuwwat lesson no 5
Khatm e nubuwwat lesson no 5Khatm e nubuwwat lesson no 5
Khatm e nubuwwat lesson no 5
 
Khatm e nubuwwat lesson no 4
Khatm e nubuwwat lesson no 4Khatm e nubuwwat lesson no 4
Khatm e nubuwwat lesson no 4
 
Khatm e nubuwwat lesson no 3
Khatm e nubuwwat lesson no 3Khatm e nubuwwat lesson no 3
Khatm e nubuwwat lesson no 3
 
Khatm e nubuwwat 40 hadees
Khatm e nubuwwat 40 hadeesKhatm e nubuwwat 40 hadees
Khatm e nubuwwat 40 hadees
 
40 hadees in urdu
40 hadees in urdu40 hadees in urdu
40 hadees in urdu
 
40 hadees in urdu & english
40 hadees in urdu & english40 hadees in urdu & english
40 hadees in urdu & english
 
Engineering basic notes
Engineering basic notesEngineering basic notes
Engineering basic notes
 
Pre stressed & pre-cast concrete technology - ce462
Pre stressed & pre-cast concrete technology - ce462Pre stressed & pre-cast concrete technology - ce462
Pre stressed & pre-cast concrete technology - ce462
 
Foundations and pavements ce367
Foundations and pavements   ce367Foundations and pavements   ce367
Foundations and pavements ce367
 
Design of hydraulic structures ce 413
Design of hydraulic structures ce 413Design of hydraulic structures ce 413
Design of hydraulic structures ce 413
 

Recently uploaded

SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 

Recently uploaded (20)

SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 

Railway pdf

  • 1. 1 | P a g e SAQIB IMRAN 0341-7549889 1 Assala mu alykum My Name is saqib imran and I am the student of b.tech (civil) in sarhad univeristy of science and technology peshawer. I have written this notes by different websites and some by self and prepare it for the student and also for engineer who work on field to get some knowledge from it. I hope you all students may like it. Remember me in your pray, allah bless me and all of you friends. If u have any confusion in this notes contact me on my gmail id: Saqibimran43@gmail.com or text me on 0341-7549889. Saqib imran.
  • 2. 2 | P a g e SAQIB IMRAN 0341-7549889 2 RAILWAY WHY CRUSHED STONES ARE USED IN RAILWAY TRACK WHY CRUSHED STONES ARE USED IN RAILWAY TRACK: The technical term for these crushed stones is “Ballast or track ballast. Tamping machine is used to pack the track ballast under railway tracks to make the tracks more durable. Usually, a 25–30 cm thick ballast layer (crushed stone 30/60) below the bottom face of sleeper is provided along the track. This thickness varies based on many parameters and conditions. Following are the reasons for using crushed stones in railway track: 1. To hold the sleepers in place, both laterally and longitudinally (as they in turn hold the rails in place & help maintain gauge. 2. To distribute the load of entire moving cargo from rails into the sub-base/formation (ground below the ballast. 3. To maintain support of and distance between the cross ties. 4. To restrain heat expansion & contraction (due to thermal stresses), and ground movements.
  • 3. 3 | P a g e SAQIB IMRAN 0341-7549889 3 5. To dampen the vibrations — as ballast provide cushioning effect (thus rendering elastic property to the railway track). 6. To absorb vibrations — The air voids present between the stones absorb vibrations and make it comfortable, not only for the traveling passengers but also for the residents next to tracks. 7. To facilitate drainage & stop building up of precipitation from rough weather (which can help — relieve frost heaves & maintain necessary shear stress in sub-base). 8. To overcome weed & plant growth from underneath. 9. To absorb much of the sounds & noises produced by train movements. 10. Minor adjustments can be made in the track as and when required. SYSTEMS OF RAILWAY – SURFACE RAILWAY, ELEVATED RAILWAY, UNDER GROUND RAILWAY, TUBE RAILWAY SYSTEMS OF RAILWAY: The railways can be provided above and below the ground surface suiting to the topography of the area. Further, the railways below the ground surface can be constructed just below the ground level or at greater depths. There are four systems of railways: 1. Surface railways 2. Elevated railways 3. Underground railways 4. Tube railways. 1. SURFACE RAILWAY: In this system, railways are provided over the ground. This is the most extensively used and best rails throughout the world. In surface railways, various means like level crossings, over bridge, under bridge etc are to be provided for crossing of the railway and road traffic safely and efficiently. 2. ELEVATED RAILWAY: In this system, the railways are provided at higher or elevated portion above the surface. A continuous viaduct supported on piers, columns etc are constructed and the track is carried on its steel deck. This system is very costly because stations, waiting rooms, offices are to be constructed at higher levels requiring staircases, escalators etc. This type of railways is proved in the heavily congested urban area where underground railways cannot be constructed.
  • 4. 4 | P a g e SAQIB IMRAN 0341-7549889 4 3. UNDERGROUND RAILWAY: In this system, the railway is provided just below the ground level. Tunnels are constructed for carrying tracks through them and an overbridge is necessary at every road-crossing to carry the road traffic over the railway traffic. Due to ventilation problem in tunnels, electricity is the only source of power for traction in underground railways. This system is provided in the heavily congested area where the traffic intensity on roads is heavy. ADVANTAGES: a) This system provides rapid and unobstructed transportation. b) This system helps in reducing traffic congestion problems. c) This system provides safety during aerial attack in war. 4 TUBE RAILWAY: The railway provided underground at a greater depth of about 18 m or more(upto 52 m) is called tube railway. This system of railways is so called as the section of the underground tunnels, carrying the track, is circular like a tube. The main purpose of providing tube railways is to avoid the interference of the tracks with water and gas pipes, sewerage systems and oil or drainage pipes etc. Some important features of tube railways are given below: 1. The railway stations have to be of cylindrical form. 2. Escalators or moving staircases are to be constructed to reach the tube railways. 3. Only electric traction is to be used to avoid the smoke and ventilation problems. 4. Automatic signaling system is to be used. 5. Such a mechanism of the train is to be used that it cannot start until all the doors are closed and it automatically stops, is the signal is at stop position.
  • 5. 5 | P a g e SAQIB IMRAN 0341-7549889 5 TYPES OF LEVEL CROSSINGS USED IN RAILWAY – CLASSIFICATION OF LEVEL CROSSING WHAT IS LEVEL CROSSING? The place where a railway line and a road cross each other is called level crossing. TYPES OF LEVEL CROSSINGS: The various types of level crossings may be classified depending upon the nature of the ground, nature of the traffic on road and number of trains passing over the level crossing. 1. Special class level crossing. 2. Class “A” level crossing. 3. Class “B” level crossing. 4. Class “C” level crossing. 5. Class “D” level crossing.
  • 6. 6 | P a g e SAQIB IMRAN 0341-7549889 6 1. SPECIAL CLASS LEVEL CROSSING: This type of level crossing is provided on very important through roads where the traffic is exceptionally heavy, to suit the individual site conditions. The design of such a level crossing is not according to the rules as given for other types of level crossings. 2. CLASS “A” LEVEL CROSSING.: These crossings provided on G.T roads. Requirements: 1. The roads meeting at these level crossings should be straight at least for 30 m on either side of the railway line. 2. The angle of crossing should be 90° but in no case less than 45°. 3. The minimum radius of curvature for approaches on either side should be 45 m and their maximum gradient be in 1 in 30. 4. A level length of at least 7.5 m to act as a platform for waiting of vehicles beyond each gate should be provided. 5. The minimum gate width should be 7.3 m which are all paved. 6. The gates should be at angles to the center line of the road on either side. 7. No part of the gate should be within 2.1 m of distance from the centerline of the adjacent track. 8. The view of level crossing should be clear from approach roads. 9. Minimum two watchmen should be deputed to take care of such level crossings. 10. The huts of watchmen should neither be on road formation nor should they obstruct the clear view of level crossings. the nearest edge of the watchmen cabin should be minimum 6m. 3. CLASS “B” LEVEL CROSSING: The level crossings provided on metalled roads of district level are known as Class “B” level crossings. Requirements: 1. Minimum gate width should be 3.7 m. 2. Minimum radius for approach road on either side of the crossing should be 30 m. 3. Minimum one watchmen should be deputed to take care of this level crossing.
  • 7. 7 | P a g e SAQIB IMRAN 0341-7549889 7 4. CLASS “C” LEVEL CROSSING: The level crossings provided on unmetalled roads are called class “C” level crossing. Requirements: 1 The minimum gate width should be 3.7 m. 2 A least a level road length of 7.5 m on either side of the crossing should be provided. 3 The road portion should be metalled up to 2.7 m beyond the position of gates on either side of the crossing. 5. CLASS “D” LEVEL CROSSING: The level crossings in the form of ramps provided at inlet into the railway fencing for pedestrians and cattle to pass are called as class “D” level crossings. Recommended Dimensions For Different Types Of level Crossings: Serial No. Class Of Level Crossing Width Of Gates In m Minimum Radius Of Approach Road in m (Within 45m) Maximum Gradient Of Approaches 1. Special Class 7.1 to 9.1 60 1 in 40 2. Class “A” 7.3 45 1 in 30 3. Class “B” 3.7 30 1 in 30 4. Class “C” 3.7 21 1 in 20 5. Class “D” 1.8 76 1 in 10 TYPES OF SLEEPERS USED IN RAILWAY – RAILWAY SLEEPER TYPES OF SLEEPERS USED IN RAILWAY: There are various types of sleepers used in railways, according to their suitability, availability, economy, and design.
  • 8. 8 | P a g e SAQIB IMRAN 0341-7549889 8 Based on the material used in the construction, the sleepers can be classified into the following three categories: 1. Wooden sleepers. 2. Metal sleepers.  Steel sleepers.  Cast iron sleepers. 3. Concrete sleepers.  Reinforced concrete sleepers.  Prestressed concrete sleepers. 1. WOODEN SLEEPERS: The sleepers made of timber are known as wooden sleepers. These sleepers were widely used as the best type of sleepers as they fulfilled all the requirements of an ideal sleeper. But these are now backdated and not used widely. ADVANTAGES OF WOODEN SLEEPERS: 1. Timber is easily available. 2. The initial cost of wooden sleeper is low. 3. They require few fastenings which are also simple to design. 4. These sleepers are easy to handle. 5. Suitable for all types of ballast. 6. They can be used with every section of rails and for any gauge of track. 7. The extent of damage during accidents is less. 8. Best for track circuiting. 9. Easy renewal of the track. DISADVANTAGES OF WOODEN SLEEPERS: 1. The life span of wooden sleepers is minimum (12 to 15 years) compared to other types of sleepers.
  • 9. 9 | P a g e SAQIB IMRAN 0341-7549889 9 2. They are liable to decay, attack of white ants, wear, spike killing, cracking, splitting, rail cutting etc. 3. The lateral and longitudinal rigidity of the track is less as the connections between the rails and the sleepers are not so strong. 4. Difficulty in maintaining gauge of the track. 5. High maintenance cost. 6. Low scrap value. Wooden Sleepers 2. METAL SLEEPERS: The sleepers usually made of cast iron or steel are known as metal sleepers. Due to growing shortage of timber to be used for wooden sleepers, their high maintenance, cast and short life, metal sleepers are now being widely used. Metal sleepers are two types: a) Steel Sleepers: The sleepers made of steel are known as steel sleepers. Steel sleepers are extensively used with excellent results. Types of steel sleepers:  Key type steel sleepers  Clip and bolt type steel sleepers. b) Cast Iron Sleepers: The sleepers made of cast iron are known as cast iron sleepers. These sleepers are extensively used in India than any other country in the world.
  • 10. 10 | P a g e SAQIB IMRAN 0341-7549889 10 Types of cast iron sleepers:  Pot or bowl sleeper.  Plate sleeper.  Box sleeper.  CST-9 sleeper.  Duplex sleeper. ADVANTAGES OF METAL SLEEPERS: 1. Longer life span (35 to 50 years). 2. Uniform in strength and durability. 3. Gauge can be easily adjusted and maintained. 4. The lateral and longitudinal stability of the track is more. 5. Renewal is not frequent. 6 High scrap value. DISADVANTAGES OF METAL SLEEPERS: 1. They require more fittings. 2. Metal is liable to rust. 3. Require more quantity of ballast. 4. These sleepers are not suitable for bridges, level crossing etc. 5. More damage during accident.
  • 11. 11 | P a g e SAQIB IMRAN 0341-7549889 11 Metal Sleepers 3. CONCRETE SLEEPERS: The sleepers made of reinforced or prestressed cement concrete are known as concrete sleepers. Types of concrete sleepers: a) RCC sleepers: The concrete sleepers constructed of reinforced cement concrete are called RCC sleepers. RCC sleepers are the following two types:  Mono-black sleeper,  Two back sleeper. b) Prestressed Concrete Sleepers: The concrete sleepers constructed of prestressed cement concrete are known as prestressed concrete sleepers. ADVANTAGES OF CONCRETE SLEEPERS: 1. Long life span ( 40 to 60 years). 2. Require fewer fittings. 3. Adjustment of gauge is simple and easy. 4. They provide strong connections between rail and sleeper. 5. The lateral and longitudinal stability of the track is more. 6. Track circuiting is possible. 7. More durable and not liable to decay. 8. Less creep in the track. 9. They can withstand the stresses induced by fast moving and heavy traffic. 10. Low maintenance cost. DISADVANTAGES OF CONCRETE SLEEPERS: 1. Initial cost is high. 2. Liable to break under rough handling or due to improper design. 3. Renewal is little bit difficult. 4. The scrap value is nil.
  • 12. 12 | P a g e SAQIB IMRAN 0341-7549889 12 Concrete Sleepers