2. Topic Name : Tools and equipment used in railway track
maintenance
PRESENTED BY:
BHAVIN PINDORIYA
3. Objectives of maintenance of railway track
The strength of track structure goes on reducing due
to high speed of trains, heavy axel loads and repetition
of loads.
The track structure is subjected to other deteriorating
effects like rain water, action sun and wind. the wear
and tear of rail and rolling stocks is bound to take
place.
The track structure has to bear so many other
curvatures, speed and load effects, particularly on
curves, point and crossings.
4. Advantages of Good maintenance
The life o both track as well as of rolling stock increases.
The journey becomes easy and comfortable.
Increase in safety.
Saving in operating costs as fuel consumption is less.
Safety of passengers and goods encourages more and more
use of railways.
Higher speed of trains is achieved.
5. Causes of Maintenance :
The strength of track structures goes on reducing due
to high speed of trains, heavy axel loads and repetition
of loads.
The track structure is subjected to other deteriorating
effects like rain water, action of sun and wind.
The wear and tear of rails and rolling stock is bound to
take place.
The track structure has to bear so many other
curvatures, speed and load effects, particularly on
curves, points and crossings.
6. Types of Maintenance :
The maintenance of railway track can be devided into two
parts :
1. Daily Maintenance
2. Periodical Maintenance
1. Daily Maintenance:
Daily maintenance is carried out by the full time staff
maintained throughout the year. The use of maintenance
gauge. All along the railway track, is made. The railway track
is divided into suitable sections 5 to 6 km length.
7. Works carried out by the maintenance gauge are,
To check the bolts of fish plates and tighten it if necessary
To check the rail gauge
To check the joints.
To check the fittings of sleepers and rails.
2.Periodical maintenance :
periodic maintenance is carried out after an interval of 2
to 3 years. during periodic maintenance the gauge, levels,
alignment, points and crossings etc. are thoroghly checked ,
the defects are detected , the causes are determined and
remedial measures are taken.
8. The periodic maintenance includes,
1. Leveling of rails
2. Track alighment
3. Gauuge
4. Proper drainage
5. Track components
6. Bridge and its approches
7. Rolling stock
8. Points and crossingges
9. Level crossings
10. tunnels
9. Tools for railway track maintenance and their functions :
o Hand tools :
beater cum pickaxe