Caribbean utility leaders (tomblin)
1. Caribbean Renewable Energy Forum:
JPS - Current State and Challenges
Kelly Tomblin
President & CEO
October 18, 2016
2. JPS Goal: To Maintain Balance
2
Sustainability
JPS helping to
ensure a Secure,
Sustainable and
Affordable
Energy Future
Our vision is aligned to the
national goals of energy
security, affordability and
sustainability.
• Our focus has is both
short term and long term
4. Old Harbour 190MW Combined Cycle
Power Plant
New 190 MW 3x1 CC
Power Block
Existing OH Units 1-4
4
190 MW CC power plant was awarded to JPS, replacing 40 year old plant
5. Project Status –
LNG Terminal
LNG contracts to be secured within 6 months of Financial Close
ADO expected 20 months from NTP and LNG expected 22 months from NTP.
Power Plant
Signed EPC contract with TSK from Spain
Modified PPA with, Emergency backup fuel ADO submitted to OUR/ESET
EPC LNTP payment made on Sep 30
Secured financial commitments from banks ($223M)
5
7. Fuel Diversity: Bogue Conversion
Delivering a least cost small scale gas delivery
system to Jamaica
Convert Bogue GT12 & 13 Gas
Turbines to Dual Fuel Operations
(ADO& Gas)
Have Bogue CCGT plant
operate reliably &
efficiently on gas October,
2016
Bogue CCGT JPS first gas fired
generating plant
Lowering energy prices through fuel
diversification
Bringing natural Gas to Jamaica, at
last
Bogue CCGT Gas Conversion Project
14. Installed Renewables-Oct 2016
80 MW Intermittent Power addition in 2016
• 24 MW Wind Power in May 2016
• 36 MW Wind Power in June 2016
• 20 MW Solar Power in May 2016
Total
• Installed Hydro Capacity - 29.12 MW
• Installed Wind Capacity - 101.3 MW
• Installed Solar Capacity - 20 MW
• Roof Top Solar - 4MW (estimated 30MW)
15. The Renewable Energy Capacity Penetration
Total Capacity = 1,024 MW
Existing RE capacity =150MW or 14.6%
VRR (Wind + Solar) = 120MW or 11.8%
Projected RE Capacity = 17.7%
VRR (Wind + Solar ) = 14.5%
Research indicates that in most large scale grid systems, VRR < 10% of peak capacity has little impact on system
operation. Larger Shares will present challenges for System Operators.
Wind Energy and Power Systems Operations: A review of Wind Integration Studies to Date” The Electricity Journal, Vol 22, Issue 10, 34-43.
Day Peak Min
Demand (MW) 580.0 400.0
Wind Capacity % 17..5% 25.3%
Solar Capacity % 3.4% 5.0%
TOTAL 20.9% 30.3%
P E A K MIN
17.5% 25.3%
3.4% 5.0%
20.9% 30.3%
RE CAPACITY PENETRATION AT ON-PEAK AND OFF-PEAK
Wind Capacity % Solar Capacity % TOTAL
19. 20
Short Term Plan 2016
Declaration of Machine Availability for Spinning Reserves
Rate of Change alarm for Renewables on the Grid, Renewable
Forecasting Improvements
Improve Ramp Response of Machines
Review Load Shedding Scheme
Spinning reserve review
21. System Operations Improvements
• High resolution visualization of grid
status and health
• Automated Demand Management
• Algorithms that identify intermittency
events and look-ahead
• Integrated forecasting software that
allows for more accurate dispatch
• Ability to manage the connection or
disconnection of micro-grids
• Work force demographics and skills
23. 24
Retail Service Offered by Energy Services
• Energy Auditing
• Load logging services (days / weeks)
• Load breakout services (logging)
• Supply and installation of LED lights
• Wind Speed Logging
25. 26
Services Offered by Energy Services
• Supply and install variable speed drives
• Supply and install energy efficient
motors
• Power factor assessment and correction
Load logging services (days / weeks)
Measurement of electrical parameters (kW, kVA, kWh, PF, current, voltage) for specific equipment or areas (e.g. Grinder, mixer, extractor fan, air conditioner, packing area, canteen etc.)
Load breakout services (logging)
Measure and show the energy contribution of various
loads to total energy consumption