2. 2
ONSHORE SOLUTION OFFSHORE SOLUTION
• Power installed (up to 1MW)
• Off-grid or connected
• Power installed 2 to 50++ MW
• Off-grid or connected
TURNKEY SOLUTIONS
3. 3
1st OTEC in a Few dates
• 2016 / Q2 Resort & OTEC Conceptual
study
• July 2016 Award
• 2016 Q2 / Q4 Detailed engineering
• 2017 Procurement
• 2018 / Q1 Offshore installation
Lights on !
• 2018 / Q2 Resort Grand Opening