Specialized Skills:
Superintendent/Project Manager, Construction Project Coordinator, Carpenter Foreman, Carpenter
I organize and manage the work flow of the construction site from start up to finish bringing projects in on time and under
budget. Projects have ranged from $1-$200 million.
*********************************************************************************
What makes me the perfect candidate for this position? My first response would be that with the multiple years of
experience in diverse types of constructions fields makes me a “Professional” in not only one field but many. I possess the
wisdom and knowledge to make projects excel, succeed and to be profitable. Safety has to be a #1 concern and an everyday
practice. I just completed the OSHA 30 course. My background includes executing Health Care Facilities, Civil, Bridge and
Highway, Residential, Commercial and Industrial types of work. During my career I was part of a team that profited my
company over a Million dollars in just the concrete restoration part of a project alone. You won’t find a more loyal person
and/or committed employee than myself. I believe in building people and take pride in every project big or small. I am a
leader and one that takes ownership and responsibility for his actions. I also possess the management skills necessary to
communicate on all levels. I believe in a team environment and have a passion for what I do.
*********************************************************************************
I invest in self improvement not only to enhance my skills but to continually educate myself to be able to keep pace with the
ever growing need for things to be done faster and faster with less time. Having a long standing in my career without many
breaks in service and strong attention to detail, I believe that ethical standards have to be a top priority to have continued
success along with high morals and integrity to move forward in ones career. The bottom line is what can I do for you? Let
me prove it!
**********************************************************************************
Specialties: Abilities and Qualities: Adaptability, Teamwork, Communication, Productivity, Accountability, Integrity,
Construction, Federal and State Government, Military, Correctional Facilities, Educational Facilities, Commercial, Medical,
Residential, Industrial, Earthwork, Paving, Bridges, Civil, Underground, Demo, Excel, Outlook, MS Project, Word,
Bluebeam, LinkedIn, Ownership of responsibilities, Manager, Coordinator, Facilitator, Responsible, Trustworthy, Electronic
media, Value Engineering, Troubleshoot, Problem Solver, Project Management and Project Site Coordination.
Skill Sets:
Bridges & Highway Construction: New construction, Demolition, Reconstruction, Rehabilitation, Deck and joint
replacements, Sheeting, Piling (Steel H and wood), Box culverts, Highway signing, Latex modified concrete deck
overlays, Pin and hanger replacement, Patch work, Approach and highway construction, Retaining walls, Parapet walls,
Barrier walls, Slope paving, Rip rap, Restoration, Underground storm and sanitary piping, Excavation and backfill, Earth
retention systems and Traffic control.
Commercial/Industrial Construction: Major project coordinator of renovations for SOM (State of Michigan), MSU
(Michigan State University), New Construction and renovations of Health Care Facilities (Sparrow) and many other
municipal buildings throughout the state. Remodels, Additions and New builds, Auditorium additions, Confined space
work, Project manager, Field engineer, Church additions, Steam tunnel renovations, Kitchen remodels, Parking structure
demolition and renovation, Subcontractor management and scheduler for project field operations. Safety coordinator, Site
concrete work, flat work, curb and gutter, footings and walls, Computer skills including Excel, Microsoft Word and
Project, Blue beam software and Outlook, Generate (RFI) Request for Information, schedule inspections through to
completion and obtaining C of O. Change over demo and reconstruction during GM plant assembly line renovations.
Oversee all trades (MEP) scope of work including Masons, Steel (Iron work) and many more.
Residential Construction: Project manager for multiple subdivision projects, Responsible for generating PO’s, material
purchases, subcontracts, maintaining budget and quality control, oversee civil portion of project development and
infrastructure, and schedule inspections to completion and obtaining C of O. Interviewed and chose subcontractors for all
facets and scope of work. Enforce warranty work through portion of retainage withheld from each contractor.
General: Always make it a priority to thoroughly interpret and research the blueprints and specifications, daily reports
and cost reports of all labor and contract work, self perform work if necessary on smaller projects, maintain a proven track
record in completing expedited schedule projects on time if not ahead of schedule, coordinate and manage all field
operations and subcontract work, perform layout. Maintain excellent communication skills with customer and
professional before, during and after the completion of all projects.
Employment History/Experience:
Superintendent: Ideal Contracting: 8-29-16 to 1-31-17
GM Milford Proving Grounds: PDPM projects from (1Million or less)
Completed approximately 50 projects in 5 months
Superintendent: Moore Trosper: 8-1-16 to 8-26-16
Fire Keepers Casino: Construction of the new Dacey’s Tap House, poker and bingo room renovations.
Carpenter: Delta T. Clemens Project: 3-21-16 to 7-29-16
Coldwater, MI
550K sft pork processing plant ($255.7 Million)
Carpenter: Barton Malow: 6-2-15 to 12-23-15
GM Proving grounds: Dyno testing room renovations
Holland Energy Park: Construction management and self-perform work for new power plant and snow melt facility for
the City of Holland, Michigan. ($200 Million)GM Grand River assembly stamping plant for new Camaro: Construction
management. Self-performed civil, concrete paving, curb and gutter, concrete form work, trenches, embeds, footings,
walls and interior floors. Majority of time spent on detail work. ($50 Million)
Carpenter: Marley/SPX, April 2015 – May 2015
Construct new cooling tower at the GM Delta Plant
Field Superintendent: Moore Trosper, Holt, 12-23-14 – 1-12-15
General contractor for the campus wide tree and stump removal in the city of Lansing, MI. Removed over 100 trees and
restoration in between winter break.
Field Superintendent: Moore Trosper, Holt, 10-6-14 – 12-22-14
General Contractor for DNR/SOM project for 3 roof replacements and field office renovations at Rose Lake and Maple
River (100K+)
Field Superintendent: Moore Trosper, Holt, 5-14-14 – 10-6-14
Project management and general contractor for total café renovation at Jackson National Life HQ in Okemos, MI
(3milliom+)
Site Superintendent: Kincaid Henry Building Group: 12/20/13- 5-13-14
Construction Management and General Contractor
Impression 5 Science Museum: 2nd Phase 1st
floor renovations
DBI Warehouse Showroom renovation
1146 S. Washington (Old Ramones) 3 building Renovation
Field Superintendent/Carpenter Foreman: Neilson Construction: 6/3/13-12/16/13
General Trade’s subcontractor for Christman Co: Lexington Hotel (5 story upgrade renovation)
MSU: Butterfield Hall 4 story complete renovation
Sparrow Urgent Care – Holt MI
Sparrow - Potterville MI
Sparrow – SPB suite 415 renovation
Project Manager/General Superintendent: William Reichenbach Co, 3/28/13-5/31/13
General Contractor: Michigan Health & Hospital Association: 25,00sft 2 story office bldg. renovation (1.5 Million)
Field Superintendent: Moore Trosper, Holt, 2/11/2008 – 1/18/2013
General Contractor: Sparrow Urgent Care and Blood Draw Clinic: 8,000sft new build in E. Lansing Michigan built in 95
workdays. (1.7Million)
MSU:
Miscellaneous T&M work, drop ceilings, interior partitions, marker boards, TV brackets and projection screens. Etc...
Fire Keepers Casino: Case work, doors and hardware, blocking and temporary protection.
(SOM) Bit lab HVAC renovation, addition of new AHU and ERU and associated duct work. ($1 Million)
(SOM) Grand Tower Bldg: Electrical trench and slab replacement and switch gear cleaning.
MSU Cyclotron: Restroom addition.
Accident Fund/new BCBS bldg ten story renovation,
The owner was very pleased to have a 94% satisfaction approval at time of walk through with employees. ($5 Million)
Lewis Cass Bldg, State of Michigan: Steam vault repair (SOM) ($200K)
Sprinkler system removal and replacement, fire proofing and ceiling installations and upgrades at the Historical Museum and
Library (SOM) ($4.2Million)
Construction Manager and Project Management for remodeling and additions for Vandercook Lake Schools ($5 Million)
Field Superintendent: Kares Construction, Charlotte, MI 4/1/2003 to 01/18/2008 ($1-24 Million)
General Contractor and Project Manager for Trinity United Methodist Church addition,
7533 W. St. Joe Hwy, Lansing MI
Sub Contractor/Granger Construction: Michigan State University Chemistry building addition
General Contractor and Field Engineer for (SOM) Ottawa Towers Parking Ramp and Plaza renovation
Downtown Lansing MI
General Contractor and Field Superintendent for Huron Valley Correctional Facility
Ypsilanti, MI. Steam tunnel renovation and kitchen remodel
Sub Contractor to Clark Construction for Lansing Community College new auditorium
Lansing, MI
General Contractor and Field Superintendent for the Combined/Support/Maintenance/Shop project for the National Guard
Lansing, MI ($24 million)
Superintendent/Carpenter Forman/Carpenter: Midwest Bridge Co., Williamston, MI. 5/1985 – 3-2003
($1-$40 Million)
General Contractor: Also was a PM for Midwest Homes & Posen, Carpenter Forman for Holloway, CA Hull, and Walter
Toebe
Laborer: Brown Brothers Construction Co., Lansing, MI. 5/1973 – 5/1985
References Upon Request

More Related Content

What's hot (19)

Burts Resume 1
Burts Resume 1Burts Resume 1
Burts Resume 1
 
Resume
ResumeResume
Resume
 
Dudley 2-7-2017
Dudley 2-7-2017Dudley 2-7-2017
Dudley 2-7-2017
 
Jimmy Locklear Resume updated 091014
Jimmy Locklear Resume updated 091014Jimmy Locklear Resume updated 091014
Jimmy Locklear Resume updated 091014
 
DanielJarrettResume
DanielJarrettResumeDanielJarrettResume
DanielJarrettResume
 
Ponicsan.Dave.DEN
Ponicsan.Dave.DENPonicsan.Dave.DEN
Ponicsan.Dave.DEN
 
jake bellamy Resume 1 (1).PDF
jake bellamy Resume 1 (1).PDFjake bellamy Resume 1 (1).PDF
jake bellamy Resume 1 (1).PDF
 
Centerre Brochure
Centerre BrochureCenterre Brochure
Centerre Brochure
 
BWRDG Company_4-5-15
BWRDG Company_4-5-15BWRDG Company_4-5-15
BWRDG Company_4-5-15
 
Connelly Darren (CV1)
Connelly Darren (CV1)Connelly Darren (CV1)
Connelly Darren (CV1)
 
Resume - Megan McIntyre
Resume - Megan McIntyreResume - Megan McIntyre
Resume - Megan McIntyre
 
Sean Cody - Resume
Sean Cody - ResumeSean Cody - Resume
Sean Cody - Resume
 
07-14-15 Marcela Conteco Brochure(1)
07-14-15 Marcela Conteco Brochure(1)07-14-15 Marcela Conteco Brochure(1)
07-14-15 Marcela Conteco Brochure(1)
 
ResumeExport
ResumeExportResumeExport
ResumeExport
 
Peter Leal Resume 2015
Peter Leal Resume 2015Peter Leal Resume 2015
Peter Leal Resume 2015
 
Brenco Company Resume
Brenco Company ResumeBrenco Company Resume
Brenco Company Resume
 
James Beam resume1
James Beam resume1James Beam resume1
James Beam resume1
 
Ronald Kempf Enterprises
Ronald Kempf EnterprisesRonald Kempf Enterprises
Ronald Kempf Enterprises
 
Resume - '14
Resume - '14Resume - '14
Resume - '14
 

Similar to Bob's most current resume 2-2-17

John Day Resume
John Day ResumeJohn Day Resume
John Day ResumeJohn Day
 
Phil Staib's Resume 2016
Phil Staib's Resume 2016Phil Staib's Resume 2016
Phil Staib's Resume 2016Phil Staib
 
2016 Bob resume (003)
2016 Bob resume (003)2016 Bob resume (003)
2016 Bob resume (003)Robert Palac
 
A P Rolfe CV March 2016
A P Rolfe  CV March 2016A P Rolfe  CV March 2016
A P Rolfe CV March 2016Tony Rolfe
 
Rodwell Murwisi CV site manager 1
Rodwell Murwisi CV site manager 1Rodwell Murwisi CV site manager 1
Rodwell Murwisi CV site manager 1Rodi Murwisi
 
Michael Mueller _04.30.15
Michael Mueller _04.30.15Michael Mueller _04.30.15
Michael Mueller _04.30.15Michael Mueller
 
Pci dwp binder_ch2
Pci dwp binder_ch2Pci dwp binder_ch2
Pci dwp binder_ch2Ramin Vaghei
 
Doug's Resume 10-18-14
Doug's Resume 10-18-14Doug's Resume 10-18-14
Doug's Resume 10-18-14Douglas Rogge
 
Michael Polito Resume Revised 7.17.16
Michael Polito Resume Revised 7.17.16Michael Polito Resume Revised 7.17.16
Michael Polito Resume Revised 7.17.16tyeeseeker
 
Composite Resume Latest Version
Composite  Resume Latest VersionComposite  Resume Latest Version
Composite Resume Latest VersionRichard Law
 
Christy_McKinzie_Resume_2015
Christy_McKinzie_Resume_2015Christy_McKinzie_Resume_2015
Christy_McKinzie_Resume_2015Christy McKinzie
 
x Professional Profile for Mac Byers 1-13-17
x Professional Profile for Mac Byers 1-13-17x Professional Profile for Mac Byers 1-13-17
x Professional Profile for Mac Byers 1-13-17Mac Byers
 
Edward E calder CV 2014
Edward E calder CV 2014Edward E calder CV 2014
Edward E calder CV 2014Edward Calder
 
Tony resume 30 jan16
Tony resume 30 jan16Tony resume 30 jan16
Tony resume 30 jan16Tony Lowery
 

Similar to Bob's most current resume 2-2-17 (20)

Resume
ResumeResume
Resume
 
John Day Resume
John Day ResumeJohn Day Resume
John Day Resume
 
Phil Staib's Resume 2016
Phil Staib's Resume 2016Phil Staib's Resume 2016
Phil Staib's Resume 2016
 
E profile
E profileE profile
E profile
 
2016 Bob resume (003)
2016 Bob resume (003)2016 Bob resume (003)
2016 Bob resume (003)
 
CM Resume
CM Resume CM Resume
CM Resume
 
A P Rolfe CV March 2016
A P Rolfe  CV March 2016A P Rolfe  CV March 2016
A P Rolfe CV March 2016
 
Rodwell Murwisi CV site manager 1
Rodwell Murwisi CV site manager 1Rodwell Murwisi CV site manager 1
Rodwell Murwisi CV site manager 1
 
Michael Mueller _04.30.15
Michael Mueller _04.30.15Michael Mueller _04.30.15
Michael Mueller _04.30.15
 
Pci dwp binder_ch2
Pci dwp binder_ch2Pci dwp binder_ch2
Pci dwp binder_ch2
 
willem cv
willem cvwillem cv
willem cv
 
Don Mac Donald CV
Don Mac Donald CVDon Mac Donald CV
Don Mac Donald CV
 
stu's resume
stu's resumestu's resume
stu's resume
 
Doug's Resume 10-18-14
Doug's Resume 10-18-14Doug's Resume 10-18-14
Doug's Resume 10-18-14
 
Michael Polito Resume Revised 7.17.16
Michael Polito Resume Revised 7.17.16Michael Polito Resume Revised 7.17.16
Michael Polito Resume Revised 7.17.16
 
Composite Resume Latest Version
Composite  Resume Latest VersionComposite  Resume Latest Version
Composite Resume Latest Version
 
Christy_McKinzie_Resume_2015
Christy_McKinzie_Resume_2015Christy_McKinzie_Resume_2015
Christy_McKinzie_Resume_2015
 
x Professional Profile for Mac Byers 1-13-17
x Professional Profile for Mac Byers 1-13-17x Professional Profile for Mac Byers 1-13-17
x Professional Profile for Mac Byers 1-13-17
 
Edward E calder CV 2014
Edward E calder CV 2014Edward E calder CV 2014
Edward E calder CV 2014
 
Tony resume 30 jan16
Tony resume 30 jan16Tony resume 30 jan16
Tony resume 30 jan16
 

More from Robert Luttrell

Crowne Plaza Hotel Renovation (TCC)
  Crowne Plaza Hotel Renovation (TCC)  Crowne Plaza Hotel Renovation (TCC)
Crowne Plaza Hotel Renovation (TCC)Robert Luttrell
 
D9 fa3765 cee6-438f-aee4-03eeb192c1ab
D9 fa3765 cee6-438f-aee4-03eeb192c1abD9 fa3765 cee6-438f-aee4-03eeb192c1ab
D9 fa3765 cee6-438f-aee4-03eeb192c1abRobert Luttrell
 
Crowne Plaza Hotel Renovation (TCC)
 Crowne Plaza Hotel Renovation (TCC) Crowne Plaza Hotel Renovation (TCC)
Crowne Plaza Hotel Renovation (TCC)Robert Luttrell
 
Crowne Plaza Hotel Renovation (TCC)
  Crowne Plaza Hotel Renovation (TCC)  Crowne Plaza Hotel Renovation (TCC)
Crowne Plaza Hotel Renovation (TCC)Robert Luttrell
 
Crowne Plaza Hotel Renovation (TCC)
  Crowne Plaza Hotel Renovation (TCC)  Crowne Plaza Hotel Renovation (TCC)
Crowne Plaza Hotel Renovation (TCC)Robert Luttrell
 
Crowne Plaza Hotel Renovation (TCC)
  Crowne Plaza Hotel Renovation (TCC)  Crowne Plaza Hotel Renovation (TCC)
Crowne Plaza Hotel Renovation (TCC)Robert Luttrell
 
Crowne Plaza Hotel Renovation (TCC)
  Crowne Plaza Hotel Renovation (TCC)  Crowne Plaza Hotel Renovation (TCC)
Crowne Plaza Hotel Renovation (TCC)Robert Luttrell
 
Crowne Plaza Hotel Renovation (TCC)
  Crowne Plaza Hotel Renovation (TCC)  Crowne Plaza Hotel Renovation (TCC)
Crowne Plaza Hotel Renovation (TCC)Robert Luttrell
 
Crowne Plaza Hotel Renovation (TCC)
  Crowne Plaza Hotel Renovation (TCC)  Crowne Plaza Hotel Renovation (TCC)
Crowne Plaza Hotel Renovation (TCC)Robert Luttrell
 

More from Robert Luttrell (9)

Crowne Plaza Hotel Renovation (TCC)
  Crowne Plaza Hotel Renovation (TCC)  Crowne Plaza Hotel Renovation (TCC)
Crowne Plaza Hotel Renovation (TCC)
 
D9 fa3765 cee6-438f-aee4-03eeb192c1ab
D9 fa3765 cee6-438f-aee4-03eeb192c1abD9 fa3765 cee6-438f-aee4-03eeb192c1ab
D9 fa3765 cee6-438f-aee4-03eeb192c1ab
 
Crowne Plaza Hotel Renovation (TCC)
 Crowne Plaza Hotel Renovation (TCC) Crowne Plaza Hotel Renovation (TCC)
Crowne Plaza Hotel Renovation (TCC)
 
Crowne Plaza Hotel Renovation (TCC)
  Crowne Plaza Hotel Renovation (TCC)  Crowne Plaza Hotel Renovation (TCC)
Crowne Plaza Hotel Renovation (TCC)
 
Crowne Plaza Hotel Renovation (TCC)
  Crowne Plaza Hotel Renovation (TCC)  Crowne Plaza Hotel Renovation (TCC)
Crowne Plaza Hotel Renovation (TCC)
 
Crowne Plaza Hotel Renovation (TCC)
  Crowne Plaza Hotel Renovation (TCC)  Crowne Plaza Hotel Renovation (TCC)
Crowne Plaza Hotel Renovation (TCC)
 
Crowne Plaza Hotel Renovation (TCC)
  Crowne Plaza Hotel Renovation (TCC)  Crowne Plaza Hotel Renovation (TCC)
Crowne Plaza Hotel Renovation (TCC)
 
Crowne Plaza Hotel Renovation (TCC)
  Crowne Plaza Hotel Renovation (TCC)  Crowne Plaza Hotel Renovation (TCC)
Crowne Plaza Hotel Renovation (TCC)
 
Crowne Plaza Hotel Renovation (TCC)
  Crowne Plaza Hotel Renovation (TCC)  Crowne Plaza Hotel Renovation (TCC)
Crowne Plaza Hotel Renovation (TCC)
 

Bob's most current resume 2-2-17

  • 1. Robert D. Luttrell 6501 Cheshire Dr. Dimondale, MI 48821 (Cell) 517-899-9161 robertluttrell@outlook.com www.linkedin.com/pub/robert-luttrell/4b/573/222/ Specialized Skills: Superintendent/Project Manager, Construction Project Coordinator, Carpenter Foreman, Carpenter I organize and manage the work flow of the construction site from start up to finish bringing projects in on time and under budget. Projects have ranged from $1-$200 million. ********************************************************************************* What makes me the perfect candidate for this position? My first response would be that with the multiple years of experience in diverse types of constructions fields makes me a “Professional” in not only one field but many. I possess the wisdom and knowledge to make projects excel, succeed and to be profitable. Safety has to be a #1 concern and an everyday practice. I just completed the OSHA 30 course. My background includes executing Health Care Facilities, Civil, Bridge and Highway, Residential, Commercial and Industrial types of work. During my career I was part of a team that profited my company over a Million dollars in just the concrete restoration part of a project alone. You won’t find a more loyal person and/or committed employee than myself. I believe in building people and take pride in every project big or small. I am a leader and one that takes ownership and responsibility for his actions. I also possess the management skills necessary to communicate on all levels. I believe in a team environment and have a passion for what I do. ********************************************************************************* I invest in self improvement not only to enhance my skills but to continually educate myself to be able to keep pace with the ever growing need for things to be done faster and faster with less time. Having a long standing in my career without many breaks in service and strong attention to detail, I believe that ethical standards have to be a top priority to have continued success along with high morals and integrity to move forward in ones career. The bottom line is what can I do for you? Let me prove it! ********************************************************************************** Specialties: Abilities and Qualities: Adaptability, Teamwork, Communication, Productivity, Accountability, Integrity, Construction, Federal and State Government, Military, Correctional Facilities, Educational Facilities, Commercial, Medical, Residential, Industrial, Earthwork, Paving, Bridges, Civil, Underground, Demo, Excel, Outlook, MS Project, Word, Bluebeam, LinkedIn, Ownership of responsibilities, Manager, Coordinator, Facilitator, Responsible, Trustworthy, Electronic media, Value Engineering, Troubleshoot, Problem Solver, Project Management and Project Site Coordination. Skill Sets: Bridges & Highway Construction: New construction, Demolition, Reconstruction, Rehabilitation, Deck and joint replacements, Sheeting, Piling (Steel H and wood), Box culverts, Highway signing, Latex modified concrete deck overlays, Pin and hanger replacement, Patch work, Approach and highway construction, Retaining walls, Parapet walls, Barrier walls, Slope paving, Rip rap, Restoration, Underground storm and sanitary piping, Excavation and backfill, Earth retention systems and Traffic control. Commercial/Industrial Construction: Major project coordinator of renovations for SOM (State of Michigan), MSU (Michigan State University), New Construction and renovations of Health Care Facilities (Sparrow) and many other municipal buildings throughout the state. Remodels, Additions and New builds, Auditorium additions, Confined space work, Project manager, Field engineer, Church additions, Steam tunnel renovations, Kitchen remodels, Parking structure demolition and renovation, Subcontractor management and scheduler for project field operations. Safety coordinator, Site concrete work, flat work, curb and gutter, footings and walls, Computer skills including Excel, Microsoft Word and Project, Blue beam software and Outlook, Generate (RFI) Request for Information, schedule inspections through to completion and obtaining C of O. Change over demo and reconstruction during GM plant assembly line renovations. Oversee all trades (MEP) scope of work including Masons, Steel (Iron work) and many more. Residential Construction: Project manager for multiple subdivision projects, Responsible for generating PO’s, material purchases, subcontracts, maintaining budget and quality control, oversee civil portion of project development and infrastructure, and schedule inspections to completion and obtaining C of O. Interviewed and chose subcontractors for all facets and scope of work. Enforce warranty work through portion of retainage withheld from each contractor.
  • 2. General: Always make it a priority to thoroughly interpret and research the blueprints and specifications, daily reports and cost reports of all labor and contract work, self perform work if necessary on smaller projects, maintain a proven track record in completing expedited schedule projects on time if not ahead of schedule, coordinate and manage all field operations and subcontract work, perform layout. Maintain excellent communication skills with customer and professional before, during and after the completion of all projects. Employment History/Experience: Superintendent: Ideal Contracting: 8-29-16 to 1-31-17 GM Milford Proving Grounds: PDPM projects from (1Million or less) Completed approximately 50 projects in 5 months Superintendent: Moore Trosper: 8-1-16 to 8-26-16 Fire Keepers Casino: Construction of the new Dacey’s Tap House, poker and bingo room renovations. Carpenter: Delta T. Clemens Project: 3-21-16 to 7-29-16 Coldwater, MI 550K sft pork processing plant ($255.7 Million) Carpenter: Barton Malow: 6-2-15 to 12-23-15 GM Proving grounds: Dyno testing room renovations Holland Energy Park: Construction management and self-perform work for new power plant and snow melt facility for the City of Holland, Michigan. ($200 Million)GM Grand River assembly stamping plant for new Camaro: Construction management. Self-performed civil, concrete paving, curb and gutter, concrete form work, trenches, embeds, footings, walls and interior floors. Majority of time spent on detail work. ($50 Million) Carpenter: Marley/SPX, April 2015 – May 2015 Construct new cooling tower at the GM Delta Plant Field Superintendent: Moore Trosper, Holt, 12-23-14 – 1-12-15 General contractor for the campus wide tree and stump removal in the city of Lansing, MI. Removed over 100 trees and restoration in between winter break. Field Superintendent: Moore Trosper, Holt, 10-6-14 – 12-22-14 General Contractor for DNR/SOM project for 3 roof replacements and field office renovations at Rose Lake and Maple River (100K+) Field Superintendent: Moore Trosper, Holt, 5-14-14 – 10-6-14 Project management and general contractor for total café renovation at Jackson National Life HQ in Okemos, MI (3milliom+) Site Superintendent: Kincaid Henry Building Group: 12/20/13- 5-13-14 Construction Management and General Contractor Impression 5 Science Museum: 2nd Phase 1st floor renovations DBI Warehouse Showroom renovation 1146 S. Washington (Old Ramones) 3 building Renovation Field Superintendent/Carpenter Foreman: Neilson Construction: 6/3/13-12/16/13 General Trade’s subcontractor for Christman Co: Lexington Hotel (5 story upgrade renovation) MSU: Butterfield Hall 4 story complete renovation Sparrow Urgent Care – Holt MI Sparrow - Potterville MI Sparrow – SPB suite 415 renovation
  • 3. Project Manager/General Superintendent: William Reichenbach Co, 3/28/13-5/31/13 General Contractor: Michigan Health & Hospital Association: 25,00sft 2 story office bldg. renovation (1.5 Million) Field Superintendent: Moore Trosper, Holt, 2/11/2008 – 1/18/2013 General Contractor: Sparrow Urgent Care and Blood Draw Clinic: 8,000sft new build in E. Lansing Michigan built in 95 workdays. (1.7Million) MSU: Miscellaneous T&M work, drop ceilings, interior partitions, marker boards, TV brackets and projection screens. Etc... Fire Keepers Casino: Case work, doors and hardware, blocking and temporary protection. (SOM) Bit lab HVAC renovation, addition of new AHU and ERU and associated duct work. ($1 Million) (SOM) Grand Tower Bldg: Electrical trench and slab replacement and switch gear cleaning. MSU Cyclotron: Restroom addition. Accident Fund/new BCBS bldg ten story renovation, The owner was very pleased to have a 94% satisfaction approval at time of walk through with employees. ($5 Million) Lewis Cass Bldg, State of Michigan: Steam vault repair (SOM) ($200K) Sprinkler system removal and replacement, fire proofing and ceiling installations and upgrades at the Historical Museum and Library (SOM) ($4.2Million) Construction Manager and Project Management for remodeling and additions for Vandercook Lake Schools ($5 Million) Field Superintendent: Kares Construction, Charlotte, MI 4/1/2003 to 01/18/2008 ($1-24 Million) General Contractor and Project Manager for Trinity United Methodist Church addition, 7533 W. St. Joe Hwy, Lansing MI Sub Contractor/Granger Construction: Michigan State University Chemistry building addition General Contractor and Field Engineer for (SOM) Ottawa Towers Parking Ramp and Plaza renovation Downtown Lansing MI General Contractor and Field Superintendent for Huron Valley Correctional Facility Ypsilanti, MI. Steam tunnel renovation and kitchen remodel Sub Contractor to Clark Construction for Lansing Community College new auditorium Lansing, MI General Contractor and Field Superintendent for the Combined/Support/Maintenance/Shop project for the National Guard Lansing, MI ($24 million) Superintendent/Carpenter Forman/Carpenter: Midwest Bridge Co., Williamston, MI. 5/1985 – 3-2003 ($1-$40 Million) General Contractor: Also was a PM for Midwest Homes & Posen, Carpenter Forman for Holloway, CA Hull, and Walter Toebe Laborer: Brown Brothers Construction Co., Lansing, MI. 5/1973 – 5/1985