SlideShare a Scribd company logo
1 of 4
Jimmy Locklear
2995 Tom M Road
Rowland, NC 28383
Home Phone: 910-522-0979
Cell Phone: 910-736-9326
Email Address: jimmylocklear@yahoo.com
Background Summary/Objective’s
36yr’s of Heavy Industrial Construction—Pulp Paper Mills—Power Plants—Chemical
Phosphate/Copper mining Projects. Working in Heavy Steel Erection/Heavy Rigging
Working with Cranes as High as 1200Tons Plus—Heavy Civil Works—Objectives are
To Manage and Coordinate Projects to my Highest Degree of Experience and Complete
Projects in a Safe below Cost and Timely Manner.
01/08/2014 – Present
Fluor-SMI Services Mining Inc.
Cerro Verde Copper Mine
Arequipa, Perú
Contact-Myron Cox Project Deputy Director #51-945113650 Cell#1-846-525-7587
Position: Structural General Superintendent
Duties: Overseeing the preassemble and erection of Area 1 which consists of five (5) major structures;
primary crusher to fine ore bins, including transfer tower bents/conveyors with a total tonnage
of 48,000 tons; estimated cost of project - 4.8 billion dollars
10/21/2013 – 12/20/2013
Jacobs Engineering Company
FMI Copper & Gold Mine Project
Morecina, AZ
Contact: Sid Spares – Project Manager (256) 412-9346
Position: Structural and Civil Superintendent
Duties: Overseeing the erection of the ball mill and wet screen structure, setting heavy equipment with
a 2250/999 Manitowoc Crane
08/01/2013 - 10/10/2013
The Roberts Company
AKZO Novel Chemical Plant
Axis, AL
Contact: Frank Thomas – Project Manager (252) 714-6457
Position: Structural and Rigging Superintendent
Duties: Overseeing the erection of the new converter structure for the upcoming 30 day shutdown for
installation
12/10/2012 - 05/07/2013
DZI Atlantic, Inc.
In Vista Chemical Plant
Chattanooga, TN
Contact: Jim Love – Project Manager (704) 418-2869
Position: Structural and Civil Superintendent
Duties: Assembling new EPCompound line; concrete pours and erecting structural steel
09/03/2012 - 11/01/2012
The Roberts Company
Augusta International Papermill
Augusta, Ga.
Contact: Frank Thomas – Project Manager (252) 714-6457
Position: Structural and Rigging Superintendent
Duties: Overseeing the erecting steel on the evaporator structural for Paper Machine #3; rigging and
setting the evaporator vessel into the structural.
02/28/2012 – 09/01/2012
DZI Atlantic, Inc.
InVista Chemical Plant
Chattanooga, TN
Contact: Jim Love – Project Manager (704) 418-2869
Position: Structural and Civil Superintendent
Duties: Install 2 new gas fire package broilers
11/24/2011 – 01/13/2012
The Roberts Company
KapCo Paper Mill
Charleston, SC
Contact: Frank Thomas – Project Manager (252) 714-6457
Position: Structural and Rigging General Foreman
Duties: Rigging structural steel and erecting overhead bridge
10/18/2010 – 11/21/2011
DZI Atlantic, Inc.
Camden, SC
Contact: Jim Love – Project Manager (704) 418-2869
Position: Structural and Civil Superintendent
Duties: Rebuild on Unit-3 Broiler, change over from coal to gas fire broiler
02/23/2010 – 07/23/2010
Fluor-RGP5 Modular Project
Nantong, China
Contact: Lee Cox – Project Manager (843) 861-2153
Position: Structural and Rigging Specialist
Duties: Superintendent overseeing the fabrication/erection/rigging structural module’s for a mining
Company (BHP) in a facility in Nantong, China to be rigged and loaded aboard a ship transported
Australia per Fluor’s rigging plans/details, maintaining all safety procedures to insure they were
carried out properly.
09/12/2009 – 02/05/2010
Day and Zimmerman International, Inc.
PGI Plant
Benson, NC
Contact: Jim Love –Project Manager (704) 418-2869
Position: Structural and Rigging General Foreman
Duties: Demo structural steel and equipment, setting in new equipment
11/03/2008 – 06/30/2009
The Roberts Company
TCS Phosphate Chemical Plant
Aurora, NC
Contact: Frank Thomas – Project Manager (252)714-6457
Position: Structural and Rigging Superintendent
Duties: Erecting steel for the new evaporator structural, setting recovery vessels and evaporator vessels
and tanks; responsible for setting all duct work tie-ins to all vessels.
10/03/2008 – 10/31/2008
BE&K Construction –Georgia Power Shutdown
Juliette, Ga.
Contact: Phil Caldron - BE&K Construction Manager
Position: Ironworker, Rigger Supervisor
Duties: Demo structural steel and erect steel for #3 stack unit and install ductwork for tie-in for new
Scrubber system and heavy rigging.
10/01/2007 – 05/01/2008
Fluor Corporation SCENG Project Wateree Station, CO2 Project
Eastover, SC
Contact: Dick Griffin – Project Manager (864) 281-6142
Position: Civil and Structural Superintendent
Duties: Concrete pours for heavy foundation for duck support foundation; assemble rebar and
Foundation; excavation duck support foundation.
Experience:
• 34 years- Heavy Industrial Construction Field
• 22 years- Supervisor Experience
Certification:
• NCCER Certified
• Rigging General Foreman.
• Structural General-Superintendent
• Civil Superintendent
• Reinforced I/W Superintendent- General Foreman
Training Certifications:
• Supervisor Training
• Crosby Rigging Training
• Line Break Training
• 30 Hours of OSHA Training
• CPR Training
• ACE Certification- I/W Supervisor
• 10 hours Lead-Abatement Certification Training
• NCCER Certifications
Education: Pembroke Sr. High School 12 years
Jimmy Locklear Resume updated 091014

More Related Content

What's hot

Cvjfm january 2015 vpdf
Cvjfm january 2015 vpdfCvjfm january 2015 vpdf
Cvjfm january 2015 vpdf
HarDik Shah
 
CV Template for GAM Applicants-LL (1)
CV Template for GAM Applicants-LL (1)CV Template for GAM Applicants-LL (1)
CV Template for GAM Applicants-LL (1)
leslie Lavender
 
Civil_Structural Engineer, Graham Chambers, December 2015
Civil_Structural Engineer, Graham Chambers, December 2015Civil_Structural Engineer, Graham Chambers, December 2015
Civil_Structural Engineer, Graham Chambers, December 2015
Graham Chambers
 
RodneyBrown_CV_July2015
RodneyBrown_CV_July2015RodneyBrown_CV_July2015
RodneyBrown_CV_July2015
Rodney Brown
 
Todd Eric Male1.docx RESUME 2015.docx2
Todd Eric Male1.docx RESUME 2015.docx2Todd Eric Male1.docx RESUME 2015.docx2
Todd Eric Male1.docx RESUME 2015.docx2
Todd Maley
 
Boilerplate Resume PDM_15027
Boilerplate Resume PDM_15027Boilerplate Resume PDM_15027
Boilerplate Resume PDM_15027
Pat McEvoy
 

What's hot (14)

Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)
Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)
Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)
 
Cvjfm january 2015 vpdf
Cvjfm january 2015 vpdfCvjfm january 2015 vpdf
Cvjfm january 2015 vpdf
 
CV Template for GAM Applicants-LL (1)
CV Template for GAM Applicants-LL (1)CV Template for GAM Applicants-LL (1)
CV Template for GAM Applicants-LL (1)
 
Resume - '14
Resume - '14Resume - '14
Resume - '14
 
Innovative Concrete Strengthening at Baylor Sammons Collins Cancer Center
Innovative Concrete Strengthening at Baylor Sammons Collins Cancer CenterInnovative Concrete Strengthening at Baylor Sammons Collins Cancer Center
Innovative Concrete Strengthening at Baylor Sammons Collins Cancer Center
 
Civil_Structural Engineer, Graham Chambers, December 2015
Civil_Structural Engineer, Graham Chambers, December 2015Civil_Structural Engineer, Graham Chambers, December 2015
Civil_Structural Engineer, Graham Chambers, December 2015
 
RodneyBrown_CV_July2015
RodneyBrown_CV_July2015RodneyBrown_CV_July2015
RodneyBrown_CV_July2015
 
Think Outside The Box
Think Outside The BoxThink Outside The Box
Think Outside The Box
 
Final_Capstone_2016
Final_Capstone_2016Final_Capstone_2016
Final_Capstone_2016
 
Side Yard Notice 06.07.16
Side Yard Notice 06.07.16Side Yard Notice 06.07.16
Side Yard Notice 06.07.16
 
0137033451 pp15
0137033451 pp150137033451 pp15
0137033451 pp15
 
Todd Eric Male1.docx RESUME 2015.docx2
Todd Eric Male1.docx RESUME 2015.docx2Todd Eric Male1.docx RESUME 2015.docx2
Todd Eric Male1.docx RESUME 2015.docx2
 
Boilerplate Resume PDM_15027
Boilerplate Resume PDM_15027Boilerplate Resume PDM_15027
Boilerplate Resume PDM_15027
 
Potomac Meadow Water Quality Improvement July 2016
Potomac Meadow Water Quality Improvement July 2016Potomac Meadow Water Quality Improvement July 2016
Potomac Meadow Water Quality Improvement July 2016
 

Similar to Jimmy Locklear Resume updated 091014 (20)

Derek Dhonau resume
Derek Dhonau resumeDerek Dhonau resume
Derek Dhonau resume
 
Resume 26-07-15
Resume 26-07-15Resume 26-07-15
Resume 26-07-15
 
john kinds resume 2015
john kinds resume 2015john kinds resume 2015
john kinds resume 2015
 
Resume C Brewer
Resume C BrewerResume C Brewer
Resume C Brewer
 
Robert W Kapp Resume
Robert W Kapp Resume Robert W Kapp Resume
Robert W Kapp Resume
 
Bill ure cv 31 08-16
Bill ure cv 31 08-16Bill ure cv 31 08-16
Bill ure cv 31 08-16
 
Resume Geoff Colvin Sept 2015
Resume Geoff Colvin Sept 2015Resume Geoff Colvin Sept 2015
Resume Geoff Colvin Sept 2015
 
number 1. pro cv
number 1. pro cvnumber 1. pro cv
number 1. pro cv
 
Resume.2015
Resume.2015Resume.2015
Resume.2015
 
Resume05[1]
Resume05[1]Resume05[1]
Resume05[1]
 
CV souvanna.2.2
CV souvanna.2.2CV souvanna.2.2
CV souvanna.2.2
 
Eric Heikkila's resume
Eric Heikkila's resumeEric Heikkila's resume
Eric Heikkila's resume
 
casa contracting
casa contractingcasa contracting
casa contracting
 
BJD Curriculum Vitae Oct 2016.doc-10
BJD Curriculum Vitae Oct 2016.doc-10BJD Curriculum Vitae Oct 2016.doc-10
BJD Curriculum Vitae Oct 2016.doc-10
 
resume of Mr Roy2
resume of Mr Roy2resume of Mr Roy2
resume of Mr Roy2
 
Danny Duggan CV
Danny Duggan CVDanny Duggan CV
Danny Duggan CV
 
A CLARK 16
A CLARK 16A CLARK 16
A CLARK 16
 
itzcoatl
itzcoatlitzcoatl
itzcoatl
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)
 
Todd Smith 2016 (Resume))
Todd Smith 2016 (Resume))Todd Smith 2016 (Resume))
Todd Smith 2016 (Resume))
 

Jimmy Locklear Resume updated 091014

  • 1. Jimmy Locklear 2995 Tom M Road Rowland, NC 28383 Home Phone: 910-522-0979 Cell Phone: 910-736-9326 Email Address: jimmylocklear@yahoo.com Background Summary/Objective’s 36yr’s of Heavy Industrial Construction—Pulp Paper Mills—Power Plants—Chemical Phosphate/Copper mining Projects. Working in Heavy Steel Erection/Heavy Rigging Working with Cranes as High as 1200Tons Plus—Heavy Civil Works—Objectives are To Manage and Coordinate Projects to my Highest Degree of Experience and Complete Projects in a Safe below Cost and Timely Manner. 01/08/2014 – Present Fluor-SMI Services Mining Inc. Cerro Verde Copper Mine Arequipa, Perú Contact-Myron Cox Project Deputy Director #51-945113650 Cell#1-846-525-7587 Position: Structural General Superintendent Duties: Overseeing the preassemble and erection of Area 1 which consists of five (5) major structures; primary crusher to fine ore bins, including transfer tower bents/conveyors with a total tonnage of 48,000 tons; estimated cost of project - 4.8 billion dollars 10/21/2013 – 12/20/2013 Jacobs Engineering Company FMI Copper & Gold Mine Project Morecina, AZ Contact: Sid Spares – Project Manager (256) 412-9346 Position: Structural and Civil Superintendent Duties: Overseeing the erection of the ball mill and wet screen structure, setting heavy equipment with a 2250/999 Manitowoc Crane 08/01/2013 - 10/10/2013 The Roberts Company AKZO Novel Chemical Plant Axis, AL Contact: Frank Thomas – Project Manager (252) 714-6457 Position: Structural and Rigging Superintendent Duties: Overseeing the erection of the new converter structure for the upcoming 30 day shutdown for installation 12/10/2012 - 05/07/2013 DZI Atlantic, Inc. In Vista Chemical Plant Chattanooga, TN Contact: Jim Love – Project Manager (704) 418-2869 Position: Structural and Civil Superintendent Duties: Assembling new EPCompound line; concrete pours and erecting structural steel 09/03/2012 - 11/01/2012 The Roberts Company
  • 2. Augusta International Papermill Augusta, Ga. Contact: Frank Thomas – Project Manager (252) 714-6457 Position: Structural and Rigging Superintendent Duties: Overseeing the erecting steel on the evaporator structural for Paper Machine #3; rigging and setting the evaporator vessel into the structural. 02/28/2012 – 09/01/2012 DZI Atlantic, Inc. InVista Chemical Plant Chattanooga, TN Contact: Jim Love – Project Manager (704) 418-2869 Position: Structural and Civil Superintendent Duties: Install 2 new gas fire package broilers 11/24/2011 – 01/13/2012 The Roberts Company KapCo Paper Mill Charleston, SC Contact: Frank Thomas – Project Manager (252) 714-6457 Position: Structural and Rigging General Foreman Duties: Rigging structural steel and erecting overhead bridge 10/18/2010 – 11/21/2011 DZI Atlantic, Inc. Camden, SC Contact: Jim Love – Project Manager (704) 418-2869 Position: Structural and Civil Superintendent Duties: Rebuild on Unit-3 Broiler, change over from coal to gas fire broiler 02/23/2010 – 07/23/2010 Fluor-RGP5 Modular Project Nantong, China Contact: Lee Cox – Project Manager (843) 861-2153 Position: Structural and Rigging Specialist Duties: Superintendent overseeing the fabrication/erection/rigging structural module’s for a mining Company (BHP) in a facility in Nantong, China to be rigged and loaded aboard a ship transported Australia per Fluor’s rigging plans/details, maintaining all safety procedures to insure they were carried out properly. 09/12/2009 – 02/05/2010 Day and Zimmerman International, Inc. PGI Plant Benson, NC Contact: Jim Love –Project Manager (704) 418-2869 Position: Structural and Rigging General Foreman Duties: Demo structural steel and equipment, setting in new equipment 11/03/2008 – 06/30/2009 The Roberts Company TCS Phosphate Chemical Plant Aurora, NC
  • 3. Contact: Frank Thomas – Project Manager (252)714-6457 Position: Structural and Rigging Superintendent Duties: Erecting steel for the new evaporator structural, setting recovery vessels and evaporator vessels and tanks; responsible for setting all duct work tie-ins to all vessels. 10/03/2008 – 10/31/2008 BE&K Construction –Georgia Power Shutdown Juliette, Ga. Contact: Phil Caldron - BE&K Construction Manager Position: Ironworker, Rigger Supervisor Duties: Demo structural steel and erect steel for #3 stack unit and install ductwork for tie-in for new Scrubber system and heavy rigging. 10/01/2007 – 05/01/2008 Fluor Corporation SCENG Project Wateree Station, CO2 Project Eastover, SC Contact: Dick Griffin – Project Manager (864) 281-6142 Position: Civil and Structural Superintendent Duties: Concrete pours for heavy foundation for duck support foundation; assemble rebar and Foundation; excavation duck support foundation. Experience: • 34 years- Heavy Industrial Construction Field • 22 years- Supervisor Experience Certification: • NCCER Certified • Rigging General Foreman. • Structural General-Superintendent • Civil Superintendent • Reinforced I/W Superintendent- General Foreman Training Certifications: • Supervisor Training • Crosby Rigging Training • Line Break Training • 30 Hours of OSHA Training • CPR Training • ACE Certification- I/W Supervisor • 10 hours Lead-Abatement Certification Training • NCCER Certifications Education: Pembroke Sr. High School 12 years