SlideShare a Scribd company logo
1 of 5
Personal
Date of Birth : 15/10/1966
Status : Married
Children : 3
Home Location : Birmingham,
Warwickshire
Professional
BSc Hons Building Engineering &
Construction Management
Bristol 1992-1996
CSCS Manager & Professional
Card – updated June 2013
CV Updated : Jan 2016
DARREN CONNELLY
Senior Engineer
Career Summary:
My education and early part of my construction career centred around the technical exercise of site
engineering, understanding the principles of construction & with the emphasis on dimensional control &
drawings relay the information both physically & verbally to the site team. Early on my experience as a
site engineer centred on concrete frame buildings, drainage works, site surveys & general bulk work
excavations.
The middle part of my career focused more on the importance & education with regard to the ‘best
practice‘ principles of construction with regard to quality, design co-ordination and the management of
both as a site engineer & through to being a section engineer. I developed my written skills in the
production of task sheets / risk assessments, method statements, management of engineers & began to
broaden my knowledge with respect to trades & works that weren’t concrete based. Various new build
projects enabled my practical knowledge of fit out & wet trade operations & therein the management of,
to increase & hence my confidence to see potential risks and ‘engineering for which I may be able to
offer practical & safe solutions.
Of more recent years my focus has been on managing engineers & myself to offer the best quality
standard of finished product in the areas of work of which I have been involved. Clear & collaborative
decision making, continued education & training in the best principles of site safety, accurate diary &
record keeping & leading by example. All engineers who have been part of my team clearly know that the
training & application of knowledge involved in temporary works, services detection, first aid, further
academic education & the various safety courses available are essential tools & to this end I push them
to pursue.
I believe myself to be a team player & I do offer valuable experience & maturity to LOR teams as well as
any involvement with designers, client or with external statutory authorities. I am pro-active & endeavour
to be informed. With regard to engineers as a rule I believe in the management idea of ‘back to basics
i.e. keep it simple and communicate with the labour force.
The learning process is a continuous one and within my profession never more so with experience being
the key & as such would wish to have a greater practical insight into contracts, programming of works &
how works are costed.
Key Skills:
 Good level of technical knowledge within the field of site surveying
 Good working knowledge of system set up with reference to engineering i.e. Survey Control,
NCR, TQ ,Temporary Works, Appointed Persons Role & Inspection test plan procedures
 Good working knowledge of concrete (insitu & post tensioned) construction, with regard to mixes,
design procedures, falsework forms, records generally, reinforcement types & elements of design
 Improved ability to critically analyse drawing, detail & specification information
 Good working knowledge attained over the last 2-3 years with regard to envelope works
 Good communicator – I try to keep the construction process simple and try to draw people in so
that the best elements of creating a team can happen
 Driven individual with a can do attitude
 Always willing to learn
Detailed Project Experience:
Laing O’Rourke Infrastructure – SAIP Improvement Project (Network Rail)
May 2015 – Present
Senior Engineer
Overall civil engineering & management responsibilities both for the SAIP self delivery team &
subcontractor management for the new NWR Stafford Depot Offices. General SAIP fit out inspector for
the new Legacy Building & general engineering manager for the self delivery external works package.
Additional Roles
Temporary Works Inspector
First Aider
Laing O’Rourke Infrastructure – A453 Widening Project
June 2013 – May 2015
Section Engineer
Overall responsibilities for the civil engineering aspects of 6km of new road construction & widening
aspect to the existing A453.
General management of site engineers, subcontract drainage, asphalt, bulk excavation, embankment
construction, removal of old & provision of new service routes, site, barrier installation & general site
furniture & landscaping operations.
Laing O’Rourke Infrastructure – London Gateway Port
July 2012 – June 2013
Senior Engineer
RC Pumping Station & Box Culvert Works
General engineering & supervisory role including management of engineers, production of RAMS,
material ordering, temporary works inspections & health & safety management
Expanded Piling Ltd - Riverlight Residential Development
December 2011 – March 2012
2ND
Eye Safety Placement –
General review of the working ‘ best ‘ practices with regard to rotary bored & secant piling.
Laing O’ Rourke Infrastructure – Heathrow T2A -Airside Apron Works
October 2010 – December 2011
Senior Engineer
Responsible for a team of engineers constructing a secant piled wall and road base tunnel into the new
terminal. Responsible for the co-ordination of design, material ordering, Q/A and subcontractor works to
the project.
Additional Roles
Hot Works Co-ordinator , Deputy Appointed Lifting Person, Temporary Works Inspector
Confined Space Co-ordinator
Temporary Works Inspector
Laing O’Rourke Infrastructure M4 / J11 Mere oak Improvement Works
Sept 2009 – October 2010
Section Engineer
Responsible for the Southern Gyratory Works – road construction works, concrete works drainage,
service installation, landscaping, signage, guardrails, fencing & earthworks. Section Manager for the
works co-ordination with utility companies.
Laing O’ Rourke Infrastructure Ltd Staythorpe Power Station Contract
Section Engineer
Sep 2008 – 2009
Section Engineer currently responsible for the 4 number Cooling Towers encompassing management of
engineering team , material ordering , TQ issue , pour / progress records & handover documentation.
Laing O’Rourke Construction North Jupiter 2 (Birmingham) Residential Build
Project Engineer
Dec 2006 – Sep 2008
Residential Development. Concrete Frame, Substructure Works, Piling, Internal & External Works.
Management of engineering team plus management of the engineering procedures as per LOR system,
material ordering to frame, Appointed Person, TWC (Co-ordinator).
Laing O’Rourke Construction North Birmingham Essex Street Residential Build
Section Engineer
Oct 2006 – Dec 2006
Residential Development. Concrete Frame & Drainage Works. Basement to 1st
floor engineer.
Laing O’Rourke Construction North Universityof Central England (UCE) Phase 1 & 2
Senior Engineer (graduating to Project Engineer)
Jun 2004 – Oct 2006
Works encompassing all bulk excavation & drainage, concrete frame works, conversion & refurbishment
to existing building, internal works to new & old build plus external landscaping & finishing. Latterly
involved in the management of engineers, lifting & temporary works procedures.
Laing O’Rourke Construction North Aston UniversityResearch Development Project
Senior Engineer
Feb 2004 – Jun 2004
Initial setting out to primary stations & build.
Laing O’Rourke Construction North - Jupiter 4 (Birmingham)
Mar 2003 – Feb 2004
Senior Engineer
Residential Development. Site Engineer & manager of engineering team on 3 development blocks, works
encompassing bored pile construction, basement to 1st
floor build, core/lift & drainage. Latterly site
engineer to brickwork package & external roadways & pathways.
Laing O’Rourke Construction North - Central Arena Residential (Birmingham)
Section Engineer
Sept 2002 – Mar 2003
Residential Development. Engineer for Framework encompassing post – tensioned slabs, lift/stair cores
+ setting out to apartment areas.
Laing O’Rourke Construction North- Oxford Bio Chemical Laboratory Building
Site Engineer
Sep 01 – Sep 02
Engineer to concrete framework, steel frame & substantial drainage works.
O’Rourke & Sons Civil Engineering Ltd - Tag Mc McLaren Building (Woking)
Site Engineer to Section Engineer
Jan 2000 – Sept 2001
Site Engineer to Slurry walls, general slab areas & steelwork.
Swift Structures Ltd Concrete Frame & Civil Works Contractor- Reading (Oracle) Shopping Retail
Development
Site Engineer
Jun 1999 – Jan 2000
Concrete Frame/drainage engineer.
Swift Structures Ltd Concrete Frame & Civil Works Contractor - Oxford Oncology Centre Building
Site Engineer
Sept 1998 – June 1999
Concrete Frame / drainage engineer.
Swift Structures Ltd Concrete Frame & Civil Works Contractor- Avon mouth Bristol Power Station
Site Engineer
June 1997 – Sept 1998
2 number office builds. Concrete/Steel frame / drainage.
Swift Structures Ltd Concrete Frame & Civil Works Contractor- Chippenham Retail Development
Site Engineer
Sept 1996 – June 1997
Concrete Frame/steelwork/drainage engineer.
Swift Structures Ltd Concrete Frame & Civil Works Contractor- Birmingham Theological College
Library
Site Engineer
July 1996 – Sept 1996
Site engineer for concrete & external envelope works.
Various Projects – Trainee Site Engineer (Year in Industry)
1994 – 1995
Projects: Sun Life Building (Bristol) & Swindon Building Society Development. 1 year out in Industry
whilst completing degree course.
J Rock Construction Ltd
1989 – 1990 J Rock Construction Ltd – Carpenter
1989 – 1990 Larry HealeyGroundwork’s Construction Ltd – Carpenter
TTallis Construction Ltd
1986 – 1987 TTallis Construction Ltd (Eire) – Carpenter
Key Training:
 IIF (Health & Safety Awareness) Part 1 to 3
 Temporary Works Design Course – Part 1
 CSCS – Registration: 01926030 (Building & Construction Related Degree) : Expiry 2020
 Management of Confined Spaces - 2006
 Hot Works Co-ordinator – LOR ( Heathrow – BAA )
 Confined Space Trained – LOR (Heathrow – BAA )
 IOSH Certificated – June 2015
 First Aid at Work Certificated – October 2015 ( Certificate No: 155236-FA3)
 CAT/Jenny Trained
 Utility Mapping & Surveying Level 3 QCF
 Education Aim: MCIOB (2016)

More Related Content

What's hot (20)

Jozwel cv
Jozwel cvJozwel cv
Jozwel cv
 
WILLY-Resume B
WILLY-Resume BWILLY-Resume B
WILLY-Resume B
 
MARTIN Daniel CV
MARTIN Daniel CVMARTIN Daniel CV
MARTIN Daniel CV
 
Approved Licensed Structural audit of old and dilapidated buildings in Mumbai...
Approved Licensed Structural audit of old and dilapidated buildings in Mumbai...Approved Licensed Structural audit of old and dilapidated buildings in Mumbai...
Approved Licensed Structural audit of old and dilapidated buildings in Mumbai...
 
API 510 RESUME
API 510 RESUMEAPI 510 RESUME
API 510 RESUME
 
mohammad fathi cv2017
mohammad fathi cv2017mohammad fathi cv2017
mohammad fathi cv2017
 
CM Resume
CM Resume CM Resume
CM Resume
 
anoop-CV 2016
anoop-CV 2016anoop-CV 2016
anoop-CV 2016
 
GERRY PANTIG MANICLANG
GERRY PANTIG MANICLANGGERRY PANTIG MANICLANG
GERRY PANTIG MANICLANG
 
Todd Smith 2016 (Resume))
Todd Smith 2016 (Resume))Todd Smith 2016 (Resume))
Todd Smith 2016 (Resume))
 
Stelian Dragomir CV
Stelian Dragomir CVStelian Dragomir CV
Stelian Dragomir CV
 
Resume-Mohammed Anowar 2016
Resume-Mohammed Anowar 2016Resume-Mohammed Anowar 2016
Resume-Mohammed Anowar 2016
 
bmc cv (2)
bmc cv (2)bmc cv (2)
bmc cv (2)
 
CV-R.B.Guinir Jr.(01-15-17)
CV-R.B.Guinir Jr.(01-15-17)CV-R.B.Guinir Jr.(01-15-17)
CV-R.B.Guinir Jr.(01-15-17)
 
Cv 2015
Cv 2015Cv 2015
Cv 2015
 
Stelian Dragomir-CV
Stelian Dragomir-CVStelian Dragomir-CV
Stelian Dragomir-CV
 
Fady samir cv
Fady samir cvFady samir cv
Fady samir cv
 
William Adams CV_N1_Jan 2016
William Adams CV_N1_Jan 2016William Adams CV_N1_Jan 2016
William Adams CV_N1_Jan 2016
 
RESUME
RESUMERESUME
RESUME
 
Building Structural repair consultant and Project Management Consultancy serv...
Building Structural repair consultant and Project Management Consultancy serv...Building Structural repair consultant and Project Management Consultancy serv...
Building Structural repair consultant and Project Management Consultancy serv...
 

Viewers also liked

Worship the lord!!
Worship the lord!!Worship the lord!!
Worship the lord!!Mark Muhati
 
Ebs Corporate Presentation Portal
Ebs Corporate Presentation PortalEbs Corporate Presentation Portal
Ebs Corporate Presentation Portalrishtandon
 
Sist de dg evangelina garcía loza
Sist de dg   evangelina garcía lozaSist de dg   evangelina garcía loza
Sist de dg evangelina garcía lozaEvange GL
 
Daily sgx sinagpore report by epic research singapore 24th april 2014
Daily sgx sinagpore report by epic research singapore 24th april 2014Daily sgx sinagpore report by epic research singapore 24th april 2014
Daily sgx sinagpore report by epic research singapore 24th april 2014Epic Research Singapore
 
JAGDEO JADHAV -BIO DATA -1
JAGDEO JADHAV  -BIO DATA  -1JAGDEO JADHAV  -BIO DATA  -1
JAGDEO JADHAV -BIO DATA -1jagdeo jadhav
 
0514 3 john 17 it was for the sake power point church sermon
0514 3 john 17 it was for the sake power point church sermon0514 3 john 17 it was for the sake power point church sermon
0514 3 john 17 it was for the sake power point church sermonPowerPoint_Sermons
 
Airbus Offices - Filton
Airbus Offices - FiltonAirbus Offices - Filton
Airbus Offices - FiltonPaul Driscoll
 
Special Event Plan Assignment
Special Event Plan AssignmentSpecial Event Plan Assignment
Special Event Plan AssignmentKelsey Koster
 
Quan Ngo work samples
Quan Ngo work samplesQuan Ngo work samples
Quan Ngo work samplesNickbsb
 
Certificate water gems
Certificate water gemsCertificate water gems
Certificate water gemsAbhinav Ahuja
 
Q C 2009 11 29
Q C 2009 11 29Q C 2009 11 29
Q C 2009 11 29stumatt2
 
Matthew 6 27 you by worrying add a single power point church sermon
Matthew 6 27 you by worrying add a single power point church sermonMatthew 6 27 you by worrying add a single power point church sermon
Matthew 6 27 you by worrying add a single power point church sermonPowerPoint_Sermons
 
M2013 s9 we ought to obey god rather than men
M2013 s9   we ought to obey god rather than menM2013 s9   we ought to obey god rather than men
M2013 s9 we ought to obey god rather than menJames Bradshaw
 
Obedience to God Is More Than a Ritual
Obedience to God Is More Than a RitualObedience to God Is More Than a Ritual
Obedience to God Is More Than a RitualJohn DiBattista
 
We Ought To Obey God
We Ought To Obey GodWe Ought To Obey God
We Ought To Obey GodMichael Smith
 
Walk through Worship
Walk through WorshipWalk through Worship
Walk through WorshipAndy Smith
 

Viewers also liked (20)

Worship the lord!!
Worship the lord!!Worship the lord!!
Worship the lord!!
 
Fact Sheet
Fact SheetFact Sheet
Fact Sheet
 
Ebs Corporate Presentation Portal
Ebs Corporate Presentation PortalEbs Corporate Presentation Portal
Ebs Corporate Presentation Portal
 
Sist de dg evangelina garcía loza
Sist de dg   evangelina garcía lozaSist de dg   evangelina garcía loza
Sist de dg evangelina garcía loza
 
Daily sgx sinagpore report by epic research singapore 24th april 2014
Daily sgx sinagpore report by epic research singapore 24th april 2014Daily sgx sinagpore report by epic research singapore 24th april 2014
Daily sgx sinagpore report by epic research singapore 24th april 2014
 
JAGDEO JADHAV -BIO DATA -1
JAGDEO JADHAV  -BIO DATA  -1JAGDEO JADHAV  -BIO DATA  -1
JAGDEO JADHAV -BIO DATA -1
 
ar Resume 20 MAY 15
ar Resume 20 MAY 15ar Resume 20 MAY 15
ar Resume 20 MAY 15
 
0514 3 john 17 it was for the sake power point church sermon
0514 3 john 17 it was for the sake power point church sermon0514 3 john 17 it was for the sake power point church sermon
0514 3 john 17 it was for the sake power point church sermon
 
Airbus Offices - Filton
Airbus Offices - FiltonAirbus Offices - Filton
Airbus Offices - Filton
 
Special Event Plan Assignment
Special Event Plan AssignmentSpecial Event Plan Assignment
Special Event Plan Assignment
 
Digipack analysis
Digipack analysisDigipack analysis
Digipack analysis
 
Quan Ngo work samples
Quan Ngo work samplesQuan Ngo work samples
Quan Ngo work samples
 
Certificate water gems
Certificate water gemsCertificate water gems
Certificate water gems
 
Q C 2009 11 29
Q C 2009 11 29Q C 2009 11 29
Q C 2009 11 29
 
Matthew 6 27 you by worrying add a single power point church sermon
Matthew 6 27 you by worrying add a single power point church sermonMatthew 6 27 you by worrying add a single power point church sermon
Matthew 6 27 you by worrying add a single power point church sermon
 
M2013 s9 we ought to obey god rather than men
M2013 s9   we ought to obey god rather than menM2013 s9   we ought to obey god rather than men
M2013 s9 we ought to obey god rather than men
 
Obedience to God Is More Than a Ritual
Obedience to God Is More Than a RitualObedience to God Is More Than a Ritual
Obedience to God Is More Than a Ritual
 
Esther:When Life Doesn't Make Sense
Esther:When Life Doesn't Make SenseEsther:When Life Doesn't Make Sense
Esther:When Life Doesn't Make Sense
 
We Ought To Obey God
We Ought To Obey GodWe Ought To Obey God
We Ought To Obey God
 
Walk through Worship
Walk through WorshipWalk through Worship
Walk through Worship
 

Similar to Connelly Darren (CV1)

Similar to Connelly Darren (CV1) (20)

David Smith 2016 CV
David Smith 2016 CVDavid Smith 2016 CV
David Smith 2016 CV
 
ronald coventry cv n5
ronald coventry cv n5ronald coventry cv n5
ronald coventry cv n5
 
Bj Byrnes Graduate
Bj Byrnes GraduateBj Byrnes Graduate
Bj Byrnes Graduate
 
RAMESH KUMAR TIWARI CV jssl 1
RAMESH KUMAR TIWARI CV jssl 1RAMESH KUMAR TIWARI CV jssl 1
RAMESH KUMAR TIWARI CV jssl 1
 
Cv
CvCv
Cv
 
CV
CVCV
CV
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Ranjith_Kumar R - CV
Ranjith_Kumar R - CVRanjith_Kumar R - CV
Ranjith_Kumar R - CV
 
RESUME_of_manish-New
RESUME_of_manish-NewRESUME_of_manish-New
RESUME_of_manish-New
 
Resume HNP Updated
Resume HNP UpdatedResume HNP Updated
Resume HNP Updated
 
CV sultan(Q)
CV sultan(Q)CV sultan(Q)
CV sultan(Q)
 
Manal ibrahim.cv 17.docx
Manal ibrahim.cv 17.docxManal ibrahim.cv 17.docx
Manal ibrahim.cv 17.docx
 
Steve Miller CV 2017
Steve Miller CV 2017Steve Miller CV 2017
Steve Miller CV 2017
 
Richard Kildea. CV October 2016
Richard Kildea. CV October 2016Richard Kildea. CV October 2016
Richard Kildea. CV October 2016
 
Jahangir.Contractor
Jahangir.ContractorJahangir.Contractor
Jahangir.Contractor
 
Vince Winkler CV (Mar 16)
Vince Winkler CV (Mar 16)Vince Winkler CV (Mar 16)
Vince Winkler CV (Mar 16)
 
Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015
 
Resume - Celieto Rey Suarez
Resume - Celieto Rey SuarezResume - Celieto Rey Suarez
Resume - Celieto Rey Suarez
 
S nikkhah CV Oil Gas CSG LNG
S nikkhah CV Oil Gas CSG LNGS nikkhah CV Oil Gas CSG LNG
S nikkhah CV Oil Gas CSG LNG
 
Wp 241016
Wp 241016Wp 241016
Wp 241016
 

Connelly Darren (CV1)

  • 1. Personal Date of Birth : 15/10/1966 Status : Married Children : 3 Home Location : Birmingham, Warwickshire Professional BSc Hons Building Engineering & Construction Management Bristol 1992-1996 CSCS Manager & Professional Card – updated June 2013 CV Updated : Jan 2016 DARREN CONNELLY Senior Engineer Career Summary: My education and early part of my construction career centred around the technical exercise of site engineering, understanding the principles of construction & with the emphasis on dimensional control & drawings relay the information both physically & verbally to the site team. Early on my experience as a site engineer centred on concrete frame buildings, drainage works, site surveys & general bulk work excavations. The middle part of my career focused more on the importance & education with regard to the ‘best practice‘ principles of construction with regard to quality, design co-ordination and the management of both as a site engineer & through to being a section engineer. I developed my written skills in the production of task sheets / risk assessments, method statements, management of engineers & began to broaden my knowledge with respect to trades & works that weren’t concrete based. Various new build projects enabled my practical knowledge of fit out & wet trade operations & therein the management of, to increase & hence my confidence to see potential risks and ‘engineering for which I may be able to offer practical & safe solutions. Of more recent years my focus has been on managing engineers & myself to offer the best quality standard of finished product in the areas of work of which I have been involved. Clear & collaborative decision making, continued education & training in the best principles of site safety, accurate diary & record keeping & leading by example. All engineers who have been part of my team clearly know that the training & application of knowledge involved in temporary works, services detection, first aid, further academic education & the various safety courses available are essential tools & to this end I push them to pursue. I believe myself to be a team player & I do offer valuable experience & maturity to LOR teams as well as any involvement with designers, client or with external statutory authorities. I am pro-active & endeavour to be informed. With regard to engineers as a rule I believe in the management idea of ‘back to basics i.e. keep it simple and communicate with the labour force. The learning process is a continuous one and within my profession never more so with experience being the key & as such would wish to have a greater practical insight into contracts, programming of works & how works are costed.
  • 2. Key Skills:  Good level of technical knowledge within the field of site surveying  Good working knowledge of system set up with reference to engineering i.e. Survey Control, NCR, TQ ,Temporary Works, Appointed Persons Role & Inspection test plan procedures  Good working knowledge of concrete (insitu & post tensioned) construction, with regard to mixes, design procedures, falsework forms, records generally, reinforcement types & elements of design  Improved ability to critically analyse drawing, detail & specification information  Good working knowledge attained over the last 2-3 years with regard to envelope works  Good communicator – I try to keep the construction process simple and try to draw people in so that the best elements of creating a team can happen  Driven individual with a can do attitude  Always willing to learn Detailed Project Experience: Laing O’Rourke Infrastructure – SAIP Improvement Project (Network Rail) May 2015 – Present Senior Engineer Overall civil engineering & management responsibilities both for the SAIP self delivery team & subcontractor management for the new NWR Stafford Depot Offices. General SAIP fit out inspector for the new Legacy Building & general engineering manager for the self delivery external works package. Additional Roles Temporary Works Inspector First Aider Laing O’Rourke Infrastructure – A453 Widening Project June 2013 – May 2015 Section Engineer Overall responsibilities for the civil engineering aspects of 6km of new road construction & widening aspect to the existing A453. General management of site engineers, subcontract drainage, asphalt, bulk excavation, embankment construction, removal of old & provision of new service routes, site, barrier installation & general site furniture & landscaping operations. Laing O’Rourke Infrastructure – London Gateway Port July 2012 – June 2013 Senior Engineer RC Pumping Station & Box Culvert Works General engineering & supervisory role including management of engineers, production of RAMS, material ordering, temporary works inspections & health & safety management Expanded Piling Ltd - Riverlight Residential Development December 2011 – March 2012 2ND Eye Safety Placement – General review of the working ‘ best ‘ practices with regard to rotary bored & secant piling. Laing O’ Rourke Infrastructure – Heathrow T2A -Airside Apron Works October 2010 – December 2011 Senior Engineer Responsible for a team of engineers constructing a secant piled wall and road base tunnel into the new terminal. Responsible for the co-ordination of design, material ordering, Q/A and subcontractor works to
  • 3. the project. Additional Roles Hot Works Co-ordinator , Deputy Appointed Lifting Person, Temporary Works Inspector Confined Space Co-ordinator Temporary Works Inspector Laing O’Rourke Infrastructure M4 / J11 Mere oak Improvement Works Sept 2009 – October 2010 Section Engineer Responsible for the Southern Gyratory Works – road construction works, concrete works drainage, service installation, landscaping, signage, guardrails, fencing & earthworks. Section Manager for the works co-ordination with utility companies. Laing O’ Rourke Infrastructure Ltd Staythorpe Power Station Contract Section Engineer Sep 2008 – 2009 Section Engineer currently responsible for the 4 number Cooling Towers encompassing management of engineering team , material ordering , TQ issue , pour / progress records & handover documentation. Laing O’Rourke Construction North Jupiter 2 (Birmingham) Residential Build Project Engineer Dec 2006 – Sep 2008 Residential Development. Concrete Frame, Substructure Works, Piling, Internal & External Works. Management of engineering team plus management of the engineering procedures as per LOR system, material ordering to frame, Appointed Person, TWC (Co-ordinator). Laing O’Rourke Construction North Birmingham Essex Street Residential Build Section Engineer Oct 2006 – Dec 2006 Residential Development. Concrete Frame & Drainage Works. Basement to 1st floor engineer. Laing O’Rourke Construction North Universityof Central England (UCE) Phase 1 & 2 Senior Engineer (graduating to Project Engineer) Jun 2004 – Oct 2006 Works encompassing all bulk excavation & drainage, concrete frame works, conversion & refurbishment to existing building, internal works to new & old build plus external landscaping & finishing. Latterly involved in the management of engineers, lifting & temporary works procedures. Laing O’Rourke Construction North Aston UniversityResearch Development Project Senior Engineer Feb 2004 – Jun 2004 Initial setting out to primary stations & build. Laing O’Rourke Construction North - Jupiter 4 (Birmingham) Mar 2003 – Feb 2004 Senior Engineer Residential Development. Site Engineer & manager of engineering team on 3 development blocks, works encompassing bored pile construction, basement to 1st floor build, core/lift & drainage. Latterly site engineer to brickwork package & external roadways & pathways. Laing O’Rourke Construction North - Central Arena Residential (Birmingham) Section Engineer Sept 2002 – Mar 2003 Residential Development. Engineer for Framework encompassing post – tensioned slabs, lift/stair cores
  • 4. + setting out to apartment areas. Laing O’Rourke Construction North- Oxford Bio Chemical Laboratory Building Site Engineer Sep 01 – Sep 02 Engineer to concrete framework, steel frame & substantial drainage works. O’Rourke & Sons Civil Engineering Ltd - Tag Mc McLaren Building (Woking) Site Engineer to Section Engineer Jan 2000 – Sept 2001 Site Engineer to Slurry walls, general slab areas & steelwork. Swift Structures Ltd Concrete Frame & Civil Works Contractor- Reading (Oracle) Shopping Retail Development Site Engineer Jun 1999 – Jan 2000 Concrete Frame/drainage engineer. Swift Structures Ltd Concrete Frame & Civil Works Contractor - Oxford Oncology Centre Building Site Engineer Sept 1998 – June 1999 Concrete Frame / drainage engineer. Swift Structures Ltd Concrete Frame & Civil Works Contractor- Avon mouth Bristol Power Station Site Engineer June 1997 – Sept 1998 2 number office builds. Concrete/Steel frame / drainage. Swift Structures Ltd Concrete Frame & Civil Works Contractor- Chippenham Retail Development Site Engineer Sept 1996 – June 1997 Concrete Frame/steelwork/drainage engineer. Swift Structures Ltd Concrete Frame & Civil Works Contractor- Birmingham Theological College Library Site Engineer July 1996 – Sept 1996 Site engineer for concrete & external envelope works. Various Projects – Trainee Site Engineer (Year in Industry) 1994 – 1995 Projects: Sun Life Building (Bristol) & Swindon Building Society Development. 1 year out in Industry whilst completing degree course. J Rock Construction Ltd 1989 – 1990 J Rock Construction Ltd – Carpenter 1989 – 1990 Larry HealeyGroundwork’s Construction Ltd – Carpenter TTallis Construction Ltd 1986 – 1987 TTallis Construction Ltd (Eire) – Carpenter
  • 5. Key Training:  IIF (Health & Safety Awareness) Part 1 to 3  Temporary Works Design Course – Part 1  CSCS – Registration: 01926030 (Building & Construction Related Degree) : Expiry 2020  Management of Confined Spaces - 2006  Hot Works Co-ordinator – LOR ( Heathrow – BAA )  Confined Space Trained – LOR (Heathrow – BAA )  IOSH Certificated – June 2015  First Aid at Work Certificated – October 2015 ( Certificate No: 155236-FA3)  CAT/Jenny Trained  Utility Mapping & Surveying Level 3 QCF  Education Aim: MCIOB (2016)