SlideShare a Scribd company logo
1 of 2
Download to read offline
Professional Profile for
William (Mac) Byers II
23840 Cadenza Drive, Murrieta CA 92562 - Cell: (951) 760-6552
E-mail: macbyers620@gmail.com
POSITION AND PERSONAL OBJECTIVE
Currently, a Senior Project Manager with C.W. Driver, Mr. Byers oversaw the construction and successful completion of the $126M Irvine
Unified School District’s Portola High School and currently oversees the $69M Temecula’s Europa Village (Three Wineries, Hotel and Spa).
Mr. Byers brings to his projects 35 years of construction experience with a strong emphasis on preconstruction services and collaborative
efforts. With his ultimate goal of “Total Project Success” for all stakeholders, Mr. Byers develops relationships early with all stakeholders
determining their requirements for success, then strategizing means and methods to help all to achieve that success. He relies on an
innovative spirit, professional ethics, integrity, respect, honesty, teamwork, trust and leadership to accomplish this goal. As Mr. Byers has
grown in age, he feels passionate about sharing his knowledge with young professionals to help them become successful in their future
endeavors.
CAREER SUMMARY
With a desire to become an architect from an early age, Mr. Byers was accepted to Arizona State University School of Architecture.
Realizing this endeavor was a little bigger than his abilities, he switched his major to Civil Engineering. Then again, after coming to the same
realization he switched his major to Construction Management, where many end up for the same reason. He graduated in 1982 from Arizona
State University with a BS Construction Management. In the last 35 years of successful hands-on construction management experience he
has work 30-feet below sea level to 500 feet above ground, Class 10 clean rooms to educational classrooms, project sizes from $100K to
$140M, private, public, educational, hard bid, CM, multiple prime contracting and lease/lease-back, all providing excellence from
preconstruction services through punch list and commissioning.
Mr. Byers’ career has been marked by others for these personal characteristics:
• Excellence in Owner, subcontractor and community
relationships
• Integrity, honesty, innovation, respect
• Vast construction experience and industry knowledge
• Professionalism
• Superior people skills, fair, diplomatic and savvy
• Attention to details, conscientious effort
• Early collaboration, great anticipation of issues
• Promotion of project integration with all stakeholders
• Exhibiting corporate leadership at its best
• Commitment and perseverance
• On time and within budget
• Aims for “Total Project Success” for all stakeholders
ACCOMPLISHMENTS AS A CONSTRUCTION MANAGER
Mr. Byers’ professional objective: To perform as a True Professional pursuing Total Project Success for all Stakeholders. Listed are some
personal accomplishments and comments from these stakeholders.
• Saved Owners millions of dollars through value engineering and proposing financial and phasing options for projects.
• Decreased project schedules by formulating scheduling strategies and “Fast Track” approaches.
• Minimized project change orders by developing scoping methods to eliminate errors and omissions in scopes of work for multiple prime
contracting.
• Continually mitigated impacts to project budget or schedule to assure timely completion and budget requirements.
• Develops and maintains positive relationships with subcontractors to promote teamwork and minimize claims.
• Continually develop or improving management systems to increase efficiency minimize risk and or eliminate waste.
• Was hired to be the company’s owner representative and initiate CM/Multiple Prime Contract contracts for two large school districts.
After 12-months of performance in each, both school districts indicated that the company would do all the future work for the district
equating to hundreds of millions in future work. This early reputation led to new work for the company with several additional school
districts.
• Comments by Owners: “Extremely satisfied.” “Highest degree of professionalism and integrity.” “His goal is to make everyone
successful.” “A long and valued record of above-and-beyond effort…”
• Comments by Architects: “His abilities, his representation of his clients, and his integrity are beyond reproach.” “His attention to
detail, understanding of architectural intent, ability to coordinate construction documents and his high level of sensitivity toward
architectural aesthetics contributed greatly to the success of the project.”
• Comments by inspection team: “His cooperation made this job one of the smoothest projects we have ever worked on.”
• Comments by high rise superintendent: “He made me smell like a rose!”
• Comments by major subcontractor: “We will work with him anytime, anywhere.”
• Comments by major subcontractor with respect to Total Project Success: “we believe there is no comparison in the industry to the
standard set on this project.”
Professional Profile for William (Mac) Byers II
Page 2 of 2
The Senior Project Manager has total responsibility for the project’s success; from its earliest conception through turnover to the
owner, the main point of contact for the Owner and the Contractor. Responsibilities include, but are not limited to the following:
• Manage, coordinate and oversee all facets of preconstruction and construction services for multiple projects including plan, organize,
direct and report project management activities including updates and progress reports to upper management. Responsible for all
aspects of contract compliance.
• Point of contact for Owner and Architect providing progress, schedule, budget updates on a regular basis.
• Advise, consult and recommend action on all potentially critical issues vital to the Owner or Architect.
• Preconstruction Services include, recommending bidding strategies, constructability reviews, budgeting and estimates, development of
bid coverage strategies, scopes of work, bid documents and project schedule, execute bid process, bid evaluation and recommendation
for awards.
• Construction Services include performance and or monitoring of day to day contract administration, safety compliance. Manage, assist,
train, mentor and coordinate construction teams.
• Assure compliance to company policy with respect to safety, reporting, and documentation.
• Encourage trust, honesty and respect by all stakeholders.
• Mentor, train and educate direct reports by taking advantage of every “teaching moment” encountered.
• Promote integration and collaboration among all parties necessary to achieve “Total Project Success” on the behalf of all stakeholders.
CORE COMPETENCIES
Arizona State University, Bachelor of Science, Construction Management, 1982
Software Knowledge: Fortran, Lotus, Excel, Word, Outlook, Prolog, Microsoft Project, Adobe Acrobat. He know parts and pieces of many others but prefers to use Millennials!
Safety Education: OSHA 30-hour safety class, EM-385, various safety classes.
Architectural Photography: Shoot Em Up Photography - Owner
Previously Licensed General Contractor, State of California
John Maxwell Team Member
COMPANY HISTORY:
2014 – Pres. C.W. Driver, Pasadena/Irvine/Rancho Cucamonga, California (Senior Project Manager)
2012 – 2014. EDGE Construction LLC, A Ledcor Group Company, Murrieta, California (Project Manager)
2009 – 2012 EDGE Development Inc, Temecula, California (Construction Manager)
2005 – 2009 Byers Construction Management, Inc / CORMAN LEIGH - BYERS CMS, Inc., Murrieta and Temecula, California. Owner / Partner / Construction
Manager, RQ Construction Company, Carlsbad, California (Pre-Construction Services)
2000 – 2005 EDGE Development Inc, Temecula, California (Construction Manager)
1999 – 2000 ProWest PCM, Inc, Temecula, California (Project Manager)
1996 – 1999 Calvary Chapel Murrieta, Murrieta, California (Administrator / Construction Project Manager)
1987 – 1996 Centex Golden / MH Golden Company, San Diego, California (Project Manager, PE, Assistant Superintendent)
1983 – 1987 J.R. Youngdale Construction Company, El Cajon, California (Assistant Project Manager, Superintendent.), Olsen Construction, San Diego, California
(assistant purchasing agent), Accent General, Inc., Santee, California (estimator)
PROJECT EXPERIENCE:
The following projects were completed with Corman Leigh – Byers CMS / Byers Construction Management, Inc. as Construction
Manager / Superintendent:
• Consulting and Advising Various Entities
• MVUSD Growth 2007 – Multiple buildings on multiple Campuses
• MVUSD Growth 2007 - New synthetic football fields, Multiple High Schools.
• MVUSD Avaxat Elementary School Growth and Expansion 2007.
• MVUSD Alta Murrieta Elementary School, MPR Building Addition 2006.
• MVUSD Growth 2006 – Multiple buildings on multiple campuses.
The following projects were completed under the position of Construction Manager for EDGE Dev. Inc./ EDGE Construction LLC:
• Westin Maui Hotel Modernization, HI, 2013-2014 ($50M)
• RCOE Murrieta Regional Learning Center, 2011-1013 ($10M)
• San Pasqual High School Addition and Expansion, 2010-2011 ($12M)
• Escondido UHSD East Valley Campus, 2010-2011 ($2M)
• Cal State San Marcos – Behavioral Science Building, 2009 ($32M)
• MVUSD Growth 2005 – Multiple buildings on multiple campuses.
• City of Highland Central Park, 2004 – 2005. ($5M)
• City of Highland Therapy Pool, 2005.
• City of Highland Fire Station No. 3, 2005.
• MVUSD Antelope Hills Elementary School, 2004 – 2005. ($12M)
• MVUSD Vista Murrieta H.S. Phases 1, 2, 3 and 4, 2002-2005 ($54M)
• MVUSD Warm Springs M.S., Phases 1, 2 and 3, 2002-2004 ($16M)
• MVUSD Monte Vista Elementary School, 2002-2003 ($12M)
• LEUSD Elsinore Middle School Modernization and Growth, 2001
• LEUSD Ortega Continuation High School, 2001. ($12M)
• LEUSD Alternative Education Facility, 2001. ($2M)
• LEUSD Maintenance Facility, 2000
The following projects were completed under the position of Project Manager (unless otherwise noted) for ProWest, Calvary Chapel
and Centex Golden respectively:
• UC Riverside Undergraduate Student Housing Expansion. ($22M)
• Calvary Chapel Murrieta Elementary School. .
• UC Riverside Engineering Science Building, Unit 1. ($32M)
• East Lake USD, East Lake High School, Phase 1. (Assistant
Superintendent) ($24M)
• America Plaza High Rise, San Diego, CA (Project Engineer) ($84M)
• Carlsbad Seaport Resort. (Project Engineer) ($24M)
• Contra Costa Merrithew Memorial Hospital Psychiatric Ward Revisions.
• Sharp HealthCare Murrieta Special Procedures Modernization and
Equipment Replacement. (Project Manager and Superintendent)
• NASA Jet Propulsion Laboratory, Micro-Devices Laboratory and Office
Building. (Project Manager and at times, Superintendent) ($12M)
• La Mesa United Methodist Church. (Superintendent) ($2M)

More Related Content

What's hot

02 JMM 15.10.24 Project Profiles
02 JMM 15.10.24 Project Profiles02 JMM 15.10.24 Project Profiles
02 JMM 15.10.24 Project ProfilesJeanne Marie M
 
Resume Oct 2015 Revision 2
Resume Oct 2015 Revision 2Resume Oct 2015 Revision 2
Resume Oct 2015 Revision 2David Seaward
 
Current 2015 resume koehler, nicholas -pm
Current 2015 resume koehler, nicholas -pmCurrent 2015 resume koehler, nicholas -pm
Current 2015 resume koehler, nicholas -pmNicholas Koehler
 
EJP Construction Manager
EJP Construction ManagerEJP Construction Manager
EJP Construction ManagerEarl Pritchard
 
Roger Carrillo Resume June 2016 w pic PROOF FNL _0006 fnl
Roger Carrillo Resume June 2016  w  pic PROOF FNL _0006 fnlRoger Carrillo Resume June 2016  w  pic PROOF FNL _0006 fnl
Roger Carrillo Resume June 2016 w pic PROOF FNL _0006 fnlRoger T. Carrillo, AIA
 
Resume 2014 without cover letter short
Resume 2014 without cover letter shortResume 2014 without cover letter short
Resume 2014 without cover letter shortLaya Hague
 
J hay resume final com pm 2016 v dp
J hay resume final com pm 2016 v dpJ hay resume final com pm 2016 v dp
J hay resume final com pm 2016 v dpJonathan Hay
 
J hay resume final com pm 2016 v dp
J hay resume final com pm 2016 v dpJ hay resume final com pm 2016 v dp
J hay resume final com pm 2016 v dpJonathan Hay
 
16 0824 fernando bravo project management & land development
16 0824 fernando bravo project management & land development16 0824 fernando bravo project management & land development
16 0824 fernando bravo project management & land developmentFernando Bravo, P.E., CFM
 
R Gray Client Recommendations pdf
R Gray Client Recommendations pdfR Gray Client Recommendations pdf
R Gray Client Recommendations pdfRob Gray
 
Roger Carrillo Resume 2016 w pic PROOF FNL
Roger Carrillo Resume 2016  w  pic PROOF FNL Roger Carrillo Resume 2016  w  pic PROOF FNL
Roger Carrillo Resume 2016 w pic PROOF FNL Roger T. Carrillo, AIA
 
J hay resume final res 2014 v dp
J hay resume final res 2014 v dpJ hay resume final res 2014 v dp
J hay resume final res 2014 v dpJonathan Hay
 
John D Parris 2015
John D Parris  2015John D Parris  2015
John D Parris 2015John Parris
 
Resume gail brody april 2013
Resume gail brody april 2013Resume gail brody april 2013
Resume gail brody april 2013Gail S. Brody
 
Roger Carrillo Resume 2015 - PROOF (2)
Roger Carrillo Resume 2015 - PROOF (2)Roger Carrillo Resume 2015 - PROOF (2)
Roger Carrillo Resume 2015 - PROOF (2)Roger T. Carrillo, AIA
 

What's hot (20)

Resume RJD
Resume RJDResume RJD
Resume RJD
 
02 JMM 15.10.24 Project Profiles
02 JMM 15.10.24 Project Profiles02 JMM 15.10.24 Project Profiles
02 JMM 15.10.24 Project Profiles
 
Resume Oct 2015 Revision 2
Resume Oct 2015 Revision 2Resume Oct 2015 Revision 2
Resume Oct 2015 Revision 2
 
SDJ resume
SDJ resumeSDJ resume
SDJ resume
 
Current 2015 resume koehler, nicholas -pm
Current 2015 resume koehler, nicholas -pmCurrent 2015 resume koehler, nicholas -pm
Current 2015 resume koehler, nicholas -pm
 
EJP Construction Manager
EJP Construction ManagerEJP Construction Manager
EJP Construction Manager
 
Roger Carrillo Resume June 2016 w pic PROOF FNL _0006 fnl
Roger Carrillo Resume June 2016  w  pic PROOF FNL _0006 fnlRoger Carrillo Resume June 2016  w  pic PROOF FNL _0006 fnl
Roger Carrillo Resume June 2016 w pic PROOF FNL _0006 fnl
 
Resume 2014 without cover letter short
Resume 2014 without cover letter shortResume 2014 without cover letter short
Resume 2014 without cover letter short
 
J hay resume final com pm 2016 v dp
J hay resume final com pm 2016 v dpJ hay resume final com pm 2016 v dp
J hay resume final com pm 2016 v dp
 
J hay resume final com pm 2016 v dp
J hay resume final com pm 2016 v dpJ hay resume final com pm 2016 v dp
J hay resume final com pm 2016 v dp
 
16 0824 fernando bravo project management & land development
16 0824 fernando bravo project management & land development16 0824 fernando bravo project management & land development
16 0824 fernando bravo project management & land development
 
Resume
ResumeResume
Resume
 
Nayer Resume March 2016
Nayer Resume March 2016Nayer Resume March 2016
Nayer Resume March 2016
 
R Gray Client Recommendations pdf
R Gray Client Recommendations pdfR Gray Client Recommendations pdf
R Gray Client Recommendations pdf
 
Roger Carrillo Resume 2016 w pic PROOF FNL
Roger Carrillo Resume 2016  w  pic PROOF FNL Roger Carrillo Resume 2016  w  pic PROOF FNL
Roger Carrillo Resume 2016 w pic PROOF FNL
 
J hay resume final res 2014 v dp
J hay resume final res 2014 v dpJ hay resume final res 2014 v dp
J hay resume final res 2014 v dp
 
Matt Moon Presentation
Matt Moon PresentationMatt Moon Presentation
Matt Moon Presentation
 
John D Parris 2015
John D Parris  2015John D Parris  2015
John D Parris 2015
 
Resume gail brody april 2013
Resume gail brody april 2013Resume gail brody april 2013
Resume gail brody april 2013
 
Roger Carrillo Resume 2015 - PROOF (2)
Roger Carrillo Resume 2015 - PROOF (2)Roger Carrillo Resume 2015 - PROOF (2)
Roger Carrillo Resume 2015 - PROOF (2)
 

Similar to x Professional Profile for Mac Byers 1-13-17

Don Schuett Resume 1016
Don Schuett Resume 1016Don Schuett Resume 1016
Don Schuett Resume 1016Donald Schuett
 
PETER E. TANYI final 2015 - 16
PETER E. TANYI final 2015 - 16PETER E. TANYI final 2015 - 16
PETER E. TANYI final 2015 - 16pet ebot
 
RonaldBennett_Resume 2016
RonaldBennett_Resume 2016RonaldBennett_Resume 2016
RonaldBennett_Resume 2016Ronnie Bennett
 
H Keen Resume With Recommendations
H Keen Resume With RecommendationsH Keen Resume With Recommendations
H Keen Resume With Recommendationsheatherkeen
 
Resume - Megan McIntyre
Resume - Megan McIntyreResume - Megan McIntyre
Resume - Megan McIntyremeganraem
 
1 Linda Rodriguez Project 2010 1116 Ver2007
1 Linda Rodriguez Project 2010 1116 Ver20071 Linda Rodriguez Project 2010 1116 Ver2007
1 Linda Rodriguez Project 2010 1116 Ver2007Topsy2000
 
Moore Anthony_matrix resumeV2C
Moore Anthony_matrix resumeV2CMoore Anthony_matrix resumeV2C
Moore Anthony_matrix resumeV2CAnthony Moore
 
Chris Smith resume
Chris Smith resumeChris Smith resume
Chris Smith resumeChris Smith
 
Dale Riley - Resume2016
Dale Riley - Resume2016Dale Riley - Resume2016
Dale Riley - Resume2016Dale Riley
 
Robert watson cv June 2018 a
Robert watson cv June 2018 aRobert watson cv June 2018 a
Robert watson cv June 2018 aRob watson
 
Michael Harrington Executive Resume
Michael  Harrington Executive ResumeMichael  Harrington Executive Resume
Michael Harrington Executive ResumeMichaelHarrington
 
Niels Andersen Resume, October 2015.
Niels Andersen Resume,  October 2015.Niels Andersen Resume,  October 2015.
Niels Andersen Resume, October 2015.Niels Andersen
 
KyleTaylorDiversityResume7-29-15
KyleTaylorDiversityResume7-29-15KyleTaylorDiversityResume7-29-15
KyleTaylorDiversityResume7-29-15Kyle Taylor
 
Builders Studio LLC Brochure 6-1-15R
Builders Studio LLC Brochure 6-1-15RBuilders Studio LLC Brochure 6-1-15R
Builders Studio LLC Brochure 6-1-15RWilliam Fleck
 
Jiby\'s Resume
Jiby\'s ResumeJiby\'s Resume
Jiby\'s Resumejibymanuel
 
Burts Resume 1
Burts Resume 1Burts Resume 1
Burts Resume 1buscott
 

Similar to x Professional Profile for Mac Byers 1-13-17 (20)

Don Schuett Resume 1016
Don Schuett Resume 1016Don Schuett Resume 1016
Don Schuett Resume 1016
 
DJT Linkedin
DJT LinkedinDJT Linkedin
DJT Linkedin
 
PETER E. TANYI final 2015 - 16
PETER E. TANYI final 2015 - 16PETER E. TANYI final 2015 - 16
PETER E. TANYI final 2015 - 16
 
RonaldBennett_Resume 2016
RonaldBennett_Resume 2016RonaldBennett_Resume 2016
RonaldBennett_Resume 2016
 
H Keen Resume With Recommendations
H Keen Resume With RecommendationsH Keen Resume With Recommendations
H Keen Resume With Recommendations
 
Resume - Megan McIntyre
Resume - Megan McIntyreResume - Megan McIntyre
Resume - Megan McIntyre
 
Construction Project Manager_RE
Construction Project Manager_REConstruction Project Manager_RE
Construction Project Manager_RE
 
1 Linda Rodriguez Project 2010 1116 Ver2007
1 Linda Rodriguez Project 2010 1116 Ver20071 Linda Rodriguez Project 2010 1116 Ver2007
1 Linda Rodriguez Project 2010 1116 Ver2007
 
Kbcl construction presentation mar 2017
Kbcl construction presentation mar 2017Kbcl construction presentation mar 2017
Kbcl construction presentation mar 2017
 
Moore Anthony_matrix resumeV2C
Moore Anthony_matrix resumeV2CMoore Anthony_matrix resumeV2C
Moore Anthony_matrix resumeV2C
 
Chris Smith resume
Chris Smith resumeChris Smith resume
Chris Smith resume
 
Dale Riley - Resume2016
Dale Riley - Resume2016Dale Riley - Resume2016
Dale Riley - Resume2016
 
Robert watson cv June 2018 a
Robert watson cv June 2018 aRobert watson cv June 2018 a
Robert watson cv June 2018 a
 
pk 2015resumw
pk 2015resumwpk 2015resumw
pk 2015resumw
 
Michael Harrington Executive Resume
Michael  Harrington Executive ResumeMichael  Harrington Executive Resume
Michael Harrington Executive Resume
 
Niels Andersen Resume, October 2015.
Niels Andersen Resume,  October 2015.Niels Andersen Resume,  October 2015.
Niels Andersen Resume, October 2015.
 
KyleTaylorDiversityResume7-29-15
KyleTaylorDiversityResume7-29-15KyleTaylorDiversityResume7-29-15
KyleTaylorDiversityResume7-29-15
 
Builders Studio LLC Brochure 6-1-15R
Builders Studio LLC Brochure 6-1-15RBuilders Studio LLC Brochure 6-1-15R
Builders Studio LLC Brochure 6-1-15R
 
Jiby\'s Resume
Jiby\'s ResumeJiby\'s Resume
Jiby\'s Resume
 
Burts Resume 1
Burts Resume 1Burts Resume 1
Burts Resume 1
 

x Professional Profile for Mac Byers 1-13-17

  • 1. Professional Profile for William (Mac) Byers II 23840 Cadenza Drive, Murrieta CA 92562 - Cell: (951) 760-6552 E-mail: macbyers620@gmail.com POSITION AND PERSONAL OBJECTIVE Currently, a Senior Project Manager with C.W. Driver, Mr. Byers oversaw the construction and successful completion of the $126M Irvine Unified School District’s Portola High School and currently oversees the $69M Temecula’s Europa Village (Three Wineries, Hotel and Spa). Mr. Byers brings to his projects 35 years of construction experience with a strong emphasis on preconstruction services and collaborative efforts. With his ultimate goal of “Total Project Success” for all stakeholders, Mr. Byers develops relationships early with all stakeholders determining their requirements for success, then strategizing means and methods to help all to achieve that success. He relies on an innovative spirit, professional ethics, integrity, respect, honesty, teamwork, trust and leadership to accomplish this goal. As Mr. Byers has grown in age, he feels passionate about sharing his knowledge with young professionals to help them become successful in their future endeavors. CAREER SUMMARY With a desire to become an architect from an early age, Mr. Byers was accepted to Arizona State University School of Architecture. Realizing this endeavor was a little bigger than his abilities, he switched his major to Civil Engineering. Then again, after coming to the same realization he switched his major to Construction Management, where many end up for the same reason. He graduated in 1982 from Arizona State University with a BS Construction Management. In the last 35 years of successful hands-on construction management experience he has work 30-feet below sea level to 500 feet above ground, Class 10 clean rooms to educational classrooms, project sizes from $100K to $140M, private, public, educational, hard bid, CM, multiple prime contracting and lease/lease-back, all providing excellence from preconstruction services through punch list and commissioning. Mr. Byers’ career has been marked by others for these personal characteristics: • Excellence in Owner, subcontractor and community relationships • Integrity, honesty, innovation, respect • Vast construction experience and industry knowledge • Professionalism • Superior people skills, fair, diplomatic and savvy • Attention to details, conscientious effort • Early collaboration, great anticipation of issues • Promotion of project integration with all stakeholders • Exhibiting corporate leadership at its best • Commitment and perseverance • On time and within budget • Aims for “Total Project Success” for all stakeholders ACCOMPLISHMENTS AS A CONSTRUCTION MANAGER Mr. Byers’ professional objective: To perform as a True Professional pursuing Total Project Success for all Stakeholders. Listed are some personal accomplishments and comments from these stakeholders. • Saved Owners millions of dollars through value engineering and proposing financial and phasing options for projects. • Decreased project schedules by formulating scheduling strategies and “Fast Track” approaches. • Minimized project change orders by developing scoping methods to eliminate errors and omissions in scopes of work for multiple prime contracting. • Continually mitigated impacts to project budget or schedule to assure timely completion and budget requirements. • Develops and maintains positive relationships with subcontractors to promote teamwork and minimize claims. • Continually develop or improving management systems to increase efficiency minimize risk and or eliminate waste. • Was hired to be the company’s owner representative and initiate CM/Multiple Prime Contract contracts for two large school districts. After 12-months of performance in each, both school districts indicated that the company would do all the future work for the district equating to hundreds of millions in future work. This early reputation led to new work for the company with several additional school districts. • Comments by Owners: “Extremely satisfied.” “Highest degree of professionalism and integrity.” “His goal is to make everyone successful.” “A long and valued record of above-and-beyond effort…” • Comments by Architects: “His abilities, his representation of his clients, and his integrity are beyond reproach.” “His attention to detail, understanding of architectural intent, ability to coordinate construction documents and his high level of sensitivity toward architectural aesthetics contributed greatly to the success of the project.” • Comments by inspection team: “His cooperation made this job one of the smoothest projects we have ever worked on.” • Comments by high rise superintendent: “He made me smell like a rose!” • Comments by major subcontractor: “We will work with him anytime, anywhere.” • Comments by major subcontractor with respect to Total Project Success: “we believe there is no comparison in the industry to the standard set on this project.”
  • 2. Professional Profile for William (Mac) Byers II Page 2 of 2 The Senior Project Manager has total responsibility for the project’s success; from its earliest conception through turnover to the owner, the main point of contact for the Owner and the Contractor. Responsibilities include, but are not limited to the following: • Manage, coordinate and oversee all facets of preconstruction and construction services for multiple projects including plan, organize, direct and report project management activities including updates and progress reports to upper management. Responsible for all aspects of contract compliance. • Point of contact for Owner and Architect providing progress, schedule, budget updates on a regular basis. • Advise, consult and recommend action on all potentially critical issues vital to the Owner or Architect. • Preconstruction Services include, recommending bidding strategies, constructability reviews, budgeting and estimates, development of bid coverage strategies, scopes of work, bid documents and project schedule, execute bid process, bid evaluation and recommendation for awards. • Construction Services include performance and or monitoring of day to day contract administration, safety compliance. Manage, assist, train, mentor and coordinate construction teams. • Assure compliance to company policy with respect to safety, reporting, and documentation. • Encourage trust, honesty and respect by all stakeholders. • Mentor, train and educate direct reports by taking advantage of every “teaching moment” encountered. • Promote integration and collaboration among all parties necessary to achieve “Total Project Success” on the behalf of all stakeholders. CORE COMPETENCIES Arizona State University, Bachelor of Science, Construction Management, 1982 Software Knowledge: Fortran, Lotus, Excel, Word, Outlook, Prolog, Microsoft Project, Adobe Acrobat. He know parts and pieces of many others but prefers to use Millennials! Safety Education: OSHA 30-hour safety class, EM-385, various safety classes. Architectural Photography: Shoot Em Up Photography - Owner Previously Licensed General Contractor, State of California John Maxwell Team Member COMPANY HISTORY: 2014 – Pres. C.W. Driver, Pasadena/Irvine/Rancho Cucamonga, California (Senior Project Manager) 2012 – 2014. EDGE Construction LLC, A Ledcor Group Company, Murrieta, California (Project Manager) 2009 – 2012 EDGE Development Inc, Temecula, California (Construction Manager) 2005 – 2009 Byers Construction Management, Inc / CORMAN LEIGH - BYERS CMS, Inc., Murrieta and Temecula, California. Owner / Partner / Construction Manager, RQ Construction Company, Carlsbad, California (Pre-Construction Services) 2000 – 2005 EDGE Development Inc, Temecula, California (Construction Manager) 1999 – 2000 ProWest PCM, Inc, Temecula, California (Project Manager) 1996 – 1999 Calvary Chapel Murrieta, Murrieta, California (Administrator / Construction Project Manager) 1987 – 1996 Centex Golden / MH Golden Company, San Diego, California (Project Manager, PE, Assistant Superintendent) 1983 – 1987 J.R. Youngdale Construction Company, El Cajon, California (Assistant Project Manager, Superintendent.), Olsen Construction, San Diego, California (assistant purchasing agent), Accent General, Inc., Santee, California (estimator) PROJECT EXPERIENCE: The following projects were completed with Corman Leigh – Byers CMS / Byers Construction Management, Inc. as Construction Manager / Superintendent: • Consulting and Advising Various Entities • MVUSD Growth 2007 – Multiple buildings on multiple Campuses • MVUSD Growth 2007 - New synthetic football fields, Multiple High Schools. • MVUSD Avaxat Elementary School Growth and Expansion 2007. • MVUSD Alta Murrieta Elementary School, MPR Building Addition 2006. • MVUSD Growth 2006 – Multiple buildings on multiple campuses. The following projects were completed under the position of Construction Manager for EDGE Dev. Inc./ EDGE Construction LLC: • Westin Maui Hotel Modernization, HI, 2013-2014 ($50M) • RCOE Murrieta Regional Learning Center, 2011-1013 ($10M) • San Pasqual High School Addition and Expansion, 2010-2011 ($12M) • Escondido UHSD East Valley Campus, 2010-2011 ($2M) • Cal State San Marcos – Behavioral Science Building, 2009 ($32M) • MVUSD Growth 2005 – Multiple buildings on multiple campuses. • City of Highland Central Park, 2004 – 2005. ($5M) • City of Highland Therapy Pool, 2005. • City of Highland Fire Station No. 3, 2005. • MVUSD Antelope Hills Elementary School, 2004 – 2005. ($12M) • MVUSD Vista Murrieta H.S. Phases 1, 2, 3 and 4, 2002-2005 ($54M) • MVUSD Warm Springs M.S., Phases 1, 2 and 3, 2002-2004 ($16M) • MVUSD Monte Vista Elementary School, 2002-2003 ($12M) • LEUSD Elsinore Middle School Modernization and Growth, 2001 • LEUSD Ortega Continuation High School, 2001. ($12M) • LEUSD Alternative Education Facility, 2001. ($2M) • LEUSD Maintenance Facility, 2000 The following projects were completed under the position of Project Manager (unless otherwise noted) for ProWest, Calvary Chapel and Centex Golden respectively: • UC Riverside Undergraduate Student Housing Expansion. ($22M) • Calvary Chapel Murrieta Elementary School. . • UC Riverside Engineering Science Building, Unit 1. ($32M) • East Lake USD, East Lake High School, Phase 1. (Assistant Superintendent) ($24M) • America Plaza High Rise, San Diego, CA (Project Engineer) ($84M) • Carlsbad Seaport Resort. (Project Engineer) ($24M) • Contra Costa Merrithew Memorial Hospital Psychiatric Ward Revisions. • Sharp HealthCare Murrieta Special Procedures Modernization and Equipment Replacement. (Project Manager and Superintendent) • NASA Jet Propulsion Laboratory, Micro-Devices Laboratory and Office Building. (Project Manager and at times, Superintendent) ($12M) • La Mesa United Methodist Church. (Superintendent) ($2M)