FA M I L I R I Z AT I O N O F T H E R M A L P O W E R
P L A N T
SUMMER TRAINING
REPORT
NAME RAKESH KUMAR
ROLLNO 11510871
SECTION E-8
RGTPP,KHEDAR(HISAR)
NIT KKR
1
RAKESH KUMAR - 11510871 2
RAKESH KUMAR - 11510871 3
THERMAL POWER PLANT IS
DIVIDED NTO 4 MAIN PARTS
1)FUEL & ASH CIRCUIT
2)AIR & GAS CIRCUIT
3)FEED WATER & STEAM
4) COOLING WATER CIRCUIT
RAKESH KUMAR - 11510871 4
MAIN PARTS OF THERMAL POWER PLANT
1) STEAM GENERATING EQUIPMENTS :
A) BOILER
B) SUPER HEATER & RE-HEATER
C) ECONOMIZER
D) AIR-PREHEATER
2 CONDENSERS
3 EVAPORATORS
4 FEED WATER HEATER
5 PRIME MOVER
6 COOLING TOWERS
7 CONTROL ROOM
8 SWITCH YARD
RAKESH KUMAR - 11510871 5
CONVERT WATER INTO STEAM
• FIRE TUBE BOILER • WATER TUBE
BOILER
RAKESH KUMAR - 11510871 6
• FUNCTION OF UPERHEATER TO SUPERHEAT THE
STEAM AT DESIRED TEMPERATURE.
• REMOVES THE LAST TRACES OF MOISTURE
• INCREASES THE CYCLE EFFICIENCY BY REDUCING
THE MOISTURE CONTENT FROM SATURATED
STEAM
RAKESH KUMAR - 11510871 7
ECONOMIZER
FUNCTION OF ECONOMIZER
IS TO HEAT THE FEED WATER
SO THAT RECOVERING A
PART OF HEAT WHICH
WOULD OTHERWISE BE LOST
THROUGH FLUE GASES.
ECONOMIZER HEATS THE
FEED WATER ON ITS WAY
TO BOILER
RAKESH KUMAR - 11510871 8
AIR PREHEATER
SINCE THE ENTIRE HEAT OF FLUE
GASES CAN’T BE EXTRACTED BY
THE ECONOMIZER SO AIR PRE
HEATER IS USED TO RECOVER
SOME OF HEAT IN THESE GASES.
ON AVERAGE INCREASE IN 20’
TEMP IN THE AIR PREHEATER
RESULTS IN AN INCEASE IN
BOILER EFFICIENCY BY 1%.
RAKESH KUMAR - 11510871 9
COOLING TOWERS
• Thermoelectric power plants boil water
to create steam, which then spins
turbines to generate electricity. The
heat used to boil water can come from
burning of a fuel, from nuclear
reactions, or directly from the sun or
geothermal heat sources
underground. Once steam has passed
through a turbine, it must be cooled
back into water before it can be reused
to produce more electricity. Colder
water cools the steam more effectively
and allows more efficient electricity
generation .
• FOR THAT’S PURPOSE COOLING
TOWERS ARE USED.
RAKESH KUMAR - 11510871 10
SWITCH YARD
RAKESH KUMAR - 11510871 11
• OUTGOING LINES
• INCOIMG LINES
• BUSBARS
• TRANSFORMERS
• INSULATORS
• CIRCUIT BREAKERS , SURGE ARRESTERS
ASSOCIATED SYSTEMS IN SUBSTATIONS
• SUBSTATION EARTHING
• FIRE FIGHTING SYSTEM
• SENSORS, DETECTION SYSTEM
• WATER SPRAY SYSTEM
• FIRE PROTECTIOB CONTROL PANELS
• ALARM SYSTEMS
• OVERHEAD EARTH WIRE SHIELDING
• PROTECTION SYSTEM
• CONTROL CABLES
• CIRCUIT BREAKERS
• CTs , VTs etc.
• Protective relay panels
RAKESH KUMAR - 11510871 12
ELECTROSTATIC PRECTIPITAOR
• ESP works on the principle of electrostatic attraction. In this
phenomenon a negatively charged particle or molecule is attracted
to a positively charged molecule. In ESP, the flue gas passes into a
chamber where the individual particles of fly ash are given an
electrical charge (Negative Charge) by the absorption of a negative
ion from a high voltage Negative DC ionizing field. So for that we
have to provide a high voltage of DC in a chamber where a high
voltage negative corona will generate and all the particles will be
ionized.
• Ionization of gases and charging of dust particles with the help of
corona generation.
• Movement of the particles to the collector plates & their Deposition
• Removing particles from the collecting surface with the help of
hammer.
RAKESH KUMAR - 11510871 13
ELECTROSTATIC PRECIPITATOR
RAKESH KUMAR - 11510871 14
RAKESH KUMAR - 11510871 15

More Related Content

What's hot

Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...haxxo24
 
Kota Thermal Training report by Abhishk mathur
Kota Thermal Training report by Abhishk mathurKota Thermal Training report by Abhishk mathur
Kota Thermal Training report by Abhishk mathurAbhishek Mathur
 
rajwest thermal power plant
rajwest thermal power plantrajwest thermal power plant
rajwest thermal power plantRama Charan
 
kota Super Thermal Power Station training ppt
kota Super Thermal Power Station training pptkota Super Thermal Power Station training ppt
kota Super Thermal Power Station training pptEr. Aman Agrawal
 
Thermal Power Generation Report
Thermal Power Generation ReportThermal Power Generation Report
Thermal Power Generation ReportManish Kumar
 
ppt on kota super thermal power plant
ppt on kota super thermal power plantppt on kota super thermal power plant
ppt on kota super thermal power plantArpit Budania
 
Thermal Power Plant training Report
Thermal Power Plant training ReportThermal Power Plant training Report
Thermal Power Plant training ReportShani Kumar Singh
 
KOTA SUPER THERMAL POWER STATION PPT
KOTA SUPER THERMAL POWER STATION PPTKOTA SUPER THERMAL POWER STATION PPT
KOTA SUPER THERMAL POWER STATION PPTMukesh Taneja
 
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial ReportELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial ReportUtkarsh Chaubey
 
A best ppt on kota super thermal power station
A best ppt on kota super thermal power stationA best ppt on kota super thermal power station
A best ppt on kota super thermal power stationNaveen Kumar
 
Thermal power station
Thermal power stationThermal power station
Thermal power stationvishal gupta
 
Vocational training report
Vocational training reportVocational training report
Vocational training reportATUL RAJ
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plantRahul Jalan
 
Kota Super Thermal Power Plant
Kota Super Thermal Power PlantKota Super Thermal Power Plant
Kota Super Thermal Power PlantHimanshu Dixit
 
Ntpc kahalgaon training report
Ntpc kahalgaon training reportNtpc kahalgaon training report
Ntpc kahalgaon training reportravi kant
 
training report on thermal power plant & thermal power generation by sagar me...
training report on thermal power plant & thermal power generation by sagar me...training report on thermal power plant & thermal power generation by sagar me...
training report on thermal power plant & thermal power generation by sagar me...Sagar Mehta
 
thermal power plant
thermal power plant thermal power plant
thermal power plant GOD BRAIN
 

What's hot (20)

Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
Kota Thermal Training report by Abhishk mathur
Kota Thermal Training report by Abhishk mathurKota Thermal Training report by Abhishk mathur
Kota Thermal Training report by Abhishk mathur
 
rajwest thermal power plant
rajwest thermal power plantrajwest thermal power plant
rajwest thermal power plant
 
kota Super Thermal Power Station training ppt
kota Super Thermal Power Station training pptkota Super Thermal Power Station training ppt
kota Super Thermal Power Station training ppt
 
Thermal Power Generation Report
Thermal Power Generation ReportThermal Power Generation Report
Thermal Power Generation Report
 
ppt on kota super thermal power plant
ppt on kota super thermal power plantppt on kota super thermal power plant
ppt on kota super thermal power plant
 
Thermal Power Plant training Report
Thermal Power Plant training ReportThermal Power Plant training Report
Thermal Power Plant training Report
 
Thermal power plant ppt
Thermal power plant pptThermal power plant ppt
Thermal power plant ppt
 
KOTA SUPER THERMAL POWER STATION PPT
KOTA SUPER THERMAL POWER STATION PPTKOTA SUPER THERMAL POWER STATION PPT
KOTA SUPER THERMAL POWER STATION PPT
 
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial ReportELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
 
A best ppt on kota super thermal power station
A best ppt on kota super thermal power stationA best ppt on kota super thermal power station
A best ppt on kota super thermal power station
 
Thermal power station
Thermal power stationThermal power station
Thermal power station
 
Vocational training report
Vocational training reportVocational training report
Vocational training report
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Thermal Power Plant
Thermal Power PlantThermal Power Plant
Thermal Power Plant
 
Kota Super Thermal Power Plant
Kota Super Thermal Power PlantKota Super Thermal Power Plant
Kota Super Thermal Power Plant
 
Economic Dispatch
Economic DispatchEconomic Dispatch
Economic Dispatch
 
Ntpc kahalgaon training report
Ntpc kahalgaon training reportNtpc kahalgaon training report
Ntpc kahalgaon training report
 
training report on thermal power plant & thermal power generation by sagar me...
training report on thermal power plant & thermal power generation by sagar me...training report on thermal power plant & thermal power generation by sagar me...
training report on thermal power plant & thermal power generation by sagar me...
 
thermal power plant
thermal power plant thermal power plant
thermal power plant
 

Similar to HPGCL Thermal power plant Summer Training report

WATER CIRCUIT.pptx
WATER CIRCUIT.pptxWATER CIRCUIT.pptx
WATER CIRCUIT.pptxjimmyvale1
 
Abdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadri
Abdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadriAbdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadri
Abdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadriAbdul Hadi Rahmani
 
THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)Baibhav Saha
 
Industrial training at NTPC Shaktinagar
Industrial training at NTPC ShaktinagarIndustrial training at NTPC Shaktinagar
Industrial training at NTPC ShaktinagarRishikesh .
 
Thermal Power Plant - Manual
Thermal Power Plant - ManualThermal Power Plant - Manual
Thermal Power Plant - ManualSheel Shah
 
Presentation 1 (2).pptx
Presentation 1 (2).pptxPresentation 1 (2).pptx
Presentation 1 (2).pptxNaveenJarwal1
 
About engineering department and its installations
About engineering department and its installationsAbout engineering department and its installations
About engineering department and its installationsPolly Thomas
 
Geothermal power plant
Geothermal power plantGeothermal power plant
Geothermal power plantSHREYANSH VATS
 
Iisrt z abhijit devaraj
Iisrt z abhijit devarajIisrt z abhijit devaraj
Iisrt z abhijit devarajIISRT
 
Ocean thermal energy (1).pptx
Ocean thermal energy (1).pptxOcean thermal energy (1).pptx
Ocean thermal energy (1).pptxtheonionrouter
 
THERMAL POWER PLANT PARALI
THERMAL POWER PLANT PARALITHERMAL POWER PLANT PARALI
THERMAL POWER PLANT PARALIMahendra Magre
 
Durgapur Steel Thermal Power Station (DSTPS), DVC, Andal
Durgapur Steel Thermal Power Station (DSTPS), DVC, AndalDurgapur Steel Thermal Power Station (DSTPS), DVC, Andal
Durgapur Steel Thermal Power Station (DSTPS), DVC, AndalAbhishek Gorai
 
Solving Reactor Water Clean-Up System Anomalies Using RELAP5 MOD33.pdf
Solving Reactor Water Clean-Up System Anomalies Using RELAP5 MOD33.pdfSolving Reactor Water Clean-Up System Anomalies Using RELAP5 MOD33.pdf
Solving Reactor Water Clean-Up System Anomalies Using RELAP5 MOD33.pdfJoe Miller
 

Similar to HPGCL Thermal power plant Summer Training report (20)

Htps
HtpsHtps
Htps
 
WATER CIRCUIT.pptx
WATER CIRCUIT.pptxWATER CIRCUIT.pptx
WATER CIRCUIT.pptx
 
Abdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadri
Abdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadriAbdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadri
Abdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadri
 
kstps training report
kstps training reportkstps training report
kstps training report
 
Wh pwr systems
Wh pwr systemsWh pwr systems
Wh pwr systems
 
THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)
 
Industrial training at NTPC Shaktinagar
Industrial training at NTPC ShaktinagarIndustrial training at NTPC Shaktinagar
Industrial training at NTPC Shaktinagar
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
 
Thermal Power Plant - Manual
Thermal Power Plant - ManualThermal Power Plant - Manual
Thermal Power Plant - Manual
 
Dev
DevDev
Dev
 
Presentation 1 (2).pptx
Presentation 1 (2).pptxPresentation 1 (2).pptx
Presentation 1 (2).pptx
 
About engineering department and its installations
About engineering department and its installationsAbout engineering department and its installations
About engineering department and its installations
 
Geothermal power plant
Geothermal power plantGeothermal power plant
Geothermal power plant
 
Attachment.doc
Attachment.docAttachment.doc
Attachment.doc
 
Paras ppt
Paras pptParas ppt
Paras ppt
 
Iisrt z abhijit devaraj
Iisrt z abhijit devarajIisrt z abhijit devaraj
Iisrt z abhijit devaraj
 
Ocean thermal energy (1).pptx
Ocean thermal energy (1).pptxOcean thermal energy (1).pptx
Ocean thermal energy (1).pptx
 
THERMAL POWER PLANT PARALI
THERMAL POWER PLANT PARALITHERMAL POWER PLANT PARALI
THERMAL POWER PLANT PARALI
 
Durgapur Steel Thermal Power Station (DSTPS), DVC, Andal
Durgapur Steel Thermal Power Station (DSTPS), DVC, AndalDurgapur Steel Thermal Power Station (DSTPS), DVC, Andal
Durgapur Steel Thermal Power Station (DSTPS), DVC, Andal
 
Solving Reactor Water Clean-Up System Anomalies Using RELAP5 MOD33.pdf
Solving Reactor Water Clean-Up System Anomalies Using RELAP5 MOD33.pdfSolving Reactor Water Clean-Up System Anomalies Using RELAP5 MOD33.pdf
Solving Reactor Water Clean-Up System Anomalies Using RELAP5 MOD33.pdf
 

Recently uploaded

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfrs7054576148
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 

Recently uploaded (20)

Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 

HPGCL Thermal power plant Summer Training report

  • 1. FA M I L I R I Z AT I O N O F T H E R M A L P O W E R P L A N T SUMMER TRAINING REPORT NAME RAKESH KUMAR ROLLNO 11510871 SECTION E-8 RGTPP,KHEDAR(HISAR) NIT KKR 1
  • 2. RAKESH KUMAR - 11510871 2
  • 3. RAKESH KUMAR - 11510871 3
  • 4. THERMAL POWER PLANT IS DIVIDED NTO 4 MAIN PARTS 1)FUEL & ASH CIRCUIT 2)AIR & GAS CIRCUIT 3)FEED WATER & STEAM 4) COOLING WATER CIRCUIT RAKESH KUMAR - 11510871 4
  • 5. MAIN PARTS OF THERMAL POWER PLANT 1) STEAM GENERATING EQUIPMENTS : A) BOILER B) SUPER HEATER & RE-HEATER C) ECONOMIZER D) AIR-PREHEATER 2 CONDENSERS 3 EVAPORATORS 4 FEED WATER HEATER 5 PRIME MOVER 6 COOLING TOWERS 7 CONTROL ROOM 8 SWITCH YARD RAKESH KUMAR - 11510871 5
  • 6. CONVERT WATER INTO STEAM • FIRE TUBE BOILER • WATER TUBE BOILER RAKESH KUMAR - 11510871 6
  • 7. • FUNCTION OF UPERHEATER TO SUPERHEAT THE STEAM AT DESIRED TEMPERATURE. • REMOVES THE LAST TRACES OF MOISTURE • INCREASES THE CYCLE EFFICIENCY BY REDUCING THE MOISTURE CONTENT FROM SATURATED STEAM RAKESH KUMAR - 11510871 7
  • 8. ECONOMIZER FUNCTION OF ECONOMIZER IS TO HEAT THE FEED WATER SO THAT RECOVERING A PART OF HEAT WHICH WOULD OTHERWISE BE LOST THROUGH FLUE GASES. ECONOMIZER HEATS THE FEED WATER ON ITS WAY TO BOILER RAKESH KUMAR - 11510871 8
  • 9. AIR PREHEATER SINCE THE ENTIRE HEAT OF FLUE GASES CAN’T BE EXTRACTED BY THE ECONOMIZER SO AIR PRE HEATER IS USED TO RECOVER SOME OF HEAT IN THESE GASES. ON AVERAGE INCREASE IN 20’ TEMP IN THE AIR PREHEATER RESULTS IN AN INCEASE IN BOILER EFFICIENCY BY 1%. RAKESH KUMAR - 11510871 9
  • 10. COOLING TOWERS • Thermoelectric power plants boil water to create steam, which then spins turbines to generate electricity. The heat used to boil water can come from burning of a fuel, from nuclear reactions, or directly from the sun or geothermal heat sources underground. Once steam has passed through a turbine, it must be cooled back into water before it can be reused to produce more electricity. Colder water cools the steam more effectively and allows more efficient electricity generation . • FOR THAT’S PURPOSE COOLING TOWERS ARE USED. RAKESH KUMAR - 11510871 10
  • 11. SWITCH YARD RAKESH KUMAR - 11510871 11 • OUTGOING LINES • INCOIMG LINES • BUSBARS • TRANSFORMERS • INSULATORS • CIRCUIT BREAKERS , SURGE ARRESTERS
  • 12. ASSOCIATED SYSTEMS IN SUBSTATIONS • SUBSTATION EARTHING • FIRE FIGHTING SYSTEM • SENSORS, DETECTION SYSTEM • WATER SPRAY SYSTEM • FIRE PROTECTIOB CONTROL PANELS • ALARM SYSTEMS • OVERHEAD EARTH WIRE SHIELDING • PROTECTION SYSTEM • CONTROL CABLES • CIRCUIT BREAKERS • CTs , VTs etc. • Protective relay panels RAKESH KUMAR - 11510871 12
  • 13. ELECTROSTATIC PRECTIPITAOR • ESP works on the principle of electrostatic attraction. In this phenomenon a negatively charged particle or molecule is attracted to a positively charged molecule. In ESP, the flue gas passes into a chamber where the individual particles of fly ash are given an electrical charge (Negative Charge) by the absorption of a negative ion from a high voltage Negative DC ionizing field. So for that we have to provide a high voltage of DC in a chamber where a high voltage negative corona will generate and all the particles will be ionized. • Ionization of gases and charging of dust particles with the help of corona generation. • Movement of the particles to the collector plates & their Deposition • Removing particles from the collecting surface with the help of hammer. RAKESH KUMAR - 11510871 13