1. Definitions
© Imants http://www.managementsupport.com
1. RCM definitions (1)
• Reliability Centered Maintenance (RCM) is a
methodology used to determine the right
maintenance tasks to ensure that any
physical asset or system continues whatever
its users want it to do, in its present
operating context
© Imants http://www.managementsupport.com
1. RCM definition (2)
Reliability
- The probability that equipment will not
fail in a given time period
- = a measure of the frequency of
downtime
© Imants http://www.managementsupport.com
1. RCM definition (3)
Maintenance
- Any activity carried out on an asset in
order to
- ensure that the asset continues to
perform its intended functions
- repair the asset
© Imants http://www.managementsupport.com
The RCM Guide
2. History
© Imants http://www.managementsupport.com
2. RCM History
• 60’s: RCM developed in the airline industry
• 70’s: RCM used in the army and the
American Navy
• 1978: first use of the term “Reliability
Centered Maintenance” in Nowlan & Heap’s
book: this book showed that a strong
correlation between age and failure rate did
not exist
• 80’s - 90’s: transfer of the RCM methodology
to other industrial sectors (railways,
chemical industry)
© Imants http://www.managementsupport.com
The RCM Guide
3. Objectives
© Imants http://www.managementsupport.com
3. RCM Objectives (1)
• Determine the optimum maintenance program
• Optimize your maintenance efforts
• focus on the most important functions of the systems
• avoid maintenance actions that are not strictly
necessary
• Strive for the required reliability
• at the lowest cost
• without sacrificing safety
• without sacrificing the environment
© Imants http://www.managementsupport.com
3. RCM Objectives (2)
• Establish maintenance practices which focus
more on
• the functional importance of a piece of equipment and
its failure/repair history
• and less on
• vendor PM recommendations
• traditional “time-directed” overhaul tasks
© Imants http://www.managementsupport.com
The RCM Guide
4. Principles
© Imants http://www.managementsupport.com
4. RCM principles
• 4.1. RCM is Business-Oriented
• 4.2. RCM is Function Oriented
• 4.3. RCM is System Focused
• 4.4. RCM investigates how Equipment Fails
• 4.5. RCM defines the best Maintenance
Strategy based on the consequences of
failures
• 4.6. RCM acknowledges Design Limitations
• 4.7. RCM is an Ongoing Task
© Imants http://www.managementsupport.com
4. RCM principles
4.1. Business oriented
• Maintenance is business oriented (not only
technical oriented):
• operations efficiency
• quality
• cost
• safety
• environment
© Imants http://www.managementsupport.com
4. RCM principles
4.2. Function oriented
• RCM focuses on preserving the functions of
equipment, not on preserving the equipment
itself
• Equipment function: what its users want it to do
• 2 function categories
• primary functions: speed, output, product quality
• secondary functions: safety, comfort, environmental
integrity
© Imants http://www.managementsupport.com
4. RCM principles
4.3. System focused
• RCM is more concerned with maintaining the
system function, than individual component
function
• If the system still provides its primary function if
a component fails, the component is allowed to
run to failure
© Imants http://www.managementsupport.com
4. RCM principles
4.4. RCM investigates how equipment fails (1)
• Failure:
• a failure is the inability of an equipment, system or
plant to fulfill one or more of its intended functions
• Failure mode:
• what is wrong
• what we need to prevent or physically fix
• Failure cause:
• why it went wrong
• Failure effect:
• the consequence of the failure mode, when it occurs
© Imants http://www.managementsupport.com
4. RCM principles
4.4. RCM investigates how equipment fails (2)
• Failure patterns:
• the relationship between the probability of failure of
an item, and its age (see Maintenance Management
Guide)
• RCM seeks to know the probability of failures at
specific ages
AGE
Prob. Of
Failure
© Imants http://www.managementsupport.com
4. RCM principles
4.5. RCM defines Maintenance Strategy
• Based on the consequences of failures, the
best maintenance strategy is defined
• Run to Failure (RTF)
• Preventive Maintenance (PM) ·
• Predictive Maintenance (PDM)
• Proactive Maintenance (PAM)
• Condition-based or predictive maintenance
strategies are favored over traditional time-
based methods
© Imants http://www.managementsupport.com
4. RCM principles
4.6. RCM recognizes Design Limitations
• A maintenance program can only maintain the
level of reliability inherent in the system design
• No amount of maintenance can overcome poor
design
• Maintenance knowledge is fed back to designers
to improve the next design
© Imants http://www.managementsupport.com
4. RCM principles
4.7. RCM is an ongoing task
• The full benefit of RCM is only achieved when
operation and maintenance experience is
continuously fed back into the analysis process.
© Imants http://www.managementsupport.com
The RCM Guide
5. Tools
© Imants http://www.managementsupport.com
5. RCM tools
• 5.1. Selection and prioritizing tool
• Pareto analysis
• 5.2. Failure analysis tool
• FMECA
• 5.3. Reliability Modeling tools
• Reliability Block Diagram
• Fault Tree
• 5.4. Decision Tool
• Decision Tree analysis
© Imants http://www.managementsupport.com
5. RCM tools
5.1. Pareto analysis (1)
• Pareto analysis is a selection and prioritizing tool
• Pareto analysis (sometimes referred to as the
80/20 rule and as ABC analysis) is a method of
classifying items, events, or activities according
to their relative importance
• Pareto analysis is based on the premise that 80
% of problems are due to 20 % of the possible
causes
© Imants http://www.managementsupport.com
5. RCM tools
5.1. Pareto analysis (2)
• Steps
• sort data in descending order of importance
• calculate individual percentages for each category
• calculate cumulative percentages for each category
• all categories with cumulative % less than or equal to
80 % can be selected for further review
© Imants http://www.managementsupport.com
5. RCM tools
5.1. Pareto chart
Problem Causes
%
20
40
60
80
100
A B C D E F ... O P
42
62
80
100
© Imants http://www.managementsupport.com
5. RCM tools
5.2. FMECA (1)
• Failure Mode, Effect and Criticality Analysis is a
Failure Analysis tool
• It is a step-by-step procedure for the systematic
evaluation of the failure effects and the criticality
of potential failure modes in equipment and plant
• A standard form (next slide) must be filled out
© Imants http://www.managementsupport.com
5. RCM tools
5.2. FMECA (2): standard form
Item Function Failure mode Failure cause Failure effect Failure detection Failure isolation Actions Severity
© Imants http://www.managementsupport.com
5. RCM tools
5.3.1. Reliability Block Diagram (RBD) analysis (1)
• RBD is a Reliability Modeling tool, and is
constructed to assess the overall system
reliability
• A Reliability Block Diagram graphically
represents the logical interaction of components
within your systems
• The components are arranged by blocks, and
are related reliability-wise
© Imants http://www.managementsupport.com
5. RCM tools
5.3.1. Reliability Block Diagram (RBD) analysis (2)
A
D
B
0.9
0.8
0.7
A,B,..: Components
Numbers: availability
© Imants http://www.managementsupport.com
5. RCM tools
5.3.2. Fault Tree Analysis (FTA) (1)
• FTA is a Reliability Modeling tool
• FTA specifies a top event (ex. a fire) to analyze,
followed by identifying all of the elements in the
system that could cause the top event to occur
• A symbolic logic diagram with AND/OR gates is
constructed
© Imants http://www.managementsupport.com
5. RCM tools
5.3.2. Fault Tree Analysis (FTA) (2)
Top event
Failure 1 Failure 2
OR
Failure 3 Failure 4
AND
© Imants http://www.managementsupport.com
5. RCM tools
5.4. Decision Tree analysis (1)
• A Decision Tree Diagram is a graphical
illustration in which lines branch out from a
central point without forming any closed loops
• The Decision Tree Diagram guides the user
through a question-and-answer process
• Options are ranked in an order of preference
© Imants http://www.managementsupport.com
5. RCM tools
5.4. Decision Tree analysis (2)
?
?
?
YES
YES
NO
NO
YES NO
Option 1 Option 2 Option 3 Option 4
© Imants http://www.managementsupport.com
The RCM Guide
6. RCM analysis
© Imants http://www.managementsupport.com
6. RCM analysis
• 6.1. Study preparation
• 6.2. System selection and definition
• 6.3. System function definition
• 6.4. Functional failures definition
• 6.5. Failure modes analysis
• 6.6. Failure consequences assessment
• 6.7. Selection of maintenance actions
• 6.8. Data collection and documentation
© Imants http://www.managementsupport.com
6. RCM analysis
6.1. Study Preparation
• Establishment of an RCM project group
• one person from the maintenance function
• one person form the operations function
• an RCM specialist
• Definition of objectives and scope of the analysis
• Definition of boundary conditions with respect to
safety and environmental protection
© Imants http://www.managementsupport.com
6. RCM analysis
6.2. System Selection and Definition
• The description of the assembly hierarchy (plant
register) is a good standing point for system
selection and definition
• Tools:
• Pareto analysis,
• Reliability Block Diagram analysis,
• Fault Tree Analysis
To which systems are an RCM analysis beneficial compared with more
traditional maintenance planning?
At what level of assembly (plant, system, subsystem …) should the
analysis be conducted?
© Imants http://www.managementsupport.com
6. RCM analysis
6.3. System function definition
• Identify and describe the system’s required
functions and performance standards in its
present operating context
• Describe input interfaces required for the
system to operate
What are the functions and the associated
desired standards of performance of the asset
in its present operating context?
© Imants http://www.managementsupport.com
6. RCM analysis
6.4. Functional failures definition
• Identify the ways in which
• the system might fail to fulfill its functions
• the system functions at an unacceptable level of
performance
In what way can the asset
fail to fulfill its functions?
© Imants http://www.managementsupport.com
6. RCM analysis
6.5. Failure modes analysis
• The objective of this step is to identify the events
which cause the failure
• normal wear
• human errors
• design
• Tool: FMECA
What causes each functional failure?
© Imants http://www.managementsupport.com
6. RCM analysis
6.6. Failure consequences assessment
• Failures which affect production / operations
• Failures which threaten
• safety
• the environment
• Failures which entail the direct cost of repair
• Tool: FMECA
What happens when the failure occurs?
© Imants http://www.managementsupport.com
6. RCM analysis
6.7. Selection of Maintenance Actions (1)
• Only applicable and cost-effective tasks may be
selected
• Applicability:a PM task will be applicable if it can
eliminate a failure, or at least reduce the probability of
occurrence to an acceptable level - or reduce the
impact of failures!
• Cost-effectiveness: the cost of performing the
maintenance is balanced with the "cost" of not
performing it.
What should be done to predict or prevent
each failure?
© Imants http://www.managementsupport.com
6. RCM analysis
6.7. Selection of Maintenance Actions (2)
• Tool: Decision Tree analysis
• Options
• do nothing: run to failure
• prevent: scheduled or non-scheduled tasks
• predict: checking the condition of equipment and
detecting failure
• redesign
• equipment
• process
• procedures
© Imants http://www.managementsupport.com
6. RCM analysis
6.8. Data Collection and Documentation
• The data necessary for the RCM analysis may
be categorized and collected in the following
three groups:
• Design data
• Operational data
• Reliability data
• The revised tasks and procedures must be
documented in a way that ensures that they will
be easily understood and performed by the
people who do the work
© Imants http://www.managementsupport.com
The RCM Guide
7. Implementation
© Imants http://www.managementsupport.com
7. RCM implementation
Eight implementation steps (1)
1. Define the scope and objectives of the
project
2. Establish review groups
• facilitator
• project manager
• operations personnel
• functions and performance standards
• maintenance personnel
• types of failures
• most appropriate condition monitoring techniques
• maintenance and operations personnel
• consequences of identified failures
© Imants http://www.managementsupport.com
7. RCM implementation
Eight implementation steps (2)
3. Train the review group
4. Estimate the amount of time to review the
selected equipment
5. Plan meetings
• date
• time
• location
© Imants http://www.managementsupport.com
7. RCM implementation
Eight implementation steps (3)
6. Plan senior management audits
Senior management has to agree on
• definition of functions and performance
standards
• identification of failure modes
• description of failure effects
• assessment of failure consequences
• selection of tasks
7. Implement the selected tasks
8. Document the tasks and procedures
© Imants http://www.managementsupport.com
The RCM Guide
8. Benefits
© Imants http://www.managementsupport.com
8. RCM benefits (1)
• Cost saving
• shift from time-based to condition-based work
• workload reduction
• spare part usage reduction
• improved operation performance
• Rationalization
• unnecessary preventive work is eliminated
• Improved safety
• Improved environmental integrity
© Imants http://www.managementsupport.com
8. RCM benefits (2)
• A precise and comprehensive maintenance
database
• during the analysis, information is gathered in a
coherent form
• Education
• improved overall level of skill and technical knowledge
• Improved teamwork
• Greater motivation of individuals
© Imants http://www.managementsupport.com
The RCM Guide
9. CMMS and RCM integration
© Imants http://www.managementsupport.com
9. CMMS and RCM integration
• Constant evolution to integrate RCM
software in the Computerized Maintenance
Management Systems:
• Reliability Prediction Programs
• Reliability Modeling Programs
• FMEA / FMECA Programs
• RCM databases
• Links:
• http://www.relexsoftware.com/
• http://www.sohar.com/software/meadep/
• http://www.itemsoft.com/
© Imants http://www.managementsupport.com
The end
Please feel free to give any
comments to
info@managementsupport.com

More Related Content

What's hot

Reliability Centered Maintenance Implementation and Case Study
Reliability Centered Maintenance Implementation and Case StudyReliability Centered Maintenance Implementation and Case Study
Reliability Centered Maintenance Implementation and Case StudyWaseem Akram
 
Reliability Centered Maintenance
Reliability Centered MaintenanceReliability Centered Maintenance
Reliability Centered MaintenanceNafis Ahmad
 
RELIABILITY CENTERED MAINTAINANCE
RELIABILITY CENTERED MAINTAINANCERELIABILITY CENTERED MAINTAINANCE
RELIABILITY CENTERED MAINTAINANCEkifayat ullah
 
Reliability Centered Maintenance II (RCM2) in Water and Wastewater Utilities ...
Reliability Centered Maintenance II (RCM2) in Water and Wastewater Utilities ...Reliability Centered Maintenance II (RCM2) in Water and Wastewater Utilities ...
Reliability Centered Maintenance II (RCM2) in Water and Wastewater Utilities ...marcus evans Network
 
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...Flevy.com Best Practices
 
Reliability Centered Maintenance
Reliability Centered MaintenanceReliability Centered Maintenance
Reliability Centered MaintenanceRonald Shewchuk
 
8 Steps To Success In Maintenance Planning And Scheduling
8 Steps To Success In Maintenance Planning And Scheduling8 Steps To Success In Maintenance Planning And Scheduling
8 Steps To Success In Maintenance Planning And SchedulingRicky Smith CMRP, CMRT
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance ManagementBisina Keshara
 
Condition based maintenance strategy
Condition based maintenance strategyCondition based maintenance strategy
Condition based maintenance strategyPriyesh Nair
 
Fundamentals of reliability engineering and applications part1of3
Fundamentals of reliability engineering and applications part1of3Fundamentals of reliability engineering and applications part1of3
Fundamentals of reliability engineering and applications part1of3ASQ Reliability Division
 
S6 Lec1 Maintenance Definition Note
S6 Lec1 Maintenance Definition NoteS6 Lec1 Maintenance Definition Note
S6 Lec1 Maintenance Definition Noteno suhaila
 
Maintenance planning systems
Maintenance planning  systemsMaintenance planning  systems
Maintenance planning systemsAnil Mohindru
 
A CASE STUDY ON RELIABLITY MAINTENANCE
A CASE STUDY ON RELIABLITY MAINTENANCEA CASE STUDY ON RELIABLITY MAINTENANCE
A CASE STUDY ON RELIABLITY MAINTENANCEZubair Ali ali
 
Maintenance types
Maintenance typesMaintenance types
Maintenance typesMotasem Ash
 
Planned Maintenance.
Planned Maintenance.Planned Maintenance.
Planned Maintenance.Hal Frohreich
 

What's hot (20)

Reliability Centered Maintenance Implementation and Case Study
Reliability Centered Maintenance Implementation and Case StudyReliability Centered Maintenance Implementation and Case Study
Reliability Centered Maintenance Implementation and Case Study
 
Reliability Centered Maintenance
Reliability Centered MaintenanceReliability Centered Maintenance
Reliability Centered Maintenance
 
RELIABILITY CENTERED MAINTAINANCE
RELIABILITY CENTERED MAINTAINANCERELIABILITY CENTERED MAINTAINANCE
RELIABILITY CENTERED MAINTAINANCE
 
RCM
RCMRCM
RCM
 
Reliability Centered Maintenance II (RCM2) in Water and Wastewater Utilities ...
Reliability Centered Maintenance II (RCM2) in Water and Wastewater Utilities ...Reliability Centered Maintenance II (RCM2) in Water and Wastewater Utilities ...
Reliability Centered Maintenance II (RCM2) in Water and Wastewater Utilities ...
 
Reliability centered maintenance
Reliability centered maintenanceReliability centered maintenance
Reliability centered maintenance
 
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...
 
RCM
RCMRCM
RCM
 
Reliability Centered Maintenance
Reliability Centered MaintenanceReliability Centered Maintenance
Reliability Centered Maintenance
 
8 Steps To Success In Maintenance Planning And Scheduling
8 Steps To Success In Maintenance Planning And Scheduling8 Steps To Success In Maintenance Planning And Scheduling
8 Steps To Success In Maintenance Planning And Scheduling
 
Cmms
CmmsCmms
Cmms
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance Management
 
Condition based maintenance strategy
Condition based maintenance strategyCondition based maintenance strategy
Condition based maintenance strategy
 
Fundamentals of reliability engineering and applications part1of3
Fundamentals of reliability engineering and applications part1of3Fundamentals of reliability engineering and applications part1of3
Fundamentals of reliability engineering and applications part1of3
 
S6 Lec1 Maintenance Definition Note
S6 Lec1 Maintenance Definition NoteS6 Lec1 Maintenance Definition Note
S6 Lec1 Maintenance Definition Note
 
Maintenance planning systems
Maintenance planning  systemsMaintenance planning  systems
Maintenance planning systems
 
Maintenance
MaintenanceMaintenance
Maintenance
 
A CASE STUDY ON RELIABLITY MAINTENANCE
A CASE STUDY ON RELIABLITY MAINTENANCEA CASE STUDY ON RELIABLITY MAINTENANCE
A CASE STUDY ON RELIABLITY MAINTENANCE
 
Maintenance types
Maintenance typesMaintenance types
Maintenance types
 
Planned Maintenance.
Planned Maintenance.Planned Maintenance.
Planned Maintenance.
 

Similar to Rcm

MAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCEMAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCElaxtwinsme
 
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptx
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptxReliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptx
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptxSamuel Gher
 
Mechanical Integrity.pdf
Mechanical Integrity.pdfMechanical Integrity.pdf
Mechanical Integrity.pdfaashir14
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Bhavesh Shukla
 
reliabilitycenteredmaintenancemadesimple.pdf
reliabilitycenteredmaintenancemadesimple.pdfreliabilitycenteredmaintenancemadesimple.pdf
reliabilitycenteredmaintenancemadesimple.pdfEdgar V Macapili
 
Unit 8 maintainance management pptx
Unit 8 maintainance management pptxUnit 8 maintainance management pptx
Unit 8 maintainance management pptxRASHMIPANWAR10
 
RELIABILITY CENTERED MAINTAINANCE
RELIABILITY CENTERED MAINTAINANCERELIABILITY CENTERED MAINTAINANCE
RELIABILITY CENTERED MAINTAINANCEkifayat ullah
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02BhaveshShukla15
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02BhaveshShukla15
 
Innovation day 2013 2.5 joris vanderschrick (verhaert) - embedded system de...
Innovation day 2013   2.5 joris vanderschrick (verhaert) - embedded system de...Innovation day 2013   2.5 joris vanderschrick (verhaert) - embedded system de...
Innovation day 2013 2.5 joris vanderschrick (verhaert) - embedded system de...Verhaert Masters in Innovation
 

Similar to Rcm (20)

Mm
MmMm
Mm
 
Tpm
TpmTpm
Tpm
 
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCEMAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
 
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptx
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptxReliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptx
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptx
 
Mechanical Integrity.pdf
Mechanical Integrity.pdfMechanical Integrity.pdf
Mechanical Integrity.pdf
 
Lm
LmLm
Lm
 
INTRODUCTION TO RCM.ppt
INTRODUCTION TO RCM.pptINTRODUCTION TO RCM.ppt
INTRODUCTION TO RCM.ppt
 
Maintenace management and TPM
Maintenace management and TPMMaintenace management and TPM
Maintenace management and TPM
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02
 
reliabilitycenteredmaintenancemadesimple.pdf
reliabilitycenteredmaintenancemadesimple.pdfreliabilitycenteredmaintenancemadesimple.pdf
reliabilitycenteredmaintenancemadesimple.pdf
 
Unit 8 maintainance management pptx
Unit 8 maintainance management pptxUnit 8 maintainance management pptx
Unit 8 maintainance management pptx
 
RELIABILITY CENTERED MAINTAINANCE
RELIABILITY CENTERED MAINTAINANCERELIABILITY CENTERED MAINTAINANCE
RELIABILITY CENTERED MAINTAINANCE
 
Maintenance 2sp
Maintenance 2spMaintenance 2sp
Maintenance 2sp
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02
 
Tpm
TpmTpm
Tpm
 
FMEA
FMEAFMEA
FMEA
 
Innovation day 2013 2.5 joris vanderschrick (verhaert) - embedded system de...
Innovation day 2013   2.5 joris vanderschrick (verhaert) - embedded system de...Innovation day 2013   2.5 joris vanderschrick (verhaert) - embedded system de...
Innovation day 2013 2.5 joris vanderschrick (verhaert) - embedded system de...
 
Tpm
TpmTpm
Tpm
 
IIoT solutions for centrifugal pump problems
IIoT solutions for centrifugal pump problemsIIoT solutions for centrifugal pump problems
IIoT solutions for centrifugal pump problems
 

More from Paul Robere

More from Paul Robere (20)

Tpm new
Tpm newTpm new
Tpm new
 
Tpm basic
Tpm basicTpm basic
Tpm basic
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
 
Words to the_wise_0911
Words to the_wise_0911Words to the_wise_0911
Words to the_wise_0911
 
Quality136 tp 060509
Quality136 tp 060509Quality136 tp 060509
Quality136 tp 060509
 
Ibi
IbiIbi
Ibi
 
Scm v20
Scm v20Scm v20
Scm v20
 
Kpi 1 day
Kpi 1 dayKpi 1 day
Kpi 1 day
 
14 epi-e-dn v.1.01(draft)
14 epi-e-dn v.1.01(draft)14 epi-e-dn v.1.01(draft)
14 epi-e-dn v.1.01(draft)
 
8 qmp
8 qmp8 qmp
8 qmp
 
7 new qc tools
7 new qc tools7 new qc tools
7 new qc tools
 
5 s training
5 s training5 s training
5 s training
 
Hr pts-e-dn-version 2.0
Hr pts-e-dn-version 2.0Hr pts-e-dn-version 2.0
Hr pts-e-dn-version 2.0
 
Train the trainer
Train the trainerTrain the trainer
Train the trainer
 
Hr tit-e-dn
Hr tit-e-dnHr tit-e-dn
Hr tit-e-dn
 
Tqm2
Tqm2Tqm2
Tqm2
 
Business writing
Business writingBusiness writing
Business writing
 
Consultative selling e
Consultative selling eConsultative selling e
Consultative selling e
 
Bd bmk e
Bd bmk eBd bmk e
Bd bmk e
 
Six sigma initiative free seminar rev4
Six sigma initiative free seminar rev4Six sigma initiative free seminar rev4
Six sigma initiative free seminar rev4
 

Recently uploaded

/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadAyesha Khan
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 

Recently uploaded (20)

/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 

Rcm

  • 1. © Imants http://www.managementsupport.com The RCM Guide Reliability Centered Maintenance © Imants http://www.managementsupport.com
  • 3. © Imants http://www.managementsupport.com 1. RCM definitions (1) • Reliability Centered Maintenance (RCM) is a methodology used to determine the right maintenance tasks to ensure that any physical asset or system continues whatever its users want it to do, in its present operating context
  • 4. © Imants http://www.managementsupport.com 1. RCM definition (2) Reliability - The probability that equipment will not fail in a given time period - = a measure of the frequency of downtime
  • 5. © Imants http://www.managementsupport.com 1. RCM definition (3) Maintenance - Any activity carried out on an asset in order to - ensure that the asset continues to perform its intended functions - repair the asset
  • 7. © Imants http://www.managementsupport.com 2. RCM History • 60’s: RCM developed in the airline industry • 70’s: RCM used in the army and the American Navy • 1978: first use of the term “Reliability Centered Maintenance” in Nowlan & Heap’s book: this book showed that a strong correlation between age and failure rate did not exist • 80’s - 90’s: transfer of the RCM methodology to other industrial sectors (railways, chemical industry)
  • 9. © Imants http://www.managementsupport.com 3. RCM Objectives (1) • Determine the optimum maintenance program • Optimize your maintenance efforts • focus on the most important functions of the systems • avoid maintenance actions that are not strictly necessary • Strive for the required reliability • at the lowest cost • without sacrificing safety • without sacrificing the environment
  • 10. © Imants http://www.managementsupport.com 3. RCM Objectives (2) • Establish maintenance practices which focus more on • the functional importance of a piece of equipment and its failure/repair history • and less on • vendor PM recommendations • traditional “time-directed” overhaul tasks
  • 12. © Imants http://www.managementsupport.com 4. RCM principles • 4.1. RCM is Business-Oriented • 4.2. RCM is Function Oriented • 4.3. RCM is System Focused • 4.4. RCM investigates how Equipment Fails • 4.5. RCM defines the best Maintenance Strategy based on the consequences of failures • 4.6. RCM acknowledges Design Limitations • 4.7. RCM is an Ongoing Task
  • 13. © Imants http://www.managementsupport.com 4. RCM principles 4.1. Business oriented • Maintenance is business oriented (not only technical oriented): • operations efficiency • quality • cost • safety • environment
  • 14. © Imants http://www.managementsupport.com 4. RCM principles 4.2. Function oriented • RCM focuses on preserving the functions of equipment, not on preserving the equipment itself • Equipment function: what its users want it to do • 2 function categories • primary functions: speed, output, product quality • secondary functions: safety, comfort, environmental integrity
  • 15. © Imants http://www.managementsupport.com 4. RCM principles 4.3. System focused • RCM is more concerned with maintaining the system function, than individual component function • If the system still provides its primary function if a component fails, the component is allowed to run to failure
  • 16. © Imants http://www.managementsupport.com 4. RCM principles 4.4. RCM investigates how equipment fails (1) • Failure: • a failure is the inability of an equipment, system or plant to fulfill one or more of its intended functions • Failure mode: • what is wrong • what we need to prevent or physically fix • Failure cause: • why it went wrong • Failure effect: • the consequence of the failure mode, when it occurs
  • 17. © Imants http://www.managementsupport.com 4. RCM principles 4.4. RCM investigates how equipment fails (2) • Failure patterns: • the relationship between the probability of failure of an item, and its age (see Maintenance Management Guide) • RCM seeks to know the probability of failures at specific ages AGE Prob. Of Failure
  • 18. © Imants http://www.managementsupport.com 4. RCM principles 4.5. RCM defines Maintenance Strategy • Based on the consequences of failures, the best maintenance strategy is defined • Run to Failure (RTF) • Preventive Maintenance (PM) · • Predictive Maintenance (PDM) • Proactive Maintenance (PAM) • Condition-based or predictive maintenance strategies are favored over traditional time- based methods
  • 19. © Imants http://www.managementsupport.com 4. RCM principles 4.6. RCM recognizes Design Limitations • A maintenance program can only maintain the level of reliability inherent in the system design • No amount of maintenance can overcome poor design • Maintenance knowledge is fed back to designers to improve the next design
  • 20. © Imants http://www.managementsupport.com 4. RCM principles 4.7. RCM is an ongoing task • The full benefit of RCM is only achieved when operation and maintenance experience is continuously fed back into the analysis process.
  • 22. © Imants http://www.managementsupport.com 5. RCM tools • 5.1. Selection and prioritizing tool • Pareto analysis • 5.2. Failure analysis tool • FMECA • 5.3. Reliability Modeling tools • Reliability Block Diagram • Fault Tree • 5.4. Decision Tool • Decision Tree analysis
  • 23. © Imants http://www.managementsupport.com 5. RCM tools 5.1. Pareto analysis (1) • Pareto analysis is a selection and prioritizing tool • Pareto analysis (sometimes referred to as the 80/20 rule and as ABC analysis) is a method of classifying items, events, or activities according to their relative importance • Pareto analysis is based on the premise that 80 % of problems are due to 20 % of the possible causes
  • 24. © Imants http://www.managementsupport.com 5. RCM tools 5.1. Pareto analysis (2) • Steps • sort data in descending order of importance • calculate individual percentages for each category • calculate cumulative percentages for each category • all categories with cumulative % less than or equal to 80 % can be selected for further review
  • 25. © Imants http://www.managementsupport.com 5. RCM tools 5.1. Pareto chart Problem Causes % 20 40 60 80 100 A B C D E F ... O P 42 62 80 100
  • 26. © Imants http://www.managementsupport.com 5. RCM tools 5.2. FMECA (1) • Failure Mode, Effect and Criticality Analysis is a Failure Analysis tool • It is a step-by-step procedure for the systematic evaluation of the failure effects and the criticality of potential failure modes in equipment and plant • A standard form (next slide) must be filled out
  • 27. © Imants http://www.managementsupport.com 5. RCM tools 5.2. FMECA (2): standard form Item Function Failure mode Failure cause Failure effect Failure detection Failure isolation Actions Severity
  • 28. © Imants http://www.managementsupport.com 5. RCM tools 5.3.1. Reliability Block Diagram (RBD) analysis (1) • RBD is a Reliability Modeling tool, and is constructed to assess the overall system reliability • A Reliability Block Diagram graphically represents the logical interaction of components within your systems • The components are arranged by blocks, and are related reliability-wise
  • 29. © Imants http://www.managementsupport.com 5. RCM tools 5.3.1. Reliability Block Diagram (RBD) analysis (2) A D B 0.9 0.8 0.7 A,B,..: Components Numbers: availability
  • 30. © Imants http://www.managementsupport.com 5. RCM tools 5.3.2. Fault Tree Analysis (FTA) (1) • FTA is a Reliability Modeling tool • FTA specifies a top event (ex. a fire) to analyze, followed by identifying all of the elements in the system that could cause the top event to occur • A symbolic logic diagram with AND/OR gates is constructed
  • 31. © Imants http://www.managementsupport.com 5. RCM tools 5.3.2. Fault Tree Analysis (FTA) (2) Top event Failure 1 Failure 2 OR Failure 3 Failure 4 AND
  • 32. © Imants http://www.managementsupport.com 5. RCM tools 5.4. Decision Tree analysis (1) • A Decision Tree Diagram is a graphical illustration in which lines branch out from a central point without forming any closed loops • The Decision Tree Diagram guides the user through a question-and-answer process • Options are ranked in an order of preference
  • 33. © Imants http://www.managementsupport.com 5. RCM tools 5.4. Decision Tree analysis (2) ? ? ? YES YES NO NO YES NO Option 1 Option 2 Option 3 Option 4
  • 35. © Imants http://www.managementsupport.com 6. RCM analysis • 6.1. Study preparation • 6.2. System selection and definition • 6.3. System function definition • 6.4. Functional failures definition • 6.5. Failure modes analysis • 6.6. Failure consequences assessment • 6.7. Selection of maintenance actions • 6.8. Data collection and documentation
  • 36. © Imants http://www.managementsupport.com 6. RCM analysis 6.1. Study Preparation • Establishment of an RCM project group • one person from the maintenance function • one person form the operations function • an RCM specialist • Definition of objectives and scope of the analysis • Definition of boundary conditions with respect to safety and environmental protection
  • 37. © Imants http://www.managementsupport.com 6. RCM analysis 6.2. System Selection and Definition • The description of the assembly hierarchy (plant register) is a good standing point for system selection and definition • Tools: • Pareto analysis, • Reliability Block Diagram analysis, • Fault Tree Analysis To which systems are an RCM analysis beneficial compared with more traditional maintenance planning? At what level of assembly (plant, system, subsystem …) should the analysis be conducted?
  • 38. © Imants http://www.managementsupport.com 6. RCM analysis 6.3. System function definition • Identify and describe the system’s required functions and performance standards in its present operating context • Describe input interfaces required for the system to operate What are the functions and the associated desired standards of performance of the asset in its present operating context?
  • 39. © Imants http://www.managementsupport.com 6. RCM analysis 6.4. Functional failures definition • Identify the ways in which • the system might fail to fulfill its functions • the system functions at an unacceptable level of performance In what way can the asset fail to fulfill its functions?
  • 40. © Imants http://www.managementsupport.com 6. RCM analysis 6.5. Failure modes analysis • The objective of this step is to identify the events which cause the failure • normal wear • human errors • design • Tool: FMECA What causes each functional failure?
  • 41. © Imants http://www.managementsupport.com 6. RCM analysis 6.6. Failure consequences assessment • Failures which affect production / operations • Failures which threaten • safety • the environment • Failures which entail the direct cost of repair • Tool: FMECA What happens when the failure occurs?
  • 42. © Imants http://www.managementsupport.com 6. RCM analysis 6.7. Selection of Maintenance Actions (1) • Only applicable and cost-effective tasks may be selected • Applicability:a PM task will be applicable if it can eliminate a failure, or at least reduce the probability of occurrence to an acceptable level - or reduce the impact of failures! • Cost-effectiveness: the cost of performing the maintenance is balanced with the "cost" of not performing it. What should be done to predict or prevent each failure?
  • 43. © Imants http://www.managementsupport.com 6. RCM analysis 6.7. Selection of Maintenance Actions (2) • Tool: Decision Tree analysis • Options • do nothing: run to failure • prevent: scheduled or non-scheduled tasks • predict: checking the condition of equipment and detecting failure • redesign • equipment • process • procedures
  • 44. © Imants http://www.managementsupport.com 6. RCM analysis 6.8. Data Collection and Documentation • The data necessary for the RCM analysis may be categorized and collected in the following three groups: • Design data • Operational data • Reliability data • The revised tasks and procedures must be documented in a way that ensures that they will be easily understood and performed by the people who do the work
  • 45. © Imants http://www.managementsupport.com The RCM Guide 7. Implementation
  • 46. © Imants http://www.managementsupport.com 7. RCM implementation Eight implementation steps (1) 1. Define the scope and objectives of the project 2. Establish review groups • facilitator • project manager • operations personnel • functions and performance standards • maintenance personnel • types of failures • most appropriate condition monitoring techniques • maintenance and operations personnel • consequences of identified failures
  • 47. © Imants http://www.managementsupport.com 7. RCM implementation Eight implementation steps (2) 3. Train the review group 4. Estimate the amount of time to review the selected equipment 5. Plan meetings • date • time • location
  • 48. © Imants http://www.managementsupport.com 7. RCM implementation Eight implementation steps (3) 6. Plan senior management audits Senior management has to agree on • definition of functions and performance standards • identification of failure modes • description of failure effects • assessment of failure consequences • selection of tasks 7. Implement the selected tasks 8. Document the tasks and procedures
  • 50. © Imants http://www.managementsupport.com 8. RCM benefits (1) • Cost saving • shift from time-based to condition-based work • workload reduction • spare part usage reduction • improved operation performance • Rationalization • unnecessary preventive work is eliminated • Improved safety • Improved environmental integrity
  • 51. © Imants http://www.managementsupport.com 8. RCM benefits (2) • A precise and comprehensive maintenance database • during the analysis, information is gathered in a coherent form • Education • improved overall level of skill and technical knowledge • Improved teamwork • Greater motivation of individuals
  • 52. © Imants http://www.managementsupport.com The RCM Guide 9. CMMS and RCM integration
  • 53. © Imants http://www.managementsupport.com 9. CMMS and RCM integration • Constant evolution to integrate RCM software in the Computerized Maintenance Management Systems: • Reliability Prediction Programs • Reliability Modeling Programs • FMEA / FMECA Programs • RCM databases • Links: • http://www.relexsoftware.com/ • http://www.sohar.com/software/meadep/ • http://www.itemsoft.com/
  • 54. © Imants http://www.managementsupport.com The end Please feel free to give any comments to info@managementsupport.com