SlideShare a Scribd company logo
1 of 38
The TPM Guide
Total Productive Maintenance
© Imants http://www.managementsupport.com
© Imants http://www.managementsupport.com
1. TPM definition (1)
• A company-wide team-based effort to build quality
into equipment and to improve overall equipment
effectiveness
• Total
• all employees are involved
• it aims to eliminate all accidents, defects and breakdowns
• Productive
• actions are performed while production goes on
• troubles for production are minimized
• Maintenance
• keep in good condition
• repair, clean, lubricate
© Imants http://www.managementsupport.com
1. TPM definition (2)
• TPM combines the traditionally American
practice of preventive maintenance with
Total Quality Control and Total Employee
Involvement, to create a culture where
operators develop ownership of their
equipment, and become full partners with
Maintenance, Engineering and Management
to assure equipment operates properly
everyday.
© Imants http://www.managementsupport.com
2. Origins of TPM
• Dr. Deming introduced statistical analysis and used
the resulting data to control quality during
manufacturing (TQM)
• Some general concepts of TQM did not work well in
the maintenance environment
• The need to go further than preventive maintenance
was quickly recognized by those companies who
were committed to TQM
• Maintenance became an integral part of TQM in the
early 90’s
© Imants http://www.managementsupport.com
3. TPM principles
• Increase Overall Equipment Effectiveness
(OEE)
• Improve existing planned maintenance
systems
• The operator is the best condition monitor
• Provide training to upgrade operations and
maintenance skills
• Involve everyone and utilize cross-functional
teamwork
© Imants http://www.managementsupport.com
4. Eight major pillars of TPM
AutonomousMaintenance
PlannedMaintenance
Equipmentandprocessimprovement
Earlymanagementofnewequipment
Processqualitymanagement
TPMintheoffice
Education and training
Safety and environmental management
© Imants http://www.managementsupport.com
4. Eight major pillars of TPM
4.1. Autonomous Maintenance (1)
• Train the operators to close the gap
between them and the maintenance staff,
making it easier for both to work as one
team
• Change the equipment so the operator
can identify any abnormal conditions and
measure deterioration before it affects the
process or leads to a failure
© Imants http://www.managementsupport.com
4. Eight major pillars of TPM
4.1. Autonomous Maintenance (2)
• 7 steps are implemented to progressively increase
operators knowledge, participation and
responsibility for their equipment
• 1. Perform initial cleaning and inspection
• 2. Countermeasures for the causes and effects of dirt
and dust
• 3. Establish cleaning and lubrication standards
• 4. Conduct general inspection training
• 5. Carry out equipment inspection checks
• 6. Workplace management and control
• 7. Continuous improvement
© Imants http://www.managementsupport.com
4. Eight major pillars of TPM
4.2. Equipment and process improvement
• Objective: maximize efficiency by eliminating
waste and manufacturing losses
• Manufacturing losses are categorized into 13 big
losses:
• Equipment losses (6)
• Manpower losses (4)
• Material losses (3)
© Imants http://www.managementsupport.com
4. Eight major pillars of TPM
4.2. Equipment and process improvement
4.2.1. Equipment losses
Downtime
loss
Speed loss
Quality loss
Equipment failure / breakdowns
Set-up / adjustments
Minor stopping / idling
Reduced speed
Process errors
Rework / scrap
© Imants http://www.managementsupport.com
4. Eight major pillars of TPM
4.2. Equipment and process improvement
4.2.2. Manpower and material losses
Manpower
losses
Material
losses
Cleaning and checking
Waiting instructions
Waiting quality confirmation
Material yield
Energy losses
Waiting materials
Consumable material losses
© Imants http://www.managementsupport.com
4. Eight major pillars of TPM
4.2. Equipment and process improvement
4.2.3 Overall Equipment Effectiveness (OEE)
• OEE figures are determined by combining the
availability and performance of your equipment
with the quality of parts made
• OEE measures the efficiency of the machine
during its planned loading time. Planned
downtime does not effect the OEE figure.
© Imants http://www.managementsupport.com
4. Eight major pillars of TPM
4.2. Equipment and process improvement
4.2.3 Overall Equipment Effectiveness (OEE)
Overall Equipment Effectiveness = Availability x Performance x Quality Yield
Availability Downtime loss
Speed lossPerformance
Quality Yield Quality loss
© Imants http://www.managementsupport.com
4. Eight major pillars of TPM
4.2. Equipment and process improvement
4.2.3 Overall Equipment Effectiveness (OEE)
Overall Equipment Effectiveness = Availability x Performance x Quality Yield
Availability = time available for production - downtime
time available for production
Performance = ideal cycle time x number of parts produced
operating time
Quality Yield = total number of parts produced - defect number
total number of parts produced
© Imants http://www.managementsupport.com
4. Eight major pillars of TPM
4.3. Planned maintenance
• Objective: establish Preventative and Predictive
Maintenance systems for equipment and tooling
• Natural life cycle of individual machine elements
must be achieved
• Correct operation
• Correct set-up
• Cleaning
• Lubrication
• Retightening
• Feedback and repair of minor defects
• Quality spare parts
© Imants http://www.managementsupport.com
4. Eight major pillars of TPM
4.4. Early Management of new equipment
• Objective: establish systems to shorten
• new product or equipment development
• start-up, commissioning and stabilization time for
quality and efficiency
• New equipment needs to be:
• easy to operate
• easy to clean
• easy to maintain and reliable
• have quick set-up times
• operate at the lowest life cycle cost
© Imants http://www.managementsupport.com
4. Eight major pillars of TPM
4.5. Process Quality Management
• Definition: a process for controlling the condition
of equipment components that affect variability
in product quality
• Objective: to set and maintain conditions to
accomplish zero defects
• Quality rate has a direct correlation with
• material conditions
• equipment precision
• production methods
• process parameters
© Imants http://www.managementsupport.com
4. Eight major pillars of TPM
4.6. TPM in administrative and support departments
• Administrative and support departments can be
seen as process plants whose principal tasks
are to collect, process, and distribute information
• Process analysis should be applied to
streamline information flow
© Imants http://www.managementsupport.com
4. Eight major pillars of TPM
4.7. Education and training
• TPM is a continuous learning process.
• 2 major components
• soft skills training: how to work as teams,
diversity training and communication skills
• technical training: upgrading problem-solving
and equipment- related skills
© Imants http://www.managementsupport.com
4. Eight major pillars of TPM
4.8. Safety and environmental management
• Assuring safety and preventing adverse
environmental impacts are important priorities in
any TPM effort
© Imants http://www.managementsupport.com
5. TPM implementation
3 requirements for fundamental improvement
• Increasing motivation: changing peoples
attitudes
• Increasing competency and peoples skills
• Improving the work environment, so that it
supports the establishment of a program for
implementing TPM
© Imants http://www.managementsupport.com
5. TPM Implementation
12 steps
Preparation
Kick-off
Implementation
Announcement to introduce TPM
Introductory education campaign for the workforce
TPM Promotion (special committees)
Establish basic TPM policies and goals
Preparation and Formulation of a master plan
Develop an equipment management program
Develop a planned maintenance program
Develop an autonomous maintenance program
Increase skills of production and maintenance personnel
Perfect TPM implementation and raise TPM levelsStabilization
Develop early equipment management program
Invite customers, affiliated companies and subcontractors
© Imants http://www.managementsupport.com
5. TPM Implementation
5.1. Announce top management’s decision to
introduce TPM
• State TPM objectives in a company
newsletter
• Place articles on TPM in the company
newspaper
© Imants http://www.managementsupport.com
5. TPM Implementation
5.2. Introductory education campaign
• Seminars for managers
• Slide presentations for all employees
© Imants http://www.managementsupport.com
5. TPM Implementation
5.3. TPM Promotion
• Special committees at every level to promote
TPM
• Newsletters
• Articles
• Videos
• Posters
© Imants http://www.managementsupport.com
5. TPM Implementation
5.4. Establish basic TPM policies and goals
• Analyze existing conditions
• Set goals
• Predict results
© Imants http://www.managementsupport.com
5. TPM Implementation
5.5. Preparation and Formulation of a master plan
• A master plan lays out your goals, what you
will do to achieve them and when you will
achieve them
• Detailed plans for each pillar have to be
prepared
© Imants http://www.managementsupport.com
5. TPM Implementation
5.6. TPM kick-off
• The main kick-off to TPM should take the
form of a formal presentation with all the
employees attending
• This opportunity can be used to gain the full
support of the employees
• Invite external customers, affiliated and
subcontracting companies
© Imants http://www.managementsupport.com
5. TPM Implementation
5.7. Develop an equipment management program (1)
• The tools of Total Quality Management and
Continuous Improvement are applied to the
management and improvement of equipment
• Form project teams
• Select model equipment
• identify equipment problems
• analyze equipment problems
• develop solutions and proposals for improvement
© Imants http://www.managementsupport.com
5. TPM Implementation
5.7. Develop an equipment management program (2)
• Typical membership of a team
• five to seven operators
• a maintenance person
• a technical expert
• Tools
• Pareto
• Cause & effect
• Root cause
• Methods Analysis
© Imants http://www.managementsupport.com
5. TPM Implementation
5.8. Develop a planned maintenance program
• Set up plans and schedules to carry out work
on equipment before it breaks down, in order
to extend the life of the equipment
• Include periodic and predictive maintenance
• Include management of spare parts and tools
© Imants http://www.managementsupport.com
5. TPM Implementation
5.8. Develop a autonomous maintenance program
• A handing-over of maintenance tasks from
specialized maintenance personnel to
production operators
• Promote the seven steps
• Tasks to hand over
• cleaning
• lubricating
• inspecting
• set-up and adjustment
© Imants http://www.managementsupport.com
5. TPM Implementation
5.10. Increase skills of production and maintenance
personnel
• The training sessions must be planned
shortly after the kick-off presentation.
• 2 major components
• soft skills training
• technical training
• Train leaders together
• Have leaders share information with group
members
© Imants http://www.managementsupport.com
5. TPM Implementation
5.11. Develop early equipment management
program(1)
• The principle of designing for maintenance
prevention can be applied to new products,
and to new and existing machines.
• New products must be designed so that they
can be easily produced on new or existing
machines
• New machines must be designed for easier
operations, changeover and maintenance
© Imants http://www.managementsupport.com
5. TPM Implementation
5.11. Develop early equipment management
program(2)
• Existing machines:
• analyze historical records for
• trends of types of failures
• frequency of component failures
• root causes of failures
• determine how to eliminate the problem and
reduce maintenance through an equipment
design change or by changing the process
© Imants http://www.managementsupport.com
5. TPM Implementation
5.12. Perfect TPM implementation and raise TPM levels
• Evaluate for the PM Award: The Japanese
Institute for Productive Maintenance runs the
annual PM Excellence Award. They provide a
checklist for companies applying for the
award.
• Set higher goals
© Imants http://www.managementsupport.com
6. TPM Benefits
• Increased equipment productivity
• Reduced equipment downtime
• Increased plant capacity
• Lower maintenance and production costs
• Approaching zero equipment-caused defects
• Enhanced job satisfaction
• Increased Return On Investment
© Imants http://www.managementsupport.com
The end
Please feel free to give any
comments to
imants@skynet.be

More Related Content

What's hot (20)

Total Productive Maintenance (TPM) for EVERTS 20Aug2018
Total Productive Maintenance (TPM) for EVERTS  20Aug2018Total Productive Maintenance (TPM) for EVERTS  20Aug2018
Total Productive Maintenance (TPM) for EVERTS 20Aug2018
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
 
Tpm
TpmTpm
Tpm
 
TPM Total Productive Maintenance Workshop for Quarry Plant (1) 09Oct16
TPM Total Productive Maintenance Workshop for Quarry Plant (1) 09Oct16TPM Total Productive Maintenance Workshop for Quarry Plant (1) 09Oct16
TPM Total Productive Maintenance Workshop for Quarry Plant (1) 09Oct16
 
Tpm new
Tpm newTpm new
Tpm new
 
Total productive maintenance (tpm)
Total productive maintenance (tpm)Total productive maintenance (tpm)
Total productive maintenance (tpm)
 
Tpm basic
Tpm basicTpm basic
Tpm basic
 
TPM Activity
TPM ActivityTPM Activity
TPM Activity
 
TPM the effective maintenance (2)
TPM the effective maintenance (2)TPM the effective maintenance (2)
TPM the effective maintenance (2)
 
total productive maintenance
total productive maintenancetotal productive maintenance
total productive maintenance
 
Tpm
TpmTpm
Tpm
 
TPM for lean manufacturing | lean tools
 TPM  for lean manufacturing |  lean tools	 TPM  for lean manufacturing |  lean tools
TPM for lean manufacturing | lean tools
 
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh AroraTotal Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
 
TPM_sample
TPM_sampleTPM_sample
TPM_sample
 
TPM - tech talk
TPM - tech talk TPM - tech talk
TPM - tech talk
 
Tpm final
Tpm finalTpm final
Tpm final
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)
 
Tpm basic
Tpm basicTpm basic
Tpm basic
 
Total Productive Maintenance
Total Productive Maintenance Total Productive Maintenance
Total Productive Maintenance
 
TPM (en)
TPM (en)TPM (en)
TPM (en)
 

Similar to TPM Guide to Total Productive Maintenance

Maintenance Total Productive TPMMMMMMMMMMMMMMMMMMM
Maintenance Total Productive TPMMMMMMMMMMMMMMMMMMMMaintenance Total Productive TPMMMMMMMMMMMMMMMMMMM
Maintenance Total Productive TPMMMMMMMMMMMMMMMMMMMsshoaib1
 
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCEMAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCElaxtwinsme
 
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET Journal
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenanceManishaHalai1
 
Production and operation Unit_3.pptx
Production and operation Unit_3.pptxProduction and operation Unit_3.pptx
Production and operation Unit_3.pptxMargi Shah
 
tpmprinciplesandconcepts-190103043928.pdf
tpmprinciplesandconcepts-190103043928.pdftpmprinciplesandconcepts-190103043928.pdf
tpmprinciplesandconcepts-190103043928.pdfmihirpatel306953
 
Total productive maintenance(TPM)
Total productive maintenance(TPM)Total productive maintenance(TPM)
Total productive maintenance(TPM)Md.Muzahid Khan
 
Total Productive Maintenance (TPM).pdf
Total Productive Maintenance (TPM).pdfTotal Productive Maintenance (TPM).pdf
Total Productive Maintenance (TPM).pdfHimanshuGupta26467
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenanceAakashGT
 
Ranveer yadav 2013 14
Ranveer yadav 2013 14Ranveer yadav 2013 14
Ranveer yadav 2013 14ranviry49
 
effective-maintenance.pdf
effective-maintenance.pdfeffective-maintenance.pdf
effective-maintenance.pdfmartinusteddy
 
MODULE 1 (PREVENTIVE MAINTENANCE OVERVIEW).pptx
MODULE 1 (PREVENTIVE MAINTENANCE OVERVIEW).pptxMODULE 1 (PREVENTIVE MAINTENANCE OVERVIEW).pptx
MODULE 1 (PREVENTIVE MAINTENANCE OVERVIEW).pptxAbiolaOgunsanwo
 

Similar to TPM Guide to Total Productive Maintenance (20)

Tpm
TpmTpm
Tpm
 
Maintenance Total Productive TPMMMMMMMMMMMMMMMMMMM
Maintenance Total Productive TPMMMMMMMMMMMMMMMMMMMMaintenance Total Productive TPMMMMMMMMMMMMMMMMMMM
Maintenance Total Productive TPMMMMMMMMMMMMMMMMMMM
 
Lm
LmLm
Lm
 
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCEMAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
 
Rcm
RcmRcm
Rcm
 
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
Production and operation Unit_3.pptx
Production and operation Unit_3.pptxProduction and operation Unit_3.pptx
Production and operation Unit_3.pptx
 
tpmprinciplesandconcepts-190103043928.pdf
tpmprinciplesandconcepts-190103043928.pdftpmprinciplesandconcepts-190103043928.pdf
tpmprinciplesandconcepts-190103043928.pdf
 
Total productive maintenance(TPM)
Total productive maintenance(TPM)Total productive maintenance(TPM)
Total productive maintenance(TPM)
 
Total Productive Maintenance (TPM).pdf
Total Productive Maintenance (TPM).pdfTotal Productive Maintenance (TPM).pdf
Total Productive Maintenance (TPM).pdf
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
Tpm basic
Tpm basicTpm basic
Tpm basic
 
Ranveer yadav 2013 14
Ranveer yadav 2013 14Ranveer yadav 2013 14
Ranveer yadav 2013 14
 
TPM-PPT-4.pptx
TPM-PPT-4.pptxTPM-PPT-4.pptx
TPM-PPT-4.pptx
 
Srj tpm
Srj tpmSrj tpm
Srj tpm
 
tpm tracking for machine shope--by ganesh kadam
tpm tracking for machine shope--by ganesh kadamtpm tracking for machine shope--by ganesh kadam
tpm tracking for machine shope--by ganesh kadam
 
effective-maintenance.pdf
effective-maintenance.pdfeffective-maintenance.pdf
effective-maintenance.pdf
 
TPM.pptx
TPM.pptxTPM.pptx
TPM.pptx
 
MODULE 1 (PREVENTIVE MAINTENANCE OVERVIEW).pptx
MODULE 1 (PREVENTIVE MAINTENANCE OVERVIEW).pptxMODULE 1 (PREVENTIVE MAINTENANCE OVERVIEW).pptx
MODULE 1 (PREVENTIVE MAINTENANCE OVERVIEW).pptx
 

More from Paul Robere

More from Paul Robere (20)

Words to the_wise_0911
Words to the_wise_0911Words to the_wise_0911
Words to the_wise_0911
 
Quality136 tp 060509
Quality136 tp 060509Quality136 tp 060509
Quality136 tp 060509
 
Ibi
IbiIbi
Ibi
 
Mm
MmMm
Mm
 
Scm v20
Scm v20Scm v20
Scm v20
 
Kpi 1 day
Kpi 1 dayKpi 1 day
Kpi 1 day
 
14 epi-e-dn v.1.01(draft)
14 epi-e-dn v.1.01(draft)14 epi-e-dn v.1.01(draft)
14 epi-e-dn v.1.01(draft)
 
8 qmp
8 qmp8 qmp
8 qmp
 
7 new qc tools
7 new qc tools7 new qc tools
7 new qc tools
 
5 s training
5 s training5 s training
5 s training
 
Hr pts-e-dn-version 2.0
Hr pts-e-dn-version 2.0Hr pts-e-dn-version 2.0
Hr pts-e-dn-version 2.0
 
Train the trainer
Train the trainerTrain the trainer
Train the trainer
 
Hr tit-e-dn
Hr tit-e-dnHr tit-e-dn
Hr tit-e-dn
 
Tqm2
Tqm2Tqm2
Tqm2
 
Business writing
Business writingBusiness writing
Business writing
 
Consultative selling e
Consultative selling eConsultative selling e
Consultative selling e
 
Bd bmk e
Bd bmk eBd bmk e
Bd bmk e
 
Six sigma initiative free seminar rev4
Six sigma initiative free seminar rev4Six sigma initiative free seminar rev4
Six sigma initiative free seminar rev4
 
Proj mangmt 22
Proj mangmt 22Proj mangmt 22
Proj mangmt 22
 
Per mangmt 100
Per mangmt 100Per mangmt 100
Per mangmt 100
 

Recently uploaded

Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckHajeJanKamps
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadAyesha Khan
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCRsoniya singh
 

Recently uploaded (20)

Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
 

TPM Guide to Total Productive Maintenance

  • 1. The TPM Guide Total Productive Maintenance © Imants http://www.managementsupport.com
  • 2. © Imants http://www.managementsupport.com 1. TPM definition (1) • A company-wide team-based effort to build quality into equipment and to improve overall equipment effectiveness • Total • all employees are involved • it aims to eliminate all accidents, defects and breakdowns • Productive • actions are performed while production goes on • troubles for production are minimized • Maintenance • keep in good condition • repair, clean, lubricate
  • 3. © Imants http://www.managementsupport.com 1. TPM definition (2) • TPM combines the traditionally American practice of preventive maintenance with Total Quality Control and Total Employee Involvement, to create a culture where operators develop ownership of their equipment, and become full partners with Maintenance, Engineering and Management to assure equipment operates properly everyday.
  • 4. © Imants http://www.managementsupport.com 2. Origins of TPM • Dr. Deming introduced statistical analysis and used the resulting data to control quality during manufacturing (TQM) • Some general concepts of TQM did not work well in the maintenance environment • The need to go further than preventive maintenance was quickly recognized by those companies who were committed to TQM • Maintenance became an integral part of TQM in the early 90’s
  • 5. © Imants http://www.managementsupport.com 3. TPM principles • Increase Overall Equipment Effectiveness (OEE) • Improve existing planned maintenance systems • The operator is the best condition monitor • Provide training to upgrade operations and maintenance skills • Involve everyone and utilize cross-functional teamwork
  • 6. © Imants http://www.managementsupport.com 4. Eight major pillars of TPM AutonomousMaintenance PlannedMaintenance Equipmentandprocessimprovement Earlymanagementofnewequipment Processqualitymanagement TPMintheoffice Education and training Safety and environmental management
  • 7. © Imants http://www.managementsupport.com 4. Eight major pillars of TPM 4.1. Autonomous Maintenance (1) • Train the operators to close the gap between them and the maintenance staff, making it easier for both to work as one team • Change the equipment so the operator can identify any abnormal conditions and measure deterioration before it affects the process or leads to a failure
  • 8. © Imants http://www.managementsupport.com 4. Eight major pillars of TPM 4.1. Autonomous Maintenance (2) • 7 steps are implemented to progressively increase operators knowledge, participation and responsibility for their equipment • 1. Perform initial cleaning and inspection • 2. Countermeasures for the causes and effects of dirt and dust • 3. Establish cleaning and lubrication standards • 4. Conduct general inspection training • 5. Carry out equipment inspection checks • 6. Workplace management and control • 7. Continuous improvement
  • 9. © Imants http://www.managementsupport.com 4. Eight major pillars of TPM 4.2. Equipment and process improvement • Objective: maximize efficiency by eliminating waste and manufacturing losses • Manufacturing losses are categorized into 13 big losses: • Equipment losses (6) • Manpower losses (4) • Material losses (3)
  • 10. © Imants http://www.managementsupport.com 4. Eight major pillars of TPM 4.2. Equipment and process improvement 4.2.1. Equipment losses Downtime loss Speed loss Quality loss Equipment failure / breakdowns Set-up / adjustments Minor stopping / idling Reduced speed Process errors Rework / scrap
  • 11. © Imants http://www.managementsupport.com 4. Eight major pillars of TPM 4.2. Equipment and process improvement 4.2.2. Manpower and material losses Manpower losses Material losses Cleaning and checking Waiting instructions Waiting quality confirmation Material yield Energy losses Waiting materials Consumable material losses
  • 12. © Imants http://www.managementsupport.com 4. Eight major pillars of TPM 4.2. Equipment and process improvement 4.2.3 Overall Equipment Effectiveness (OEE) • OEE figures are determined by combining the availability and performance of your equipment with the quality of parts made • OEE measures the efficiency of the machine during its planned loading time. Planned downtime does not effect the OEE figure.
  • 13. © Imants http://www.managementsupport.com 4. Eight major pillars of TPM 4.2. Equipment and process improvement 4.2.3 Overall Equipment Effectiveness (OEE) Overall Equipment Effectiveness = Availability x Performance x Quality Yield Availability Downtime loss Speed lossPerformance Quality Yield Quality loss
  • 14. © Imants http://www.managementsupport.com 4. Eight major pillars of TPM 4.2. Equipment and process improvement 4.2.3 Overall Equipment Effectiveness (OEE) Overall Equipment Effectiveness = Availability x Performance x Quality Yield Availability = time available for production - downtime time available for production Performance = ideal cycle time x number of parts produced operating time Quality Yield = total number of parts produced - defect number total number of parts produced
  • 15. © Imants http://www.managementsupport.com 4. Eight major pillars of TPM 4.3. Planned maintenance • Objective: establish Preventative and Predictive Maintenance systems for equipment and tooling • Natural life cycle of individual machine elements must be achieved • Correct operation • Correct set-up • Cleaning • Lubrication • Retightening • Feedback and repair of minor defects • Quality spare parts
  • 16. © Imants http://www.managementsupport.com 4. Eight major pillars of TPM 4.4. Early Management of new equipment • Objective: establish systems to shorten • new product or equipment development • start-up, commissioning and stabilization time for quality and efficiency • New equipment needs to be: • easy to operate • easy to clean • easy to maintain and reliable • have quick set-up times • operate at the lowest life cycle cost
  • 17. © Imants http://www.managementsupport.com 4. Eight major pillars of TPM 4.5. Process Quality Management • Definition: a process for controlling the condition of equipment components that affect variability in product quality • Objective: to set and maintain conditions to accomplish zero defects • Quality rate has a direct correlation with • material conditions • equipment precision • production methods • process parameters
  • 18. © Imants http://www.managementsupport.com 4. Eight major pillars of TPM 4.6. TPM in administrative and support departments • Administrative and support departments can be seen as process plants whose principal tasks are to collect, process, and distribute information • Process analysis should be applied to streamline information flow
  • 19. © Imants http://www.managementsupport.com 4. Eight major pillars of TPM 4.7. Education and training • TPM is a continuous learning process. • 2 major components • soft skills training: how to work as teams, diversity training and communication skills • technical training: upgrading problem-solving and equipment- related skills
  • 20. © Imants http://www.managementsupport.com 4. Eight major pillars of TPM 4.8. Safety and environmental management • Assuring safety and preventing adverse environmental impacts are important priorities in any TPM effort
  • 21. © Imants http://www.managementsupport.com 5. TPM implementation 3 requirements for fundamental improvement • Increasing motivation: changing peoples attitudes • Increasing competency and peoples skills • Improving the work environment, so that it supports the establishment of a program for implementing TPM
  • 22. © Imants http://www.managementsupport.com 5. TPM Implementation 12 steps Preparation Kick-off Implementation Announcement to introduce TPM Introductory education campaign for the workforce TPM Promotion (special committees) Establish basic TPM policies and goals Preparation and Formulation of a master plan Develop an equipment management program Develop a planned maintenance program Develop an autonomous maintenance program Increase skills of production and maintenance personnel Perfect TPM implementation and raise TPM levelsStabilization Develop early equipment management program Invite customers, affiliated companies and subcontractors
  • 23. © Imants http://www.managementsupport.com 5. TPM Implementation 5.1. Announce top management’s decision to introduce TPM • State TPM objectives in a company newsletter • Place articles on TPM in the company newspaper
  • 24. © Imants http://www.managementsupport.com 5. TPM Implementation 5.2. Introductory education campaign • Seminars for managers • Slide presentations for all employees
  • 25. © Imants http://www.managementsupport.com 5. TPM Implementation 5.3. TPM Promotion • Special committees at every level to promote TPM • Newsletters • Articles • Videos • Posters
  • 26. © Imants http://www.managementsupport.com 5. TPM Implementation 5.4. Establish basic TPM policies and goals • Analyze existing conditions • Set goals • Predict results
  • 27. © Imants http://www.managementsupport.com 5. TPM Implementation 5.5. Preparation and Formulation of a master plan • A master plan lays out your goals, what you will do to achieve them and when you will achieve them • Detailed plans for each pillar have to be prepared
  • 28. © Imants http://www.managementsupport.com 5. TPM Implementation 5.6. TPM kick-off • The main kick-off to TPM should take the form of a formal presentation with all the employees attending • This opportunity can be used to gain the full support of the employees • Invite external customers, affiliated and subcontracting companies
  • 29. © Imants http://www.managementsupport.com 5. TPM Implementation 5.7. Develop an equipment management program (1) • The tools of Total Quality Management and Continuous Improvement are applied to the management and improvement of equipment • Form project teams • Select model equipment • identify equipment problems • analyze equipment problems • develop solutions and proposals for improvement
  • 30. © Imants http://www.managementsupport.com 5. TPM Implementation 5.7. Develop an equipment management program (2) • Typical membership of a team • five to seven operators • a maintenance person • a technical expert • Tools • Pareto • Cause & effect • Root cause • Methods Analysis
  • 31. © Imants http://www.managementsupport.com 5. TPM Implementation 5.8. Develop a planned maintenance program • Set up plans and schedules to carry out work on equipment before it breaks down, in order to extend the life of the equipment • Include periodic and predictive maintenance • Include management of spare parts and tools
  • 32. © Imants http://www.managementsupport.com 5. TPM Implementation 5.8. Develop a autonomous maintenance program • A handing-over of maintenance tasks from specialized maintenance personnel to production operators • Promote the seven steps • Tasks to hand over • cleaning • lubricating • inspecting • set-up and adjustment
  • 33. © Imants http://www.managementsupport.com 5. TPM Implementation 5.10. Increase skills of production and maintenance personnel • The training sessions must be planned shortly after the kick-off presentation. • 2 major components • soft skills training • technical training • Train leaders together • Have leaders share information with group members
  • 34. © Imants http://www.managementsupport.com 5. TPM Implementation 5.11. Develop early equipment management program(1) • The principle of designing for maintenance prevention can be applied to new products, and to new and existing machines. • New products must be designed so that they can be easily produced on new or existing machines • New machines must be designed for easier operations, changeover and maintenance
  • 35. © Imants http://www.managementsupport.com 5. TPM Implementation 5.11. Develop early equipment management program(2) • Existing machines: • analyze historical records for • trends of types of failures • frequency of component failures • root causes of failures • determine how to eliminate the problem and reduce maintenance through an equipment design change or by changing the process
  • 36. © Imants http://www.managementsupport.com 5. TPM Implementation 5.12. Perfect TPM implementation and raise TPM levels • Evaluate for the PM Award: The Japanese Institute for Productive Maintenance runs the annual PM Excellence Award. They provide a checklist for companies applying for the award. • Set higher goals
  • 37. © Imants http://www.managementsupport.com 6. TPM Benefits • Increased equipment productivity • Reduced equipment downtime • Increased plant capacity • Lower maintenance and production costs • Approaching zero equipment-caused defects • Enhanced job satisfaction • Increased Return On Investment
  • 38. © Imants http://www.managementsupport.com The end Please feel free to give any comments to imants@skynet.be