SlideShare a Scribd company logo
1 of 24
Download to read offline
Minimizing the integrity failures ofMinimizing the integrity failures of
agingaging plants andplants and equipmentsequipments
ThroughThrough
Reliability Centered MaintenanceReliability Centered Maintenance
ProSafeProSafe APACAPAC
Process Safety Management ConferenceProcess Safety Management Conference
9 March 20159 March 2015
Bhavesh ShuklaBhavesh Shukla
1
Introduction to
Minimizing Integrity Failure
through RCM
2015 Bhavesh Shukla
All rights reserved. No part of this publication may be reproduced, distributed, by any
means, without the prior written permission of the publisher.
2
Agenda
• Failure Case study
• Types of Maintenance
• Risk Based Maintenance Strategy
• Process Steps
• Exercise
3
Reactor agitator failure
Coupling with
Torque Limiting Slip (TLS) Plate
(Clutch)
4
Agitator FailureCost Analysis:
i. Additional cost to Business due to failure =1.3 Million
ii. Cost to prevent failure=$10000
Causal Factor:
i. Aging equipment
ii. Lack of predictive maintenance
iii. torque limiting setting was set too low during gear box
replacement which caused pre-mature clutch top limiterreplacement which caused pre-mature clutch top limiter
slipping which generated heat and caused the high speed
coupling to fail
Preventive Action:
i. Temperature monitoring of Gearboxes and motor
ii. Vibration check and analysis program
iii. Lubrication test and analysis program
5
Types of Maintenance
•Repair
Run to failure
•Preventive Maintenance
Time basedTime based
•Predictive Maintenance
Condition based
6
Repair
• Repair – run to failure, is suitable for small
items which are non critical,
inconsequential, unlikely to fail and
redundant.
• For critical equipments and parts is not an• For critical equipments and parts is not an
option.
• When Stakes are high Repair is not an
option
7
8
9
•Preventive maintenance is time base
Maintenance.
•We change parts or service equipment
before it fail and some time before it need
Preventive Maintenance
before it fail and some time before it need
to be.
10
11
12
13
Predictive Maintenance
• Is based on predictive testing, monitoring and
inspection.
• It is suitable for critical equipment which has
random failure
not subject to wear
PM induced failure
14
15
Vibration Monitoring & Analysis
16
17
Condition Based Maintenance
18
Reliability Centered Maintenance
• Reliability Centered Maintenance (RCM) is a
maintenance strategy that is implemented to optimize
the maintenance program of a company or facility using
cost-effective maintenance techniques.
• There are four principles that are critical for an RCM• There are four principles that are critical for an RCM
program.
The primary objective is to preserve system function
Identify failure modes that can affect the system function
Prioritize the failure modes
Select applicable and effective tasks to control the failure
modes
19
RCM Process Steps
Operational Risk Number
System Risk Number
Safety Issues, Regulatory Compliance,
Product Quality Issues, Process Throughput,
Operational Cost
In series and will stop the system (24 hr lost)
, Important (8 hr lost) ,Can be Bypassed,
Little effect to system, No effect to system
20
Asset Risk Number
Failure Probability Factor
Maintenance Priority Number
Reactive Maintenance Performed…
Daily, Weekly, Monthly, Quarterly, Annually
System Risk Ranking Process
Area SF RC QF PT OC SRN
PROCESS SYSTEM NAME
Safety
Failures
Regulatory
Compliance
Quality
Failures
Process
Throughput
Operational
Cost
System
Risk Number
Reactor
(1-10) (1-10) (1-10) (1-10) (1-10) 1-10(1-10) (1-10) (1-10) (1-10) (1-10) 1-10
Agitator TLS plate 8 2 10 10 10 8
Cooling control valve 6 8 9 8 5 7.35
Heating Control valve 5 6 6 8 8 6.71
Cooling insulation 3 2 3 4 3 3.07
21
Maintenance Priority Ranking Process
Risk Number ORN FPF
10 24 Hours Lost Daily
8 8 Hours Lost Weekly
6 2 Hours Lost Monthly
4 <1 Hour Lost Quarterly
2 No Lost Annually
System
Risk
Operational
Risk
Asset
Risk
Failure
Probability Maintenance
22
PROCESS SYSTEM NAME
Risk
Number
Risk
Number
Risk
Number
Probability
Factor
Maintenance
Priority Number
#1-10 (1-10) # 1-100 (1-10) # 1-1000
Reactor SRN ORN ARN FPF MPN
Agitator TLS Plate 8 10 80 3 240
Cooling control valve 7.35 4 29.40 2 59
Heating Control valve 6.71 3 20.13 5 101
Cooling insulation 3.07 2 6.14 1 6
Maintenance Strategy
Maintenance Priority Index to determine which
type of maintenance is most effective.
• Repair- run to failure• Repair- run to failure
• Preventive Maintenance
• Predictive Maintenance
23
Contact:
bhaveshjayati@hotmail.com
+65 96907710
24

More Related Content

What's hot

Boeing - Reliability Centered Maintenance
Boeing - Reliability Centered MaintenanceBoeing - Reliability Centered Maintenance
Boeing - Reliability Centered MaintenanceNandhagopal Muralithar
 
Reliability Centred Maintenance Presentation
Reliability Centred Maintenance PresentationReliability Centred Maintenance Presentation
Reliability Centred Maintenance PresentationAndy_Watson_Sim
 
Results before and after dynamic alarm mgt emerson
Results before and after dynamic alarm mgt   emersonResults before and after dynamic alarm mgt   emerson
Results before and after dynamic alarm mgt emersonMary Claire Simoneaux
 
Examination of Events that Occur During an Alarm Flood Examination
Examination of Events that Occur During an Alarm Flood ExaminationExamination of Events that Occur During an Alarm Flood Examination
Examination of Events that Occur During an Alarm Flood ExaminationMary Claire Simoneaux
 
Alarm Rationalization Workshop - Tips, Tricks and Traps
Alarm Rationalization Workshop - Tips, Tricks and Traps Alarm Rationalization Workshop - Tips, Tricks and Traps
Alarm Rationalization Workshop - Tips, Tricks and Traps Mary Claire Simoneaux
 
Operator errors and what can be done to minimize
Operator errors and what can be done to minimizeOperator errors and what can be done to minimize
Operator errors and what can be done to minimizeMary Claire Simoneaux
 
Predictive maintenance
Predictive maintenancePredictive maintenance
Predictive maintenanceJames Shearer
 
Reliability Through Correlation and Colaboration
Reliability Through Correlation and ColaborationReliability Through Correlation and Colaboration
Reliability Through Correlation and ColaborationChad Broussard
 
E Com Security solutions hand book on Firewall security management in PCI Com...
E Com Security solutions hand book on Firewall security management in PCI Com...E Com Security solutions hand book on Firewall security management in PCI Com...
E Com Security solutions hand book on Firewall security management in PCI Com...Dolly Juhu
 
Poster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects Analysis
Poster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects AnalysisPoster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects Analysis
Poster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects AnalysisAnas Momen
 
V-Map G3 A3 Flyer (Final Rev 0)
V-Map G3 A3 Flyer (Final Rev 0)V-Map G3 A3 Flyer (Final Rev 0)
V-Map G3 A3 Flyer (Final Rev 0)shangothetammy
 
20110204 alarm management seminar ureason v1 3
20110204 alarm management seminar ureason v1 320110204 alarm management seminar ureason v1 3
20110204 alarm management seminar ureason v1 3UReasonChannel
 
Predictive Maintenance
Predictive MaintenancePredictive Maintenance
Predictive MaintenancePritesh Gandhi
 
Plant Maintenance & Condition Monitoring
Plant Maintenance & Condition MonitoringPlant Maintenance & Condition Monitoring
Plant Maintenance & Condition MonitoringElena Maria Vaccher
 
Tool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and WhyTool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and WhyRicky Smith CMRP, CMRT
 
Reliability centred maintenance
Reliability centred maintenanceReliability centred maintenance
Reliability centred maintenanceSHIVAJI CHOUDHURY
 
Condition based maintenance
Condition based maintenanceCondition based maintenance
Condition based maintenanceCristian Garcia
 
Arrelic Services | APM
Arrelic Services | APMArrelic Services | APM
Arrelic Services | APMArrelic
 

What's hot (20)

Boeing - Reliability Centered Maintenance
Boeing - Reliability Centered MaintenanceBoeing - Reliability Centered Maintenance
Boeing - Reliability Centered Maintenance
 
Reliability Centred Maintenance Presentation
Reliability Centred Maintenance PresentationReliability Centred Maintenance Presentation
Reliability Centred Maintenance Presentation
 
Results before and after dynamic alarm mgt emerson
Results before and after dynamic alarm mgt   emersonResults before and after dynamic alarm mgt   emerson
Results before and after dynamic alarm mgt emerson
 
Examination of Events that Occur During an Alarm Flood Examination
Examination of Events that Occur During an Alarm Flood ExaminationExamination of Events that Occur During an Alarm Flood Examination
Examination of Events that Occur During an Alarm Flood Examination
 
Alarm Rationalization Workshop - Tips, Tricks and Traps
Alarm Rationalization Workshop - Tips, Tricks and Traps Alarm Rationalization Workshop - Tips, Tricks and Traps
Alarm Rationalization Workshop - Tips, Tricks and Traps
 
Operator errors and what can be done to minimize
Operator errors and what can be done to minimizeOperator errors and what can be done to minimize
Operator errors and what can be done to minimize
 
Predictive maintenance
Predictive maintenancePredictive maintenance
Predictive maintenance
 
Reliability Through Correlation and Colaboration
Reliability Through Correlation and ColaborationReliability Through Correlation and Colaboration
Reliability Through Correlation and Colaboration
 
E Com Security solutions hand book on Firewall security management in PCI Com...
E Com Security solutions hand book on Firewall security management in PCI Com...E Com Security solutions hand book on Firewall security management in PCI Com...
E Com Security solutions hand book on Firewall security management in PCI Com...
 
Poster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects Analysis
Poster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects AnalysisPoster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects Analysis
Poster_EGY_TE_Anas Momen_Hilal-Failure Modes and Effects Analysis
 
V-Map G3 A3 Flyer (Final Rev 0)
V-Map G3 A3 Flyer (Final Rev 0)V-Map G3 A3 Flyer (Final Rev 0)
V-Map G3 A3 Flyer (Final Rev 0)
 
20110204 alarm management seminar ureason v1 3
20110204 alarm management seminar ureason v1 320110204 alarm management seminar ureason v1 3
20110204 alarm management seminar ureason v1 3
 
RCM
RCMRCM
RCM
 
Predictive Maintenance
Predictive MaintenancePredictive Maintenance
Predictive Maintenance
 
Plant Maintenance & Condition Monitoring
Plant Maintenance & Condition MonitoringPlant Maintenance & Condition Monitoring
Plant Maintenance & Condition Monitoring
 
Beast alarm guideline_2013
Beast alarm guideline_2013Beast alarm guideline_2013
Beast alarm guideline_2013
 
Tool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and WhyTool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and Why
 
Reliability centred maintenance
Reliability centred maintenanceReliability centred maintenance
Reliability centred maintenance
 
Condition based maintenance
Condition based maintenanceCondition based maintenance
Condition based maintenance
 
Arrelic Services | APM
Arrelic Services | APMArrelic Services | APM
Arrelic Services | APM
 

Similar to Apac 2015 minimizing integrity failure r02

Introduction to Reliability Centered Maintenance
Introduction to Reliability Centered MaintenanceIntroduction to Reliability Centered Maintenance
Introduction to Reliability Centered MaintenanceDibyendu De
 
Condition Based Asset Management R K Gupta
Condition Based Asset Management R K GuptaCondition Based Asset Management R K Gupta
Condition Based Asset Management R K GuptaRajuGupta88
 
reliabilitycenteredmaintenancemadesimple.pdf
reliabilitycenteredmaintenancemadesimple.pdfreliabilitycenteredmaintenancemadesimple.pdf
reliabilitycenteredmaintenancemadesimple.pdfEdgar V Macapili
 
Root Cause Analysis .pdf
Root Cause Analysis .pdfRoot Cause Analysis .pdf
Root Cause Analysis .pdfssuser089410
 
A CASE STUDY ON RELIABLITY MAINTENANCE
A CASE STUDY ON RELIABLITY MAINTENANCEA CASE STUDY ON RELIABLITY MAINTENANCE
A CASE STUDY ON RELIABLITY MAINTENANCEZubair Ali ali
 
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptx
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptxReliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptx
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptxSamuel Gher
 
Implementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programsImplementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programshossam hassanein
 
Planned preventive maintenance report
Planned preventive maintenance reportPlanned preventive maintenance report
Planned preventive maintenance reportbabarsaleeem11
 
002 Maintenance M Overview 20 06 06[1]
002 Maintenance M Overview 20 06 06[1]002 Maintenance M Overview 20 06 06[1]
002 Maintenance M Overview 20 06 06[1]lcgg59
 
Best Practices in Maintenance and Reliability
Best Practices in Maintenance and ReliabilityBest Practices in Maintenance and Reliability
Best Practices in Maintenance and ReliabilityRicky Smith CMRP, CMRT
 
Key Considerations for Scoping Reinstrumentation Projects
Key Considerations for Scoping Reinstrumentation ProjectsKey Considerations for Scoping Reinstrumentation Projects
Key Considerations for Scoping Reinstrumentation ProjectsYokogawa1
 
TPM Training HON Torrance
TPM Training HON TorranceTPM Training HON Torrance
TPM Training HON TorranceWayne Miller
 
RCM made simple for stress free Implementation
RCM  made simple for stress free  ImplementationRCM  made simple for stress free  Implementation
RCM made simple for stress free ImplementationNyana Pragasam
 
Stork Presentation on Migration (Willem Hazenberg)
Stork Presentation on Migration (Willem Hazenberg)Stork Presentation on Migration (Willem Hazenberg)
Stork Presentation on Migration (Willem Hazenberg)ARC Advisory Group
 
Smart Maintenance engineering
Smart Maintenance engineering Smart Maintenance engineering
Smart Maintenance engineering Michel Mafumba
 
TYPE OF WORLD CLASS MAINTENANCE.pptx
TYPE OF WORLD CLASS MAINTENANCE.pptxTYPE OF WORLD CLASS MAINTENANCE.pptx
TYPE OF WORLD CLASS MAINTENANCE.pptxIsmailJulaihi
 

Similar to Apac 2015 minimizing integrity failure r02 (20)

Introduction to Reliability Centered Maintenance
Introduction to Reliability Centered MaintenanceIntroduction to Reliability Centered Maintenance
Introduction to Reliability Centered Maintenance
 
Condition Based Asset Management R K Gupta
Condition Based Asset Management R K GuptaCondition Based Asset Management R K Gupta
Condition Based Asset Management R K Gupta
 
INTRODUCTION TO RCM.ppt
INTRODUCTION TO RCM.pptINTRODUCTION TO RCM.ppt
INTRODUCTION TO RCM.ppt
 
reliabilitycenteredmaintenancemadesimple.pdf
reliabilitycenteredmaintenancemadesimple.pdfreliabilitycenteredmaintenancemadesimple.pdf
reliabilitycenteredmaintenancemadesimple.pdf
 
Root Cause Analysis .pdf
Root Cause Analysis .pdfRoot Cause Analysis .pdf
Root Cause Analysis .pdf
 
Root Cause Analysis.pdf
Root Cause Analysis.pdfRoot Cause Analysis.pdf
Root Cause Analysis.pdf
 
A CASE STUDY ON RELIABLITY MAINTENANCE
A CASE STUDY ON RELIABLITY MAINTENANCEA CASE STUDY ON RELIABLITY MAINTENANCE
A CASE STUDY ON RELIABLITY MAINTENANCE
 
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptx
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptxReliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptx
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptx
 
Implementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programsImplementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programs
 
Planned preventive maintenance report
Planned preventive maintenance reportPlanned preventive maintenance report
Planned preventive maintenance report
 
Lecture 1 - part 1.pptx
Lecture 1 - part 1.pptxLecture 1 - part 1.pptx
Lecture 1 - part 1.pptx
 
002 Maintenance M Overview 20 06 06[1]
002 Maintenance M Overview 20 06 06[1]002 Maintenance M Overview 20 06 06[1]
002 Maintenance M Overview 20 06 06[1]
 
Rcm
RcmRcm
Rcm
 
Best Practices in Maintenance and Reliability
Best Practices in Maintenance and ReliabilityBest Practices in Maintenance and Reliability
Best Practices in Maintenance and Reliability
 
Key Considerations for Scoping Reinstrumentation Projects
Key Considerations for Scoping Reinstrumentation ProjectsKey Considerations for Scoping Reinstrumentation Projects
Key Considerations for Scoping Reinstrumentation Projects
 
TPM Training HON Torrance
TPM Training HON TorranceTPM Training HON Torrance
TPM Training HON Torrance
 
RCM made simple for stress free Implementation
RCM  made simple for stress free  ImplementationRCM  made simple for stress free  Implementation
RCM made simple for stress free Implementation
 
Stork Presentation on Migration (Willem Hazenberg)
Stork Presentation on Migration (Willem Hazenberg)Stork Presentation on Migration (Willem Hazenberg)
Stork Presentation on Migration (Willem Hazenberg)
 
Smart Maintenance engineering
Smart Maintenance engineering Smart Maintenance engineering
Smart Maintenance engineering
 
TYPE OF WORLD CLASS MAINTENANCE.pptx
TYPE OF WORLD CLASS MAINTENANCE.pptxTYPE OF WORLD CLASS MAINTENANCE.pptx
TYPE OF WORLD CLASS MAINTENANCE.pptx
 

Recently uploaded

Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 

Recently uploaded (20)

Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 

Apac 2015 minimizing integrity failure r02

  • 1. Minimizing the integrity failures ofMinimizing the integrity failures of agingaging plants andplants and equipmentsequipments ThroughThrough Reliability Centered MaintenanceReliability Centered Maintenance ProSafeProSafe APACAPAC Process Safety Management ConferenceProcess Safety Management Conference 9 March 20159 March 2015 Bhavesh ShuklaBhavesh Shukla 1
  • 2. Introduction to Minimizing Integrity Failure through RCM 2015 Bhavesh Shukla All rights reserved. No part of this publication may be reproduced, distributed, by any means, without the prior written permission of the publisher. 2
  • 3. Agenda • Failure Case study • Types of Maintenance • Risk Based Maintenance Strategy • Process Steps • Exercise 3
  • 4. Reactor agitator failure Coupling with Torque Limiting Slip (TLS) Plate (Clutch) 4
  • 5. Agitator FailureCost Analysis: i. Additional cost to Business due to failure =1.3 Million ii. Cost to prevent failure=$10000 Causal Factor: i. Aging equipment ii. Lack of predictive maintenance iii. torque limiting setting was set too low during gear box replacement which caused pre-mature clutch top limiterreplacement which caused pre-mature clutch top limiter slipping which generated heat and caused the high speed coupling to fail Preventive Action: i. Temperature monitoring of Gearboxes and motor ii. Vibration check and analysis program iii. Lubrication test and analysis program 5
  • 6. Types of Maintenance •Repair Run to failure •Preventive Maintenance Time basedTime based •Predictive Maintenance Condition based 6
  • 7. Repair • Repair – run to failure, is suitable for small items which are non critical, inconsequential, unlikely to fail and redundant. • For critical equipments and parts is not an• For critical equipments and parts is not an option. • When Stakes are high Repair is not an option 7
  • 8. 8
  • 9. 9
  • 10. •Preventive maintenance is time base Maintenance. •We change parts or service equipment before it fail and some time before it need Preventive Maintenance before it fail and some time before it need to be. 10
  • 11. 11
  • 12. 12
  • 13. 13
  • 14. Predictive Maintenance • Is based on predictive testing, monitoring and inspection. • It is suitable for critical equipment which has random failure not subject to wear PM induced failure 14
  • 15. 15
  • 16. Vibration Monitoring & Analysis 16
  • 17. 17
  • 19. Reliability Centered Maintenance • Reliability Centered Maintenance (RCM) is a maintenance strategy that is implemented to optimize the maintenance program of a company or facility using cost-effective maintenance techniques. • There are four principles that are critical for an RCM• There are four principles that are critical for an RCM program. The primary objective is to preserve system function Identify failure modes that can affect the system function Prioritize the failure modes Select applicable and effective tasks to control the failure modes 19
  • 20. RCM Process Steps Operational Risk Number System Risk Number Safety Issues, Regulatory Compliance, Product Quality Issues, Process Throughput, Operational Cost In series and will stop the system (24 hr lost) , Important (8 hr lost) ,Can be Bypassed, Little effect to system, No effect to system 20 Asset Risk Number Failure Probability Factor Maintenance Priority Number Reactive Maintenance Performed… Daily, Weekly, Monthly, Quarterly, Annually
  • 21. System Risk Ranking Process Area SF RC QF PT OC SRN PROCESS SYSTEM NAME Safety Failures Regulatory Compliance Quality Failures Process Throughput Operational Cost System Risk Number Reactor (1-10) (1-10) (1-10) (1-10) (1-10) 1-10(1-10) (1-10) (1-10) (1-10) (1-10) 1-10 Agitator TLS plate 8 2 10 10 10 8 Cooling control valve 6 8 9 8 5 7.35 Heating Control valve 5 6 6 8 8 6.71 Cooling insulation 3 2 3 4 3 3.07 21
  • 22. Maintenance Priority Ranking Process Risk Number ORN FPF 10 24 Hours Lost Daily 8 8 Hours Lost Weekly 6 2 Hours Lost Monthly 4 <1 Hour Lost Quarterly 2 No Lost Annually System Risk Operational Risk Asset Risk Failure Probability Maintenance 22 PROCESS SYSTEM NAME Risk Number Risk Number Risk Number Probability Factor Maintenance Priority Number #1-10 (1-10) # 1-100 (1-10) # 1-1000 Reactor SRN ORN ARN FPF MPN Agitator TLS Plate 8 10 80 3 240 Cooling control valve 7.35 4 29.40 2 59 Heating Control valve 6.71 3 20.13 5 101 Cooling insulation 3.07 2 6.14 1 6
  • 23. Maintenance Strategy Maintenance Priority Index to determine which type of maintenance is most effective. • Repair- run to failure• Repair- run to failure • Preventive Maintenance • Predictive Maintenance 23