Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

Condition based maintenance strategy

2,536 views

Published on

A brief Overview onthe benefits of Condition BAsed Monitoring popularly known as Predictive Maintenance. Its advantages and area of applicability.

Published in: Engineering
  • Be the first to comment

Condition based maintenance strategy

  1. 1. Condition Based monitoring By, Priyesh Nair
  2. 2. Contents: 1. Maintenance Objectives 2. Maintenance Classification 3. Predictive Maintenance & CBM 4. Comparison of Machine to Human 5. Advantages & Necessity of CBM 6. Techniques & Frequency of CBM 7. Flow Chart of Implementation 8. Implementation Priyesh Nair
  3. 3. 1. Maintenance Objectives: Priyesh Nair
  4. 4. 2. Maintenance Classification: Entire maintenance can be broken down into sub categories which is as follows: Priyesh Nair
  5. 5. 3. Predictive Maintenance:  As the name implies it involves the prediction of the failure before it occurs, identifying the root cause for those failure symptoms and eliminating those causes before the y result in extensive damage of equipment.  Type of maintenance performed continuously or at regular intervals according to the requirements to diagnose a condition and monitor a condition or system. Also known as Condition Based Monitoring. Condition Based Monitoring:  The ultimate objective of CBM program is to ensure the availability of the equipment for safe and reliable operation during its useful life at optimum maintenance cost. Priyesh Nair
  6. 6. oPredictive Of M/C Is As Doctor Care Human  FOR HUMAN: HEARTBEAT READING----TEMPRATURE-----BLOOD TEST---------CARDIOGRAPH  FOR M/C: VIBRATION-----------------THERMOGRAPHY--------M/C OIL TEST------FFT SIGNATURE 4. Comparison of Machine to Human Priyesh Nair
  7. 7. An approach to best Condition Monitoring Practices  Factors Affecting Industrial Appliances: ◦ Where downtime cost is predominantly high. ◦ Where a safety risk is particularly likely to arise from the breakdown of machinery. ◦ Where accurate and advanced planning of maintenance is essential. ◦ Where plant/equipment is of recent design and may have residual development problems ◦ Where operators cannot be expected to detect faults in expensive equipment whose breakdown may result in serious damage. ◦ Where instruments or other equipments required for condition monitoring can be used or is already being used ◦ Where the manufacturer can offer a condition monitoring service to users of its equipment Priyesh Nair
  8. 8. 5. Advantages of CBM:  Allows planned maintenance rather than breakdown maintenance.  Production can be modified to extend unit life.  Cause of failure can be analyzed.  Permits for maintenance can be planned.  Manpower/Spares can be arranged well in advance.  Modifications can be planned. Necessity for CBM: Cost Benefits Time Benefits Minimum equipment damage/repairs Reduced downtime of equipment through scheduled vs unscheduled repairs Minimal oil use and disposal Less use of inventory items through reliability enhancement Reduced Mean Time To Repair Indirect cost-less part loading due to equipment outage High Mean Time Between Failures differences.Priyesh Nair
  9. 9. 6. Techniques for monitoring CBM:  Vibration Analysis  Thermography  Motor Current Signature Analysis  Oil Analysis  Wear Debris Analysis Frequency of implementation: S.No. Method Frequency 1. Vibration Analysis Monthly 2. Thermography Quarterly 3. Motor Current Signature Analysis Quarterly 4. Oil Analysis Monthly 5. Wear Debris Analysis On need basis Priyesh Nair
  10. 10. 7. Flow Chart of Implementation: Identify equipment and CBM technique Scheduling and Planning Measurement • Scheduled • Unscheduled Data Entry Abnormal Reading Normal Reading Report Generation and circulation Analysis Exception Report for corrective action Corrective Action by Department Feedback from Department Re- measurement Data Entry to History Sheets/SoftwaresPriyesh Nair
  11. 11. 8. Implementation:  The CBM methods are implemented based on the equipments that needs assessment. S.No. Technique Equipment 1. Vibration Analysis Rotating and reciprocating equipments 2. Thermography All Electrical PCC, MCC, switchyards etc. 3. Motor Current Signature Analysis All Terminal Boxes 4. Oil Analysis All type of Hydraulic and lubricating oils 5. Wear Debris Analysis All type of Hydraulic and lubricating oils Priyesh Nair
  12. 12. Priyesh Nair

×