PGSR Workstation Presentation8. Safe working ....environment 15. Grit blasting being conducted on the steam turbine rotor A noise survey showed 112dB inside and 99dB outside the workstation 17. With old methods if crane work is to be carried out, licensed scaffolders are required to modify the structure 20. No licences are required for personnel to erect, modify or move the Workstation 23. A temperature of 32o C and humidity of 40% has been maintained for over 2 weeks on the turbine deck A de-humidifier is used to control humidity for ideal generator rotor conditions