esdm.go.id| @kesdm Ministry of Energy and Mineral Resources|
Lowering Clean Energy Risk
Through Government
Regulation
Directorate General of New, Renewable Energy, and Energy Conservation
Ministry of Energy and Mineral Resources
Republic of Indonesia
Foto: Hasrullah Arifin/Lomba Foto KESDM 2019
Jakarta, 16 June 2021
FGD on Use of Insurance Products to De-risk Clean
Energy Projects
1
Chrisnawan Anditya
Director of Various New and Renewable Energy
esdm.go.id| @kesdm Ministry of Energy and Mineral Resources| 2
1 Energy Sector Commitments Towards Net Zero Emission 3
2 Government Programs for NRE Development 4
3 Investment Risks in Renewable Energy 5
4 Lowering Clean Energy Risk Through Government Regulation 6
5 Closing 12
OUTLINE
esdm.go.id| @kesdm Ministry of Energy and Mineral Resources|
ENERGY SECTOR COMMITMENTS TOWARDS NET ZERO EMISSION
Leaders Summit on Climate, 22 April 2021
UNFCCC - COP21, December 2015
National Commitments 2016-2030:
• The mandate of Law No. 16/2016 on Ratification of the
Paris Agreement: reducing GHG emissions by 29% (self-
effort) or 41% (with international assistance) by 2030
according to NDC;
• The energy sector reduces GHG by 314–398 million tons of
CO2 in 2030, through the development of renewable
energy, implementation of energy efficiency, energy
conservation, as well as the application of clean energy
technology.
National Commitments 2021-2050:
• Implement concrete actions on climate change through a
moratorium on forest and peat land conversion to reduce
forest fires by 82%;
• Encouraging green development through the development of
a Green Industrial Park covering an area of ​​12,500 hectares in
North Kalimantan;
• Unlock investment in the energy transition through the
development of biofuels, lithium battery industry, and
electric vehicles.
3
3
esdm.go.id| @kesdm Ministry of Energy and Mineral Resources|
Source: National Grand Strategy for Energy Concept
esdm.go.id| @kesdm 4
1. Indonesian Government aims to add 38 GWof NRE
Installed Capacity by2035
2. Solar energy is prioritized due to its relativelylow cost
and short installationduration.
3. NRE AccelerationEfforts:
• Primary Final Energy Substitution, by utilizing the
existing technology; B30-B50, co-firing, RDF
utilization.
• Fossil Primary Energy Conversion, converting Diesel
PP or Coal Powered PP into NRE PP, biogas, and
pellet forcooking.
• Increasing NRE Capacity, to meet the new demand;
focus on the development of Solar PP
• Utilization of Non-Electric NRE /Non-Biofuel such
as briquettes and drying of biogas agricultural
products
• Implementation of the Presidential Regulation
regarding the price of NRE.
• The revised Ministerial Regulation regarding
Rooftop Solar PV.
10 10 11
13
15
18
24
27
30
32
35
37
39
41
43
45
48
2019 2021 2023 2025 2027 2029 2031 2033 2035
Total Capacity RE (GW)
NRE Target
23%
GOVERNMENT PROGRAMS FOR NRE DEVELOPMENT
4
esdm.go.id| @kesdm Ministry of Energy and Mineral Resources|
CHALLENGES
5
Social Social Social
Permit Engineering Engineering
Engineering Policy/Regulatory Policy/Regulatory
PPA/Contract Technology Technology
Policy/Regulatory Construction Labour
Procurement Process Labour Nature
Land Acquisition Nature Currency
Currency Hydrology
Grid Connection
Curtailment
Development Construction Operation
Which risks are acceptable to project developers, investors, lenders, utility company? And which are not
acceptable? What to do about it?
Source: Indonesia Renewable Energy Society, 2019
INVESTMENT RISKS IN RENEWABLE ENERGY
esdm.go.id| @kesdm Ministry of Energy and Mineral Resources|
CHALLENGES
6
DE-RISK CLEAN ENERGY PROJECTS: REPOSITIONING OF AUTHORITY
Minister of EMR
• Carried out by State Enterprises (PLN);
• Business Entities which have cross provinces business
areas;
• Business entities which sell electricity to electricity business
license holder issued by Minister.
• Electricity Business Area Holder which provide integrated
electricity supply.
Governor
• Business entities which have business area in a single
province;
• Business entities which sell electricity to electricity business
license holder issued by Governor.
• Electricity Business Area Holders which do not include
electricity generation business
Authority of Minister of EMR / Governor after issuing IUPTL:
AUTHORITY OF ISSUING THE ELECTRICITY SUPPLY BUSINESS LICENSE FOR PUBLIC (IUPTL)
Minister of EMR
• Stipulation of Electricity Tariff;
• Stipulation of Electricity Sale Price Agreement and Grid Lease for
business entity which its license was issued by Minister;
• Ratification of Electricity Business Plan for business entity which
its license was issued by Minister;
• Supervision and Monitoring;
• Administrative Sanctions Arrangement.
Governor
• Stipulation of Electricity Sale Price Agreement and Grid Lease for
business entity which its license was issued by Governor;
• Ratification of Electricity Business Plan for business entity which its
license was issued by Governor;
• Supervision and Monitoring;
• Administrative Sanctions Arrangement.
Based on Government Reg. No. 5/2021 and Government Reg. No 25/2021
esdm.go.id| @kesdm Ministry of Energy and Mineral Resources|
CHALLENGES
7
DE-RISK CLEAN ENERGY PROJECTS: EASY OF PERMITS
ESBL(IUPTL) is an Electricity Supply Business
License for Public Interest
Shall have:
1. Business ID / NIB (Nomor Induk Berusaha);
2. Beneficial Ownership (Daftar Penerima Manfaat);
ESBL (IUPTL) Requirements :
1. Feasibility study of electricity supply business, with
documents that contains (in Indonesian
Language/Bahasa) :
a. Financial Feasibility Study;
b. Operational Feasibility Study;
c. Grid Interconnection Study;
d. Installation location;
e. One Line Diagram;
f. Type and capacity of business;
g. Construction Schedule; and
h. Operation Schedule, which prepared by Certified
Business Entity; and
2. Electricity Sale and Purchase Agreement between
applicant and prospective electricity buyer (ESPA/PJBL
with its amendments) according to Electricity Sale
Price Criteria or has obtained Electricity Sale Price
Approval from Minister of EMR or Governor, based on
the authority.
Business entity submit licensing
request in OSS
(oss.go.id)
DG Electricity MEMR
Carried out verification of technical
requirements
(Business Licensing Commintment)
COMPLETE
& VALID
?
APPLICANT
NO
YES
ESDM Licensing App
(perizinan.esdm.go.id)
ESBL/IUPTL
Issued
(oss.go.id)
5
Working
Days
BID (Business ID) / NIB
(Nomor Induk Berusaha)
ESBL/IUPTL
(not activated)
Rejected
ESBL/IUPTL
Efektif
Commitment Fulfilled Letter
(perizinan.esdm.go.id)
Commitment
Fulfilled
The Electricity Supply Business
License for Public (IUPTL)
Before After
Requirements 9/10 2
Period (days) 30 5
Based on Government Reg. No. 23/2014 jo. Government Reg.
No. 14/2012; Government Reg. No. 24/2018; Government Reg.
No. 5/2021; and Government Reg. No 25/2021
esdm.go.id| @kesdm Ministry of Energy and Mineral Resources|
CHALLENGES
8
DE-RISK CLEAN ENERGY PROJECTS: ON-LINE PERMIT PROCESS
Request
(Licensing)
Business
Entities
OSS
KESDM
Application
(Evaluation)
perizinan.esdm.go.id
Rejected
NIB (Business ID) and
Licensing Output (not activated)
Approved/Rejected
Integration
Business License
(Activated)
Commitments
fulfilled
Approval
Request Tracking
Based on Government Reg. No. 23/2014 jo. Government
Reg. No. 14/2012; Government Reg. No. 24/2018;
Government Reg. No. 5/2021; and Government Reg. No
25/2021
esdm.go.id| @kesdm Ministry of Energy and Mineral Resources|
CHALLENGES
9
DE-RISK CLEAN ENERGY PROJECTS: PPA GUIDANCE
1. PJBL : Period
2. Rights and obligations : seller - buyer
3. Guarantee
4. Commissioning & COD
5. Fuel supply
6. Transactions
7. Generation Performance Penalties
8. PJBL : Termination
9. Transfer of rights
10.Price adjustment requirements
11.Dispute resolution
12.force majeur
PRINCIPLE OF ARRANGEMENTS:
1. The longest period of ESPA/PJBL is 30 years, with considering
generation type and starting date from COD.
2. Build, Own, Operate, Transfer (BOOT) is used as cooperation
pattern in ESPA/PJBL.
1. Comissioning terms shall refer to MEMR Regulation No 5/2014
jo MEMR Regulation No 10/2016 concerning on Electricity
Accreditation and Certification Procedure.
2. Electricity operation shall refer to MEMR Regulation concerning
on Grid Code.
3. If there is COD acceleration by PLN’s request → vendor have
right to obtain incentives
4. If there is late COD → PLN have right to give penalty
1. PLN shall purchase electricity matched with Availability Factor
(AF) or Capacity Factor (CF) with price as stated in purchase
agreement.
2. IPP shall provide electricity energy as stated in the contract
(deliver or pay).
3. In the condition that PLN can not absorb electricity as stated in
the contract and this condition is caused by PLN’s fault, then
PLN shall pay the penalty to the seller (take or pay).
ESPA (PJBL) :
COMISSIONING & COD:
TRANSAKSI:
Based on MEMR Reg No. 10/2017 jo MEMR
Reg. No. 10/2018
esdm.go.id| @kesdm Ministry of Energy and Mineral Resources|
CHALLENGES
10
DE-RISK CLEAN ENERGY PROJECTS: PRICE AND MECHANISM *)
*) Draft Presidential Regulation on NRE
PRICE
FiT staging 2 no excalation phase, location factor is valid for
Staging 1:
▪ Hydro PP (including Hydro PP reservoir) for capacity up to 5 MW
▪ Solar PV and Wind PP for capacity up to 5 MW
▪ Biomass PP and Biogas PP for capacity up to 5 MW
▪ Solar PV and Wind PP expansion for capacity up to 5 MW
▪ Biomass PP and Biogas PP expansion for capacity up to 5 MW
Ceiling price (HPT) staging 2 no excalation phase, location factor is
valid for staging 1:
▪ Geothermal PP for all capacity
▪ Hydro Power Plant (including Hydro Power Plant reservoir) for
capacity>5 MW
▪ PV and Wind PP >5 MW
▪ Biomass PP and Biogas PP for capacity >5 MW
▪ PV and Wind PP expansion >5 MW
▪ Biomass PP and Biogas PP expansion >5 MW
▪ excess power Geothermal, Hydro, Biomass, Biogas PP all
capacity.
Agreement Price:
▪ Hydro Power Plant Peaker for all capacity
▪ Waste PP,Biofuel PP, Sea Energy PP for all capacity
MECHANISM OF PURCHASING ELECTRIC POWER
Direct Appointment:
▪ Hydro PP for all capacity;
▪ Solar PV and Wind PP for capacity up to 5 MW
▪ Biomass PP and Biogas PP for capacity up to 5 MW
▪ Expansion of hydro PP, geothermal, Solar PV, wind PP, Biomass PP,
Biogas for all capacity.
▪ Excess power of dari hydro PP, geothermal, Biomass PP, Biogas for
all capacity.
Direct Appointment : assignment for Hydro PP reservoir &
Geothermal
Direct selection: Solar PV, Wind PP, Biomass PP and Biogas PP for
capacity up to 5 MW
BOOT mechanisme: B to B.
Period of contract: 30 years for hydro PP, geothermal, Solar PV, wind
PP; 20 years for PLTBg and 25 years for Bimass PP.
Transaction using Rupiah.
The agreement price requires the approval from the MEMR
The provision of electricity purchase price is evaluated 3 years at the
most.
1
2
3
1
2
3
4
6
7
8
5
esdm.go.id| @kesdm Ministry of Energy and Mineral Resources|
CHALLENGES
11
DE-RISK CLEAN ENERGY PROJECTS: GOVERNMENT SUPPORT *)
Ministry of EMR: Formulating NRE PP
development plan and determining the
NRE quota
01
Ministry of Finance:
▪ Providing fiscal and non-fiscal incentives
▪ Giving compensation to PT PLN if the
electricity purchase price regulated in
the Presidential Regulation > BPP PT
PLN
02
Ministry of SOE: Determining the NRE
utilization target in PT PLN’s performance
indicator and assigning SOE to develop
NRE industry
03
Ministry of Agrarian Affairs and Spatial
Planning/National Land Agency:
Providing ease of licensing and prioritizing
NRE utilization in national spatial planning
04
Ministry of Environment and Forestry:
Providing ease of licensing for land
utilization in forest areas and cost
deduction in NRE development
05
Ministry of Industry:
▪ Supporting Business Entities to prioritize domestic
products utilization through creating of supply
capability
▪ Determining import quotas for NRE PP components,
▪ Executing Verification of Domestic Component Level
for NRE PP components
▪ Formulating roadmap for electricity supporting
industry development
06
Ministry of Public Works and Housing :
Providing ease of licensing and cost deduction
in NRE development
07
Ministry of Home Affairs: Formulating policy
to support the development of NRE PP in the
scope of regional government
08
Regional Government: Providing ease of
licensing, incentives (deduction of land and
building tax), and collateral of land availability
for NRE PP development
09
The Head of BKPM: Ensuring the ease of
licensing issuance in NRE development both in
central and regional areas
10
Coordinating Minister of Maritime and
Investment: Coordinating the formulation of
policy and the implementation of Government
supports
11
*) Draft Presidential Regulation on NRE
esdm.go.id| @kesdm Ministry of Energy and Mineral Resources|
CHALLENGES
12
CLOSING
Indonesia has committed to achieve the 23% new and renewable
energy target by 2025 as mandated by the national energy policy
as well as Paris Agreement.
1
NRE development is one of efforts to achieve renewable energy
target as well as reducing emission target.
2
Improved regulations is part of creating a conducive investment
climate as well as lowering risk of NRE development
3
esdm.go.id| @kesdm Ministry of Energy and Mineral Resources|
Thank You
www.esdm.go.id
Jl. Medan Merdeka Selatan
No.18 Jakarta Pusat
Address
Kementerian Energi dan
Sumber Daya Mineral
@KementerianESDM
@kesdm
KementerianESDM
Follow Us on:
13
Kementerian Energi dan Sumber Daya Mineral | 13
esdm.go.id| @kesdm Ministry of Energy and Mineral Resources| 14
REGULATION FRAMEWORK
1. Peraturan Menteri ESDM Nomor 28 Tahun 2012 jo. Peraturan Menteri ESDM Nomor 07 Tahun 2016 tentang Tata Cara Permohonan
Wilayah Usaha Penyediaan Tenaga Listrik Untuk Kepentingan Umum;
2. Peraturan Menteri ESDM Nomor 35 Tahun 2013 jo. Peraturan Menteri ESDM Nomor 12 Tahun 2016 tentang Tata Cara Perizinan Usaha
Ketenagalistrikan;
3. Peraturan Menteri ESDM Nomor 31 Tahun 2015 tentang Penyediaan Tenaga Listrik dalam Kawasan Terbatas;
4. Peraturan Menteri ESDM Nomor 39 Tahun 2018 tentang Pelayanan Perizinan Berusaha Terintegrasi Secara Elektronik Bidang
Ketenagalistrikan.
5. Peraturan Menteri ESDM Nomor 12 Tahun 2019 tentang Kapasitas Pembangkit Tenaga Listrik Untuk Kepentingan Sendiri Yang Dilaksanakan
Berdasarkan Izin Operasi;
UNDANG-UNDANG
PERATURAN PEMERINTAH
PERATURAN MENTERI
1. Undang - Undang Nomor 30 Tahun 2009 tentang Ketenagalistrikan;
2. Undang – Undang Nomor 11 Tahun 2020 tentang Cipta Kerja.
1. Peraturan Pemerintah Nomor 42 Tahun 2012 tentang Jual Beli Listrik Lintas Negara
2. Peraturan Pemerintah Nomor 23 Tahun 2014 tentang Perubahan atas Peraturan Pemerintah Nomor 14 Tahun 2012 Kegiatan Usaha
Penyediaan Tenaga Listrik
3. Peraturan Pemerintah Nomor 24 Tahun 2018 tentang Pelayanan Perizinan Berusaha Terintegrasi Secara Elektronik
4. Peraturan Pemerintah Nomor 5 Tahun 2021 tentang Penyelenggaraan Perizinan Berusaha Berbasis Risiko
5. Peraturan Pemerintah Nomor 25 Tahun 2021 tentang Penyelenggaraan Bidang Energi dan Sumber Daya Mineral

More Related Content

What's hot

Course on Regulation and Sustainable Energy in Developing Countries - Session 10
Course on Regulation and Sustainable Energy in Developing Countries - Session 10Course on Regulation and Sustainable Energy in Developing Countries - Session 10
Course on Regulation and Sustainable Energy in Developing Countries - Session 10
Leonardo ENERGY
 
A review of systems approaches in Ecodesign and Energy Labelling
A review of systems approaches in Ecodesign and Energy LabellingA review of systems approaches in Ecodesign and Energy Labelling
A review of systems approaches in Ecodesign and Energy Labelling
Leonardo ENERGY
 

What's hot (20)

"EU and MENA: Market Potentials and Opportunities for Synergy" Presentation
"EU and MENA: Market Potentials and Opportunities for Synergy" Presentation"EU and MENA: Market Potentials and Opportunities for Synergy" Presentation
"EU and MENA: Market Potentials and Opportunities for Synergy" Presentation
 
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
 
Better Energy Communities - Marcella Maher Keogh
Better Energy Communities - Marcella Maher KeoghBetter Energy Communities - Marcella Maher Keogh
Better Energy Communities - Marcella Maher Keogh
 
Reducing energy intensity of the Indian economy, Saurabh Diddi, Bureau of Ene...
Reducing energy intensity of the Indian economy, Saurabh Diddi, Bureau of Ene...Reducing energy intensity of the Indian economy, Saurabh Diddi, Bureau of Ene...
Reducing energy intensity of the Indian economy, Saurabh Diddi, Bureau of Ene...
 
Energy Transition - A comprehensive approach
Energy Transition - A comprehensive approachEnergy Transition - A comprehensive approach
Energy Transition - A comprehensive approach
 
Tesla has electric vehicle technology
Tesla has electric vehicle technologyTesla has electric vehicle technology
Tesla has electric vehicle technology
 
EE Initiatives and National EE Master Plan by The Ministry of Energy, Green T...
EE Initiatives and National EE Master Plan by The Ministry of Energy, Green T...EE Initiatives and National EE Master Plan by The Ministry of Energy, Green T...
EE Initiatives and National EE Master Plan by The Ministry of Energy, Green T...
 
Vehicle electrification
Vehicle electrificationVehicle electrification
Vehicle electrification
 
NEEAP Development
NEEAP DevelopmentNEEAP Development
NEEAP Development
 
Energy efficiency trends in the EU: Have we got off track?
Energy efficiency trends in the EU: Have we got off track?Energy efficiency trends in the EU: Have we got off track?
Energy efficiency trends in the EU: Have we got off track?
 
Course on Regulation and Sustainable Energy in Developing Countries - Session 10
Course on Regulation and Sustainable Energy in Developing Countries - Session 10Course on Regulation and Sustainable Energy in Developing Countries - Session 10
Course on Regulation and Sustainable Energy in Developing Countries - Session 10
 
SME Business Briefing Webinar 2021
SME Business Briefing Webinar 2021SME Business Briefing Webinar 2021
SME Business Briefing Webinar 2021
 
SSCG Auto Outlook - Global Electric Vehicle (EV) Market and Economic Mega Tre...
SSCG Auto Outlook - Global Electric Vehicle (EV) Market and Economic Mega Tre...SSCG Auto Outlook - Global Electric Vehicle (EV) Market and Economic Mega Tre...
SSCG Auto Outlook - Global Electric Vehicle (EV) Market and Economic Mega Tre...
 
European Power Quality Survey Report
European Power Quality Survey ReportEuropean Power Quality Survey Report
European Power Quality Survey Report
 
Scaling up energy efficiency in morocco
Scaling up energy efficiency in moroccoScaling up energy efficiency in morocco
Scaling up energy efficiency in morocco
 
The International Energy Agency’s Efficient World Scenario
The International Energy Agency’s Efficient World ScenarioThe International Energy Agency’s Efficient World Scenario
The International Energy Agency’s Efficient World Scenario
 
A review of systems approaches in Ecodesign and Energy Labelling
A review of systems approaches in Ecodesign and Energy LabellingA review of systems approaches in Ecodesign and Energy Labelling
A review of systems approaches in Ecodesign and Energy Labelling
 
Introduction to the Energy Efficiency Directive
Introduction to the Energy Efficiency DirectiveIntroduction to the Energy Efficiency Directive
Introduction to the Energy Efficiency Directive
 
Ch 2 energy conservation act and its features
Ch 2 energy conservation act and its featuresCh 2 energy conservation act and its features
Ch 2 energy conservation act and its features
 
Course on Regulation and Sustainable Energy in Developing Countries - Session 4
Course on Regulation and Sustainable Energy in Developing Countries - Session 4Course on Regulation and Sustainable Energy in Developing Countries - Session 4
Course on Regulation and Sustainable Energy in Developing Countries - Session 4
 

Similar to Lowering-Clean-Energy-Risk-Through-Government-Regulation-presentation-Chrisnawan-Anditya

Geothermal Indonesia Investment Opportunities 2015
Geothermal Indonesia Investment Opportunities 2015Geothermal Indonesia Investment Opportunities 2015
Geothermal Indonesia Investment Opportunities 2015
Frank Mercado
 
Draft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsDraft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projects
Sanman Rajput
 

Similar to Lowering-Clean-Energy-Risk-Through-Government-Regulation-presentation-Chrisnawan-Anditya (20)

Acceleration the utilization of Renewable Energy
Acceleration the utilization of Renewable Energy Acceleration the utilization of Renewable Energy
Acceleration the utilization of Renewable Energy
 
Harris, MEMR - Indonesia's RE Investment Promotion Strategy in Eastern Islands
Harris, MEMR - Indonesia's RE Investment Promotion Strategy in Eastern IslandsHarris, MEMR - Indonesia's RE Investment Promotion Strategy in Eastern Islands
Harris, MEMR - Indonesia's RE Investment Promotion Strategy in Eastern Islands
 
National Renewable Energy Program (NREP) 2020-2040 and sector updates, Ruby G...
National Renewable Energy Program (NREP) 2020-2040 and sector updates, Ruby G...National Renewable Energy Program (NREP) 2020-2040 and sector updates, Ruby G...
National Renewable Energy Program (NREP) 2020-2040 and sector updates, Ruby G...
 
PPT Devi Ebtke - OECD Stakeholder Dialogue on Mobilising Clean Energy Finance...
PPT Devi Ebtke - OECD Stakeholder Dialogue on Mobilising Clean Energy Finance...PPT Devi Ebtke - OECD Stakeholder Dialogue on Mobilising Clean Energy Finance...
PPT Devi Ebtke - OECD Stakeholder Dialogue on Mobilising Clean Energy Finance...
 
Renewable energy projects in jordan
Renewable energy projects in jordanRenewable energy projects in jordan
Renewable energy projects in jordan
 
Energy policy and development in zambia
Energy policy and development in zambiaEnergy policy and development in zambia
Energy policy and development in zambia
 
Prospect of Developments of the Clean Energy in Indonesia
Prospect of Developments of the Clean Energy in IndonesiaProspect of Developments of the Clean Energy in Indonesia
Prospect of Developments of the Clean Energy in Indonesia
 
Recent progress-on-regulatory-framework-to-accelerate-energy-transition-in-in...
Recent progress-on-regulatory-framework-to-accelerate-energy-transition-in-in...Recent progress-on-regulatory-framework-to-accelerate-energy-transition-in-in...
Recent progress-on-regulatory-framework-to-accelerate-energy-transition-in-in...
 
Mylene Capongol, Department of Energy - Philippine Experience in Furthering R...
Mylene Capongol, Department of Energy - Philippine Experience in Furthering R...Mylene Capongol, Department of Energy - Philippine Experience in Furthering R...
Mylene Capongol, Department of Energy - Philippine Experience in Furthering R...
 
3 energy sector mr sagar raj goutam
3 energy sector mr sagar raj goutam3 energy sector mr sagar raj goutam
3 energy sector mr sagar raj goutam
 
Bapak Hariyanto, MEMR - Energy Conservation Investment in Indonesia
Bapak Hariyanto, MEMR - Energy Conservation Investment in IndonesiaBapak Hariyanto, MEMR - Energy Conservation Investment in Indonesia
Bapak Hariyanto, MEMR - Energy Conservation Investment in Indonesia
 
Renewables will shape Argentina’s new energy matrix
Renewables will shape Argentina’s new	energy matrixRenewables will shape Argentina’s new	energy matrix
Renewables will shape Argentina’s new energy matrix
 
Geothermal Indonesia Investment Opportunities 2015
Geothermal Indonesia Investment Opportunities 2015Geothermal Indonesia Investment Opportunities 2015
Geothermal Indonesia Investment Opportunities 2015
 
Session 2 Dr Ziad Jibril Sabra, Jordan
Session 2 Dr Ziad Jibril Sabra, JordanSession 2 Dr Ziad Jibril Sabra, Jordan
Session 2 Dr Ziad Jibril Sabra, Jordan
 
Lag 305 siddiqsons generation lic 14-09-2015-13666-71
Lag 305 siddiqsons generation lic 14-09-2015-13666-71Lag 305 siddiqsons generation lic 14-09-2015-13666-71
Lag 305 siddiqsons generation lic 14-09-2015-13666-71
 
Renewable Energy Policy Mechanisms and Investment Opportunities - Mylene Capo...
Renewable Energy Policy Mechanisms and Investment Opportunities - Mylene Capo...Renewable Energy Policy Mechanisms and Investment Opportunities - Mylene Capo...
Renewable Energy Policy Mechanisms and Investment Opportunities - Mylene Capo...
 
Indonesia's emission cap and trade in power sector - Bayu Nugroho, MEMR
Indonesia's emission cap and trade in power sector - Bayu Nugroho, MEMRIndonesia's emission cap and trade in power sector - Bayu Nugroho, MEMR
Indonesia's emission cap and trade in power sector - Bayu Nugroho, MEMR
 
API Prijandaru.pdf
API Prijandaru.pdfAPI Prijandaru.pdf
API Prijandaru.pdf
 
Draft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsDraft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projects
 
RENEWABLE POLICY
RENEWABLE POLICYRENEWABLE POLICY
RENEWABLE POLICY
 

More from OECD Environment

More from OECD Environment (20)

Detlef Van Vuuren- Integrated modelling for interrelated crises.pdf
Detlef Van Vuuren- Integrated modelling for interrelated crises.pdfDetlef Van Vuuren- Integrated modelling for interrelated crises.pdf
Detlef Van Vuuren- Integrated modelling for interrelated crises.pdf
 
Thomas Hertel- Integrated Policies for the Triple Planetary Crisis.pdf
Thomas Hertel- Integrated Policies for the Triple Planetary Crisis.pdfThomas Hertel- Integrated Policies for the Triple Planetary Crisis.pdf
Thomas Hertel- Integrated Policies for the Triple Planetary Crisis.pdf
 
Jon Sampedro - Assessing synergies and trade offs for health and sustainable ...
Jon Sampedro - Assessing synergies and trade offs for health and sustainable ...Jon Sampedro - Assessing synergies and trade offs for health and sustainable ...
Jon Sampedro - Assessing synergies and trade offs for health and sustainable ...
 
Astrid Bos - Identifying trade offs & searching for synergies.pdf
Astrid Bos - Identifying trade offs & searching for synergies.pdfAstrid Bos - Identifying trade offs & searching for synergies.pdf
Astrid Bos - Identifying trade offs & searching for synergies.pdf
 
Ruth Delzeit - Modelling environmental and socio-economic impacts of cropland...
Ruth Delzeit - Modelling environmental and socio-economic impacts of cropland...Ruth Delzeit - Modelling environmental and socio-economic impacts of cropland...
Ruth Delzeit - Modelling environmental and socio-economic impacts of cropland...
 
Wilfried Winiwarter - Implementing nitrogen pollution control pathways in the...
Wilfried Winiwarter - Implementing nitrogen pollution control pathways in the...Wilfried Winiwarter - Implementing nitrogen pollution control pathways in the...
Wilfried Winiwarter - Implementing nitrogen pollution control pathways in the...
 
Laurent Drouet - Physical and Economic Risks of Climate Change.pdf
Laurent Drouet - Physical and Economic Risks of Climate Change.pdfLaurent Drouet - Physical and Economic Risks of Climate Change.pdf
Laurent Drouet - Physical and Economic Risks of Climate Change.pdf
 
Shinichiro Fujimori - Biodiversity modeling in AIM (Asia pacific Integrated M...
Shinichiro Fujimori - Biodiversity modeling in AIM (Asia pacific Integrated M...Shinichiro Fujimori - Biodiversity modeling in AIM (Asia pacific Integrated M...
Shinichiro Fujimori - Biodiversity modeling in AIM (Asia pacific Integrated M...
 
HyeJin Kim and Simon Smart - The biodiversity nexus across multiple drivers: ...
HyeJin Kim and Simon Smart - The biodiversity nexus across multiple drivers: ...HyeJin Kim and Simon Smart - The biodiversity nexus across multiple drivers: ...
HyeJin Kim and Simon Smart - The biodiversity nexus across multiple drivers: ...
 
GREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdfGREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdf
 
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
 
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
 
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
 
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
 
Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...
 
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
 
APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...
 
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESThe U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
 
Problem formulation for environmental risk assessment – Finnish case study: ...
Problem formulation for environmental risk assessment – Finnish case study:  ...Problem formulation for environmental risk assessment – Finnish case study:  ...
Problem formulation for environmental risk assessment – Finnish case study: ...
 
Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...
 

Recently uploaded

Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
BrixsonLajara
 
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
zubnm
 

Recently uploaded (20)

Russian Call girls in Dubai 0508644382 Dubai Call girls
Russian Call girls in Dubai 0508644382 Dubai Call girlsRussian Call girls in Dubai 0508644382 Dubai Call girls
Russian Call girls in Dubai 0508644382 Dubai Call girls
 
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls ServiceMira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
 
Environmental Topic : Soil Pollution by Afzalul Hoda.pptx
Environmental Topic : Soil Pollution by Afzalul Hoda.pptxEnvironmental Topic : Soil Pollution by Afzalul Hoda.pptx
Environmental Topic : Soil Pollution by Afzalul Hoda.pptx
 
Climate Change
Climate ChangeClimate Change
Climate Change
 
Jumping Scales and Producing peripheries.pptx
Jumping Scales and Producing peripheries.pptxJumping Scales and Producing peripheries.pptx
Jumping Scales and Producing peripheries.pptx
 
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
 
Call girl in Sharjah 0503464457 Sharjah Call girl
Call girl in Sharjah 0503464457 Sharjah Call girlCall girl in Sharjah 0503464457 Sharjah Call girl
Call girl in Sharjah 0503464457 Sharjah Call girl
 
Role of Copper and Zinc Nanoparticles in Plant Disease Management
Role of Copper and Zinc Nanoparticles in Plant Disease ManagementRole of Copper and Zinc Nanoparticles in Plant Disease Management
Role of Copper and Zinc Nanoparticles in Plant Disease Management
 
Yil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery Newsletter
Yil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery NewsletterYil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery Newsletter
Yil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery Newsletter
 
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star HotelTop Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
 
Call girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl servicesCall girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl services
 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995
 
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
 
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
 
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
 
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
 
Top Call Girls in Bishnupur 9332606886 High Profile Call Girls You Can Get...
Top Call Girls in Bishnupur   9332606886  High Profile Call Girls You Can Get...Top Call Girls in Bishnupur   9332606886  High Profile Call Girls You Can Get...
Top Call Girls in Bishnupur 9332606886 High Profile Call Girls You Can Get...
 
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
 
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
 

Lowering-Clean-Energy-Risk-Through-Government-Regulation-presentation-Chrisnawan-Anditya

  • 1. esdm.go.id| @kesdm Ministry of Energy and Mineral Resources| Lowering Clean Energy Risk Through Government Regulation Directorate General of New, Renewable Energy, and Energy Conservation Ministry of Energy and Mineral Resources Republic of Indonesia Foto: Hasrullah Arifin/Lomba Foto KESDM 2019 Jakarta, 16 June 2021 FGD on Use of Insurance Products to De-risk Clean Energy Projects 1 Chrisnawan Anditya Director of Various New and Renewable Energy
  • 2. esdm.go.id| @kesdm Ministry of Energy and Mineral Resources| 2 1 Energy Sector Commitments Towards Net Zero Emission 3 2 Government Programs for NRE Development 4 3 Investment Risks in Renewable Energy 5 4 Lowering Clean Energy Risk Through Government Regulation 6 5 Closing 12 OUTLINE
  • 3. esdm.go.id| @kesdm Ministry of Energy and Mineral Resources| ENERGY SECTOR COMMITMENTS TOWARDS NET ZERO EMISSION Leaders Summit on Climate, 22 April 2021 UNFCCC - COP21, December 2015 National Commitments 2016-2030: • The mandate of Law No. 16/2016 on Ratification of the Paris Agreement: reducing GHG emissions by 29% (self- effort) or 41% (with international assistance) by 2030 according to NDC; • The energy sector reduces GHG by 314–398 million tons of CO2 in 2030, through the development of renewable energy, implementation of energy efficiency, energy conservation, as well as the application of clean energy technology. National Commitments 2021-2050: • Implement concrete actions on climate change through a moratorium on forest and peat land conversion to reduce forest fires by 82%; • Encouraging green development through the development of a Green Industrial Park covering an area of ​​12,500 hectares in North Kalimantan; • Unlock investment in the energy transition through the development of biofuels, lithium battery industry, and electric vehicles. 3 3
  • 4. esdm.go.id| @kesdm Ministry of Energy and Mineral Resources| Source: National Grand Strategy for Energy Concept esdm.go.id| @kesdm 4 1. Indonesian Government aims to add 38 GWof NRE Installed Capacity by2035 2. Solar energy is prioritized due to its relativelylow cost and short installationduration. 3. NRE AccelerationEfforts: • Primary Final Energy Substitution, by utilizing the existing technology; B30-B50, co-firing, RDF utilization. • Fossil Primary Energy Conversion, converting Diesel PP or Coal Powered PP into NRE PP, biogas, and pellet forcooking. • Increasing NRE Capacity, to meet the new demand; focus on the development of Solar PP • Utilization of Non-Electric NRE /Non-Biofuel such as briquettes and drying of biogas agricultural products • Implementation of the Presidential Regulation regarding the price of NRE. • The revised Ministerial Regulation regarding Rooftop Solar PV. 10 10 11 13 15 18 24 27 30 32 35 37 39 41 43 45 48 2019 2021 2023 2025 2027 2029 2031 2033 2035 Total Capacity RE (GW) NRE Target 23% GOVERNMENT PROGRAMS FOR NRE DEVELOPMENT 4
  • 5. esdm.go.id| @kesdm Ministry of Energy and Mineral Resources| CHALLENGES 5 Social Social Social Permit Engineering Engineering Engineering Policy/Regulatory Policy/Regulatory PPA/Contract Technology Technology Policy/Regulatory Construction Labour Procurement Process Labour Nature Land Acquisition Nature Currency Currency Hydrology Grid Connection Curtailment Development Construction Operation Which risks are acceptable to project developers, investors, lenders, utility company? And which are not acceptable? What to do about it? Source: Indonesia Renewable Energy Society, 2019 INVESTMENT RISKS IN RENEWABLE ENERGY
  • 6. esdm.go.id| @kesdm Ministry of Energy and Mineral Resources| CHALLENGES 6 DE-RISK CLEAN ENERGY PROJECTS: REPOSITIONING OF AUTHORITY Minister of EMR • Carried out by State Enterprises (PLN); • Business Entities which have cross provinces business areas; • Business entities which sell electricity to electricity business license holder issued by Minister. • Electricity Business Area Holder which provide integrated electricity supply. Governor • Business entities which have business area in a single province; • Business entities which sell electricity to electricity business license holder issued by Governor. • Electricity Business Area Holders which do not include electricity generation business Authority of Minister of EMR / Governor after issuing IUPTL: AUTHORITY OF ISSUING THE ELECTRICITY SUPPLY BUSINESS LICENSE FOR PUBLIC (IUPTL) Minister of EMR • Stipulation of Electricity Tariff; • Stipulation of Electricity Sale Price Agreement and Grid Lease for business entity which its license was issued by Minister; • Ratification of Electricity Business Plan for business entity which its license was issued by Minister; • Supervision and Monitoring; • Administrative Sanctions Arrangement. Governor • Stipulation of Electricity Sale Price Agreement and Grid Lease for business entity which its license was issued by Governor; • Ratification of Electricity Business Plan for business entity which its license was issued by Governor; • Supervision and Monitoring; • Administrative Sanctions Arrangement. Based on Government Reg. No. 5/2021 and Government Reg. No 25/2021
  • 7. esdm.go.id| @kesdm Ministry of Energy and Mineral Resources| CHALLENGES 7 DE-RISK CLEAN ENERGY PROJECTS: EASY OF PERMITS ESBL(IUPTL) is an Electricity Supply Business License for Public Interest Shall have: 1. Business ID / NIB (Nomor Induk Berusaha); 2. Beneficial Ownership (Daftar Penerima Manfaat); ESBL (IUPTL) Requirements : 1. Feasibility study of electricity supply business, with documents that contains (in Indonesian Language/Bahasa) : a. Financial Feasibility Study; b. Operational Feasibility Study; c. Grid Interconnection Study; d. Installation location; e. One Line Diagram; f. Type and capacity of business; g. Construction Schedule; and h. Operation Schedule, which prepared by Certified Business Entity; and 2. Electricity Sale and Purchase Agreement between applicant and prospective electricity buyer (ESPA/PJBL with its amendments) according to Electricity Sale Price Criteria or has obtained Electricity Sale Price Approval from Minister of EMR or Governor, based on the authority. Business entity submit licensing request in OSS (oss.go.id) DG Electricity MEMR Carried out verification of technical requirements (Business Licensing Commintment) COMPLETE & VALID ? APPLICANT NO YES ESDM Licensing App (perizinan.esdm.go.id) ESBL/IUPTL Issued (oss.go.id) 5 Working Days BID (Business ID) / NIB (Nomor Induk Berusaha) ESBL/IUPTL (not activated) Rejected ESBL/IUPTL Efektif Commitment Fulfilled Letter (perizinan.esdm.go.id) Commitment Fulfilled The Electricity Supply Business License for Public (IUPTL) Before After Requirements 9/10 2 Period (days) 30 5 Based on Government Reg. No. 23/2014 jo. Government Reg. No. 14/2012; Government Reg. No. 24/2018; Government Reg. No. 5/2021; and Government Reg. No 25/2021
  • 8. esdm.go.id| @kesdm Ministry of Energy and Mineral Resources| CHALLENGES 8 DE-RISK CLEAN ENERGY PROJECTS: ON-LINE PERMIT PROCESS Request (Licensing) Business Entities OSS KESDM Application (Evaluation) perizinan.esdm.go.id Rejected NIB (Business ID) and Licensing Output (not activated) Approved/Rejected Integration Business License (Activated) Commitments fulfilled Approval Request Tracking Based on Government Reg. No. 23/2014 jo. Government Reg. No. 14/2012; Government Reg. No. 24/2018; Government Reg. No. 5/2021; and Government Reg. No 25/2021
  • 9. esdm.go.id| @kesdm Ministry of Energy and Mineral Resources| CHALLENGES 9 DE-RISK CLEAN ENERGY PROJECTS: PPA GUIDANCE 1. PJBL : Period 2. Rights and obligations : seller - buyer 3. Guarantee 4. Commissioning & COD 5. Fuel supply 6. Transactions 7. Generation Performance Penalties 8. PJBL : Termination 9. Transfer of rights 10.Price adjustment requirements 11.Dispute resolution 12.force majeur PRINCIPLE OF ARRANGEMENTS: 1. The longest period of ESPA/PJBL is 30 years, with considering generation type and starting date from COD. 2. Build, Own, Operate, Transfer (BOOT) is used as cooperation pattern in ESPA/PJBL. 1. Comissioning terms shall refer to MEMR Regulation No 5/2014 jo MEMR Regulation No 10/2016 concerning on Electricity Accreditation and Certification Procedure. 2. Electricity operation shall refer to MEMR Regulation concerning on Grid Code. 3. If there is COD acceleration by PLN’s request → vendor have right to obtain incentives 4. If there is late COD → PLN have right to give penalty 1. PLN shall purchase electricity matched with Availability Factor (AF) or Capacity Factor (CF) with price as stated in purchase agreement. 2. IPP shall provide electricity energy as stated in the contract (deliver or pay). 3. In the condition that PLN can not absorb electricity as stated in the contract and this condition is caused by PLN’s fault, then PLN shall pay the penalty to the seller (take or pay). ESPA (PJBL) : COMISSIONING & COD: TRANSAKSI: Based on MEMR Reg No. 10/2017 jo MEMR Reg. No. 10/2018
  • 10. esdm.go.id| @kesdm Ministry of Energy and Mineral Resources| CHALLENGES 10 DE-RISK CLEAN ENERGY PROJECTS: PRICE AND MECHANISM *) *) Draft Presidential Regulation on NRE PRICE FiT staging 2 no excalation phase, location factor is valid for Staging 1: ▪ Hydro PP (including Hydro PP reservoir) for capacity up to 5 MW ▪ Solar PV and Wind PP for capacity up to 5 MW ▪ Biomass PP and Biogas PP for capacity up to 5 MW ▪ Solar PV and Wind PP expansion for capacity up to 5 MW ▪ Biomass PP and Biogas PP expansion for capacity up to 5 MW Ceiling price (HPT) staging 2 no excalation phase, location factor is valid for staging 1: ▪ Geothermal PP for all capacity ▪ Hydro Power Plant (including Hydro Power Plant reservoir) for capacity>5 MW ▪ PV and Wind PP >5 MW ▪ Biomass PP and Biogas PP for capacity >5 MW ▪ PV and Wind PP expansion >5 MW ▪ Biomass PP and Biogas PP expansion >5 MW ▪ excess power Geothermal, Hydro, Biomass, Biogas PP all capacity. Agreement Price: ▪ Hydro Power Plant Peaker for all capacity ▪ Waste PP,Biofuel PP, Sea Energy PP for all capacity MECHANISM OF PURCHASING ELECTRIC POWER Direct Appointment: ▪ Hydro PP for all capacity; ▪ Solar PV and Wind PP for capacity up to 5 MW ▪ Biomass PP and Biogas PP for capacity up to 5 MW ▪ Expansion of hydro PP, geothermal, Solar PV, wind PP, Biomass PP, Biogas for all capacity. ▪ Excess power of dari hydro PP, geothermal, Biomass PP, Biogas for all capacity. Direct Appointment : assignment for Hydro PP reservoir & Geothermal Direct selection: Solar PV, Wind PP, Biomass PP and Biogas PP for capacity up to 5 MW BOOT mechanisme: B to B. Period of contract: 30 years for hydro PP, geothermal, Solar PV, wind PP; 20 years for PLTBg and 25 years for Bimass PP. Transaction using Rupiah. The agreement price requires the approval from the MEMR The provision of electricity purchase price is evaluated 3 years at the most. 1 2 3 1 2 3 4 6 7 8 5
  • 11. esdm.go.id| @kesdm Ministry of Energy and Mineral Resources| CHALLENGES 11 DE-RISK CLEAN ENERGY PROJECTS: GOVERNMENT SUPPORT *) Ministry of EMR: Formulating NRE PP development plan and determining the NRE quota 01 Ministry of Finance: ▪ Providing fiscal and non-fiscal incentives ▪ Giving compensation to PT PLN if the electricity purchase price regulated in the Presidential Regulation > BPP PT PLN 02 Ministry of SOE: Determining the NRE utilization target in PT PLN’s performance indicator and assigning SOE to develop NRE industry 03 Ministry of Agrarian Affairs and Spatial Planning/National Land Agency: Providing ease of licensing and prioritizing NRE utilization in national spatial planning 04 Ministry of Environment and Forestry: Providing ease of licensing for land utilization in forest areas and cost deduction in NRE development 05 Ministry of Industry: ▪ Supporting Business Entities to prioritize domestic products utilization through creating of supply capability ▪ Determining import quotas for NRE PP components, ▪ Executing Verification of Domestic Component Level for NRE PP components ▪ Formulating roadmap for electricity supporting industry development 06 Ministry of Public Works and Housing : Providing ease of licensing and cost deduction in NRE development 07 Ministry of Home Affairs: Formulating policy to support the development of NRE PP in the scope of regional government 08 Regional Government: Providing ease of licensing, incentives (deduction of land and building tax), and collateral of land availability for NRE PP development 09 The Head of BKPM: Ensuring the ease of licensing issuance in NRE development both in central and regional areas 10 Coordinating Minister of Maritime and Investment: Coordinating the formulation of policy and the implementation of Government supports 11 *) Draft Presidential Regulation on NRE
  • 12. esdm.go.id| @kesdm Ministry of Energy and Mineral Resources| CHALLENGES 12 CLOSING Indonesia has committed to achieve the 23% new and renewable energy target by 2025 as mandated by the national energy policy as well as Paris Agreement. 1 NRE development is one of efforts to achieve renewable energy target as well as reducing emission target. 2 Improved regulations is part of creating a conducive investment climate as well as lowering risk of NRE development 3
  • 13. esdm.go.id| @kesdm Ministry of Energy and Mineral Resources| Thank You www.esdm.go.id Jl. Medan Merdeka Selatan No.18 Jakarta Pusat Address Kementerian Energi dan Sumber Daya Mineral @KementerianESDM @kesdm KementerianESDM Follow Us on: 13 Kementerian Energi dan Sumber Daya Mineral | 13
  • 14. esdm.go.id| @kesdm Ministry of Energy and Mineral Resources| 14 REGULATION FRAMEWORK 1. Peraturan Menteri ESDM Nomor 28 Tahun 2012 jo. Peraturan Menteri ESDM Nomor 07 Tahun 2016 tentang Tata Cara Permohonan Wilayah Usaha Penyediaan Tenaga Listrik Untuk Kepentingan Umum; 2. Peraturan Menteri ESDM Nomor 35 Tahun 2013 jo. Peraturan Menteri ESDM Nomor 12 Tahun 2016 tentang Tata Cara Perizinan Usaha Ketenagalistrikan; 3. Peraturan Menteri ESDM Nomor 31 Tahun 2015 tentang Penyediaan Tenaga Listrik dalam Kawasan Terbatas; 4. Peraturan Menteri ESDM Nomor 39 Tahun 2018 tentang Pelayanan Perizinan Berusaha Terintegrasi Secara Elektronik Bidang Ketenagalistrikan. 5. Peraturan Menteri ESDM Nomor 12 Tahun 2019 tentang Kapasitas Pembangkit Tenaga Listrik Untuk Kepentingan Sendiri Yang Dilaksanakan Berdasarkan Izin Operasi; UNDANG-UNDANG PERATURAN PEMERINTAH PERATURAN MENTERI 1. Undang - Undang Nomor 30 Tahun 2009 tentang Ketenagalistrikan; 2. Undang – Undang Nomor 11 Tahun 2020 tentang Cipta Kerja. 1. Peraturan Pemerintah Nomor 42 Tahun 2012 tentang Jual Beli Listrik Lintas Negara 2. Peraturan Pemerintah Nomor 23 Tahun 2014 tentang Perubahan atas Peraturan Pemerintah Nomor 14 Tahun 2012 Kegiatan Usaha Penyediaan Tenaga Listrik 3. Peraturan Pemerintah Nomor 24 Tahun 2018 tentang Pelayanan Perizinan Berusaha Terintegrasi Secara Elektronik 4. Peraturan Pemerintah Nomor 5 Tahun 2021 tentang Penyelenggaraan Perizinan Berusaha Berbasis Risiko 5. Peraturan Pemerintah Nomor 25 Tahun 2021 tentang Penyelenggaraan Bidang Energi dan Sumber Daya Mineral