No. NEPRA/R/DL/LAG-305/ LiZZZ. -71 September 14, 2015
Mr. Abdul Rahim Rafi
Chief Executive Officer
Siddiqsons Energy Limited
26th Floor, Ocean Tower,
Plot G-3, Block-9, Clifton,
Karachi.
Subject: Grant of Generation Licence No. IGSPL/65/2015
Licence Application No. LAG-305
Siddiasons Enemy Limited (SDSEL)
Reference: Your application vide letter No. Nil, dated Nil (received on 09.04.2015).
Enclosed please find herewith Determination of the Authority in the matter of Application of
"Siddiqsons Energy Limited (SDSEL)" for the "Grant of Generation Licence" along with Generation
Licence No. IGSPL/65/2015 annexed to this determination granted by the National Electric Power
Regulatory Authority (NEPRA) to "Siddiqsons Energy Limited (SDSEL)" for its 350.00 MW
Imported Coal based Thermal Generation Facility located at Plot No. 12, Eastern Industrial Zone at
Port Qasim, Karachi in the Province of Sindh" pursuant to Section 15 of the Regulation of
Generation, Transmission and Distribution of Electric Power Act (XL of 1997).
2. Please quote above mentioned Generation Licence No. for future correspondence.
Enclosure: Generation Licence
(IGSPL/65/2015)
Copy to:
(Syed Safeer Hussain)
1. Chief Executive Officer, NTDC, 414-WAFT ouse, Lahore
2. Chief Operating Officer, CPPA-G, 107-WAPDA House, Lahore
3. Managing Director, Private Power and Infrastructure Board (PPIB), 50-Nazimuddin Road,
Sector F-7/4, Islamabad.
4. Chief Executive Officer, K-Electric Limited (KEL), KE House, 39-B, Sunset Boulevard,
Phase II (Ext), DHA, Karachi.
5. Director General, Environment Protection Agency, Government of Sindh, Complex Plot
No. ST-2/1, Korangi Industrial Area, Karachi.
National Electric Power Regulatory Authority
(NEPRA)
Determination of the Authority in the Matter of
Application of Siddiqsons Energy Limited for the Grant of
Generation Licence
September 02, 2015
Case No. LAG-305
(A). Background
(I). The Government of Pakistan (GoP) has set up Private Power
Infrastructure Board (PPIB) as a one window facilitator for the entrepreneurs
interested in setting up new generation facilities.
(ii). In order to meet the future electricity/energy needs of the country and
to improve the energy mix, the GoP has decided to install Generation
Facilities/Thermal Power Plants (TPPs) operating on either imported or indigenous
Coal. In order to implement the said initiative, PPIB has issued Letter of Intent (Lol)
to various local and foreign investors/groups. PPIB also issued to Siddiqsons
Limited (SDSL) the Lol for setting up an approximately 350.00 MW Imported Coal
based Generation Facility/TPP at Port Qasim, Karachi, in the Province of Sindh.
(iii). In order to implement the project, the SDSUthe Sponsors of the project
incorporated a Special Purpose Vehicle (SPV) in the name of Siddiqsons Energy
Limited-SDSEL, as stipulated under the companies' ordinance 1984.
(B). Filing of Generation Licence Application
(i). In accordance with Section-15 of Regulation of Generation,
Transmission and Distribution of Electric Power Act, 1997 (the NEPRA Act),
SDSEL submitted an application on April 09, 2015 requesting for the grant of
Generation Licence.
Page 1 of 8
(ii). The Registrar examined the submitted application to confirm its
compliance with the NEPRA Licensing (Application and Modification Procedure)
Regulations, 1999 (the "Regulations"). The Registrar observed that the application
lacked some of the required information/documentation. Accordingly, SDSEL was
directed for submitting the missing information/documentation. SDSEL completed
the missing information/documentation on May 04, 2015. The Authority considered
the matter in its Regulatory Meeting (RM-15-427), held on June 02, 2015 and
found the form and content of the application in substantial compliance with
Regulation-3 of the Regulations. Accordingly, the Authority admitted the application
for consideration of the grant of the Generation Licence as stipulated in
Regulation-7 of the Regulations. The Authority approved the advertisement
[containing (a). the prospectus; (b). a notice to the general public about the
admission of the application of SDSEL], inviting the general public for submitting
their comments in the matter as stipulated in Regulation-8 of the Regulations. The
Authority also approved the list of the relevant stakeholders for providing their
comments or otherwise to assist the Authority in the matter. Accordingly, the
advertisement was published in one Urdu and one English National Newspaper on
June 06, 2015.
(iii). Apart from the above, separate letters were also sent to Government
Ministries, their Attached Departments, Representative Organizations and
Individual Experts etc. on June 10, 2015. The said stakeholders were directed for
submitting their views/comments for the assistance of the Authority.
(C). Comments of Stakeholders
(i). In response to the above, the Authority received comments from four
(04) stakeholders. These included The Federation of Pakistan Chambers of
Commerce & Industry (TFoPCoC&I), Ministry of Petroleum and Natural Resources
(MoP&NR), Pakistan Mineral Development Corporation (Pvt.) Limited (PMDCPL)
and WAPDA Power Privatization Organization (WPPO) of National Transmission
and Despatch Company Limited (NTDC). The comments of the above
stakeholders are summarized below:
Page 2 of 8
Page 3 of 8
(a). TFoPCoC&I remarked that sustainable electrification of the
country demands a high level of local participation at all levels.
The real impact and sustainability can be obtained through
close collaboration of local private and financial sector firms. In
view of the serious shortage of energy in the country,
TFoPCoC&I strongly recommend to expedite the processing
of all applications of power projects pending before the
Authority. Further, TFoPCoC&I expressed its no objection to
the issuance of Generation Licence to SDSEL;
(b). MoP&NR stated that the company intends to install a Coal
Fired TPP operating on Imported/Local Coal. As the project
does not require Natural Gas for its operation therefore, the
ministry has no objection to the grant of Generation Licence to
SDSEL;
(c). PMDCPL appreciated the proposal of SDSEL as this will help
to overcome the energy crisis in the country. However,
PMDCPL suggested that blending of local coal should also be
considered for the project; and
(d). NTDC submitted that it has issued a concurrence for the site,
location, fuel and technology of the proposed project.
(ii). The Authority considered the above comments of the stakeholders
and found the same in favor of the grant of Generation Licence except to the
observation of PMDCPL that blending of the local coal for the project may be
considered.
(iii). The Authority decided to seek a clarification on the above
observations of PMDCPL. In its rejoinder, the company/SDSEL submitted that the
Lol of the project is based on imported coal therefore, the blending of local coal
has not been envisaged as of now. However, the blending of the local coal may be(2
considered subsequently if the local coal of compatible performance and
characteristics is available in future.
(iv). In view of the above, the Authority considered it appropriate to
process the application for the consideration of the grant of Generation Licence as
stipulated in the Regulations and the NEPRA Licensing (Generation) Rules, 2000
(the Rules).
(D). Grant of Generation Licence
(i). Electricity is a fundamental element for the economic growth of any
country. The electricity consumption per capita has a strong correlation to the
Social Development Indices (Human Development Index-HDI, life expectancy at
birth, infant mortality rate, and maternal mortality) and Economic Indices (such as
GDP per capita).
(ii). Increasing electricity consumption per capita can directly stimulate
faster economic growth and indirectly achieve enhanced social development. In
short, the Economic Growth of any country is directly linked with the availability of
safe, secure, reliable and cheaper supply of electricity. In view of the said, the
Authority is of the considered opinion that for sustainable development, all types of
electric power generation resources including Coal (Imported/Indigenous), Hydel,
Wind, Solar and other Renewable Energy (RE) resources must be tapped and
developed on priority basis both in Public and Private Sectors.
(iii). The existing energy mix of the country is heavily skewed towards the
costlier thermal Generation FacilitiesfTPPs, operating on Furnace Oil. The Import
of expensive Furnace Oil results in depletion of the precious foreign exchange
reserves of the country affecting the macro and micro stability of the country. In
view of the said, an increase in the consumer end tariff is experienced which not
only results in higher inflation but it also affects the competitiveness of the local
Industry with its foreign peers. In order to address the said issues, the Authority
considers it imperative that efforts must be made to change the energy mix
towards cheaper fuels. With the depleting Natural Gas Reserves in the country and
relatively longer lead time for the constructio of Hydro Electric Power Projects, the
7
Page 4 of 8
Coal Power Plants are considered the best option in the Short and Medium Term
Planning. Therefore, to reduce the Demand-Supply gap and to achieve sustainable
development, it is vital that indigenous as well as imported Coal Projects are given
priority for power generation and their development is encouraged. In view of the
said, the Council of Common Interests (CCI) approved the Power Policy 2013
which envisages rationalizing the energy mix and reducing the Demand-Supply
gap through Imported and Indigenous coal based power generation. In
consideration of the said, the Authority is of the view that the proposed project of
SDSEL is consistent with the provisions of Power Policy 2013.
(iv). The Authority has examined the details submitted by the sponsors
about the proposed Generation Facility/TPP of SDSEL with reference to its
location, the type of technology being deployed, interconnection arrangements for
dispersal of electric power and other specific details. The Project will be located in
the Eastern Industrial Zone of Port Qasim, Karachi, in the Province of Sindh. The
Company has acquired land measuring about 100 acres. The Land Coordinates
are (a). 24° 4T 20.09"N, 67° 22' 59.38E; (b). 24° 46' 48.16"N, 67° 23' 1.05"E; (c).
24° 47' 21.99"N, 67° 23'14.19"E and (d). 24° 46' 48.88"N, 67° 2315.82"E.
(v). The Authority has observed that the proposed Generation
Facility/TPP will be consisting of 1 x 350MW Super-Critical Unit with one Boiler,
Steam Turbine and Generator. The boiler will be fueled by imported coal with the
capability to burn local coal in future. The coal for the Project is expected to be
imported from Indonesia and South Africa. The Imported Bituminous/Sub-
Bituminous coal will be transported by ship and unloaded at a bulk terminal in
Karachi. In this regard, the sponsors have signed a Memorandum of
Understanding with Pakistan International Bulk Terminal. The Authority considers
that the Supercritical Technology is very mature with many units in operation
worldwide for many years with good track records. SDSEL has confirmed that the
selected main parameters of the Steam Turbine and Boiler (571.1°C and 254.4
bar) of the Generation Facility/TPP are at the high end of the supercritical class.
Further, SDSEL has confirmed that the Gross Efficiency of the proposed
Generation Facility/TPP will be more than 40% (i.e. 40.20%) whereas the Net
Efficiency of same will be greater than 39.00% and will result in less emission per
unit of electricity generated. The Authority considers that the high efficiency of the
/
Page 5 of 8
proposed Generation Facility/TPP and the low cost of fuel (i.e. Imported Coal) will
generate the lowest cost power and will provide an economically feasible solution
to relieve power shortages in the country.
(vi). The Authority is satisfied that the NTDC has endorsed the site and
parameters of the project. Further, NTDC has also confirmed about carrying out
the required studies pertaining to the dispersal of electric power from the proposed
Generation Facility/TPP. In this regard, it has been confirmed that the electric
power from the Imported Coal based Generation Facility/TPP of SDSEL will be
evacuated through 500 kV Transmission Line(s).
(vii). The term of a Generation Licence under the Rule-5 (1) of the Rules,
is to be commensurate with the maximum expected useful life of the units
comprised in a generating facility. As explained above, the proposed Generation
Facility/TPP of SDSEL will be consisting of one (01) Steam Turbine Unit of 350.00
MW. According to the International benchmarks available, the useful life of a
Steam Turbine is normally taken at least thirty (30) years from its Commercial
Operation Date (COD). Further, SDSEL has also confirmed that it will be
negotiating a Power Purchase Agreement (PPA) with the Power Purchaser having
a term of thirty (30) years. In view of the said, the Authority hereby sets the term of
the proposed Generation Licence of SDSEL to be thirty (30) years from its COD.
(viii). Regarding the Tariff of Generation Company (i.e. SDSEL) that it will
charge the Power Purchaser, the Authority through its Determination No.
NEPRATTRF-313/SEL-2015/10440-10442, dated July 13, 2015 has granted
SDSEL an Up-front Tariff for its Project. The Authority directs SDSEL to follow the
terms and conditions of the granted Up-Front Tariff in letter and spirit and charge
the Power Purchaser only such tariff which has been determined, approved or
specified by the Authority as stipulated in Article-6 of its proposed Generation
Licence.
(ix). As explained above, the proposed Generation Facility/TPP for which
Generation Licence has been sought is based on Imported Coal. The Coal based
Generation Facility/TPP may be harmful to environment because of emission of
Page 6 of 8
Page 7 of 8
Green House Gases (GHG) and production of ash and other effluents. In this
regard, SDSEL confirmed that proposed Generation Facility/Coal Power Plant will
meet local regulatory emissions limits. It has been confirmed that dry low NO
burners (implemented in an overall low NO combustion system) shall be installed
in conformance with the local regulations for emission control. Extractive systems
shall be used to monitor NO and SO2. Continuous Emission Monitoring System
(CEMS) shall be provided to measure emissions and produce all required data
logging and reporting. The data logging and reporting system shall store adequate
amount of data and automatically produce reports as required. According to the air
dispersion modeling, if coal having Sulphur contents in excess of 0.5% is used
then the Project may require a Flue Gas Desulphurization (FGD) unit. However, to
keep flexibility in coal specifications and sourcing, it is envisaged that a FDG shall
be installed to meet the mandatory regulatory environmental requirements.
Electrostatic Precipitators (ESP) will be designed and installed which will be
capable of being operated such that emissions do not exceed the limit of
50mg/Nm3 when firing design coal. One set of pneumatic fly ash conveyor system
will also be provided. There will be a concrete fly ash silos capable of storing the fly
ash produced in fourteen (14) days. There will be discharge outlets at the bottom
of fly ash silo which will be equipped with humidifying device to discharge wet fly
ash which will be transported to ash yard by dump trucks. The bottom ash handling
system shall provide for the collection and removal of bottom ash from the steam
generator (pulverized coal type) furnaces. A completely dry type bottom ash
removal system shall be provided. The sponsors have confirmed that the proposed
Generation Facility/TPP will comply with the Environmental Standards of the
country. Further, SDSEL has provided a copy of the Environmental Impact
Assessment (EIA) submitted to Environmental Protection Agency Govt. of Sindh
(EPAGoS) confirming that NEQs will be followed. The Authority has considered the
submissions and directs SDSEL to get the matter expedited with EPAGoS for
getting the approval of the EIA and obtain the required No Objection Certificate
(NOC). The Authority directs SDSEL to complete all formalities at the earliest and
submit the NOC within six (06) months of the issuance of the Generation Licence.
Apart from the above, the Authority directs SDSEL to ensure that the Generation
Facility/TPP conforms to the environment standards during the term of the
Generation Licence. In view of the said, the Authority has included a separate
article along with other terms and conditions that the Licensee will comply with
--Ii--
REGUL9T I d
Brig. (R) Tariq Saddozai
(Chairman)
11
_J REGIST.t
za
*
ATAR A
-----K---
(-----
1 tl ol Page 8 of 8
relevant environmental standards. Further, the Authority also directs SDSEL to
submit a report on a bi-annual basis, confirming that operation of its proposed
Generation Facility/TPP is compliant with required Environmental Standards as
prescribed by EPAGoS.
(x). In view of the above, the Authority hereby decides to approve the
grant of Generation Licence to SDSEL on the terms and conditions as set out in
the Generation Licence annexed to this determination. The grant of Generation
Licence will be subject to the provisions contained in the NEPRA Act, relevant
rules, regulations framed there under and the other applicable documents.
Authority
Syed Masood-ul-Hassan Naqvi
(Member)
Himayat Ullah Khan
(Member)
Khawaja Muhammad Naeem
(Member)
Maj. (R) Haroon Rashid
(Member)/(Vice Chairman)
National Electric Power Regulatory Authority
(NEPRA)
Islamabad Pakistan
GENERATION LICENCE
No. IGSPL/65/2015
In exercise of the Powers conferred upon the National Electric Power
Regulatory Authority (NEPRA) under Section-15 of the Regulation of
Generation, Transmission and Distribution of Electric Power Act,
1997, the Authority hereby grants a Generation Licence to:
SIDDIQSONS ENERGY LIMITED
Incorporated under the Companies Ordinance, 1984
Under Corporate Universal Identification No. 0088316, Dated May 15, 2014
for its Imported Coal Based Thermal Generation Facility Located at Plot No. 12,
Eastern Industrial Zone at Port Qasim, Karachi
in the Province of Sindh
(Total Installed Capacity: 350.00 MW Gross)
to engage in generation business subject to and in accordance with the
Articles of this Licence.
Given under my hand this 44A day of September Two
Thousand & Fifteen and expires on 30th day of December
Two Thousand & Forty Eight.
Registrar
Generation Licence
Siddiqsons Energy Limited
Plot No. 12, Eastern Industrial Zone
at Port Qasim, Karachi
in the Province of Sindh
Article-1
Definitions
1.1 In this Licence
(a). "Act" means "the Regulation of Generation, Transmission and
Distribution of Electric Power Act, 1997";
(b). "Authority" means "the National Electric Power Regulatory
Authority constituted under Section-3 of the Act";
(c). "Bus Bar" means a system of conductors in the generation facility
of the Licensee on which the electric power of all the generators
is collected for supplying to the Power Purchaser;
(d). "Commercial Operations Date (COD)" means the day immediately
following the date on which the generation facility of the Licensee
is commissioned;
(e). "CPPA-G" means "the Central Power Purchasing Agency
(Guarantee) Limited or any other entity created for the like
purpose;
(f). "Grid Code" means the grid code prepared by NTDC and
approved by the Authority, as it may be revised from time to time
by NTDC with the necessary approval of the Authority;
(g). "IEC" means International Electrotechnical Commission or any
other entity created for the like purpose and its successors or
permitted assigns;
(h). "IEEE" means the Institute of Electrical and Electronics Engineers
and its successors or permitted assigns°
-------
ot REG • /-ii
R
it- 'P.:
0 v
LU
C:.
--I geG1S
-4
,may
s
4-o Ni-
Page 2 of 6
Generation Licence
Siddiqsons Energy Limited
Plot No. 12, Eastern Industrial Zone
at Port Qasim, Karachi
in the Province of Sindh
"Licensee" means "Siddiqsons Energy Limited" and its
successors or permitted assigns;
(j). "NTDC" means National Transmission and Despatch Company
Limited and its successors or permitted assigns;
(k). "Power Purchase Agreement" means the power purchase
agreement, entered or to be entered into by and between the
Power Purchaser and the Licensee, for the purchase and sale of
electric energy generated by the generation facility, as may be
amended by the parties thereto from time to time;
(I). "Power Purchaser" means the CPPA-G purchasing power on
behalf of XW-DISCOs;
(m). "Regulation" means "the National Electric Power Regulatory
Authority Licensing (Application & Modification Procedure)
Regulations, 1999" as amended or replaced from time to time;
(n). "Rules" mean "the National Electric Power Regulatory Authority
Licensing (Generation) Rules, 2000";
(o). "XW DISCO" means "an Ex-WAPDA distribution company
engaged in the distribution of electric power".
1.2 Words and expressions used but not defined herein bear the meaning given
thereto in the Act or in the Rules.
Article-2
Application of Rules
This Licence is issued subject to the provisions of the Rules, as amended
from time to time.:_r_)
Page 3 of 6
The Licensee shall charge only such tariff which has been determined,
approved or specified by the Authority in terms of Rule-6 of the Rules.c1
f l
Page 4 of 6
Generation Licence
Siddiqsons Energy Limited
Plot No. 12, Eastern Industrial Zone
at Port Qasim, Karachi
in the Province of Sindh
Article-3
Generation Facilities
3.1 The location, size (capacity in MW), technology, interconnection
arrangements, technical limits, technical and functional specifications and other
details specific to the generation facility of the Licensee are set out in Scheduled of
this Licence.
3.2 The net capacity of the generation facility of the Licensee is set out in
Schedule-II hereto.
3.3 The Licensee shall provide the final arrangement, technical and financial
specifications and other specific details pertaining to its generation facility before its
COD.
Article-4
Term of Licence
4.1 The Licence is granted for a term of thirty (30) years from the COD of the
generation facility.
4.2 Unless suspended or revoked earlier, the Licensee may apply for renewal of
the Licence within ninety (90) days prior to the expiry of the term of the Licence, as
stipulated in the Regulations.
Article-5
Licence fee
After the grant of the Generation Licence, the Licensee shall pay to the
Authority the Licence fee, in the amount, manner and at the time set out in the
National Electric Power Regulatory Authority (Fees) Rules, 2002.
Article-6
Tariff
Generation Licence
Siddiqsons Energy Limited
Plot No. 12, Eastern Industrial Zone
at Port Qasim, Karachi
in the Province of Sindh
Article-7
Competitive Trading Arrangement
7.1 The Licensee shall participate in such manner as may be directed by the
Authority from time to time for development of a Competitive Trading Arrangement.
The Licensee shall in good faith work towards implementation and operation of the
aforesaid Competitive Trading Arrangement in the manner and time period specified
by the Authority. Provided that any such participation shall be subject to any contract
entered into between the Licensee and another party with the approval of the
Authority.
7.2 Any variation or modification in the above-mentioned contracts for allowing
the parties thereto to participate wholly or partially in the Competitive Trading
Arrangement shall be subject to mutual agreement of the parties thereto and such
terms and conditions as may be approved by the Authority.
Article-8
Maintenance of Records
For the purpose of sub-rule (1) of Rule-19 of the Rules, copies of records and
data shall be retained in standard and electronic form and all such records and data
shall, subject to just claims of confidentiality, be accessible by authorized officers of
the Authority.
Article-9
Compliance with Performance Standards
The Licensee shall comply with the relevant provisions of the National Electric
Power Regulatory Authority Performance Standards (Generation) Rules 2009 as
amended from time to time.
Article-10
Compliance with Environmental Standards
10.1 The Licensee at all times shall comply with the environmental standards as
may be prescribed by the relevant competent authority as amended from time to
Page 5 of 6
/
Page 6 of 6
Generation Licence
Siddiqsons Energy Limited
Plot No. 12, Eastern Industrial Zone
at Port Qasim, Karachi
in the Province of Sindh
10.2 The Licensee shall provide a certificate on bi-annual basis, confirming that
the operation of its generation facility is in line with environmental standards as
prescribed by the relevant competent authority.
Article-11
Power off take Point and Voltage
The Licensee shall deliver power to the Power Purchaser at the outgoing Bus
Bar of its grid station. The up-gradation (step up) of generation voltage up to the
required Interconnection voltage level will be the responsibility of the Licensee.
Article-12
Provision of Information
12.1 The obligation of the Licensee to provide information to the Authority shall be
in accordance with Section-44 of the Act.
12.2 The Licensee shall be subject to such penalties as may be specified in the
relevant rules made by the Authority for failure to furnish such information as may be
required from time to time by the Authority and which is or ought to be or has been
in the control or possession of the Licensee.
Article-13
Design & Manufacturing Standards
All the components of the generation facility/power plant shall be designed,
manufactured and tested according to the latest IEC, IEEE or any other equivalent
standards. All plant and equipment shall be unused and brand new./
Generation Licence
Siddiqsons Energy Limited
Plot No. 12, Eastern Industrial Zone
at Port Qasim, Karachi
in the Province of Sindh
SCHEDULE-I
The Location, Size (i.e. Capacity in MW), Type of Technology,
Interconnection Arrangements, Technical Limits, Technical/Functional
Specifications and other details specific to the Generation Facilities of
the Licensee are described in this Schedule
REGISTRAR
0
*
NEPRN
z Page 1 of 24 of Schedule -I
Page 2 of 24 of Schedule -I
4
Generation Licence
Siddiqsons Energy Limited
Plot No. 12, Eastern Industrial Zone
at Port Qasim, Karachi
in the Province of Sindh
A
National Highway LOCATION PLAN FOR 350 MW IMPORTED COAL BASED POWER PLANT BIN QASIM KARACHI
CZ mY N
c
E R
8 g
E a g
O
H
Page3of24ofSchedule-1
- To Thatta
Lotte Pakistan Pvt Ltd
Engro Zarkhei Engro Polymers
SSGCL
RIAG Project
PAKISTAN ENGINEERING SERVICES (PVT ) LTD
7 - B. COMMERCIAL AREA PHASE - V
D H A, LAHORE
erna:I - .nfo4Ppespk corn
6
PROJECT
350 MW IMPORTED
COAL BASED POWER
PLANT BIN-QASIM KARACHI
TTLE
LOCATION PLAN
DRAWN DATE MA°C -
DESIGNED DRAWING NC.
CHECdED
APPROVED
REV No
0
E
8
Generation Licence
Siddiqsons Energy Limited
Plot No 12. Eastern Industrial Zone
at Port Qasim, Karachi
in the Province of Sindh
-
N
z
•1 
•
4t.k.
919%AR
SEc FRONIOR NEI?
,51S0
(139.
di)• • .7
•IRAN,A iA RE f- INAR !mi r co
0
/
Page 4 of 24 of Schedule -I
0
Generation Licence
Siddlosons Energy Limited
Plot No. 12, Eastern Industrial Zone
at Port Qasim, Karachi
In the Province of Sindh
Page 5 of 24 of Schedule -I
C
6?,
ts
Es
C
2
12 8
4
et
r
C
2200
e:
23
AA
2
la
b
Generation Licence
Siddiqsons Energy Limited
Plot No. 12, Eastern Industrial Zone
at Port Qasim, Karachi
in the Province of Sindh
Page 6 of 24 of Schedule -I
Y
01045.92 G
Generation Licence
Siddiqsons Energy Limited
Plot No. 12, Eastern Industrial Zone
at Port Qasim, Karachi
in the Province of Sindh
6
S IS
54.87 G
LIQ
0:1
0
0.21 G
23.43 G
00
00
a 8
0.17 G
e-
30.37 G
42.02 G
0
4J 66 G 0.17 G
29.61 G
0010
40.51 G
79.08 G
79.93 G
04—
I4 s
Page 7 of 24 of Schedule -I
$11016X LILTS
NU MIMI 1 XN III OK T110 M31 UT
Page 8 of 24 of Schedule -I
Generation Licence
Siddiqsons Energy Limited
Plot No. 12, Eastern Industrial Zone
at Port Qasim, Karachi
in the Province of Sindh
Generation Licence
Siddiqsons Energy Limited
Plot No. 12, Eastern Industrial Zone
at Port Qasim, Karachi
in the Province of Sindh
I . 1 .
I
,
I 1 I . I ,
Vld s•••••••• I.•• t.. I .... ..
,
Malin SNOS0100IS
•!I! !M..
......
...
aim I se am •
•
.....
,...
OM 00d SU 143 M Mixt 910501016 DIM
.L •
0 0 0
t
11D 0 0 0.11 0 0 0 0
_
• LTALIAI
111111.1111111.11lal
1
,
-
.
8 _
e
0
_
.0
,
--
0 —
—
.
-
,
-
--4
-43
--0
. ,,,„
a
_tzt
3 _
iirIli
o K=IIME ana
MiMr"4111641 /.1a
--- r ---1--4---F--
1
i
-illi
. ..„. , , a,
.,—..,
1
t
_4__.;,,4__ _.... 1
- - - mi,s,.
I It I
I .:;,•''
.......
I
—0
.
I
II
•-9:-
"I ---
I I
'r ifl
own
7.
2 1 ..4
NI ---f14---
-1' IN
1s1 I!'
lig -
Iligii1 WI 4_
-
-15:it. tji2u
Rpm Flirt
-
I
.
IMOIDII ?4:410011:
Ifhe
AL
.41-}-‘11
1 —
AL
46.11
B.
a
rall
a
ra
Ili
. I .
ll!
"
I leai !
III
I I
ill
I
'ill
MI
1 •
I
____
irP
---l-
20
1
N W-AW
1 gm_ri=
I WA LW
Imy ___
Higialin
=LI
- 7
_ _ _ _i______
1
(---
1 a2.43111111114►Niiii
iri
viER Rk- .:16MI:.
w' 1
•,,,..-2,
4
REGISTRAR .
_
.,1,..74.:
.
:•,
. . .
I
. . I f
Page 9 of 24 of Schedule -I
JOS
IN Ili 01 It I EA ME WM
01011 DEMOS
Page 10 of 24 of Schedule -IC
Generation Licence
Siddiqsons Energy Limited
Plot No. 12, Eastern Industrial Zone
at Port Qasim, Karachi
In the Province of Sindh
I69 Yi
I19 Nib Iona
1I It C
sAIR 1113
ISO
UMal Foe
raw
MD IN X191 411
-I"
I Cal I FEelli
.1111411111.11M
MINI ISOM 1 x111 I KIRI MB A.111
eismeI we
Page 11 of 24 of Schedule -I
Generation Licence
Siddiqsons Energy Limited
Plot No. 12, Eastern Industrial Zone
at Port Qasim, Karachi
In the Province of Sindh
MUM
—TaphiinOwifshl
HSeibilf gyp.
rit unCi vat Ins
lefiWydo
—Irwriww
ft kr
411112
IEEE LIES
Ulsia1111100 1E0 I 01 FIE RENE
INNION I MI
III MMUS
OM •
w.
I I I
Page 12 of 24 of Schedule -1
Generation Licence
Siddiqsons Energy Limited
Plot No. 12, Eastern Industrial Zone
at Port Qasim, Karachi
In the Province of Sindh
ISOVENIE
1241
12/1011119
SIMONE
3
-N-
N
u'
a IM n MIenou 9 Imar 1 V mull
111 s
TROMP
NAn
a
Ime
a
MR
tilhEWE
EM1111
trirOlrolrlus
I
41•11101111
11111111111
a
IAN
a
a
n111111
0"
woo
111111110111
VIC=
s
a
OM I
Generation Licence
Siddiqsons Energy Limited
Plot No. 12, Eastern Industrial Zone
at Port Clasim, Karachi
In the Province of Sindh
IM>Cor al)-"ytogc;ii
i l
I
I! I I
11 1 1 11;i f illii
i i
L
i;
IUusikl-iiii.oeioq
ii f ili:111 1 : 1
I
IIIIEW!Iiiiii
i
I
1!
U
I
"
Page 13 of 24 of Schedule -I
I
I III UMW /Akek
la MI 1E 14M= Irtt
USTCf
011 / IS • •••••••
11011011(11/4E
0
moms map
Nerii wax aII 21150
Page 14 of 24 of Schedule -I
1 MInto ad
Generation Licence
Siddiqsons Energy Limited
Plot No. 12, Eastern Industrial Zone
at Port Oasim, Karachi
In the Province of Sindh
Pt int OCPP0104 Pt PP UPPICUIP
Page 15 of 24 of Schedule -I
Generation Licence
Siddiqsons Energy Limited
Plot No. 12, Eastern Industrial Zone
at Port Qasim, Karachi
In the Province of Sindh
-it
Page 16 of 24 of Schedule -I
Generation Licence
Siddiqsons Energy Limited
Plot No. 12, Eastern Industrial Zone
at Port Qasim, Karachi
In the Province of Sindh
Generation Licence
Siddiqsons Energy Limited
Plot No. 12, Eastern Industrial Zone
at Port Qasim, Karachi
in the Province of Sindh
I
I
I
1
A
I 1
I
a
I
5
t
I
I I
I
I I
I
I I
I
Page 17 of 24 of Schedule -I
Generation Licence
Siddiqsons Energy Limited
Plot No. 12, Eastern Industrial Zone
at Port Qasim, Karachi
In the Province of Sindh
Page 18 of 24 of Schedule -I
Generation Licence
Siddiqsons Energy Limited
Plot No. 12, Eastern Industrial Zone
at Port Qasim, Karachi
in the Province of Sindh
Interconnection Facilities/
Transmission Arrangements for Dispersal of Power from
the Generation Facility
The electric power from the Imported Coal based generation facility/power
plant of the Licensee/Siddiqsons Energy Limited (SDSEL) will be dispersed to
the National Grid.
(2). The Interconnection Facilities (IF)/Transmission Arrangements (TA) for
supplying to National Grid from the above mentioned generation facility shall be
at 500 KV level. The dispersal/interconnection arrangement for supplying to
National Grid will be consisting of a 500 KV Double Circuit (D/C) Transmission
Line measuring about 180 Kilometer (Quad Bundled of AASC Greeley
Conductor) connecting the generation facility with 500 KV Matiari Grid Station of
NTDC.
(3). Any change in the above mentioned IF/TA for dispersal of electric power
as agreed by the Licensee and the Power Purchaser shall be communicated to
the Authority in due course of time.0
//
Page 19 of 24 of Schedule -1
EPCO)
HESCO
500kV HYDEL P/STN F9
500kV THERMAL P/STN [21ARABIAN SEA Page 20 of 24 of Schedule -I
PESHAWAR
HUBCO NEW
1320 MW
Ler771 H 0
MW
LUCKY S1DDIOUE SONS
POWER PROJECTS
K-2 I K-3
POWER PROJECTS
2x1100 MIN
ECT
1320 MW
Generation Licence
Siddiqsons Energy Limited
Plot No. 12. Eastern Industrial Zone
at Port Qasim. Karachi
in the Province of Sindh
(CASA -1000) PESCI?)
1000 MW
IMPORT FROM TAJIKLSTAN
2500kV HVDC
0011°°
1 MAW
(SW Eat)
co
DASLI-I
2160 kW
yzy.,
ISD.
WEST
EHLIM
CHAKWAL
BD•WEST
/ le
/P01%1 CT
e
ir:/1200 MW
45(11AW
4.ESCOi
CIESCO
M.GARH
D.G. KHAN
'Zs
sk-t/i
'41r
RPUR
DADU
NE
LEGEND
EXISTING PROPOSED
G/STN T/L G/STN T/L
JAMSHORO
KRA
T
C HIN A
GHAZI BROTHA
1450MW
UDEWALA
NEW
MULTAN
500kV
220kV
t500kV HVDC
t000kV HVDC
er (.7 ESC(?)
Generation Licence
Siddiqsons Energy Limited
Plot No. 12, Eastern Industrial Zone
at Port Qasim, Karachi
in the Province of Sindh
Detail of
Generation Facility/Thermal
Power Plant
(A). General Information
Name of Company/
Licensee
Siddiqsons Energy Limited
(ii). Registered Office
7th Floor, Siddiqsons Tower, 3 J.C.H. Society,
Block 7 & 8, Shahrah-e-Faisal, Karachi,
Province of Sindh, Pakistan
(iii). Business Office
27th Floor, Ocean Tower, Plot G-3, Block-9,
Clifton, Karachi, Province of Sindh, Pakistan
(iv).
Location of the
Generation Facility/
Power Plant
Plot No. 12, Eastern Industrial Zone, at Port
Qasim, Karachi, in the Province of Sindh.
(v).
Type of Generation
Facility/
Power Plant
Thermal Generation Facility
(B). Configuration of Generation Facility
(i).
Installed Capacity/Size
of the Generation
Facility/
Power Plant
350.00 MW
(ii). Type of Technology
Conventional Thermal Power Generation
Facility with Super Critical Boiler and Steam
Turbine
(iii).
Number of
Units/Size (MW)
1 x 350 MW
(iv).
Unit Make/Model/Type
& Year of Manufacture
Etc.
ER RE i
<2 /,
At-
Steam
turbine
Super-critical, condensing
Steam Turbine/ Dongfang
Turbine Corp. Ltd. / Shanghai
Electric Group Co.,Ltd./ Harbin
TTurbine Co., Ltd./ Alstom /
Siemens / Hitachi / Siemens /
Toshiba or Equivalent
Boiler
Supercritical thermal power unit,
once-through, single pass,
single reheat, balanced draft
Page 21 of 24 of Schedule -I
Generation Licence
Siddiqsons Energy Limited
Plot No. 12, Eastern Industrial Zone
at Port Qasim, Karach'
in the Province of Sindh
radiant furnace, dry bottom /
Dongfang Boiler Group Co.,
Ltd./ Harbin Boiler Co., Ltd./
Shanghai Electric Group Co.,
Ltd./ B&W(Beijing) Co., Ltd./
Alstom/ Ansaldo/ Foster
Wheeler or Equivalent
`(v).
COD of the Generation
Facil
Powe
ity/
r Plant
(Anticipated)
December 31, 2018
(vi).
Expected Useful Life of
the Generation Facility/
Power Plant from COD
30 years
(C). Fuel/Raw Material Details
(i). Primary Fuel Imported Bituminous/Sub-Bituminous Coal
(ii). Start-Up Fuel Light Diesel Oil (LDO)
(iv).
Fuel Source for each
of the above (i.e.
Imported/Indigenous)
Primary Fuel Start-Up Fuel
Bituminous/Sub-
•Bituminous Coal
from Indonesia,
South Africa,
Botswana, Ukraine,
Australia, Columbia,
USA and others
Indigenous/Imported
(v).'
Fuel Supplier for each
of the above
Primary Fuel Start-Up Fuel
Dharti Commodities
General Trading or
others
Shell
Pakistan/Pakistan
State Oil/Any other
OMC Company
(vo.
'
Supply Arrangement
for each of the above
Primary Fuel Start-Up Fuel
Page 22 of 24 of Schedule -I
Cfi
REGISTRAR
Generation Licence
Siddiqsons Energy Limited
Plot No. 12, Eastern Industrial Zone
at Port Qasim, Karachi
in the Province of Sindh
Fuels Through Ships, Jetty
of Pakistan
International Bulk
Terminal (PIBT) and
to Site through
Trucks etc.
Through Oil Tankers
(vii).
No of Storage
Bunkers/Tanks/
Open Yard
Primary Fuel Start-Up Fuel
One open yard One oil tank
(viii).
Storage Capacity of
each Bunkers/Tanks/
Open Yard
Primary Fuel Start-Up Fuel
About 315, 000
Tons
lx 500m3
(ix). Gross Storage
Primary Fuel Start-Up Fuel
About 315, 000
Tons
1 x 500m3
(D). Emission Values
Primary Fuel Start-Up Fuel
(i). SOX (mg/Nm3) <450 As per NEQ
(ii). NOx (mg/Nm3) <200 -do-
(iii). PM <50 -do-
(E). Cooling System
Cooling Water
Source/Cycle
The cooling water is from adjacent sea channel of
Port Qasim south of the site. Once through sea
water cooling system will be adopted for plant
design.
(F). Plant Characteristics
`11
(.1
'
Generation
Voltage
20-22kV
(ii). Frequency 50Hz
Page 23 of 24 of Schedule -I
Generation Licence
Siddiqsons Energy Limited
Plot No. 12, Eastern Industrial Zone
at Port Qasim, Karach*
in the Province of Sindh
(iii). Power Factor 0.8 (lagging)-0.95(leading)
(iv).
Automatic
Generation
Control (AGC)
(MW control is
the general
practice)
AGC Unit is included in the NCS, and AGC Unit
can accept command signal from Despatch. The
command signal is converted to analog, and
then the analog transmitted to the DCS via
hardware to achieve the AGC function.
(v).
Ramping Rate
(MW/min)
Under 30%
MCR
Between 30%
to 50% MCR
Between 50%
to 100% MCR
13.20MW/Min 19.80 MW/Min 33.00 MW/Min
(vi).
Time required to
Synchronize to
Grid
Hot Start Warm Start Cold Start
0.75 hours 2.00 hours 4.25 hours ,
r
Page 24 of 24 of Schedule -I
Generation Licence
Siddiqsons Energy Limited
Plot No. 12, Eastern Industrial Zone
at Port Qasim, Karachi
in the Province of Sindh
SCHEDULE-II
The Installed/ISO Capacity (MW), De-Rated Capacity At Mean Site
Conditions (MW), Auxiliary Consumption (MW) and the Net Capacity
At Mean Site Conditions (MW) of the Generation Facilities of Licensee
is given in this Schedule
y
Page 1 of 2 of Schedule-II
Generation Licence
Siddiqsons Energy Limited
Plot No. 12, Eastern Industrial Zone
at Port Qasim, Karachi
in the Province of Sindh
SCHEDULE-II
(1).
Total Gross Installed Capacity of the
Generation Facility/Power Plant
350.00 MW
(2).
De-rated Capacity of Generation
Facility/Power Plant at Reference Site
Conditions
322.00 MW
(3).
Auxiliary Consumption of the Generation
Facility/Power Plant 031.50 MW
(4).
Total Installed Net Capacity of Generation
Facility/Power Plant at Reference Site
Condition
290.50 MW
Note
All the above figures are indicative as provided by the Licensee. The Net
Capacity available to Power Purchaser for dispatch will be determined through
procedure(s) contained in the Power Purchase Agreement or any other applicable
document(s).
--...,_
Page 2 of 2 of Schedule-II

More Related Content

What's hot

Gujarat chemical & petrochemical sector
Gujarat chemical & petrochemical sectorGujarat chemical & petrochemical sector
Gujarat chemical & petrochemical sectorOutlook Menia
 
New base 1048 special 04 july 2017 energy news
New base 1048 special 04 july 2017 energy newsNew base 1048 special 04 july 2017 energy news
New base 1048 special 04 july 2017 energy newsKhaled Al Awadi
 
Growth of Electricity Sector in India since 1947 to 2015
Growth of Electricity Sector in India since 1947 to 2015Growth of Electricity Sector in India since 1947 to 2015
Growth of Electricity Sector in India since 1947 to 2015Ashish Verma
 
эрчим хүчний яам
эрчим хүчний яамэрчим хүчний яам
эрчим хүчний яамBayar Tsend
 
Laode Sulaeman, MEMR - Skill and Capacity Development Strategy to Support a C...
Laode Sulaeman, MEMR - Skill and Capacity Development Strategy to Support a C...Laode Sulaeman, MEMR - Skill and Capacity Development Strategy to Support a C...
Laode Sulaeman, MEMR - Skill and Capacity Development Strategy to Support a C...OECD Environment
 
Hydropower in-india-key-enablers-for-better-tomorrow
Hydropower in-india-key-enablers-for-better-tomorrowHydropower in-india-key-enablers-for-better-tomorrow
Hydropower in-india-key-enablers-for-better-tomorrowPriya Zadu
 
Capital Power June 2016 Investor Meetings
Capital Power June 2016 Investor MeetingsCapital Power June 2016 Investor Meetings
Capital Power June 2016 Investor MeetingsMichael Sheehan
 
energy future holindings commitments
energy future holindings  commitmentsenergy future holindings  commitments
energy future holindings commitmentsfinance29
 
IEA gas based power india
IEA gas based power indiaIEA gas based power india
IEA gas based power indiaManish1611
 
New base 07 november 2021 energy news issue 1468 by khaled al awadi
New base  07 november  2021 energy news issue   1468  by khaled al awadiNew base  07 november  2021 energy news issue   1468  by khaled al awadi
New base 07 november 2021 energy news issue 1468 by khaled al awadiKhaled Al Awadi
 
Andhra Pradesh solar power policy 2012
Andhra Pradesh solar power policy  2012Andhra Pradesh solar power policy  2012
Andhra Pradesh solar power policy 2012Bakul Haria
 
10 chapter 08 financial issues 25.01.2012
10 chapter 08 financial issues 25.01.201210 chapter 08 financial issues 25.01.2012
10 chapter 08 financial issues 25.01.2012cooldudesahil49
 
Indian Renewable Energy Status Report
Indian Renewable Energy Status ReportIndian Renewable Energy Status Report
Indian Renewable Energy Status ReportREN21
 

What's hot (14)

Gujarat chemical & petrochemical sector
Gujarat chemical & petrochemical sectorGujarat chemical & petrochemical sector
Gujarat chemical & petrochemical sector
 
New base 1048 special 04 july 2017 energy news
New base 1048 special 04 july 2017 energy newsNew base 1048 special 04 july 2017 energy news
New base 1048 special 04 july 2017 energy news
 
Growth of Electricity Sector in India since 1947 to 2015
Growth of Electricity Sector in India since 1947 to 2015Growth of Electricity Sector in India since 1947 to 2015
Growth of Electricity Sector in India since 1947 to 2015
 
эрчим хүчний яам
эрчим хүчний яамэрчим хүчний яам
эрчим хүчний яам
 
Laode Sulaeman, MEMR - Skill and Capacity Development Strategy to Support a C...
Laode Sulaeman, MEMR - Skill and Capacity Development Strategy to Support a C...Laode Sulaeman, MEMR - Skill and Capacity Development Strategy to Support a C...
Laode Sulaeman, MEMR - Skill and Capacity Development Strategy to Support a C...
 
Hydropower in-india-key-enablers-for-better-tomorrow
Hydropower in-india-key-enablers-for-better-tomorrowHydropower in-india-key-enablers-for-better-tomorrow
Hydropower in-india-key-enablers-for-better-tomorrow
 
Capital Power June 2016 Investor Meetings
Capital Power June 2016 Investor MeetingsCapital Power June 2016 Investor Meetings
Capital Power June 2016 Investor Meetings
 
energy future holindings commitments
energy future holindings  commitmentsenergy future holindings  commitments
energy future holindings commitments
 
IEA gas based power india
IEA gas based power indiaIEA gas based power india
IEA gas based power india
 
New base 07 november 2021 energy news issue 1468 by khaled al awadi
New base  07 november  2021 energy news issue   1468  by khaled al awadiNew base  07 november  2021 energy news issue   1468  by khaled al awadi
New base 07 november 2021 energy news issue 1468 by khaled al awadi
 
Andhra Pradesh solar power policy 2012
Andhra Pradesh solar power policy  2012Andhra Pradesh solar power policy  2012
Andhra Pradesh solar power policy 2012
 
10 chapter 08 financial issues 25.01.2012
10 chapter 08 financial issues 25.01.201210 chapter 08 financial issues 25.01.2012
10 chapter 08 financial issues 25.01.2012
 
Nl energy july 25 - july 31 2015
Nl energy july 25 - july 31 2015Nl energy july 25 - july 31 2015
Nl energy july 25 - july 31 2015
 
Indian Renewable Energy Status Report
Indian Renewable Energy Status ReportIndian Renewable Energy Status Report
Indian Renewable Energy Status Report
 

Viewers also liked

Production of Polylactic Acid Feasibility Report_Team Apollo.docx
Production of Polylactic Acid Feasibility Report_Team Apollo.docxProduction of Polylactic Acid Feasibility Report_Team Apollo.docx
Production of Polylactic Acid Feasibility Report_Team Apollo.docxLucas Ripley
 
Steyer.Dylan_Resume.2015
Steyer.Dylan_Resume.2015Steyer.Dylan_Resume.2015
Steyer.Dylan_Resume.2015Dylan Steyer
 
Sarah Tillman Classes
Sarah Tillman ClassesSarah Tillman Classes
Sarah Tillman ClassesSarah Tillman
 
Internet World 2011 - eLearning Talk
Internet World 2011 - eLearning TalkInternet World 2011 - eLearning Talk
Internet World 2011 - eLearning TalkTony Wood
 
Methods of Change in Character
Methods of Change in CharacterMethods of Change in Character
Methods of Change in CharacterFatin Nazihah Aziz
 
[Webinar du 6/11/2014] Réussir son projet E-commerce en mode agile
[Webinar du 6/11/2014] Réussir son projet E-commerce en mode agile[Webinar du 6/11/2014] Réussir son projet E-commerce en mode agile
[Webinar du 6/11/2014] Réussir son projet E-commerce en mode agileKaliop-slide
 
Reussir un site ecommerce
Reussir un site ecommerceReussir un site ecommerce
Reussir un site ecommerceUpMyBiz
 
Varanasi / Benarés (India)
Varanasi / Benarés (India)Varanasi / Benarés (India)
Varanasi / Benarés (India)F. Ovies
 
E z conference 2016 : The Next Generation of Innovative Applications: Powere...
E z conference 2016  : The Next Generation of Innovative Applications: Powere...E z conference 2016  : The Next Generation of Innovative Applications: Powere...
E z conference 2016 : The Next Generation of Innovative Applications: Powere...Kaliop-slide
 
Tata indicom project
Tata indicom projectTata indicom project
Tata indicom projectpravinshashi
 
الفنون الاسلاميه زكي حسنBy MosaadRamadan
الفنون الاسلاميه زكي حسنBy MosaadRamadanالفنون الاسلاميه زكي حسنBy MosaadRamadan
الفنون الاسلاميه زكي حسنBy MosaadRamadanMosaadRamadan AbdAlhk
 

Viewers also liked (16)

Production of Polylactic Acid Feasibility Report_Team Apollo.docx
Production of Polylactic Acid Feasibility Report_Team Apollo.docxProduction of Polylactic Acid Feasibility Report_Team Apollo.docx
Production of Polylactic Acid Feasibility Report_Team Apollo.docx
 
Readings english ii 2014 b
Readings english ii 2014 bReadings english ii 2014 b
Readings english ii 2014 b
 
resume_5
resume_5resume_5
resume_5
 
Steyer.Dylan_Resume.2015
Steyer.Dylan_Resume.2015Steyer.Dylan_Resume.2015
Steyer.Dylan_Resume.2015
 
Topic 10 - Ibn Taimiyyah
Topic 10 - Ibn TaimiyyahTopic 10 - Ibn Taimiyyah
Topic 10 - Ibn Taimiyyah
 
Sarah Tillman Classes
Sarah Tillman ClassesSarah Tillman Classes
Sarah Tillman Classes
 
21.08 giugno 2012
21.08 giugno 201221.08 giugno 2012
21.08 giugno 2012
 
Internet World 2011 - eLearning Talk
Internet World 2011 - eLearning TalkInternet World 2011 - eLearning Talk
Internet World 2011 - eLearning Talk
 
Methods of Change in Character
Methods of Change in CharacterMethods of Change in Character
Methods of Change in Character
 
[Webinar du 6/11/2014] Réussir son projet E-commerce en mode agile
[Webinar du 6/11/2014] Réussir son projet E-commerce en mode agile[Webinar du 6/11/2014] Réussir son projet E-commerce en mode agile
[Webinar du 6/11/2014] Réussir son projet E-commerce en mode agile
 
Reussir un site ecommerce
Reussir un site ecommerceReussir un site ecommerce
Reussir un site ecommerce
 
Varanasi / Benarés (India)
Varanasi / Benarés (India)Varanasi / Benarés (India)
Varanasi / Benarés (India)
 
E z conference 2016 : The Next Generation of Innovative Applications: Powere...
E z conference 2016  : The Next Generation of Innovative Applications: Powere...E z conference 2016  : The Next Generation of Innovative Applications: Powere...
E z conference 2016 : The Next Generation of Innovative Applications: Powere...
 
Tata indicom project
Tata indicom projectTata indicom project
Tata indicom project
 
الفنون الاسلاميه زكي حسنBy MosaadRamadan
الفنون الاسلاميه زكي حسنBy MosaadRamadanالفنون الاسلاميه زكي حسنBy MosaadRamadan
الفنون الاسلاميه زكي حسنBy MosaadRamadan
 
Farabi Centaur Chiron
Farabi Centaur ChironFarabi Centaur Chiron
Farabi Centaur Chiron
 

Similar to Lag 305 siddiqsons generation lic 14-09-2015-13666-71

Lag 05 mgl k-electric 13-03-2019
Lag 05 mgl k-electric 13-03-2019Lag 05 mgl k-electric 13-03-2019
Lag 05 mgl k-electric 13-03-2019abdul basit
 
Foundation Power Plant Report
Foundation Power Plant Report Foundation Power Plant Report
Foundation Power Plant Report FarooqueAhmed20
 
Vietnam Power and Energy Future with Power Development Plan 8 - Getting deals...
Vietnam Power and Energy Future with Power Development Plan 8 - Getting deals...Vietnam Power and Energy Future with Power Development Plan 8 - Getting deals...
Vietnam Power and Energy Future with Power Development Plan 8 - Getting deals...Dr. Oliver Massmann
 
Lowering-Clean-Energy-Risk-Through-Government-Regulation-presentation-Chrisna...
Lowering-Clean-Energy-Risk-Through-Government-Regulation-presentation-Chrisna...Lowering-Clean-Energy-Risk-Through-Government-Regulation-presentation-Chrisna...
Lowering-Clean-Energy-Risk-Through-Government-Regulation-presentation-Chrisna...OECD Environment
 
Indian power sector (chirag harwani)
Indian power sector (chirag harwani)Indian power sector (chirag harwani)
Indian power sector (chirag harwani)chiragharwani
 
New base 809 special 16 march 2016
New base 809 special 16 march 2016New base 809 special 16 march 2016
New base 809 special 16 march 2016Khaled Al Awadi
 
New base special 24 march 2014
New base special  24 march 2014New base special  24 march 2014
New base special 24 march 2014Khaled Al Awadi
 
Acceleration of the Usage EV Battery-powered Vehicle for Road Transportation.pdf
Acceleration of the Usage EV Battery-powered Vehicle for Road Transportation.pdfAcceleration of the Usage EV Battery-powered Vehicle for Road Transportation.pdf
Acceleration of the Usage EV Battery-powered Vehicle for Road Transportation.pdfAHRP Law Firm
 
Indonesian electricity-guide 2011
Indonesian electricity-guide 2011Indonesian electricity-guide 2011
Indonesian electricity-guide 2011Denny Saputra
 
Project on expense booking in the service and stores section of F&A dept. of ...
Project on expense booking in the service and stores section of F&A dept. of ...Project on expense booking in the service and stores section of F&A dept. of ...
Project on expense booking in the service and stores section of F&A dept. of ...CA Abhimanyu Chakraborty
 
NewBase 612 special 26 may 2015
NewBase 612 special 26 may 2015NewBase 612 special 26 may 2015
NewBase 612 special 26 may 2015Khaled Al Awadi
 
Renewable Energy Act of 2008 - Seven Years After
Renewable Energy Act of 2008 - Seven Years AfterRenewable Energy Act of 2008 - Seven Years After
Renewable Energy Act of 2008 - Seven Years AfterFernando Penarroyo
 
Ap solar policy 2012.
Ap solar policy 2012.Ap solar policy 2012.
Ap solar policy 2012.antastoya
 
Indian Captive Power Producers Association - Rajiv Agrawal, Secretary, ICPPA
Indian Captive Power Producers Association - Rajiv Agrawal, Secretary, ICPPAIndian Captive Power Producers Association - Rajiv Agrawal, Secretary, ICPPA
Indian Captive Power Producers Association - Rajiv Agrawal, Secretary, ICPPAIPPAI
 
Birendra Behuria ppt.pptx
Birendra Behuria ppt.pptxBirendra Behuria ppt.pptx
Birendra Behuria ppt.pptxBanaDurga
 
New base 1033 special 23 may 2017 energy news
New base 1033 special 23 may 2017 energy newsNew base 1033 special 23 may 2017 energy news
New base 1033 special 23 may 2017 energy newsKhaled Al Awadi
 
New base special 16 february 2014
New base special  16 february 2014New base special  16 february 2014
New base special 16 february 2014Khaled Al Awadi
 
Cost of Electricity Generation and the National Economy
Cost of Electricity Generation and the National EconomyCost of Electricity Generation and the National Economy
Cost of Electricity Generation and the National EconomyIshara Gamage
 
National Renewable Energy Program (NREP) 2020-2040 and sector updates, Ruby G...
National Renewable Energy Program (NREP) 2020-2040 and sector updates, Ruby G...National Renewable Energy Program (NREP) 2020-2040 and sector updates, Ruby G...
National Renewable Energy Program (NREP) 2020-2040 and sector updates, Ruby G...OECD Environment
 

Similar to Lag 305 siddiqsons generation lic 14-09-2015-13666-71 (20)

Lag 05 mgl k-electric 13-03-2019
Lag 05 mgl k-electric 13-03-2019Lag 05 mgl k-electric 13-03-2019
Lag 05 mgl k-electric 13-03-2019
 
Foundation Power Plant Report
Foundation Power Plant Report Foundation Power Plant Report
Foundation Power Plant Report
 
Vietnam Power and Energy Future with Power Development Plan 8 - Getting deals...
Vietnam Power and Energy Future with Power Development Plan 8 - Getting deals...Vietnam Power and Energy Future with Power Development Plan 8 - Getting deals...
Vietnam Power and Energy Future with Power Development Plan 8 - Getting deals...
 
Lowering-Clean-Energy-Risk-Through-Government-Regulation-presentation-Chrisna...
Lowering-Clean-Energy-Risk-Through-Government-Regulation-presentation-Chrisna...Lowering-Clean-Energy-Risk-Through-Government-Regulation-presentation-Chrisna...
Lowering-Clean-Energy-Risk-Through-Government-Regulation-presentation-Chrisna...
 
Indian power sector (chirag harwani)
Indian power sector (chirag harwani)Indian power sector (chirag harwani)
Indian power sector (chirag harwani)
 
New base 809 special 16 march 2016
New base 809 special 16 march 2016New base 809 special 16 march 2016
New base 809 special 16 march 2016
 
New base special 24 march 2014
New base special  24 march 2014New base special  24 march 2014
New base special 24 march 2014
 
Acceleration of the Usage EV Battery-powered Vehicle for Road Transportation.pdf
Acceleration of the Usage EV Battery-powered Vehicle for Road Transportation.pdfAcceleration of the Usage EV Battery-powered Vehicle for Road Transportation.pdf
Acceleration of the Usage EV Battery-powered Vehicle for Road Transportation.pdf
 
Indonesian electricity-guide 2011
Indonesian electricity-guide 2011Indonesian electricity-guide 2011
Indonesian electricity-guide 2011
 
Project on expense booking in the service and stores section of F&A dept. of ...
Project on expense booking in the service and stores section of F&A dept. of ...Project on expense booking in the service and stores section of F&A dept. of ...
Project on expense booking in the service and stores section of F&A dept. of ...
 
NewBase 612 special 26 may 2015
NewBase 612 special 26 may 2015NewBase 612 special 26 may 2015
NewBase 612 special 26 may 2015
 
RENEWABLE POLICY
RENEWABLE POLICYRENEWABLE POLICY
RENEWABLE POLICY
 
Renewable Energy Act of 2008 - Seven Years After
Renewable Energy Act of 2008 - Seven Years AfterRenewable Energy Act of 2008 - Seven Years After
Renewable Energy Act of 2008 - Seven Years After
 
Ap solar policy 2012.
Ap solar policy 2012.Ap solar policy 2012.
Ap solar policy 2012.
 
Indian Captive Power Producers Association - Rajiv Agrawal, Secretary, ICPPA
Indian Captive Power Producers Association - Rajiv Agrawal, Secretary, ICPPAIndian Captive Power Producers Association - Rajiv Agrawal, Secretary, ICPPA
Indian Captive Power Producers Association - Rajiv Agrawal, Secretary, ICPPA
 
Birendra Behuria ppt.pptx
Birendra Behuria ppt.pptxBirendra Behuria ppt.pptx
Birendra Behuria ppt.pptx
 
New base 1033 special 23 may 2017 energy news
New base 1033 special 23 may 2017 energy newsNew base 1033 special 23 may 2017 energy news
New base 1033 special 23 may 2017 energy news
 
New base special 16 february 2014
New base special  16 february 2014New base special  16 february 2014
New base special 16 february 2014
 
Cost of Electricity Generation and the National Economy
Cost of Electricity Generation and the National EconomyCost of Electricity Generation and the National Economy
Cost of Electricity Generation and the National Economy
 
National Renewable Energy Program (NREP) 2020-2040 and sector updates, Ruby G...
National Renewable Energy Program (NREP) 2020-2040 and sector updates, Ruby G...National Renewable Energy Program (NREP) 2020-2040 and sector updates, Ruby G...
National Renewable Energy Program (NREP) 2020-2040 and sector updates, Ruby G...
 

More from zubeditufail

International Environmental Impact Assessment - Atkins.pdf
International Environmental Impact Assessment - Atkins.pdfInternational Environmental Impact Assessment - Atkins.pdf
International Environmental Impact Assessment - Atkins.pdfzubeditufail
 
The Holy Quran with Easy Word Meaning
The Holy Quran with Easy Word MeaningThe Holy Quran with Easy Word Meaning
The Holy Quran with Easy Word Meaningzubeditufail
 
Use of fungus bricks in construction sector
Use of fungus bricks in construction sectorUse of fungus bricks in construction sector
Use of fungus bricks in construction sectorzubeditufail
 
SPMC training iso 45001 awareness
SPMC training iso 45001 awarenessSPMC training iso 45001 awareness
SPMC training iso 45001 awarenesszubeditufail
 
SPMC - Pakistan training iso 14001 EMS awareness
SPMC - Pakistan training iso 14001 EMS awarenessSPMC - Pakistan training iso 14001 EMS awareness
SPMC - Pakistan training iso 14001 EMS awarenesszubeditufail
 
SPMC - Pakistan training iso 9001 QMS awareness
SPMC - Pakistan training iso 9001 QMS awarenessSPMC - Pakistan training iso 9001 QMS awareness
SPMC - Pakistan training iso 9001 QMS awarenesszubeditufail
 
SPMC - Pakistan Training Calendar 2020
SPMC - Pakistan Training Calendar 2020SPMC - Pakistan Training Calendar 2020
SPMC - Pakistan Training Calendar 2020zubeditufail
 
ISO 9001:2015 Life Cycle
ISO 9001:2015 Life Cycle ISO 9001:2015 Life Cycle
ISO 9001:2015 Life Cycle zubeditufail
 
CODEX HACCP Short Introduction
CODEX HACCP Short Introduction CODEX HACCP Short Introduction
CODEX HACCP Short Introduction zubeditufail
 
Pakistan Income Tax Ordinance amendment 2016
Pakistan Income Tax Ordinance amendment 2016Pakistan Income Tax Ordinance amendment 2016
Pakistan Income Tax Ordinance amendment 2016zubeditufail
 
Heat stroke by SPMCpk.com
Heat stroke by SPMCpk.comHeat stroke by SPMCpk.com
Heat stroke by SPMCpk.comzubeditufail
 
APPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCE
APPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCEAPPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCE
APPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCEzubeditufail
 
Resettlement Policy Framework - Karachi Neighborhood Improvement Project (KNIP)
Resettlement Policy Framework - Karachi Neighborhood Improvement Project (KNIP)Resettlement Policy Framework - Karachi Neighborhood Improvement Project (KNIP)
Resettlement Policy Framework - Karachi Neighborhood Improvement Project (KNIP)zubeditufail
 
Environmental and Social Management Framework (ESMF) - Karachi Neighborhood I...
Environmental and Social Management Framework (ESMF) - Karachi Neighborhood I...Environmental and Social Management Framework (ESMF) - Karachi Neighborhood I...
Environmental and Social Management Framework (ESMF) - Karachi Neighborhood I...zubeditufail
 
Ohsas 18001 self assessment checklist
Ohsas 18001 self assessment checklistOhsas 18001 self assessment checklist
Ohsas 18001 self assessment checklistzubeditufail
 
Draft2 guiding principles_and_recommendations_for_businesses_in_and_around_kb...
Draft2 guiding principles_and_recommendations_for_businesses_in_and_around_kb...Draft2 guiding principles_and_recommendations_for_businesses_in_and_around_kb...
Draft2 guiding principles_and_recommendations_for_businesses_in_and_around_kb...zubeditufail
 
A global standard_for_the_identification_of_key_biodiversity_areas_final_web
A global standard_for_the_identification_of_key_biodiversity_areas_final_webA global standard_for_the_identification_of_key_biodiversity_areas_final_web
A global standard_for_the_identification_of_key_biodiversity_areas_final_webzubeditufail
 
The Daily Dawn newspaper - millineium development goals report - Pakistan
The Daily Dawn newspaper - millineium development goals report - PakistanThe Daily Dawn newspaper - millineium development goals report - Pakistan
The Daily Dawn newspaper - millineium development goals report - Pakistanzubeditufail
 
shehri Letter to sepa
shehri Letter to sepashehri Letter to sepa
shehri Letter to sepazubeditufail
 
EIA of Engro Powergen Limited 450 MW RLNG CCPP at PQA, Karachi Sep 29, 2015 b...
EIA of Engro Powergen Limited 450 MW RLNG CCPP at PQA, Karachi Sep 29, 2015 b...EIA of Engro Powergen Limited 450 MW RLNG CCPP at PQA, Karachi Sep 29, 2015 b...
EIA of Engro Powergen Limited 450 MW RLNG CCPP at PQA, Karachi Sep 29, 2015 b...zubeditufail
 

More from zubeditufail (20)

International Environmental Impact Assessment - Atkins.pdf
International Environmental Impact Assessment - Atkins.pdfInternational Environmental Impact Assessment - Atkins.pdf
International Environmental Impact Assessment - Atkins.pdf
 
The Holy Quran with Easy Word Meaning
The Holy Quran with Easy Word MeaningThe Holy Quran with Easy Word Meaning
The Holy Quran with Easy Word Meaning
 
Use of fungus bricks in construction sector
Use of fungus bricks in construction sectorUse of fungus bricks in construction sector
Use of fungus bricks in construction sector
 
SPMC training iso 45001 awareness
SPMC training iso 45001 awarenessSPMC training iso 45001 awareness
SPMC training iso 45001 awareness
 
SPMC - Pakistan training iso 14001 EMS awareness
SPMC - Pakistan training iso 14001 EMS awarenessSPMC - Pakistan training iso 14001 EMS awareness
SPMC - Pakistan training iso 14001 EMS awareness
 
SPMC - Pakistan training iso 9001 QMS awareness
SPMC - Pakistan training iso 9001 QMS awarenessSPMC - Pakistan training iso 9001 QMS awareness
SPMC - Pakistan training iso 9001 QMS awareness
 
SPMC - Pakistan Training Calendar 2020
SPMC - Pakistan Training Calendar 2020SPMC - Pakistan Training Calendar 2020
SPMC - Pakistan Training Calendar 2020
 
ISO 9001:2015 Life Cycle
ISO 9001:2015 Life Cycle ISO 9001:2015 Life Cycle
ISO 9001:2015 Life Cycle
 
CODEX HACCP Short Introduction
CODEX HACCP Short Introduction CODEX HACCP Short Introduction
CODEX HACCP Short Introduction
 
Pakistan Income Tax Ordinance amendment 2016
Pakistan Income Tax Ordinance amendment 2016Pakistan Income Tax Ordinance amendment 2016
Pakistan Income Tax Ordinance amendment 2016
 
Heat stroke by SPMCpk.com
Heat stroke by SPMCpk.comHeat stroke by SPMCpk.com
Heat stroke by SPMCpk.com
 
APPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCE
APPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCEAPPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCE
APPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCE
 
Resettlement Policy Framework - Karachi Neighborhood Improvement Project (KNIP)
Resettlement Policy Framework - Karachi Neighborhood Improvement Project (KNIP)Resettlement Policy Framework - Karachi Neighborhood Improvement Project (KNIP)
Resettlement Policy Framework - Karachi Neighborhood Improvement Project (KNIP)
 
Environmental and Social Management Framework (ESMF) - Karachi Neighborhood I...
Environmental and Social Management Framework (ESMF) - Karachi Neighborhood I...Environmental and Social Management Framework (ESMF) - Karachi Neighborhood I...
Environmental and Social Management Framework (ESMF) - Karachi Neighborhood I...
 
Ohsas 18001 self assessment checklist
Ohsas 18001 self assessment checklistOhsas 18001 self assessment checklist
Ohsas 18001 self assessment checklist
 
Draft2 guiding principles_and_recommendations_for_businesses_in_and_around_kb...
Draft2 guiding principles_and_recommendations_for_businesses_in_and_around_kb...Draft2 guiding principles_and_recommendations_for_businesses_in_and_around_kb...
Draft2 guiding principles_and_recommendations_for_businesses_in_and_around_kb...
 
A global standard_for_the_identification_of_key_biodiversity_areas_final_web
A global standard_for_the_identification_of_key_biodiversity_areas_final_webA global standard_for_the_identification_of_key_biodiversity_areas_final_web
A global standard_for_the_identification_of_key_biodiversity_areas_final_web
 
The Daily Dawn newspaper - millineium development goals report - Pakistan
The Daily Dawn newspaper - millineium development goals report - PakistanThe Daily Dawn newspaper - millineium development goals report - Pakistan
The Daily Dawn newspaper - millineium development goals report - Pakistan
 
shehri Letter to sepa
shehri Letter to sepashehri Letter to sepa
shehri Letter to sepa
 
EIA of Engro Powergen Limited 450 MW RLNG CCPP at PQA, Karachi Sep 29, 2015 b...
EIA of Engro Powergen Limited 450 MW RLNG CCPP at PQA, Karachi Sep 29, 2015 b...EIA of Engro Powergen Limited 450 MW RLNG CCPP at PQA, Karachi Sep 29, 2015 b...
EIA of Engro Powergen Limited 450 MW RLNG CCPP at PQA, Karachi Sep 29, 2015 b...
 

Recently uploaded

(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Species composition, diversity and community structure of mangroves in Barang...
Species composition, diversity and community structure of mangroves in Barang...Species composition, diversity and community structure of mangroves in Barang...
Species composition, diversity and community structure of mangroves in Barang...Open Access Research Paper
 
VIP Call Girls Ramanthapur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Ramanthapur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Ramanthapur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Ramanthapur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...Suhani Kapoor
 
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...Suhani Kapoor
 
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Tina Ji
 
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一F dds
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Determination of antibacterial activity of various broad spectrum antibiotics...
Determination of antibacterial activity of various broad spectrum antibiotics...Determination of antibacterial activity of various broad spectrum antibiotics...
Determination of antibacterial activity of various broad spectrum antibiotics...Open Access Research Paper
 
Freegle User Survey as visual display - BH
Freegle User Survey as visual display - BHFreegle User Survey as visual display - BH
Freegle User Survey as visual display - BHbill846304
 
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...Suhani Kapoor
 
Air pollution soli pollution water pollution noise pollution land pollution
Air pollution soli pollution water pollution noise pollution land pollutionAir pollution soli pollution water pollution noise pollution land pollution
Air pollution soli pollution water pollution noise pollution land pollutionrgxv72jrgc
 
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...ranjana rawat
 
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012sapnasaifi408
 
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...Cluster TWEED
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashikranjana rawat
 
NO1 Famous Kala Jadu specialist Expert in Pakistan kala ilam specialist Exper...
NO1 Famous Kala Jadu specialist Expert in Pakistan kala ilam specialist Exper...NO1 Famous Kala Jadu specialist Expert in Pakistan kala ilam specialist Exper...
NO1 Famous Kala Jadu specialist Expert in Pakistan kala ilam specialist Exper...Amil baba
 

Recently uploaded (20)

(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Species composition, diversity and community structure of mangroves in Barang...
Species composition, diversity and community structure of mangroves in Barang...Species composition, diversity and community structure of mangroves in Barang...
Species composition, diversity and community structure of mangroves in Barang...
 
FULL ENJOY Call Girls In kashmiri gate (Delhi) Call Us 9953056974
FULL ENJOY Call Girls In  kashmiri gate (Delhi) Call Us 9953056974FULL ENJOY Call Girls In  kashmiri gate (Delhi) Call Us 9953056974
FULL ENJOY Call Girls In kashmiri gate (Delhi) Call Us 9953056974
 
VIP Call Girls Ramanthapur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Ramanthapur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Ramanthapur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Ramanthapur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
 
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
 
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
 
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
 
Determination of antibacterial activity of various broad spectrum antibiotics...
Determination of antibacterial activity of various broad spectrum antibiotics...Determination of antibacterial activity of various broad spectrum antibiotics...
Determination of antibacterial activity of various broad spectrum antibiotics...
 
Freegle User Survey as visual display - BH
Freegle User Survey as visual display - BHFreegle User Survey as visual display - BH
Freegle User Survey as visual display - BH
 
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
 
Gandhi Nagar (Delhi) 9953330565 Escorts, Call Girls Services
Gandhi Nagar (Delhi) 9953330565 Escorts, Call Girls ServicesGandhi Nagar (Delhi) 9953330565 Escorts, Call Girls Services
Gandhi Nagar (Delhi) 9953330565 Escorts, Call Girls Services
 
Air pollution soli pollution water pollution noise pollution land pollution
Air pollution soli pollution water pollution noise pollution land pollutionAir pollution soli pollution water pollution noise pollution land pollution
Air pollution soli pollution water pollution noise pollution land pollution
 
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
 
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
 
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
 
NO1 Famous Kala Jadu specialist Expert in Pakistan kala ilam specialist Exper...
NO1 Famous Kala Jadu specialist Expert in Pakistan kala ilam specialist Exper...NO1 Famous Kala Jadu specialist Expert in Pakistan kala ilam specialist Exper...
NO1 Famous Kala Jadu specialist Expert in Pakistan kala ilam specialist Exper...
 
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
 

Lag 305 siddiqsons generation lic 14-09-2015-13666-71

  • 1. National Electric Power Regulatory Authority Islamic Republic of Pakistan NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph:+92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk, E-mail: registrar@nepra.org.pk No. NEPRA/R/DL/LAG-305/ LiZZZ. -71 September 14, 2015 Mr. Abdul Rahim Rafi Chief Executive Officer Siddiqsons Energy Limited 26th Floor, Ocean Tower, Plot G-3, Block-9, Clifton, Karachi. Subject: Grant of Generation Licence No. IGSPL/65/2015 Licence Application No. LAG-305 Siddiasons Enemy Limited (SDSEL) Reference: Your application vide letter No. Nil, dated Nil (received on 09.04.2015). Enclosed please find herewith Determination of the Authority in the matter of Application of "Siddiqsons Energy Limited (SDSEL)" for the "Grant of Generation Licence" along with Generation Licence No. IGSPL/65/2015 annexed to this determination granted by the National Electric Power Regulatory Authority (NEPRA) to "Siddiqsons Energy Limited (SDSEL)" for its 350.00 MW Imported Coal based Thermal Generation Facility located at Plot No. 12, Eastern Industrial Zone at Port Qasim, Karachi in the Province of Sindh" pursuant to Section 15 of the Regulation of Generation, Transmission and Distribution of Electric Power Act (XL of 1997). 2. Please quote above mentioned Generation Licence No. for future correspondence. Enclosure: Generation Licence (IGSPL/65/2015) Copy to: (Syed Safeer Hussain) 1. Chief Executive Officer, NTDC, 414-WAFT ouse, Lahore 2. Chief Operating Officer, CPPA-G, 107-WAPDA House, Lahore 3. Managing Director, Private Power and Infrastructure Board (PPIB), 50-Nazimuddin Road, Sector F-7/4, Islamabad. 4. Chief Executive Officer, K-Electric Limited (KEL), KE House, 39-B, Sunset Boulevard, Phase II (Ext), DHA, Karachi. 5. Director General, Environment Protection Agency, Government of Sindh, Complex Plot No. ST-2/1, Korangi Industrial Area, Karachi.
  • 2. National Electric Power Regulatory Authority (NEPRA) Determination of the Authority in the Matter of Application of Siddiqsons Energy Limited for the Grant of Generation Licence September 02, 2015 Case No. LAG-305 (A). Background (I). The Government of Pakistan (GoP) has set up Private Power Infrastructure Board (PPIB) as a one window facilitator for the entrepreneurs interested in setting up new generation facilities. (ii). In order to meet the future electricity/energy needs of the country and to improve the energy mix, the GoP has decided to install Generation Facilities/Thermal Power Plants (TPPs) operating on either imported or indigenous Coal. In order to implement the said initiative, PPIB has issued Letter of Intent (Lol) to various local and foreign investors/groups. PPIB also issued to Siddiqsons Limited (SDSL) the Lol for setting up an approximately 350.00 MW Imported Coal based Generation Facility/TPP at Port Qasim, Karachi, in the Province of Sindh. (iii). In order to implement the project, the SDSUthe Sponsors of the project incorporated a Special Purpose Vehicle (SPV) in the name of Siddiqsons Energy Limited-SDSEL, as stipulated under the companies' ordinance 1984. (B). Filing of Generation Licence Application (i). In accordance with Section-15 of Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997 (the NEPRA Act), SDSEL submitted an application on April 09, 2015 requesting for the grant of Generation Licence. Page 1 of 8
  • 3. (ii). The Registrar examined the submitted application to confirm its compliance with the NEPRA Licensing (Application and Modification Procedure) Regulations, 1999 (the "Regulations"). The Registrar observed that the application lacked some of the required information/documentation. Accordingly, SDSEL was directed for submitting the missing information/documentation. SDSEL completed the missing information/documentation on May 04, 2015. The Authority considered the matter in its Regulatory Meeting (RM-15-427), held on June 02, 2015 and found the form and content of the application in substantial compliance with Regulation-3 of the Regulations. Accordingly, the Authority admitted the application for consideration of the grant of the Generation Licence as stipulated in Regulation-7 of the Regulations. The Authority approved the advertisement [containing (a). the prospectus; (b). a notice to the general public about the admission of the application of SDSEL], inviting the general public for submitting their comments in the matter as stipulated in Regulation-8 of the Regulations. The Authority also approved the list of the relevant stakeholders for providing their comments or otherwise to assist the Authority in the matter. Accordingly, the advertisement was published in one Urdu and one English National Newspaper on June 06, 2015. (iii). Apart from the above, separate letters were also sent to Government Ministries, their Attached Departments, Representative Organizations and Individual Experts etc. on June 10, 2015. The said stakeholders were directed for submitting their views/comments for the assistance of the Authority. (C). Comments of Stakeholders (i). In response to the above, the Authority received comments from four (04) stakeholders. These included The Federation of Pakistan Chambers of Commerce & Industry (TFoPCoC&I), Ministry of Petroleum and Natural Resources (MoP&NR), Pakistan Mineral Development Corporation (Pvt.) Limited (PMDCPL) and WAPDA Power Privatization Organization (WPPO) of National Transmission and Despatch Company Limited (NTDC). The comments of the above stakeholders are summarized below: Page 2 of 8
  • 4. Page 3 of 8 (a). TFoPCoC&I remarked that sustainable electrification of the country demands a high level of local participation at all levels. The real impact and sustainability can be obtained through close collaboration of local private and financial sector firms. In view of the serious shortage of energy in the country, TFoPCoC&I strongly recommend to expedite the processing of all applications of power projects pending before the Authority. Further, TFoPCoC&I expressed its no objection to the issuance of Generation Licence to SDSEL; (b). MoP&NR stated that the company intends to install a Coal Fired TPP operating on Imported/Local Coal. As the project does not require Natural Gas for its operation therefore, the ministry has no objection to the grant of Generation Licence to SDSEL; (c). PMDCPL appreciated the proposal of SDSEL as this will help to overcome the energy crisis in the country. However, PMDCPL suggested that blending of local coal should also be considered for the project; and (d). NTDC submitted that it has issued a concurrence for the site, location, fuel and technology of the proposed project. (ii). The Authority considered the above comments of the stakeholders and found the same in favor of the grant of Generation Licence except to the observation of PMDCPL that blending of the local coal for the project may be considered. (iii). The Authority decided to seek a clarification on the above observations of PMDCPL. In its rejoinder, the company/SDSEL submitted that the Lol of the project is based on imported coal therefore, the blending of local coal has not been envisaged as of now. However, the blending of the local coal may be(2
  • 5. considered subsequently if the local coal of compatible performance and characteristics is available in future. (iv). In view of the above, the Authority considered it appropriate to process the application for the consideration of the grant of Generation Licence as stipulated in the Regulations and the NEPRA Licensing (Generation) Rules, 2000 (the Rules). (D). Grant of Generation Licence (i). Electricity is a fundamental element for the economic growth of any country. The electricity consumption per capita has a strong correlation to the Social Development Indices (Human Development Index-HDI, life expectancy at birth, infant mortality rate, and maternal mortality) and Economic Indices (such as GDP per capita). (ii). Increasing electricity consumption per capita can directly stimulate faster economic growth and indirectly achieve enhanced social development. In short, the Economic Growth of any country is directly linked with the availability of safe, secure, reliable and cheaper supply of electricity. In view of the said, the Authority is of the considered opinion that for sustainable development, all types of electric power generation resources including Coal (Imported/Indigenous), Hydel, Wind, Solar and other Renewable Energy (RE) resources must be tapped and developed on priority basis both in Public and Private Sectors. (iii). The existing energy mix of the country is heavily skewed towards the costlier thermal Generation FacilitiesfTPPs, operating on Furnace Oil. The Import of expensive Furnace Oil results in depletion of the precious foreign exchange reserves of the country affecting the macro and micro stability of the country. In view of the said, an increase in the consumer end tariff is experienced which not only results in higher inflation but it also affects the competitiveness of the local Industry with its foreign peers. In order to address the said issues, the Authority considers it imperative that efforts must be made to change the energy mix towards cheaper fuels. With the depleting Natural Gas Reserves in the country and relatively longer lead time for the constructio of Hydro Electric Power Projects, the 7 Page 4 of 8
  • 6. Coal Power Plants are considered the best option in the Short and Medium Term Planning. Therefore, to reduce the Demand-Supply gap and to achieve sustainable development, it is vital that indigenous as well as imported Coal Projects are given priority for power generation and their development is encouraged. In view of the said, the Council of Common Interests (CCI) approved the Power Policy 2013 which envisages rationalizing the energy mix and reducing the Demand-Supply gap through Imported and Indigenous coal based power generation. In consideration of the said, the Authority is of the view that the proposed project of SDSEL is consistent with the provisions of Power Policy 2013. (iv). The Authority has examined the details submitted by the sponsors about the proposed Generation Facility/TPP of SDSEL with reference to its location, the type of technology being deployed, interconnection arrangements for dispersal of electric power and other specific details. The Project will be located in the Eastern Industrial Zone of Port Qasim, Karachi, in the Province of Sindh. The Company has acquired land measuring about 100 acres. The Land Coordinates are (a). 24° 4T 20.09"N, 67° 22' 59.38E; (b). 24° 46' 48.16"N, 67° 23' 1.05"E; (c). 24° 47' 21.99"N, 67° 23'14.19"E and (d). 24° 46' 48.88"N, 67° 2315.82"E. (v). The Authority has observed that the proposed Generation Facility/TPP will be consisting of 1 x 350MW Super-Critical Unit with one Boiler, Steam Turbine and Generator. The boiler will be fueled by imported coal with the capability to burn local coal in future. The coal for the Project is expected to be imported from Indonesia and South Africa. The Imported Bituminous/Sub- Bituminous coal will be transported by ship and unloaded at a bulk terminal in Karachi. In this regard, the sponsors have signed a Memorandum of Understanding with Pakistan International Bulk Terminal. The Authority considers that the Supercritical Technology is very mature with many units in operation worldwide for many years with good track records. SDSEL has confirmed that the selected main parameters of the Steam Turbine and Boiler (571.1°C and 254.4 bar) of the Generation Facility/TPP are at the high end of the supercritical class. Further, SDSEL has confirmed that the Gross Efficiency of the proposed Generation Facility/TPP will be more than 40% (i.e. 40.20%) whereas the Net Efficiency of same will be greater than 39.00% and will result in less emission per unit of electricity generated. The Authority considers that the high efficiency of the / Page 5 of 8
  • 7. proposed Generation Facility/TPP and the low cost of fuel (i.e. Imported Coal) will generate the lowest cost power and will provide an economically feasible solution to relieve power shortages in the country. (vi). The Authority is satisfied that the NTDC has endorsed the site and parameters of the project. Further, NTDC has also confirmed about carrying out the required studies pertaining to the dispersal of electric power from the proposed Generation Facility/TPP. In this regard, it has been confirmed that the electric power from the Imported Coal based Generation Facility/TPP of SDSEL will be evacuated through 500 kV Transmission Line(s). (vii). The term of a Generation Licence under the Rule-5 (1) of the Rules, is to be commensurate with the maximum expected useful life of the units comprised in a generating facility. As explained above, the proposed Generation Facility/TPP of SDSEL will be consisting of one (01) Steam Turbine Unit of 350.00 MW. According to the International benchmarks available, the useful life of a Steam Turbine is normally taken at least thirty (30) years from its Commercial Operation Date (COD). Further, SDSEL has also confirmed that it will be negotiating a Power Purchase Agreement (PPA) with the Power Purchaser having a term of thirty (30) years. In view of the said, the Authority hereby sets the term of the proposed Generation Licence of SDSEL to be thirty (30) years from its COD. (viii). Regarding the Tariff of Generation Company (i.e. SDSEL) that it will charge the Power Purchaser, the Authority through its Determination No. NEPRATTRF-313/SEL-2015/10440-10442, dated July 13, 2015 has granted SDSEL an Up-front Tariff for its Project. The Authority directs SDSEL to follow the terms and conditions of the granted Up-Front Tariff in letter and spirit and charge the Power Purchaser only such tariff which has been determined, approved or specified by the Authority as stipulated in Article-6 of its proposed Generation Licence. (ix). As explained above, the proposed Generation Facility/TPP for which Generation Licence has been sought is based on Imported Coal. The Coal based Generation Facility/TPP may be harmful to environment because of emission of Page 6 of 8
  • 8. Page 7 of 8 Green House Gases (GHG) and production of ash and other effluents. In this regard, SDSEL confirmed that proposed Generation Facility/Coal Power Plant will meet local regulatory emissions limits. It has been confirmed that dry low NO burners (implemented in an overall low NO combustion system) shall be installed in conformance with the local regulations for emission control. Extractive systems shall be used to monitor NO and SO2. Continuous Emission Monitoring System (CEMS) shall be provided to measure emissions and produce all required data logging and reporting. The data logging and reporting system shall store adequate amount of data and automatically produce reports as required. According to the air dispersion modeling, if coal having Sulphur contents in excess of 0.5% is used then the Project may require a Flue Gas Desulphurization (FGD) unit. However, to keep flexibility in coal specifications and sourcing, it is envisaged that a FDG shall be installed to meet the mandatory regulatory environmental requirements. Electrostatic Precipitators (ESP) will be designed and installed which will be capable of being operated such that emissions do not exceed the limit of 50mg/Nm3 when firing design coal. One set of pneumatic fly ash conveyor system will also be provided. There will be a concrete fly ash silos capable of storing the fly ash produced in fourteen (14) days. There will be discharge outlets at the bottom of fly ash silo which will be equipped with humidifying device to discharge wet fly ash which will be transported to ash yard by dump trucks. The bottom ash handling system shall provide for the collection and removal of bottom ash from the steam generator (pulverized coal type) furnaces. A completely dry type bottom ash removal system shall be provided. The sponsors have confirmed that the proposed Generation Facility/TPP will comply with the Environmental Standards of the country. Further, SDSEL has provided a copy of the Environmental Impact Assessment (EIA) submitted to Environmental Protection Agency Govt. of Sindh (EPAGoS) confirming that NEQs will be followed. The Authority has considered the submissions and directs SDSEL to get the matter expedited with EPAGoS for getting the approval of the EIA and obtain the required No Objection Certificate (NOC). The Authority directs SDSEL to complete all formalities at the earliest and submit the NOC within six (06) months of the issuance of the Generation Licence. Apart from the above, the Authority directs SDSEL to ensure that the Generation Facility/TPP conforms to the environment standards during the term of the Generation Licence. In view of the said, the Authority has included a separate article along with other terms and conditions that the Licensee will comply with --Ii-- REGUL9T I d
  • 9. Brig. (R) Tariq Saddozai (Chairman) 11 _J REGIST.t za * ATAR A -----K--- (----- 1 tl ol Page 8 of 8 relevant environmental standards. Further, the Authority also directs SDSEL to submit a report on a bi-annual basis, confirming that operation of its proposed Generation Facility/TPP is compliant with required Environmental Standards as prescribed by EPAGoS. (x). In view of the above, the Authority hereby decides to approve the grant of Generation Licence to SDSEL on the terms and conditions as set out in the Generation Licence annexed to this determination. The grant of Generation Licence will be subject to the provisions contained in the NEPRA Act, relevant rules, regulations framed there under and the other applicable documents. Authority Syed Masood-ul-Hassan Naqvi (Member) Himayat Ullah Khan (Member) Khawaja Muhammad Naeem (Member) Maj. (R) Haroon Rashid (Member)/(Vice Chairman)
  • 10. National Electric Power Regulatory Authority (NEPRA) Islamabad Pakistan GENERATION LICENCE No. IGSPL/65/2015 In exercise of the Powers conferred upon the National Electric Power Regulatory Authority (NEPRA) under Section-15 of the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997, the Authority hereby grants a Generation Licence to: SIDDIQSONS ENERGY LIMITED Incorporated under the Companies Ordinance, 1984 Under Corporate Universal Identification No. 0088316, Dated May 15, 2014 for its Imported Coal Based Thermal Generation Facility Located at Plot No. 12, Eastern Industrial Zone at Port Qasim, Karachi in the Province of Sindh (Total Installed Capacity: 350.00 MW Gross) to engage in generation business subject to and in accordance with the Articles of this Licence. Given under my hand this 44A day of September Two Thousand & Fifteen and expires on 30th day of December Two Thousand & Forty Eight. Registrar
  • 11. Generation Licence Siddiqsons Energy Limited Plot No. 12, Eastern Industrial Zone at Port Qasim, Karachi in the Province of Sindh Article-1 Definitions 1.1 In this Licence (a). "Act" means "the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997"; (b). "Authority" means "the National Electric Power Regulatory Authority constituted under Section-3 of the Act"; (c). "Bus Bar" means a system of conductors in the generation facility of the Licensee on which the electric power of all the generators is collected for supplying to the Power Purchaser; (d). "Commercial Operations Date (COD)" means the day immediately following the date on which the generation facility of the Licensee is commissioned; (e). "CPPA-G" means "the Central Power Purchasing Agency (Guarantee) Limited or any other entity created for the like purpose; (f). "Grid Code" means the grid code prepared by NTDC and approved by the Authority, as it may be revised from time to time by NTDC with the necessary approval of the Authority; (g). "IEC" means International Electrotechnical Commission or any other entity created for the like purpose and its successors or permitted assigns; (h). "IEEE" means the Institute of Electrical and Electronics Engineers and its successors or permitted assigns° ------- ot REG • /-ii R it- 'P.: 0 v LU C:. --I geG1S -4 ,may s 4-o Ni- Page 2 of 6
  • 12. Generation Licence Siddiqsons Energy Limited Plot No. 12, Eastern Industrial Zone at Port Qasim, Karachi in the Province of Sindh "Licensee" means "Siddiqsons Energy Limited" and its successors or permitted assigns; (j). "NTDC" means National Transmission and Despatch Company Limited and its successors or permitted assigns; (k). "Power Purchase Agreement" means the power purchase agreement, entered or to be entered into by and between the Power Purchaser and the Licensee, for the purchase and sale of electric energy generated by the generation facility, as may be amended by the parties thereto from time to time; (I). "Power Purchaser" means the CPPA-G purchasing power on behalf of XW-DISCOs; (m). "Regulation" means "the National Electric Power Regulatory Authority Licensing (Application & Modification Procedure) Regulations, 1999" as amended or replaced from time to time; (n). "Rules" mean "the National Electric Power Regulatory Authority Licensing (Generation) Rules, 2000"; (o). "XW DISCO" means "an Ex-WAPDA distribution company engaged in the distribution of electric power". 1.2 Words and expressions used but not defined herein bear the meaning given thereto in the Act or in the Rules. Article-2 Application of Rules This Licence is issued subject to the provisions of the Rules, as amended from time to time.:_r_) Page 3 of 6
  • 13. The Licensee shall charge only such tariff which has been determined, approved or specified by the Authority in terms of Rule-6 of the Rules.c1 f l Page 4 of 6 Generation Licence Siddiqsons Energy Limited Plot No. 12, Eastern Industrial Zone at Port Qasim, Karachi in the Province of Sindh Article-3 Generation Facilities 3.1 The location, size (capacity in MW), technology, interconnection arrangements, technical limits, technical and functional specifications and other details specific to the generation facility of the Licensee are set out in Scheduled of this Licence. 3.2 The net capacity of the generation facility of the Licensee is set out in Schedule-II hereto. 3.3 The Licensee shall provide the final arrangement, technical and financial specifications and other specific details pertaining to its generation facility before its COD. Article-4 Term of Licence 4.1 The Licence is granted for a term of thirty (30) years from the COD of the generation facility. 4.2 Unless suspended or revoked earlier, the Licensee may apply for renewal of the Licence within ninety (90) days prior to the expiry of the term of the Licence, as stipulated in the Regulations. Article-5 Licence fee After the grant of the Generation Licence, the Licensee shall pay to the Authority the Licence fee, in the amount, manner and at the time set out in the National Electric Power Regulatory Authority (Fees) Rules, 2002. Article-6 Tariff
  • 14. Generation Licence Siddiqsons Energy Limited Plot No. 12, Eastern Industrial Zone at Port Qasim, Karachi in the Province of Sindh Article-7 Competitive Trading Arrangement 7.1 The Licensee shall participate in such manner as may be directed by the Authority from time to time for development of a Competitive Trading Arrangement. The Licensee shall in good faith work towards implementation and operation of the aforesaid Competitive Trading Arrangement in the manner and time period specified by the Authority. Provided that any such participation shall be subject to any contract entered into between the Licensee and another party with the approval of the Authority. 7.2 Any variation or modification in the above-mentioned contracts for allowing the parties thereto to participate wholly or partially in the Competitive Trading Arrangement shall be subject to mutual agreement of the parties thereto and such terms and conditions as may be approved by the Authority. Article-8 Maintenance of Records For the purpose of sub-rule (1) of Rule-19 of the Rules, copies of records and data shall be retained in standard and electronic form and all such records and data shall, subject to just claims of confidentiality, be accessible by authorized officers of the Authority. Article-9 Compliance with Performance Standards The Licensee shall comply with the relevant provisions of the National Electric Power Regulatory Authority Performance Standards (Generation) Rules 2009 as amended from time to time. Article-10 Compliance with Environmental Standards 10.1 The Licensee at all times shall comply with the environmental standards as may be prescribed by the relevant competent authority as amended from time to Page 5 of 6
  • 15. / Page 6 of 6 Generation Licence Siddiqsons Energy Limited Plot No. 12, Eastern Industrial Zone at Port Qasim, Karachi in the Province of Sindh 10.2 The Licensee shall provide a certificate on bi-annual basis, confirming that the operation of its generation facility is in line with environmental standards as prescribed by the relevant competent authority. Article-11 Power off take Point and Voltage The Licensee shall deliver power to the Power Purchaser at the outgoing Bus Bar of its grid station. The up-gradation (step up) of generation voltage up to the required Interconnection voltage level will be the responsibility of the Licensee. Article-12 Provision of Information 12.1 The obligation of the Licensee to provide information to the Authority shall be in accordance with Section-44 of the Act. 12.2 The Licensee shall be subject to such penalties as may be specified in the relevant rules made by the Authority for failure to furnish such information as may be required from time to time by the Authority and which is or ought to be or has been in the control or possession of the Licensee. Article-13 Design & Manufacturing Standards All the components of the generation facility/power plant shall be designed, manufactured and tested according to the latest IEC, IEEE or any other equivalent standards. All plant and equipment shall be unused and brand new./
  • 16. Generation Licence Siddiqsons Energy Limited Plot No. 12, Eastern Industrial Zone at Port Qasim, Karachi in the Province of Sindh SCHEDULE-I The Location, Size (i.e. Capacity in MW), Type of Technology, Interconnection Arrangements, Technical Limits, Technical/Functional Specifications and other details specific to the Generation Facilities of the Licensee are described in this Schedule REGISTRAR 0 * NEPRN z Page 1 of 24 of Schedule -I
  • 17. Page 2 of 24 of Schedule -I 4 Generation Licence Siddiqsons Energy Limited Plot No. 12, Eastern Industrial Zone at Port Qasim, Karachi in the Province of Sindh
  • 18. A National Highway LOCATION PLAN FOR 350 MW IMPORTED COAL BASED POWER PLANT BIN QASIM KARACHI CZ mY N c E R 8 g E a g O H Page3of24ofSchedule-1 - To Thatta Lotte Pakistan Pvt Ltd Engro Zarkhei Engro Polymers SSGCL RIAG Project PAKISTAN ENGINEERING SERVICES (PVT ) LTD 7 - B. COMMERCIAL AREA PHASE - V D H A, LAHORE erna:I - .nfo4Ppespk corn 6 PROJECT 350 MW IMPORTED COAL BASED POWER PLANT BIN-QASIM KARACHI TTLE LOCATION PLAN DRAWN DATE MA°C - DESIGNED DRAWING NC. CHECdED APPROVED REV No 0
  • 19. E 8 Generation Licence Siddiqsons Energy Limited Plot No 12. Eastern Industrial Zone at Port Qasim, Karachi in the Province of Sindh - N z •1 • 4t.k. 919%AR SEc FRONIOR NEI? ,51S0 (139. di)• • .7 •IRAN,A iA RE f- INAR !mi r co 0 / Page 4 of 24 of Schedule -I 0
  • 20. Generation Licence Siddlosons Energy Limited Plot No. 12, Eastern Industrial Zone at Port Qasim, Karachi In the Province of Sindh Page 5 of 24 of Schedule -I
  • 21. C 6?, ts Es C 2 12 8 4 et r C 2200 e: 23 AA 2 la b Generation Licence Siddiqsons Energy Limited Plot No. 12, Eastern Industrial Zone at Port Qasim, Karachi in the Province of Sindh Page 6 of 24 of Schedule -I
  • 22. Y 01045.92 G Generation Licence Siddiqsons Energy Limited Plot No. 12, Eastern Industrial Zone at Port Qasim, Karachi in the Province of Sindh 6 S IS 54.87 G LIQ 0:1 0 0.21 G 23.43 G 00 00 a 8 0.17 G e- 30.37 G 42.02 G 0 4J 66 G 0.17 G 29.61 G 0010 40.51 G 79.08 G 79.93 G 04— I4 s Page 7 of 24 of Schedule -I
  • 23. $11016X LILTS NU MIMI 1 XN III OK T110 M31 UT Page 8 of 24 of Schedule -I Generation Licence Siddiqsons Energy Limited Plot No. 12, Eastern Industrial Zone at Port Qasim, Karachi in the Province of Sindh
  • 24. Generation Licence Siddiqsons Energy Limited Plot No. 12, Eastern Industrial Zone at Port Qasim, Karachi in the Province of Sindh I . 1 . I , I 1 I . I , Vld s•••••••• I.•• t.. I .... .. , Malin SNOS0100IS •!I! !M.. ...... ... aim I se am • • ..... ,... OM 00d SU 143 M Mixt 910501016 DIM .L • 0 0 0 t 11D 0 0 0.11 0 0 0 0 _ • LTALIAI 111111.1111111.11lal 1 , - . 8 _ e 0 _ .0 , -- 0 — — . - , - --4 -43 --0 . ,,,„ a _tzt 3 _ iirIli o K=IIME ana MiMr"4111641 /.1a --- r ---1--4---F-- 1 i -illi . ..„. , , a, .,—.., 1 t _4__.;,,4__ _.... 1 - - - mi,s,. I It I I .:;,•'' ....... I —0 . I II •-9:- "I --- I I 'r ifl own 7. 2 1 ..4 NI ---f14--- -1' IN 1s1 I!' lig - Iligii1 WI 4_ - -15:it. tji2u Rpm Flirt - I . IMOIDII ?4:410011: Ifhe AL .41-}-‘11 1 — AL 46.11 B. a rall a ra Ili . I . ll! " I leai ! III I I ill I 'ill MI 1 • I ____ irP ---l- 20 1 N W-AW 1 gm_ri= I WA LW Imy ___ Higialin =LI - 7 _ _ _ _i______ 1 (--- 1 a2.43111111114►Niiii iri viER Rk- .:16MI:. w' 1 •,,,..-2, 4 REGISTRAR . _ .,1,..74.: . :•, . . . I . . I f Page 9 of 24 of Schedule -I
  • 25. JOS IN Ili 01 It I EA ME WM 01011 DEMOS Page 10 of 24 of Schedule -IC Generation Licence Siddiqsons Energy Limited Plot No. 12, Eastern Industrial Zone at Port Qasim, Karachi In the Province of Sindh
  • 26. I69 Yi I19 Nib Iona 1I It C sAIR 1113 ISO UMal Foe raw MD IN X191 411 -I" I Cal I FEelli .1111411111.11M MINI ISOM 1 x111 I KIRI MB A.111 eismeI we Page 11 of 24 of Schedule -I Generation Licence Siddiqsons Energy Limited Plot No. 12, Eastern Industrial Zone at Port Qasim, Karachi In the Province of Sindh
  • 27. MUM —TaphiinOwifshl HSeibilf gyp. rit unCi vat Ins lefiWydo —Irwriww ft kr 411112 IEEE LIES Ulsia1111100 1E0 I 01 FIE RENE INNION I MI III MMUS OM • w. I I I Page 12 of 24 of Schedule -1 Generation Licence Siddiqsons Energy Limited Plot No. 12, Eastern Industrial Zone at Port Qasim, Karachi In the Province of Sindh ISOVENIE 1241 12/1011119 SIMONE 3 -N- N u' a IM n MIenou 9 Imar 1 V mull 111 s TROMP NAn a Ime a MR tilhEWE EM1111 trirOlrolrlus I 41•11101111 11111111111 a IAN a a n111111 0" woo 111111110111 VIC= s a OM I
  • 28. Generation Licence Siddiqsons Energy Limited Plot No. 12, Eastern Industrial Zone at Port Clasim, Karachi In the Province of Sindh IM>Cor al)-"ytogc;ii i l I I! I I 11 1 1 11;i f illii i i L i; IUusikl-iiii.oeioq ii f ili:111 1 : 1 I IIIIEW!Iiiiii i I 1! U I " Page 13 of 24 of Schedule -I
  • 29. I I III UMW /Akek la MI 1E 14M= Irtt USTCf 011 / IS • ••••••• 11011011(11/4E 0 moms map Nerii wax aII 21150 Page 14 of 24 of Schedule -I 1 MInto ad Generation Licence Siddiqsons Energy Limited Plot No. 12, Eastern Industrial Zone at Port Oasim, Karachi In the Province of Sindh
  • 30. Pt int OCPP0104 Pt PP UPPICUIP Page 15 of 24 of Schedule -I Generation Licence Siddiqsons Energy Limited Plot No. 12, Eastern Industrial Zone at Port Qasim, Karachi In the Province of Sindh -it
  • 31. Page 16 of 24 of Schedule -I Generation Licence Siddiqsons Energy Limited Plot No. 12, Eastern Industrial Zone at Port Qasim, Karachi In the Province of Sindh
  • 32. Generation Licence Siddiqsons Energy Limited Plot No. 12, Eastern Industrial Zone at Port Qasim, Karachi in the Province of Sindh I I I 1 A I 1 I a I 5 t I I I I I I I I I I Page 17 of 24 of Schedule -I
  • 33. Generation Licence Siddiqsons Energy Limited Plot No. 12, Eastern Industrial Zone at Port Qasim, Karachi In the Province of Sindh Page 18 of 24 of Schedule -I
  • 34. Generation Licence Siddiqsons Energy Limited Plot No. 12, Eastern Industrial Zone at Port Qasim, Karachi in the Province of Sindh Interconnection Facilities/ Transmission Arrangements for Dispersal of Power from the Generation Facility The electric power from the Imported Coal based generation facility/power plant of the Licensee/Siddiqsons Energy Limited (SDSEL) will be dispersed to the National Grid. (2). The Interconnection Facilities (IF)/Transmission Arrangements (TA) for supplying to National Grid from the above mentioned generation facility shall be at 500 KV level. The dispersal/interconnection arrangement for supplying to National Grid will be consisting of a 500 KV Double Circuit (D/C) Transmission Line measuring about 180 Kilometer (Quad Bundled of AASC Greeley Conductor) connecting the generation facility with 500 KV Matiari Grid Station of NTDC. (3). Any change in the above mentioned IF/TA for dispersal of electric power as agreed by the Licensee and the Power Purchaser shall be communicated to the Authority in due course of time.0 // Page 19 of 24 of Schedule -1
  • 35. EPCO) HESCO 500kV HYDEL P/STN F9 500kV THERMAL P/STN [21ARABIAN SEA Page 20 of 24 of Schedule -I PESHAWAR HUBCO NEW 1320 MW Ler771 H 0 MW LUCKY S1DDIOUE SONS POWER PROJECTS K-2 I K-3 POWER PROJECTS 2x1100 MIN ECT 1320 MW Generation Licence Siddiqsons Energy Limited Plot No. 12. Eastern Industrial Zone at Port Qasim. Karachi in the Province of Sindh (CASA -1000) PESCI?) 1000 MW IMPORT FROM TAJIKLSTAN 2500kV HVDC 0011°° 1 MAW (SW Eat) co DASLI-I 2160 kW yzy., ISD. WEST EHLIM CHAKWAL BD•WEST / le /P01%1 CT e ir:/1200 MW 45(11AW 4.ESCOi CIESCO M.GARH D.G. KHAN 'Zs sk-t/i '41r RPUR DADU NE LEGEND EXISTING PROPOSED G/STN T/L G/STN T/L JAMSHORO KRA T C HIN A GHAZI BROTHA 1450MW UDEWALA NEW MULTAN 500kV 220kV t500kV HVDC t000kV HVDC er (.7 ESC(?)
  • 36. Generation Licence Siddiqsons Energy Limited Plot No. 12, Eastern Industrial Zone at Port Qasim, Karachi in the Province of Sindh Detail of Generation Facility/Thermal Power Plant (A). General Information Name of Company/ Licensee Siddiqsons Energy Limited (ii). Registered Office 7th Floor, Siddiqsons Tower, 3 J.C.H. Society, Block 7 & 8, Shahrah-e-Faisal, Karachi, Province of Sindh, Pakistan (iii). Business Office 27th Floor, Ocean Tower, Plot G-3, Block-9, Clifton, Karachi, Province of Sindh, Pakistan (iv). Location of the Generation Facility/ Power Plant Plot No. 12, Eastern Industrial Zone, at Port Qasim, Karachi, in the Province of Sindh. (v). Type of Generation Facility/ Power Plant Thermal Generation Facility (B). Configuration of Generation Facility (i). Installed Capacity/Size of the Generation Facility/ Power Plant 350.00 MW (ii). Type of Technology Conventional Thermal Power Generation Facility with Super Critical Boiler and Steam Turbine (iii). Number of Units/Size (MW) 1 x 350 MW (iv). Unit Make/Model/Type & Year of Manufacture Etc. ER RE i <2 /, At- Steam turbine Super-critical, condensing Steam Turbine/ Dongfang Turbine Corp. Ltd. / Shanghai Electric Group Co.,Ltd./ Harbin TTurbine Co., Ltd./ Alstom / Siemens / Hitachi / Siemens / Toshiba or Equivalent Boiler Supercritical thermal power unit, once-through, single pass, single reheat, balanced draft Page 21 of 24 of Schedule -I
  • 37. Generation Licence Siddiqsons Energy Limited Plot No. 12, Eastern Industrial Zone at Port Qasim, Karach' in the Province of Sindh radiant furnace, dry bottom / Dongfang Boiler Group Co., Ltd./ Harbin Boiler Co., Ltd./ Shanghai Electric Group Co., Ltd./ B&W(Beijing) Co., Ltd./ Alstom/ Ansaldo/ Foster Wheeler or Equivalent `(v). COD of the Generation Facil Powe ity/ r Plant (Anticipated) December 31, 2018 (vi). Expected Useful Life of the Generation Facility/ Power Plant from COD 30 years (C). Fuel/Raw Material Details (i). Primary Fuel Imported Bituminous/Sub-Bituminous Coal (ii). Start-Up Fuel Light Diesel Oil (LDO) (iv). Fuel Source for each of the above (i.e. Imported/Indigenous) Primary Fuel Start-Up Fuel Bituminous/Sub- •Bituminous Coal from Indonesia, South Africa, Botswana, Ukraine, Australia, Columbia, USA and others Indigenous/Imported (v).' Fuel Supplier for each of the above Primary Fuel Start-Up Fuel Dharti Commodities General Trading or others Shell Pakistan/Pakistan State Oil/Any other OMC Company (vo. ' Supply Arrangement for each of the above Primary Fuel Start-Up Fuel Page 22 of 24 of Schedule -I
  • 38. Cfi REGISTRAR Generation Licence Siddiqsons Energy Limited Plot No. 12, Eastern Industrial Zone at Port Qasim, Karachi in the Province of Sindh Fuels Through Ships, Jetty of Pakistan International Bulk Terminal (PIBT) and to Site through Trucks etc. Through Oil Tankers (vii). No of Storage Bunkers/Tanks/ Open Yard Primary Fuel Start-Up Fuel One open yard One oil tank (viii). Storage Capacity of each Bunkers/Tanks/ Open Yard Primary Fuel Start-Up Fuel About 315, 000 Tons lx 500m3 (ix). Gross Storage Primary Fuel Start-Up Fuel About 315, 000 Tons 1 x 500m3 (D). Emission Values Primary Fuel Start-Up Fuel (i). SOX (mg/Nm3) <450 As per NEQ (ii). NOx (mg/Nm3) <200 -do- (iii). PM <50 -do- (E). Cooling System Cooling Water Source/Cycle The cooling water is from adjacent sea channel of Port Qasim south of the site. Once through sea water cooling system will be adopted for plant design. (F). Plant Characteristics `11 (.1 ' Generation Voltage 20-22kV (ii). Frequency 50Hz Page 23 of 24 of Schedule -I
  • 39. Generation Licence Siddiqsons Energy Limited Plot No. 12, Eastern Industrial Zone at Port Qasim, Karach* in the Province of Sindh (iii). Power Factor 0.8 (lagging)-0.95(leading) (iv). Automatic Generation Control (AGC) (MW control is the general practice) AGC Unit is included in the NCS, and AGC Unit can accept command signal from Despatch. The command signal is converted to analog, and then the analog transmitted to the DCS via hardware to achieve the AGC function. (v). Ramping Rate (MW/min) Under 30% MCR Between 30% to 50% MCR Between 50% to 100% MCR 13.20MW/Min 19.80 MW/Min 33.00 MW/Min (vi). Time required to Synchronize to Grid Hot Start Warm Start Cold Start 0.75 hours 2.00 hours 4.25 hours , r Page 24 of 24 of Schedule -I
  • 40. Generation Licence Siddiqsons Energy Limited Plot No. 12, Eastern Industrial Zone at Port Qasim, Karachi in the Province of Sindh SCHEDULE-II The Installed/ISO Capacity (MW), De-Rated Capacity At Mean Site Conditions (MW), Auxiliary Consumption (MW) and the Net Capacity At Mean Site Conditions (MW) of the Generation Facilities of Licensee is given in this Schedule y Page 1 of 2 of Schedule-II
  • 41. Generation Licence Siddiqsons Energy Limited Plot No. 12, Eastern Industrial Zone at Port Qasim, Karachi in the Province of Sindh SCHEDULE-II (1). Total Gross Installed Capacity of the Generation Facility/Power Plant 350.00 MW (2). De-rated Capacity of Generation Facility/Power Plant at Reference Site Conditions 322.00 MW (3). Auxiliary Consumption of the Generation Facility/Power Plant 031.50 MW (4). Total Installed Net Capacity of Generation Facility/Power Plant at Reference Site Condition 290.50 MW Note All the above figures are indicative as provided by the Licensee. The Net Capacity available to Power Purchaser for dispatch will be determined through procedure(s) contained in the Power Purchase Agreement or any other applicable document(s). --...,_ Page 2 of 2 of Schedule-II