Gujarat Metro Rail Corporation (GMRC) Limited
(SPV of Government of India & Government of Gujarat)
Gujarat Metro Rail Corporation (GMRC) Limited
(SPV of Government of India & Government of Gujarat)
Inspection No GMRC/PHASE-II/C1/AFCONS/11/2022/ Date:21-11-2022
Location: TAPOVAN,
N.CANAL,PDPU,CASTING YARD
Name of
Contractor AFCONS
Time:11:00 AM to
01:30 PM
Member
Present GMRC-Safety, AFCONS-Safety and execution team.
Weekly SHE walk down inspection report (SHE NCR)
2
Sr. No Observation Hazard Responsibility Action required
1
Work at height safety measures has not been followed by site
in charge.
1. Work permit (PTW) not followed at site.
2. Edge protection was not provided on track arm top level
area.
3. Grouting work was observed without site engineer, at
least competent supervisor was not there from AFCONS
side.
4. Ground level area was not barricaded properly to avoid
un authorized entry
Fall hazard Area in chare 1. Work at height work should be done under supervision of
site engineer from AFCONS side.
2. All work at height related safety measures should be
taken care during work.
3. SHE manual condition of contract clause No 18 should be
followed strictly.
CRITICAL SAFETY ISSUE:
3
Repeated issue
Location: Tapovan Station
Sr. No Observation Hazard Responsibility Action required
2
Barricade board was removed at Tapovan station, opening
was observed at RHS side.
1. Issue is repeatedly observing at every location.
2. High risk of vehicle incident was observed.
Hit by vehicle Area in charge 1. Opening should be covered on immediate basis after
completion of erection work.
3
Traffic marshal was observed without light batten/flag Traffic management Area in charge 1. Awareness training to be imparted to the all traffic
marshal
CRITICAL SAFETY ISSUE:
4
Repeated issue
Location: Tapovan station
Sr. No Observation Hazard Responsibility Action required
5
Soil contamination was observed due to oil leakage at site.
1. Legal non compliance shall be complied as per SHE manual
Soil contamination Area in charge Legal compliance should be done as per She manual clause
No53 and 54
6
Fall protection was found not satisfactory as per work
condition.
Life line sagging was more then the requirement, not
tightened provided
Fall hazard Area in charge Fall protection should be ensured before starting of work
Work at height compliance shall be done as per condition of
SHE manual of clause No 18.
CRITICAL SAFETY ISSUE:
5
Repeated issue
Location: Tapovan station
Sr. No Observation Hazard Responsibility Action required
7
1. PT slab storage was not found as per MS.
2. SOP has been not developed and not provided in MS of
casting and storage of PT slab.
3. Damage concrete bock was provided as storage support in
PT slab (Not as per safety standard requirement)
Fall hazard Area in charge 1. Compliance shall be done as per condition of SHE
manual part-2
2. MS statement should be revised with respect to storage
of PT slab and developed SOP
8
Improper house keeping was observed at casting yard Fall hazard Area in charge 1. Compliance shall be done as per condition of SHE manual
of clause no 17
CRITICAL SAFETY ISSUE:
6
Repeated issue
Location: Casting yard
Sr. No Observation Hazard Responsibility Action required
9
Barrier was not provided at main road side to protect
unexpected vehicle hitting to gantry crane
Hit by vehicle Area in charge 1. Barrier shall be provided as per requirement
10
Un secured gas cylinder was observed at working site which
can be cause of fall and injury
Fall hazard Area in charge Gas cylinder rules shall be fallowed strictly
CRITICAL SAFETY ISSUE:
7
Repeated issue
Location: Casting yard
Sr. No Observation Hazard Responsibility Action required
11
Opening was observed at PT slab storage area which can be
cause fall of person on sump
Fall hazard Area in charge 1. Opening should be covered in a such way to avoid fall of
person and cover the opening
12
Damage web sling was observed at parapet casting area
Un identified, non-tested, damaged wire rope sling
Fall hazard Area in charge 1. Ensure all lifting tools and tackles shall be complied as
per legal requirement
CRITICAL SAFETY ISSUE:
8
Repeated issue
Location: Casting yard
Sr. No Observation Hazard Responsibility Action required
13
Local people movement was observed below PDPU station
and worker was working on pier arm level
Fall hazard Area in charge Station area should be barricaded by hard barricading board
to avoid local movement from any side of the area.
Compliance shall be done as per condition of SHE manual
clause no 18 and 18.10.4 and 18.11
14
PTW was not observed at PDPU station while worker was
working at height.
No any life line was provided to avoid fall from height
Fall hazard Area in charge 1. Ensure Compliance as per condition of contract clause
no 18.
CRITICAL SAFETY ISSUE:
9
Repeated issue
Location: PDPU station
Sr. No Observation Hazard Responsibility Action required
13
Hydra operator was observed with over speed driving at
PDPU station
Over speed Area in charge Awareness training to be provided
14
CRITICAL SAFETY ISSUE:
10
Repeated issue
Location: PDPU station
Sr. No Observation Hazard Responsibility Action required
13
Non standard access was observed at PDPU station. Ladder
was provided in unsafe position also
Fall hazard Area in charge Ensure compliance should be done as per condition of SHE
manual clause no 18.
Ensure stair case type access if height is more then 4 meter
14 Working area was not covered
CRITICAL SAFETY ISSUE:
11
Repeated issue
Location: PDPU station
Thanks
12

More Related Content

Similar to Weekly SHE walkdown report Phase-2 (AFCONS)-21.11.22[15962].pptx

10 use of mobile concrete pump risk assessment templates
10 use of mobile concrete pump risk assessment templates10 use of mobile concrete pump risk assessment templates
10 use of mobile concrete pump risk assessment templatesDwarika Bhushan Sharma
 
Risk assessment for testing & commissioning of cranes
Risk assessment for  testing & commissioning of cranesRisk assessment for  testing & commissioning of cranes
Risk assessment for testing & commissioning of cranesAzmeel Contracting Company
 
LADDER PERMIT REV 1 MARCH 28 2018 Form # HSEQ - LP Rev 2.docx
LADDER PERMIT REV 1 MARCH 28 2018 Form # HSEQ - LP Rev 2.docxLADDER PERMIT REV 1 MARCH 28 2018 Form # HSEQ - LP Rev 2.docx
LADDER PERMIT REV 1 MARCH 28 2018 Form # HSEQ - LP Rev 2.docxDwarika Bhushan Sharma
 
22 casting of concrete columns risk assessment templates
22 casting of concrete columns risk assessment templates22 casting of concrete columns risk assessment templates
22 casting of concrete columns risk assessment templatesDwarika Bhushan Sharma
 
DE-SHUTTERING WORK PERMIT Form # HSEQ - DSWP Rev 2.docx
DE-SHUTTERING WORK PERMIT Form # HSEQ - DSWP Rev 2.docxDE-SHUTTERING WORK PERMIT Form # HSEQ - DSWP Rev 2.docx
DE-SHUTTERING WORK PERMIT Form # HSEQ - DSWP Rev 2.docxDwarika Bhushan Sharma
 
23 Casting of concrete slabs Risk Assessment Templates.docx
23 Casting of concrete slabs Risk Assessment Templates.docx23 Casting of concrete slabs Risk Assessment Templates.docx
23 Casting of concrete slabs Risk Assessment Templates.docxDwarika Bhushan Sharma
 
Accident_Cases_2.pptAccident_Cases_2.ppt
Accident_Cases_2.pptAccident_Cases_2.pptAccident_Cases_2.pptAccident_Cases_2.ppt
Accident_Cases_2.pptAccident_Cases_2.pptconnecttoumair
 
10 Use of Mobile Concrete Pump Risk Assessment Templates.docx
10 Use of Mobile Concrete Pump Risk Assessment Templates.docx10 Use of Mobile Concrete Pump Risk Assessment Templates.docx
10 Use of Mobile Concrete Pump Risk Assessment Templates.docxDwarika Bhushan Sharma
 
SI visitation machinery education
SI visitation machinery educationSI visitation machinery education
SI visitation machinery educationValentin Bañaco
 
Eversendai - HSE Performance Management Systems-R1.pptx
Eversendai - HSE Performance Management Systems-R1.pptxEversendai - HSE Performance Management Systems-R1.pptx
Eversendai - HSE Performance Management Systems-R1.pptxADILRASHID54
 
23 casting of concrete slabs risk assessment templates
23 casting of concrete slabs risk assessment templates23 casting of concrete slabs risk assessment templates
23 casting of concrete slabs risk assessment templatesDwarika Bhushan Sharma
 
11 piling operations with rebar cage installation risk assessment templates
11 piling operations with rebar cage installation risk assessment templates11 piling operations with rebar cage installation risk assessment templates
11 piling operations with rebar cage installation risk assessment templatesDwarika Bhushan Sharma
 
4 Cofferdams (Temporary Works) Risk Assessment Templates.docx
4 Cofferdams (Temporary Works) Risk Assessment Templates.docx4 Cofferdams (Temporary Works) Risk Assessment Templates.docx
4 Cofferdams (Temporary Works) Risk Assessment Templates.docxDwarika Bhushan Sharma
 
24 casting of bridge decks risk assessment templates
24 casting of bridge decks risk assessment templates24 casting of bridge decks risk assessment templates
24 casting of bridge decks risk assessment templatesDwarika Bhushan Sharma
 
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJESUSBASILIOANTONIO
 
Safety aspects on construction site in noida area Anshul
Safety aspects on construction site in noida area AnshulSafety aspects on construction site in noida area Anshul
Safety aspects on construction site in noida area AnshulAnshul Shakya
 
22 Casting of concrete columns Risk Assessment Templates.docx
22 Casting of concrete columns Risk Assessment Templates.docx22 Casting of concrete columns Risk Assessment Templates.docx
22 Casting of concrete columns Risk Assessment Templates.docxDwarika Bhushan Sharma
 
Risk Assessment Example.pdf
Risk Assessment Example.pdfRisk Assessment Example.pdf
Risk Assessment Example.pdfBalamuruganD26
 
Si visitation machinery education
Si visitation machinery educationSi visitation machinery education
Si visitation machinery educationValentin Bañaco
 

Similar to Weekly SHE walkdown report Phase-2 (AFCONS)-21.11.22[15962].pptx (20)

10 use of mobile concrete pump risk assessment templates
10 use of mobile concrete pump risk assessment templates10 use of mobile concrete pump risk assessment templates
10 use of mobile concrete pump risk assessment templates
 
Risk assessment for testing & commissioning of cranes
Risk assessment for  testing & commissioning of cranesRisk assessment for  testing & commissioning of cranes
Risk assessment for testing & commissioning of cranes
 
LADDER PERMIT REV 1 MARCH 28 2018 Form # HSEQ - LP Rev 2.docx
LADDER PERMIT REV 1 MARCH 28 2018 Form # HSEQ - LP Rev 2.docxLADDER PERMIT REV 1 MARCH 28 2018 Form # HSEQ - LP Rev 2.docx
LADDER PERMIT REV 1 MARCH 28 2018 Form # HSEQ - LP Rev 2.docx
 
22 casting of concrete columns risk assessment templates
22 casting of concrete columns risk assessment templates22 casting of concrete columns risk assessment templates
22 casting of concrete columns risk assessment templates
 
DE-SHUTTERING WORK PERMIT Form # HSEQ - DSWP Rev 2.docx
DE-SHUTTERING WORK PERMIT Form # HSEQ - DSWP Rev 2.docxDE-SHUTTERING WORK PERMIT Form # HSEQ - DSWP Rev 2.docx
DE-SHUTTERING WORK PERMIT Form # HSEQ - DSWP Rev 2.docx
 
23 Casting of concrete slabs Risk Assessment Templates.docx
23 Casting of concrete slabs Risk Assessment Templates.docx23 Casting of concrete slabs Risk Assessment Templates.docx
23 Casting of concrete slabs Risk Assessment Templates.docx
 
Construction safety at 071C20R new
Construction  safety at 071C20R newConstruction  safety at 071C20R new
Construction safety at 071C20R new
 
Accident_Cases_2.pptAccident_Cases_2.ppt
Accident_Cases_2.pptAccident_Cases_2.pptAccident_Cases_2.pptAccident_Cases_2.ppt
Accident_Cases_2.pptAccident_Cases_2.ppt
 
10 Use of Mobile Concrete Pump Risk Assessment Templates.docx
10 Use of Mobile Concrete Pump Risk Assessment Templates.docx10 Use of Mobile Concrete Pump Risk Assessment Templates.docx
10 Use of Mobile Concrete Pump Risk Assessment Templates.docx
 
SI visitation machinery education
SI visitation machinery educationSI visitation machinery education
SI visitation machinery education
 
Eversendai - HSE Performance Management Systems-R1.pptx
Eversendai - HSE Performance Management Systems-R1.pptxEversendai - HSE Performance Management Systems-R1.pptx
Eversendai - HSE Performance Management Systems-R1.pptx
 
23 casting of concrete slabs risk assessment templates
23 casting of concrete slabs risk assessment templates23 casting of concrete slabs risk assessment templates
23 casting of concrete slabs risk assessment templates
 
11 piling operations with rebar cage installation risk assessment templates
11 piling operations with rebar cage installation risk assessment templates11 piling operations with rebar cage installation risk assessment templates
11 piling operations with rebar cage installation risk assessment templates
 
4 Cofferdams (Temporary Works) Risk Assessment Templates.docx
4 Cofferdams (Temporary Works) Risk Assessment Templates.docx4 Cofferdams (Temporary Works) Risk Assessment Templates.docx
4 Cofferdams (Temporary Works) Risk Assessment Templates.docx
 
24 casting of bridge decks risk assessment templates
24 casting of bridge decks risk assessment templates24 casting of bridge decks risk assessment templates
24 casting of bridge decks risk assessment templates
 
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
 
Safety aspects on construction site in noida area Anshul
Safety aspects on construction site in noida area AnshulSafety aspects on construction site in noida area Anshul
Safety aspects on construction site in noida area Anshul
 
22 Casting of concrete columns Risk Assessment Templates.docx
22 Casting of concrete columns Risk Assessment Templates.docx22 Casting of concrete columns Risk Assessment Templates.docx
22 Casting of concrete columns Risk Assessment Templates.docx
 
Risk Assessment Example.pdf
Risk Assessment Example.pdfRisk Assessment Example.pdf
Risk Assessment Example.pdf
 
Si visitation machinery education
Si visitation machinery educationSi visitation machinery education
Si visitation machinery education
 

Recently uploaded

8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...josephjonse
 
What is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, FunctionsWhat is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, FunctionsVIEW
 
Interfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdfInterfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdfragupathi90
 
Working Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdfWorking Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdfSkNahidulIslamShrabo
 
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxSLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxCHAIRMAN M
 
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdflitvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdfAlexander Litvinenko
 
Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1T.D. Shashikala
 
handbook on reinforce concrete and detailing
handbook on reinforce concrete and detailinghandbook on reinforce concrete and detailing
handbook on reinforce concrete and detailingAshishSingh1301
 
Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...IJECEIAES
 
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsMathias Magdowski
 
Intro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney UniIntro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney UniR. Sosa
 
Adsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) pptAdsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) pptjigup7320
 
electrical installation and maintenance.
electrical installation and maintenance.electrical installation and maintenance.
electrical installation and maintenance.benjamincojr
 
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024EMMANUELLEFRANCEHELI
 
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and ToolsMaximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Toolssoginsider
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 
21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological universityMohd Saifudeen
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisDr.Costas Sachpazis
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docxrahulmanepalli02
 
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTUUNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTUankushspencer015
 

Recently uploaded (20)

8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
What is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, FunctionsWhat is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, Functions
 
Interfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdfInterfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdf
 
Working Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdfWorking Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdf
 
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxSLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
 
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdflitvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
 
Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1
 
handbook on reinforce concrete and detailing
handbook on reinforce concrete and detailinghandbook on reinforce concrete and detailing
handbook on reinforce concrete and detailing
 
Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...
 
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility Applications
 
Intro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney UniIntro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney Uni
 
Adsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) pptAdsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) ppt
 
electrical installation and maintenance.
electrical installation and maintenance.electrical installation and maintenance.
electrical installation and maintenance.
 
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
 
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and ToolsMaximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
 
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTUUNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
 

Weekly SHE walkdown report Phase-2 (AFCONS)-21.11.22[15962].pptx

  • 1. Gujarat Metro Rail Corporation (GMRC) Limited (SPV of Government of India & Government of Gujarat)
  • 2. Gujarat Metro Rail Corporation (GMRC) Limited (SPV of Government of India & Government of Gujarat) Inspection No GMRC/PHASE-II/C1/AFCONS/11/2022/ Date:21-11-2022 Location: TAPOVAN, N.CANAL,PDPU,CASTING YARD Name of Contractor AFCONS Time:11:00 AM to 01:30 PM Member Present GMRC-Safety, AFCONS-Safety and execution team. Weekly SHE walk down inspection report (SHE NCR) 2
  • 3. Sr. No Observation Hazard Responsibility Action required 1 Work at height safety measures has not been followed by site in charge. 1. Work permit (PTW) not followed at site. 2. Edge protection was not provided on track arm top level area. 3. Grouting work was observed without site engineer, at least competent supervisor was not there from AFCONS side. 4. Ground level area was not barricaded properly to avoid un authorized entry Fall hazard Area in chare 1. Work at height work should be done under supervision of site engineer from AFCONS side. 2. All work at height related safety measures should be taken care during work. 3. SHE manual condition of contract clause No 18 should be followed strictly. CRITICAL SAFETY ISSUE: 3 Repeated issue Location: Tapovan Station
  • 4. Sr. No Observation Hazard Responsibility Action required 2 Barricade board was removed at Tapovan station, opening was observed at RHS side. 1. Issue is repeatedly observing at every location. 2. High risk of vehicle incident was observed. Hit by vehicle Area in charge 1. Opening should be covered on immediate basis after completion of erection work. 3 Traffic marshal was observed without light batten/flag Traffic management Area in charge 1. Awareness training to be imparted to the all traffic marshal CRITICAL SAFETY ISSUE: 4 Repeated issue Location: Tapovan station
  • 5. Sr. No Observation Hazard Responsibility Action required 5 Soil contamination was observed due to oil leakage at site. 1. Legal non compliance shall be complied as per SHE manual Soil contamination Area in charge Legal compliance should be done as per She manual clause No53 and 54 6 Fall protection was found not satisfactory as per work condition. Life line sagging was more then the requirement, not tightened provided Fall hazard Area in charge Fall protection should be ensured before starting of work Work at height compliance shall be done as per condition of SHE manual of clause No 18. CRITICAL SAFETY ISSUE: 5 Repeated issue Location: Tapovan station
  • 6. Sr. No Observation Hazard Responsibility Action required 7 1. PT slab storage was not found as per MS. 2. SOP has been not developed and not provided in MS of casting and storage of PT slab. 3. Damage concrete bock was provided as storage support in PT slab (Not as per safety standard requirement) Fall hazard Area in charge 1. Compliance shall be done as per condition of SHE manual part-2 2. MS statement should be revised with respect to storage of PT slab and developed SOP 8 Improper house keeping was observed at casting yard Fall hazard Area in charge 1. Compliance shall be done as per condition of SHE manual of clause no 17 CRITICAL SAFETY ISSUE: 6 Repeated issue Location: Casting yard
  • 7. Sr. No Observation Hazard Responsibility Action required 9 Barrier was not provided at main road side to protect unexpected vehicle hitting to gantry crane Hit by vehicle Area in charge 1. Barrier shall be provided as per requirement 10 Un secured gas cylinder was observed at working site which can be cause of fall and injury Fall hazard Area in charge Gas cylinder rules shall be fallowed strictly CRITICAL SAFETY ISSUE: 7 Repeated issue Location: Casting yard
  • 8. Sr. No Observation Hazard Responsibility Action required 11 Opening was observed at PT slab storage area which can be cause fall of person on sump Fall hazard Area in charge 1. Opening should be covered in a such way to avoid fall of person and cover the opening 12 Damage web sling was observed at parapet casting area Un identified, non-tested, damaged wire rope sling Fall hazard Area in charge 1. Ensure all lifting tools and tackles shall be complied as per legal requirement CRITICAL SAFETY ISSUE: 8 Repeated issue Location: Casting yard
  • 9. Sr. No Observation Hazard Responsibility Action required 13 Local people movement was observed below PDPU station and worker was working on pier arm level Fall hazard Area in charge Station area should be barricaded by hard barricading board to avoid local movement from any side of the area. Compliance shall be done as per condition of SHE manual clause no 18 and 18.10.4 and 18.11 14 PTW was not observed at PDPU station while worker was working at height. No any life line was provided to avoid fall from height Fall hazard Area in charge 1. Ensure Compliance as per condition of contract clause no 18. CRITICAL SAFETY ISSUE: 9 Repeated issue Location: PDPU station
  • 10. Sr. No Observation Hazard Responsibility Action required 13 Hydra operator was observed with over speed driving at PDPU station Over speed Area in charge Awareness training to be provided 14 CRITICAL SAFETY ISSUE: 10 Repeated issue Location: PDPU station
  • 11. Sr. No Observation Hazard Responsibility Action required 13 Non standard access was observed at PDPU station. Ladder was provided in unsafe position also Fall hazard Area in charge Ensure compliance should be done as per condition of SHE manual clause no 18. Ensure stair case type access if height is more then 4 meter 14 Working area was not covered CRITICAL SAFETY ISSUE: 11 Repeated issue Location: PDPU station