SlideShare a Scribd company logo
1 of 107
Over 36 Years Experience
Delivering iconic projects for the construction and energy industries
1
2
1 PROJECT HSE TEAM STRUCTURE
2
PROJECT & CORPORATE SAFETY INTERFACE: EXPLAINING HOW YOUR CORPORATE SAFETY WILL INTERFACE WITH PROJECT SAFETY
(CORPORATE & REGIONAL HSE STRUCTURE)
3 5 YEARS SAFETY PERFORMANCE INDICATORS (5 YEARS LEADING & LAGGING INDICATORS)
4
HIGH RISK ACTIVITIES HSE APPROACH (WORK AT HEIGHT, ELECTRICAL, MECHANICAL, LIFTING, MATERIAL HANDLING, GROUND
DISTURBANCE, ENERGY ISOLATION, CONFINED SPACE, ETC.)
5 LESSONS LEARNED FROM PAST INCIDENTS (DETAILS, RCA, CAPA OF ALL INCIDENTS)
6 PPE MATRIX AND MANDATORY SITE
7 COVID-19 PRECAUTIONS (COVID APPROACH FOR ADANICONNEX PROJECT)
8 WORKERS WELFARE AT SITE
9 LEVERAGING TECHNOLOGY FOR EHS: TELL US HOW YOU ARE GOING TO LEVERAGE TECHNOLOGY ONSITE
10
INCIDENT REPORTING, AND INVESTIGATION METHOD –AND COMMUNICATION MATRIX (HOW AND IN WHAT TIMELINE WILL THE
INCIDENT BE COMMUNICATED TO ACX)
11
COMPETENCY DEVELOPMENT PROGRAM AT PROJECT SITE (HOW WILL THE TRAINING & SKILL ENHANCEMENT FOR SAFETY WILL BE TAKEN
CARE AT SITE)
12 REWARDS & DISCIPLINARY POLICY
PROJECT HSE TEAM STRUCTURE
3
Project HSE Team Structure
4
HSE HEAD – INDIA
HSE Manager/ Asst Manager
HSE Engineer
Asst HSE Engineer
Project Manager
HSE PGET/ HSE GET
Adani DC, Pune
PROJECT & CORPORATE SAFETY INTERFACE
5
PROJECT & CORPORATE SAFETY INTERFACE
6
 Policy sets out the IMS Manual, procedures and objectives for managing the Business Processes.
 The IMS Manual, Standard Operating Procedures (SOP) and Process Flow Chart describes the way
in which a work is to be done.
 Work Instruction, Forms, Guideline, Plan, Chart, List, Log, Schedule, Template, Table or Matrix act
as aids and references for work to be done.
 Records & Reports are objective evidence for work commencement or work done.
Adani DC, Pune
5 YEARS SAFETY PERFORMANCE INDICATORS
7
HSE Statistics (5 Years)
8
Sr. No Description 2019 2020 2021 2022 2023
1. Total Safe Manhour Logged 8837792 6328304 12364864 17250953 7989276
2. Number of Fatal accident* NIL NIL NIL NIL NIL
3. Number Lost Time Injury* NIL NIL NIL NIL NIL
4.
Number of Medical Treatment Case
(MTC)*
NIL NIL NIL NIL NIL
5. Number of First Aid Cases 124 21 109 111 54
6. Number of Restricted Work Cases NIL NIL NIL NIL NIL
7. Number of Dangerous Occurrence NIL NIL NIL NIL NIL
8 Number Occupational illness NIL NIL NIL NIL NIL
9. Number of days lost due to incident NIL NIL NIL NIL NIL
10. Number of Near miss reported 33 11 56 66 67
Adani DC, Pune
HSE Statistics (5 Years)
9
Sr. No Description 2019 2020 2021 2022 2023
11. Lost Time Injury Frequency Rate NIL NIL NIL NIL NIL
12. Total Recordable Injury Frequency Rate NIL NIL NIL NIL NIL
13 Severity Rate NIL NIL NIL NIL NIL
*Provide detail of incident with RCA, CAPA and what action taken across the projects to prevent re-occurrence
*Lesson learn form incidents
LTIR
Lost Time Injury Rate = Total number of lost time injuries x 200000 / Manhours worked
TRIR
Total Recordable Injury Rate = Total Recordable Injuries x 200000 / Manhours worked
FR
Frequency Rate = Total no. of Lost time injuries + Total no. of Major accidents x 10^6 / Manhours
worked
SR
Severity Rate = Total no. of Man days lost due to injuries and restricted work x 10^6 / Manhours
worked
Adani DC, Pune
HIGH RISK ACTIVITIES HSE APPROACH
10
EXTERNAL SCAFFOLD FALL PROTECTION SYSTEM
11
Adani DC, Pune
WIND SCREEN PROTECTION SYSTEM @ SESEN, MUMBAI
12
Adani DC, Pune
WIND SCREEN PROTECTION SYSTEM @ REVANTA, MUMBAI
13
Adani DC, Pune
WIND SCREEN PROTECTION SYSTEM @ LODHA, MUMBAI
14
Adani DC, Pune
THREE LAYER CATCH NET SYSTEM
15
Adani DC, Pune
FAN CATCH NET SYSTEM
16
Adani DC, Pune
CATCH NET FALL PROTECTION SYSTEM
17
Adani DC, Pune
TEMPORARY ACCESS & EGRESS
18
Adani DC, Pune
FORM WORK SAFE PRACTICE
19
Adani DC, Pune
ROAD SAFETY SAFE PRACTICE
20
Adani DC, Pune
Motivational Programme
21
Adani DC, Pune
Eye Wash Station For workmen
22
Adani DC, Pune
Spill Kit For Chemical Storage
23
Adani DC, Pune
STRUCTURE WORK SAFE PRACTICE
24
Adani DC, Pune
STRUCTURE WORK SAFE PRACTICE
25
Adani DC, Pune
STRUCTURE WORK SAFE PRACTICE
26
Adani DC, Pune
STRUCTURE WORK SAFE PRACTICE
27
Adani DC, Pune
STRUCTURE WORK SAFE PRACTICE
28
Adani DC, Pune
Life Line for moving
on edge
Hard barrication for temporary edge
protection Retractable Fall
Arrester Blocks for
temporary fall
prevention
STRUCTURE WORK SAFE PRACTICE
29
Adani DC, Pune
Separate Cabin with
drip tray for Paint
drums storage
Diesel Storage with
drip tray facility
STRUCTURE WORK SAFE PRACTICE
30
Adani DC, Pune
STRUCTURE WORK SAFE PRACTICE
31
Adani DC, Pune
HEIGHT PASS TEST
32
Adani DC, Pune
HEIGHT WORK- PERSONEL FALL ARREST SYSTEM
33
Adani DC, Pune
FORM WORK DE-SHUTTERING SAFE PRACTICE
34
Adani DC, Pune
FLOOR EDGE PROTECTION AND STAIRCASE RAILINGS
35
Adani DC, Pune
ELCB TEST INSPECTION
36
Adani DC, Pune
ELECTRICAL EQUIPMENT INSPECTION
37
Adani DC, Pune
ELECTRICAL SAFETY INSPECTION
38
Adani DC, Pune
ELCB TEST INSPECTION
39
Adani DC, Pune
TOWER CRANE EQUIPMENT INSPECTION
40
Adani DC, Pune
TOWER CRANE EQUIPMENT INSPECTION
41
Adani DC, Pune
HSE INSPECTIONS AND COLOR CODING OF TOOLS AND EQUIPMENTS
42
Adani DC, Pune
Safety method of erection/approach-Lifting of Steel Beam Adani DC, Pune
Beam on bed
Assessing CG (Centre of Gravity) of Steel members prior to sling
Provision
of proper
packing to
sharp
edges
Color coding of lifting
gears
Safety method of erection/approach-Beam Erection
44
Adani DC, Pune
Lifting towards position…
Safety method of erection/approach-Column Erection Infosys, Bengaluru
Preparatory works for column erection
Attached by lifting gears at two ends…
Isolated the intended erection location…
MANUAL MATERIAL HANDLING WITH APPROPRIATE PPE
46
Adani DC, Pune
BARRICADING AND SHORING FOR EXCAVATED AREA
47
Adani DC, Pune
ELECTRICAL DB ISOLATION
48
Adani DC, Pune
ELECTRICAL DB ISOLATION and Fire Point
49
Adani DC, Pune
LOTO SYSTEM
50
Adani DC, Pune
CONFINED SPACE
51
Adani DC, Pune
Identification Sticker
24 Watts Light Provision
Exhaust Fan Provision
Entry Register Provision of Barricading
LESSONS LEARNED FROM PAST INCIDENTS
52
LESSONS LEARNED FROM PAST INCIDENTS
53
Adani DC, Pune
WHAT HAPPENED?
 On 14th DEC 2023 around 3.40 PM, Gas cutter have been engaged for Pipe line cutting activity at ‘’L9” After
cutting the angle (approx. 150 mm lengths), Gas cutter try to placed the angle at working platform. While
placing Gas cutter’s hand slipped and angle fell through the gab in the plat form 7 Meter height
(approximate). No injuries were sustained by workmen.
CAUSE FOR THE ACCIDENT:
 Loose material stored at the working platform
 Gab between planks in the working platform
 Ground level cordon off not provided
 Inadequate training for gas cutter
NEAR MISS CASES EXAMPLE - 1
LESSONS LEARNED FROM PAST INCIDENTS
54
Adani DC, Pune
NEAR MISS CASES EXAMPLE - 1
PREVENTIVE ACTIONS:
 After Cutting the angle, initial securing with the help of binding wire at platform.
 Ensure no gag between the planks in working platform
 Below level cordon off required with watcher to avoid the unauthorized person entry inside secured area.
 Adequate training to be provided to the gas cutter and crew
LESSONS LEARNED:
 Trained and competent person only shall be ensured on work
 Proper Fall protection system shall be ensured at workplace
 Proper supervision shall be ensured
 Before commencing work, Detailed work methodology shall be prepared at it should be familiar with workmen
crew by JST and the same shall be implemented at work place
LESSONS LEARNED FROM PAST INCIDENTS
55
Adani DC, Pune
NEAR MISS CASES EXAMPLE - 2
WHAT HAPPENED?
 On 20th JAN 2024 around 5.42 PM, Tractor was used for Debris shifting work at WTP to stilt-1 ramp area.
Once tractor was loaded by Bobcat, The driver moved the tractor backwards at the time the tractor trailer
rear wheel roll over the steel mesh (which was kept to secure the drain) slipped and the real wheel fell on
the drain whish was 600MM depth. Immediately P&M team involved and lifted the trailer wheel using
Jackie. No Man are Material got damaged during this incident.
CAUSE FOR THE ACCIDENT:
 Lack of Banks man for tractor
 Illumination not considerate during evening the activity
 Steel mesh not fixed properly
LESSONS LEARNED FROM PAST INCIDENTS
56
Adani DC, Pune
NEAR MISS CASES EXAMPLE - 2
PREVENTIVE ACTIONS:
 Ensured Banks man for tractor during reversing
 Backfilling the drain where ever the vehicle movement.
 Provide adequate illumination
LESSONS LEARNED:
 Reflective stickers and Causation sinages board shall be located near the vehicle movement area.
 Considering the time period of the work and preparing the work place .
 Before commencing work, Detailed work methodology shall be prepared at it should be familiar with
workmen crew by JST and the same shall be implemented at work place.
LESSONS LEARNED FROM PAST INCIDENTS
57
Adani DC, Pune
LESSON LEARNED LOG SAMPLE
HSE ALERT FORMAT SAMPLE
CAPA REGISTER SAMPLE
PPE MATRIX AND MANDATORY SITE
58
BARRICADING AND SHORING FOR EXCAVATED AREA
59
Adani DC, Pune
Personnel Protective Equipment Matrix
Sr. No. Activity
PPE Required
Helmet
Reflective
Jacket
Safety
Shoes
Shoulder
Pad
Gum
Boot
Hand Gloves
Goggles
Face
Shield
Welding
Shield
Ear
Plug
Face
Mask
Full
Body
Safety
Harness
with
Double
Lanyard
(Yes
If
Applicable)
Leather
Cotton
Rubber
Cut
Resistor
1 Plastering / Painting Yes Yes Yes - - - - Yes Yes - Yes - Yes Yes
2
Welding and gas cuttingPPE MATRIX
AND MANDATORY SITE
Yes Yes Yes - - Yes - - Yes - Yes - Yes Yes
3 Erection of Beams and columns Yes Yes Yes - - - - - Yes - - - - Yes Yes
4 Rebar works Yes Yes Yes Yes - - Yes - Yes Yes - - - Yes Yes
5 Shuttering and capentary works Yes Yes Yes - - - Yes - Yes Yes - - - Yes Yes
6 Housekeeping Yes Yes Yes - - - Yes - - - - - Yes Yes
7 Concreting Yes Yes Yes - Yes - Yes - Yes - - - Yes Yes
8 Chipping / Jack Hammering Yes Yes Yes - - - Yes - Yes - - Yes Yes Yes
9 Rigging and slinging Yes Yes Yes - - - Yes - Yes - - - - Yes Yes
10 Dewatering Yes Yes Yes - Yes - Yes - - - - - Yes Yes
11 Electrical works Yes Yes Yes - - - Yes - - - - - Yes Yes
12 Drivers and operators Yes Yes Yes - - - - - - - - - Yes Yes
13 Scaffolding erection Yes Yes Yes - - - Yes - - - - - Yes Yes
14 Power Tools operations Yes Yes Yes - - Yes Yes - Yes Yes - Yes Yes Yes
COVID-19 PRECAUTIONS
60
COVID-19 PRECAUTIONS
61
Adani DC, Pune
DAILY THERMAL SCREENING DONE TO WORKMEN & STAFF AND TEMPERATURE RECORD MAINTAINED
62
Adani DC, Pune
SOCIAL DISTANCE MARKING – COVID-19
63
Adani DC, Pune
SOCIAL DISTANCE MARKING – COVID-19
64
Adani DC, Pune
TOUCH FREE HANDWASH / SANITIZER MECHANISM FOR WORKMEN & STAFF
65
Adani DC, Pune
QUARANTINE ROOM FACILITY
66
Adani DC, Pune
WORKERS WELFARE AT SITE
67
FIRST AID CENTRE AND AMBULANCE
68
Adani DC, Pune
WORKMEN CAMP FACILITY
69
Adani DC, Pune
WELFARE MONITORING
70
Adani DC, Pune
WELFARE MONITORING
71
Adani DC, Pune
CPR TRAINING TO HSE PERSONS BY MEDICAL PRACTITIONER
72
Adani DC, Pune
PRE-MEDICAL AND INDUCTION PROGRAM
73
Adani DC, Pune
PRE-MEDICAL AND INDUCTION PROGRAM
74
Adani DC, Pune
LEVERAGING TECHNOLOGY FOR EHS
75
LEVERAGING TECHNOLOGY
76
Adani DC, Pune
CONDUCTING ONLINE MEETING
DEVELOPED APP FOR SAFETY OBSERVATION AS PER THE CLIENT REQUIREMENT
COMMUNICATION IN SOCIAL MEDIA (WHAT'S APP)
INCIDENT REPORTING, AND INVESTIGATION METHOD
–AND COMMUNICATION MATRIX
77
INCIDENT REPORTING-FLOW CHART
78
Adani DC, Pune
COMPETENCY DEVELOPMENT PROGRAM AT
PROJECT SITE
79
HEIGHT WORK & RESCUE OPERATION TRAINING
80
Adani DC, Pune
BASIS LIFE SUPPORT TRAINING
81
Adani DC, Pune
EMERGENCY RESCUE MOCK DRILL
82
Adani DC, Pune
EMERGENCY RESCUE MOCK DRILL
83
Adani DC, Pune
TRAINING ON FIRE FIGHTING
84
Adani DC, Pune
FIRE EMERGENCY MOCK DRILL
85
Adani DC, Pune
FIRE EMERGENCY MOCK DRILL
86
Adani DC, Pune
TOOL BOX MEETING
87
Adani DC, Pune
SAFETY DAY CELEBRATIONS
88
Adani DC, Pune
MASS TOOL BOX TALK
89
Adani DC, Pune
HSE COMMITTEE MEETING
90
Adani DC, Pune
ROAD SAFETY AWARENESS
91
Adani DC, Pune
MOTIVATIONAL PROGRAM AWARD DISTRIBUTION
92
Adani DC, Pune
NATIONAL SAFETY DAY CELEBRATION
93
Adani DC, Pune
WORLD ENVIRONMENTAL DAY CELEBRATION AT WORKMEN CAMP
94
Adani DC, Pune
Booked Capacity in MT
95
MASS TOOL BOX TALK
96
Adani DC, Pune
2013 2014 2015
HSE PERFORMANCE ROLLING PLAQUE – DAICEC
97
Adani DC, Pune
Dec 2015 Jan 2016
MASS TOOL BOX TALK
98
Adani DC, Pune
Feb 2016
Apr 2016
May 2016
SAFETY AWARDS – GULITA - 2015
99
Adani DC, Pune
BEST SAFETY PERFORMANCE – WORLI MIXED USE PROJECT - 2016
100
Adani DC, Pune
SAFETY AWARD – STATUE OF UNITY – DEC 2018
101
Adani DC, Pune
SAFETY AWARD – DLF IT/TES – 2019 & 2020
102
Adani DC, Pune
SAFETY AWARD –– 2020 & 2021
103
Adani DC, Pune
DLF DT 1&2 TARAMANI
THE WORLD TOWER PROJECTS
SAFETY AWARD –THE WORLD TOWER PROJECTS / DAICEC 2021 & 2022
104
Adani DC, Pune
SAFETY AWARD –-2021 & 2022
105
Adani DC, Pune
DLF DT 1&2 TARAMANI
DLF IT PARK-SEZ-PHASE III
SAFETY AWARD – 2022 & 2023
106
Adani DC, Pune
For more information, visit www.eversendai.com
107

More Related Content

Similar to Eversendai - HSE Performance Management Systems-R1.pptx

Ahmad-Elzidy-CV-12-2015
Ahmad-Elzidy-CV-12-2015Ahmad-Elzidy-CV-12-2015
Ahmad-Elzidy-CV-12-2015
ahmed elzidy
 
DIVE ELECTRICAL TECHNICIAN RESUME-SUBHASH SINGH
DIVE ELECTRICAL TECHNICIAN RESUME-SUBHASH SINGHDIVE ELECTRICAL TECHNICIAN RESUME-SUBHASH SINGH
DIVE ELECTRICAL TECHNICIAN RESUME-SUBHASH SINGH
subhash singh
 
Sunil Kumar K V- Mechanical Resume
Sunil Kumar K V- Mechanical ResumeSunil Kumar K V- Mechanical Resume
Sunil Kumar K V- Mechanical Resume
Sunil Kumar K V
 
iain loudon CV 2016
iain loudon CV 2016iain loudon CV 2016
iain loudon CV 2016
Iain Loudon
 
L&T Inplant training at chennai metro report
L&T Inplant training at chennai metro reportL&T Inplant training at chennai metro report
L&T Inplant training at chennai metro report
hemanth kumar
 
RESUME- Manvendra_Mechanical Engineer
RESUME- Manvendra_Mechanical EngineerRESUME- Manvendra_Mechanical Engineer
RESUME- Manvendra_Mechanical Engineer
Manvendra Kumar
 
CV-Engr. JAKIR_05-October-2015
CV-Engr. JAKIR_05-October-2015CV-Engr. JAKIR_05-October-2015
CV-Engr. JAKIR_05-October-2015
S.M. Jakir Hossain
 

Similar to Eversendai - HSE Performance Management Systems-R1.pptx (20)

Latest update CV
Latest update CVLatest update CV
Latest update CV
 
Ms pipe internal cleaning (2)
Ms pipe internal cleaning (2)Ms pipe internal cleaning (2)
Ms pipe internal cleaning (2)
 
OH&S Audit Report- JSW Nandyal.doc
OH&S Audit Report- JSW Nandyal.docOH&S Audit Report- JSW Nandyal.doc
OH&S Audit Report- JSW Nandyal.doc
 
SIVAKUMAR
SIVAKUMARSIVAKUMAR
SIVAKUMAR
 
Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisor
 
Ahmad-Elzidy-CV-12-2015
Ahmad-Elzidy-CV-12-2015Ahmad-Elzidy-CV-12-2015
Ahmad-Elzidy-CV-12-2015
 
PANKAJ KUMAR CV
PANKAJ KUMAR CVPANKAJ KUMAR CV
PANKAJ KUMAR CV
 
manoj cv planning
manoj cv planningmanoj cv planning
manoj cv planning
 
MHB-QESH-2015
MHB-QESH-2015MHB-QESH-2015
MHB-QESH-2015
 
G S Sharma CV
G S Sharma CVG S Sharma CV
G S Sharma CV
 
Austin Okwordu CV PDF
Austin Okwordu CV PDFAustin Okwordu CV PDF
Austin Okwordu CV PDF
 
DIVE ELECTRICAL TECHNICIAN RESUME-SUBHASH SINGH
DIVE ELECTRICAL TECHNICIAN RESUME-SUBHASH SINGHDIVE ELECTRICAL TECHNICIAN RESUME-SUBHASH SINGH
DIVE ELECTRICAL TECHNICIAN RESUME-SUBHASH SINGH
 
RAJEEV CV.DOCX
RAJEEV CV.DOCXRAJEEV CV.DOCX
RAJEEV CV.DOCX
 
Sunil Kumar K V- Mechanical Resume
Sunil Kumar K V- Mechanical ResumeSunil Kumar K V- Mechanical Resume
Sunil Kumar K V- Mechanical Resume
 
iain loudon CV 2016
iain loudon CV 2016iain loudon CV 2016
iain loudon CV 2016
 
L&T Inplant training at chennai metro report
L&T Inplant training at chennai metro reportL&T Inplant training at chennai metro report
L&T Inplant training at chennai metro report
 
Vipul CV
Vipul CVVipul CV
Vipul CV
 
RESUME- Manvendra_Mechanical Engineer
RESUME- Manvendra_Mechanical EngineerRESUME- Manvendra_Mechanical Engineer
RESUME- Manvendra_Mechanical Engineer
 
CV-Engr. JAKIR_05-October-2015
CV-Engr. JAKIR_05-October-2015CV-Engr. JAKIR_05-October-2015
CV-Engr. JAKIR_05-October-2015
 
My Contributions in Health and Safety, QA/QC and Basic of Site Execution in J...
My Contributions in Health and Safety, QA/QC and Basic of Site Execution in J...My Contributions in Health and Safety, QA/QC and Basic of Site Execution in J...
My Contributions in Health and Safety, QA/QC and Basic of Site Execution in J...
 

Recently uploaded

Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
HenryBriggs2
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptx
hublikarsn
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
pritamlangde
 
Query optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsQuery optimization and processing for advanced database systems
Query optimization and processing for advanced database systems
meharikiros2
 

Recently uploaded (20)

UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...
 
Post office management system project ..pdf
Post office management system project ..pdfPost office management system project ..pdf
Post office management system project ..pdf
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To Curves
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata Model
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptx
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor
 
Query optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsQuery optimization and processing for advanced database systems
Query optimization and processing for advanced database systems
 

Eversendai - HSE Performance Management Systems-R1.pptx

  • 1. Over 36 Years Experience Delivering iconic projects for the construction and energy industries 1
  • 2. 2 1 PROJECT HSE TEAM STRUCTURE 2 PROJECT & CORPORATE SAFETY INTERFACE: EXPLAINING HOW YOUR CORPORATE SAFETY WILL INTERFACE WITH PROJECT SAFETY (CORPORATE & REGIONAL HSE STRUCTURE) 3 5 YEARS SAFETY PERFORMANCE INDICATORS (5 YEARS LEADING & LAGGING INDICATORS) 4 HIGH RISK ACTIVITIES HSE APPROACH (WORK AT HEIGHT, ELECTRICAL, MECHANICAL, LIFTING, MATERIAL HANDLING, GROUND DISTURBANCE, ENERGY ISOLATION, CONFINED SPACE, ETC.) 5 LESSONS LEARNED FROM PAST INCIDENTS (DETAILS, RCA, CAPA OF ALL INCIDENTS) 6 PPE MATRIX AND MANDATORY SITE 7 COVID-19 PRECAUTIONS (COVID APPROACH FOR ADANICONNEX PROJECT) 8 WORKERS WELFARE AT SITE 9 LEVERAGING TECHNOLOGY FOR EHS: TELL US HOW YOU ARE GOING TO LEVERAGE TECHNOLOGY ONSITE 10 INCIDENT REPORTING, AND INVESTIGATION METHOD –AND COMMUNICATION MATRIX (HOW AND IN WHAT TIMELINE WILL THE INCIDENT BE COMMUNICATED TO ACX) 11 COMPETENCY DEVELOPMENT PROGRAM AT PROJECT SITE (HOW WILL THE TRAINING & SKILL ENHANCEMENT FOR SAFETY WILL BE TAKEN CARE AT SITE) 12 REWARDS & DISCIPLINARY POLICY
  • 3. PROJECT HSE TEAM STRUCTURE 3
  • 4. Project HSE Team Structure 4 HSE HEAD – INDIA HSE Manager/ Asst Manager HSE Engineer Asst HSE Engineer Project Manager HSE PGET/ HSE GET Adani DC, Pune
  • 5. PROJECT & CORPORATE SAFETY INTERFACE 5
  • 6. PROJECT & CORPORATE SAFETY INTERFACE 6  Policy sets out the IMS Manual, procedures and objectives for managing the Business Processes.  The IMS Manual, Standard Operating Procedures (SOP) and Process Flow Chart describes the way in which a work is to be done.  Work Instruction, Forms, Guideline, Plan, Chart, List, Log, Schedule, Template, Table or Matrix act as aids and references for work to be done.  Records & Reports are objective evidence for work commencement or work done. Adani DC, Pune
  • 7. 5 YEARS SAFETY PERFORMANCE INDICATORS 7
  • 8. HSE Statistics (5 Years) 8 Sr. No Description 2019 2020 2021 2022 2023 1. Total Safe Manhour Logged 8837792 6328304 12364864 17250953 7989276 2. Number of Fatal accident* NIL NIL NIL NIL NIL 3. Number Lost Time Injury* NIL NIL NIL NIL NIL 4. Number of Medical Treatment Case (MTC)* NIL NIL NIL NIL NIL 5. Number of First Aid Cases 124 21 109 111 54 6. Number of Restricted Work Cases NIL NIL NIL NIL NIL 7. Number of Dangerous Occurrence NIL NIL NIL NIL NIL 8 Number Occupational illness NIL NIL NIL NIL NIL 9. Number of days lost due to incident NIL NIL NIL NIL NIL 10. Number of Near miss reported 33 11 56 66 67 Adani DC, Pune
  • 9. HSE Statistics (5 Years) 9 Sr. No Description 2019 2020 2021 2022 2023 11. Lost Time Injury Frequency Rate NIL NIL NIL NIL NIL 12. Total Recordable Injury Frequency Rate NIL NIL NIL NIL NIL 13 Severity Rate NIL NIL NIL NIL NIL *Provide detail of incident with RCA, CAPA and what action taken across the projects to prevent re-occurrence *Lesson learn form incidents LTIR Lost Time Injury Rate = Total number of lost time injuries x 200000 / Manhours worked TRIR Total Recordable Injury Rate = Total Recordable Injuries x 200000 / Manhours worked FR Frequency Rate = Total no. of Lost time injuries + Total no. of Major accidents x 10^6 / Manhours worked SR Severity Rate = Total no. of Man days lost due to injuries and restricted work x 10^6 / Manhours worked Adani DC, Pune
  • 10. HIGH RISK ACTIVITIES HSE APPROACH 10
  • 11. EXTERNAL SCAFFOLD FALL PROTECTION SYSTEM 11 Adani DC, Pune
  • 12. WIND SCREEN PROTECTION SYSTEM @ SESEN, MUMBAI 12 Adani DC, Pune
  • 13. WIND SCREEN PROTECTION SYSTEM @ REVANTA, MUMBAI 13 Adani DC, Pune
  • 14. WIND SCREEN PROTECTION SYSTEM @ LODHA, MUMBAI 14 Adani DC, Pune
  • 15. THREE LAYER CATCH NET SYSTEM 15 Adani DC, Pune
  • 16. FAN CATCH NET SYSTEM 16 Adani DC, Pune
  • 17. CATCH NET FALL PROTECTION SYSTEM 17 Adani DC, Pune
  • 18. TEMPORARY ACCESS & EGRESS 18 Adani DC, Pune
  • 19. FORM WORK SAFE PRACTICE 19 Adani DC, Pune
  • 20. ROAD SAFETY SAFE PRACTICE 20 Adani DC, Pune
  • 22. Eye Wash Station For workmen 22 Adani DC, Pune
  • 23. Spill Kit For Chemical Storage 23 Adani DC, Pune
  • 24. STRUCTURE WORK SAFE PRACTICE 24 Adani DC, Pune
  • 25. STRUCTURE WORK SAFE PRACTICE 25 Adani DC, Pune
  • 26. STRUCTURE WORK SAFE PRACTICE 26 Adani DC, Pune
  • 27. STRUCTURE WORK SAFE PRACTICE 27 Adani DC, Pune
  • 28. STRUCTURE WORK SAFE PRACTICE 28 Adani DC, Pune Life Line for moving on edge Hard barrication for temporary edge protection Retractable Fall Arrester Blocks for temporary fall prevention
  • 29. STRUCTURE WORK SAFE PRACTICE 29 Adani DC, Pune Separate Cabin with drip tray for Paint drums storage Diesel Storage with drip tray facility
  • 30. STRUCTURE WORK SAFE PRACTICE 30 Adani DC, Pune
  • 31. STRUCTURE WORK SAFE PRACTICE 31 Adani DC, Pune
  • 33. HEIGHT WORK- PERSONEL FALL ARREST SYSTEM 33 Adani DC, Pune
  • 34. FORM WORK DE-SHUTTERING SAFE PRACTICE 34 Adani DC, Pune
  • 35. FLOOR EDGE PROTECTION AND STAIRCASE RAILINGS 35 Adani DC, Pune
  • 40. TOWER CRANE EQUIPMENT INSPECTION 40 Adani DC, Pune
  • 41. TOWER CRANE EQUIPMENT INSPECTION 41 Adani DC, Pune
  • 42. HSE INSPECTIONS AND COLOR CODING OF TOOLS AND EQUIPMENTS 42 Adani DC, Pune
  • 43. Safety method of erection/approach-Lifting of Steel Beam Adani DC, Pune Beam on bed Assessing CG (Centre of Gravity) of Steel members prior to sling Provision of proper packing to sharp edges Color coding of lifting gears
  • 44. Safety method of erection/approach-Beam Erection 44 Adani DC, Pune Lifting towards position…
  • 45. Safety method of erection/approach-Column Erection Infosys, Bengaluru Preparatory works for column erection Attached by lifting gears at two ends… Isolated the intended erection location…
  • 46. MANUAL MATERIAL HANDLING WITH APPROPRIATE PPE 46 Adani DC, Pune
  • 47. BARRICADING AND SHORING FOR EXCAVATED AREA 47 Adani DC, Pune
  • 49. ELECTRICAL DB ISOLATION and Fire Point 49 Adani DC, Pune
  • 51. CONFINED SPACE 51 Adani DC, Pune Identification Sticker 24 Watts Light Provision Exhaust Fan Provision Entry Register Provision of Barricading
  • 52. LESSONS LEARNED FROM PAST INCIDENTS 52
  • 53. LESSONS LEARNED FROM PAST INCIDENTS 53 Adani DC, Pune WHAT HAPPENED?  On 14th DEC 2023 around 3.40 PM, Gas cutter have been engaged for Pipe line cutting activity at ‘’L9” After cutting the angle (approx. 150 mm lengths), Gas cutter try to placed the angle at working platform. While placing Gas cutter’s hand slipped and angle fell through the gab in the plat form 7 Meter height (approximate). No injuries were sustained by workmen. CAUSE FOR THE ACCIDENT:  Loose material stored at the working platform  Gab between planks in the working platform  Ground level cordon off not provided  Inadequate training for gas cutter NEAR MISS CASES EXAMPLE - 1
  • 54. LESSONS LEARNED FROM PAST INCIDENTS 54 Adani DC, Pune NEAR MISS CASES EXAMPLE - 1 PREVENTIVE ACTIONS:  After Cutting the angle, initial securing with the help of binding wire at platform.  Ensure no gag between the planks in working platform  Below level cordon off required with watcher to avoid the unauthorized person entry inside secured area.  Adequate training to be provided to the gas cutter and crew LESSONS LEARNED:  Trained and competent person only shall be ensured on work  Proper Fall protection system shall be ensured at workplace  Proper supervision shall be ensured  Before commencing work, Detailed work methodology shall be prepared at it should be familiar with workmen crew by JST and the same shall be implemented at work place
  • 55. LESSONS LEARNED FROM PAST INCIDENTS 55 Adani DC, Pune NEAR MISS CASES EXAMPLE - 2 WHAT HAPPENED?  On 20th JAN 2024 around 5.42 PM, Tractor was used for Debris shifting work at WTP to stilt-1 ramp area. Once tractor was loaded by Bobcat, The driver moved the tractor backwards at the time the tractor trailer rear wheel roll over the steel mesh (which was kept to secure the drain) slipped and the real wheel fell on the drain whish was 600MM depth. Immediately P&M team involved and lifted the trailer wheel using Jackie. No Man are Material got damaged during this incident. CAUSE FOR THE ACCIDENT:  Lack of Banks man for tractor  Illumination not considerate during evening the activity  Steel mesh not fixed properly
  • 56. LESSONS LEARNED FROM PAST INCIDENTS 56 Adani DC, Pune NEAR MISS CASES EXAMPLE - 2 PREVENTIVE ACTIONS:  Ensured Banks man for tractor during reversing  Backfilling the drain where ever the vehicle movement.  Provide adequate illumination LESSONS LEARNED:  Reflective stickers and Causation sinages board shall be located near the vehicle movement area.  Considering the time period of the work and preparing the work place .  Before commencing work, Detailed work methodology shall be prepared at it should be familiar with workmen crew by JST and the same shall be implemented at work place.
  • 57. LESSONS LEARNED FROM PAST INCIDENTS 57 Adani DC, Pune LESSON LEARNED LOG SAMPLE HSE ALERT FORMAT SAMPLE CAPA REGISTER SAMPLE
  • 58. PPE MATRIX AND MANDATORY SITE 58
  • 59. BARRICADING AND SHORING FOR EXCAVATED AREA 59 Adani DC, Pune Personnel Protective Equipment Matrix Sr. No. Activity PPE Required Helmet Reflective Jacket Safety Shoes Shoulder Pad Gum Boot Hand Gloves Goggles Face Shield Welding Shield Ear Plug Face Mask Full Body Safety Harness with Double Lanyard (Yes If Applicable) Leather Cotton Rubber Cut Resistor 1 Plastering / Painting Yes Yes Yes - - - - Yes Yes - Yes - Yes Yes 2 Welding and gas cuttingPPE MATRIX AND MANDATORY SITE Yes Yes Yes - - Yes - - Yes - Yes - Yes Yes 3 Erection of Beams and columns Yes Yes Yes - - - - - Yes - - - - Yes Yes 4 Rebar works Yes Yes Yes Yes - - Yes - Yes Yes - - - Yes Yes 5 Shuttering and capentary works Yes Yes Yes - - - Yes - Yes Yes - - - Yes Yes 6 Housekeeping Yes Yes Yes - - - Yes - - - - - Yes Yes 7 Concreting Yes Yes Yes - Yes - Yes - Yes - - - Yes Yes 8 Chipping / Jack Hammering Yes Yes Yes - - - Yes - Yes - - Yes Yes Yes 9 Rigging and slinging Yes Yes Yes - - - Yes - Yes - - - - Yes Yes 10 Dewatering Yes Yes Yes - Yes - Yes - - - - - Yes Yes 11 Electrical works Yes Yes Yes - - - Yes - - - - - Yes Yes 12 Drivers and operators Yes Yes Yes - - - - - - - - - Yes Yes 13 Scaffolding erection Yes Yes Yes - - - Yes - - - - - Yes Yes 14 Power Tools operations Yes Yes Yes - - Yes Yes - Yes Yes - Yes Yes Yes
  • 62. DAILY THERMAL SCREENING DONE TO WORKMEN & STAFF AND TEMPERATURE RECORD MAINTAINED 62 Adani DC, Pune
  • 63. SOCIAL DISTANCE MARKING – COVID-19 63 Adani DC, Pune
  • 64. SOCIAL DISTANCE MARKING – COVID-19 64 Adani DC, Pune
  • 65. TOUCH FREE HANDWASH / SANITIZER MECHANISM FOR WORKMEN & STAFF 65 Adani DC, Pune
  • 68. FIRST AID CENTRE AND AMBULANCE 68 Adani DC, Pune
  • 72. CPR TRAINING TO HSE PERSONS BY MEDICAL PRACTITIONER 72 Adani DC, Pune
  • 73. PRE-MEDICAL AND INDUCTION PROGRAM 73 Adani DC, Pune
  • 74. PRE-MEDICAL AND INDUCTION PROGRAM 74 Adani DC, Pune
  • 76. LEVERAGING TECHNOLOGY 76 Adani DC, Pune CONDUCTING ONLINE MEETING DEVELOPED APP FOR SAFETY OBSERVATION AS PER THE CLIENT REQUIREMENT COMMUNICATION IN SOCIAL MEDIA (WHAT'S APP)
  • 77. INCIDENT REPORTING, AND INVESTIGATION METHOD –AND COMMUNICATION MATRIX 77
  • 79. COMPETENCY DEVELOPMENT PROGRAM AT PROJECT SITE 79
  • 80. HEIGHT WORK & RESCUE OPERATION TRAINING 80 Adani DC, Pune
  • 81. BASIS LIFE SUPPORT TRAINING 81 Adani DC, Pune
  • 82. EMERGENCY RESCUE MOCK DRILL 82 Adani DC, Pune
  • 83. EMERGENCY RESCUE MOCK DRILL 83 Adani DC, Pune
  • 84. TRAINING ON FIRE FIGHTING 84 Adani DC, Pune
  • 85. FIRE EMERGENCY MOCK DRILL 85 Adani DC, Pune
  • 86. FIRE EMERGENCY MOCK DRILL 86 Adani DC, Pune
  • 89. MASS TOOL BOX TALK 89 Adani DC, Pune
  • 92. MOTIVATIONAL PROGRAM AWARD DISTRIBUTION 92 Adani DC, Pune
  • 93. NATIONAL SAFETY DAY CELEBRATION 93 Adani DC, Pune
  • 94. WORLD ENVIRONMENTAL DAY CELEBRATION AT WORKMEN CAMP 94 Adani DC, Pune
  • 96. MASS TOOL BOX TALK 96 Adani DC, Pune 2013 2014 2015
  • 97. HSE PERFORMANCE ROLLING PLAQUE – DAICEC 97 Adani DC, Pune Dec 2015 Jan 2016
  • 98. MASS TOOL BOX TALK 98 Adani DC, Pune Feb 2016 Apr 2016 May 2016
  • 99. SAFETY AWARDS – GULITA - 2015 99 Adani DC, Pune
  • 100. BEST SAFETY PERFORMANCE – WORLI MIXED USE PROJECT - 2016 100 Adani DC, Pune
  • 101. SAFETY AWARD – STATUE OF UNITY – DEC 2018 101 Adani DC, Pune
  • 102. SAFETY AWARD – DLF IT/TES – 2019 & 2020 102 Adani DC, Pune
  • 103. SAFETY AWARD –– 2020 & 2021 103 Adani DC, Pune DLF DT 1&2 TARAMANI THE WORLD TOWER PROJECTS
  • 104. SAFETY AWARD –THE WORLD TOWER PROJECTS / DAICEC 2021 & 2022 104 Adani DC, Pune
  • 105. SAFETY AWARD –-2021 & 2022 105 Adani DC, Pune DLF DT 1&2 TARAMANI DLF IT PARK-SEZ-PHASE III
  • 106. SAFETY AWARD – 2022 & 2023 106 Adani DC, Pune
  • 107. For more information, visit www.eversendai.com 107