1. REPORT ON SUMMER TRAINING AT
DLW, VARANASI
By: RAKESH KUMAR
ME 7th semester
Dr. K N MODI UNIVERCITY
,NEWAI,RAJ.
To : Pradeep Sir
Ass. Proff. Of ME
(DKNMU)
2. CONTENTS:-
Introduction
Production Unit
DLW, Varanasi
Types of product
Diesel Traction Assembly
Specification Of WDM& Performance
Specification of WDG & Performance
Welding Shop
Machine Shop
Heat Treatment Shop
Engine Erection Shop
Sub Assembely Shop
Conclusion
3. INDIAN RAILWAYS: AT A GLANCE
Indian Railways (Hindi: भारतीय रेल Bhāratīya Rail),
abbreviated as IR (Hindi: भा.रे.), is a departmental
undertaking of Government of India, which owns and
operates most of India's rail transport. It is overseen by
the Ministry of Railways of the Government of India.
4. Indian Railways has 113,617 kilometres (70,598 mi). of
total track over a route of 63,974 kilometres (39,752
mi) and 7,083 stations. It has the world's fourth largest
railway network after those of the USA ,
Russia and China. The railways traverse the length and
breadth of the country and carry over 30 million
passengers and 2.8 million tons of freight daily . It is the
world's second largest commercial or utility employer,
with more than 1.36 million employees As for rolling
stock, IR owns over 219,931 (freight) wagons, 51,030
coaches and 8,889 locomotives.
5. PRODUCTION UNITS
Indian Railways manufactures much of its rolling
stock and heavy engineering components at its six
manufacturing plants, called Production Units, which are
managed directly by the Ministry. Popular rolling stock
builders such as CLW and DLW for electric and diesel
locomotives; ICF and RCF for passenger coaches are
Production Units of Indian Railways. Over the years,
Indian Railways has not only achieved self-sufficiency in
production of rolling stock in the country but also
exported rolling stock to other countries. Each of these
six production units is headed by a General Manager,
who also reports directly to the Railway Board. The six
Production Units are:-
6. DIESEL LOCOMOTIVE WORKS, VARANASI
Brief history
August 1961 DLW set up as a green field project in
technical collaboration with ALCO,
USA for manufacture of Diesel
Electric Locomotives
January 1964
First Locomotive rolled out and dedicated
to the Nation
January 1976
Entered Export market, first locomotive
exported to Tanzania
December 1977 First Diesel Generating Set commissioned
October 1995 The Transfer of Technology agreement
was signed
March 2002
The first indigenous EMD WDG4 freight
loco manufactured
November 2002 3600 HP Engine produced
March
2003
The first indigenous passenger version of
EMD loco WDP4 manufactured
7. TYPES OF LOCOMOTIVES PRODUCED AT DLW
The first letter (gauge)
1. W-Indian broad gauge (The "W" Stands for Wide
Gauge - 5 Feet)
2. Y-metre gauge (The "Y" stands for Yard Gauge - 3
Feet)
3. Z-narrow gauge(2 ft 6 in)
4. N-narrow gauge (2 ft)
The second letter (motive power)
1. D-Diesel
2. C-DC electric (can run under DC traction only)
3. A-AC electric (can run under AC traction only)
4. CA-Both DC and AC (can run under both AC and DC
tractions), 'CA' is considered a single letter
5. B-Battery electric locomotive (rare)
8. The third letter (job type)
1. G-goods
2. P-passenger
3. M-mixed; both goods and passenger
4. S-Used for shunting (Also known as switching engines
or switchers in United states and some other countries)
5. U-Electric multiple units (used as commuters in city
suburbs)
6. R-Railcars
9. For example, in "WDM 3A":
1. "W" means broad gauge
2. "D" means diesel motive power
3. "M" means suitable for mixed(for both goods
and passenger)service
4. "3A" means the locomotive's power is 3,100 hp ('3'
stands for 3000 hp, 'A' denotes 100 hp more)
Or, in "WAP 5":
1. "W" means broad gauge
2. "A" mean AC electric traction motive power
3. "P" means suitable for Passenger service
4. "5" denotes that this locomotive is chronologically the
fifth electric locomotive model used by the railways for
passenger service
10. DIESEL TRACTION
ASSEMBLY AT DLW
Following types of diesel loco are being produced in
the DLW:
1. WDM - Wide Diesel Mixed
2. WDP - Wide Diesel Passenger
3. WDG - Wide Diesel Goods
4. WDS - Wide Diesel Shunter
12. SPECIFICATION OF WDM CLASS
Power type Diesel
Builder Alco, DLW
Model DL560C
Build date 1962 onwards
Total production 2700+
UIC classification Co-Co
Gauge 1,676 mm (5 ft 6 in)
Wheel diameter 1,092 mm (3 ft 7.0 in)
Wheelbase 12.834 m (42 ft 1.3 in)
Length 17.12 m (56 ft 2 in)
Width 2.864 m (9 ft 4.8 in)
Height 4.185 m (13 ft 8.8 in)
Axle load 18,800 kg (41,000 lb)
13. Locomotive weight 112,800 kg (249,000 lb)
Fuel capacity 5,000 l (1,100 imp gal; 1,300 US
gal)
Prime mover ALCO 251-B
Engine RPM range 400 - 1000 rpm
Aspiration Turbo-supercharged
Cylinders 16
Top speed 120 km/h (75 mph)
Power output 2,400 hp (1,800 kW)
Factor of adhesion 0.27
Disposition active
14. PERFORMANCE
The class WDM-2 is Indian Railways' workhorse diesel
locomotive. The first units were imported fully built from
the American Locomotive Company (Alco) in 1962.
Since 1964, it has been manufactured in India by
the Diesel Locomotive Works (DLW), Varanasi. The
model name stands for broad gauge (W), diesel (D),
mixed traffic (M) engine. The WDM-2 is the most
common diesel locomotive of Indian Railways.
The WDM-2A is a variant of the original WDM-2. These
units have been retro-fitted with air brakes, in addition to
the original vacuum brakes. TheWDM-2B is a more
recent locomotive, built with air brakes as original
equipment. The WDM-2 locos have a maximum speed
of 120 km/h (75 mph) , restricted to 100 km/h (62 mph)
when run long hood forward - the gear ratio is 65:18.
16. SPECIFICATION OF WDG CLASS
Power type Diesel-electric
Builder EMD & DLW
Model GT46PAC
Build date (EMD) 2001; (DLW) 2003–Present
Total production (EMD) 10; (DLW) 80+ under
license (in production)
AAR wheel arr. A1A-A1A
Gauge 5 ft 6 in (1.68 m)
Trucks HTSC
Bogies •Bo-1-1-Bo (WDP-4)
•Co-Co (WDP-4B and WDP-4D)
Fuel type diesel
17. Fuel capacity 6,000 liters
Prime mover 16-710G3B
Engine type 2-stroke diesel
Aspiration turbocharged
Displacement 11,360 in² (186.2 liters)
Alternator TA-17-CA6A
Traction motors AC
Cylinders V16
Transmission electric; AC alternator, 1 inverter
per truck, AC traction motors
Power output •4,000 hp (WDP-4)
•4500 hp (WDP-4B and WDP-4D)
Locomotive brakes air
Train brakes air
18. PERFORMANCE
The WDP-4 is capable of hauling 24 coach trains at 110-
120 km/hour. It has also been used for speed trials
where it has hauled 8 coach trains at 160 km/hour.
The locomotives can be used in either direction, and
frequently haul trains long hood forward, as in the
picture. Newer editions with 4500hp have been
produced which have been named with the sub class
WDP-4B /WDP-4D which have different traction control
with six traction motors and are Co-Co bogie equipped,
unlike the original which has a Bo-1-1-Bo arrangement
with four traction motors.
The loco is very fuel efficient and has minimal exhaust
emissions due to its 2 stroke diesel engine. It is
characterized by its loud horn, which can be heard for
large distances around, and aircraft-like sound of its
running engine.
19. TRAINING PERIOD
Following four workshop were assigned to me
during my training period of four weeks:
1. Heavy Welding Shop
2. Heavy Machine Shop
3. Sub Assembling shop
20. HEAVY WELDING SHOP
In heavy welding shop steel sheets of about 75mm are
welded together. To form engine block for both ALCO and
GM engines. The conventional form of manufacturing
engine blocks of such enormous size would have been
very uneconomical.
The three main type of welding are:
1. Submerged Arc Welding (SAW)
2. Shielded Metal Arc Welding (SMAW)
3. Gas Metal Arc Welding (GMAW)
21. After welding the engine blocks are thoroughly
inspected for under welding and over welding.
Internal cracks are detected using NDT.
The blocks are then passed to HMS for further
machining and boring of holes for cylinders or
Power Pack Assembly. Generally 12 to 16 holes are
bored.
22. HEAVY MACHINE SHOP
As the name suggests in the heavy machine shop
the finished engine blocks are then machined upon
to produce holes for power pack assembly.
The main machines in HMS are:
1. Angular boring machine (TAL / HMT)
2. CNC Portal milling ( Waldrich coburg)
3. Radial Drill (max. 25 ton)
4. Hydraulic press
23. HEAT TREATMENT SHOP
All the components used in an engine are heat treated
before they are assembled. The main objective behind
heat treatment is to improve the machinability and wear
resistance of the components.
Some of the heat treatment used are :
1. Normalizing
2. Quenching
3. Carburizing
4. Induction hardening
25. NORMALIZING
In this heat treatment process the material is kept at
a temperature 40° to 50℃ above critical
temperature. This done due to following reasons:
1. To remove coarse grain structure
2. To remove internal stresses
3. To improve mechanical properties
27. QUENCHING
In quenching the material is heated to a
temperature of about 815° to 900°C and then it is
rapidly cooled by a mixture of water and
polystyrene glycol.
The main advantage of quenching is to improve
machinability, hardness and development of
martensite structure. Generally all the components
used in the locomotive are quenched before any
other heat treatment process.
29. CARBURIZING OR CASE HARDENING
In this process a hard surface is produced on a low
carbon steel of 0.15 percent carbon. In course of
process the outer layer is converted into a high
carbon steel with a carbon content ranging from 0.9
to 1.2 per cent of a carbon.
The components in the carburizing process are
kept in contact with carbonaceous compounds and
energizer (BaCO3). Then they are kept together in
a furnace for a given period of time.
30. The hardness depends upon the penetration of
carbon, temperature and time up to which its is
kept in furnace. An hour of heating produces 4000
to 5000 hardness.
The main components which are carburized in the
HTS are main piston pin, rocker arm assembly,
crab bolts etc.
31. ENGINE ERECTION SHOP
In this shop we can check engine is properly work or not,
Pump use
•Scavenging pump
32. SUB ASSEMBLY SHOP
This shop deals with following section:--
Turbo machining section
Cylinder head & shot blast section
Fuel pump, Support, Cam shaft ate section
Cylinder head
Turbo
Governor, Water Pump, Fan drive, Lube oil
Pump, After cooler assembly section.
33. INDUCTION HARDENING
Induction hardening process is the heat treatment
process in which components of high carbon percentage
are hardened using high frequency ac current. Generally
a p.d. of 200kv to 130kv is used.
In induction hardening process there is no change in
chemical composition. The work piece is kept at a
distance of 3-4 mm from the coils. The current produces
a magnetic flux which produces eddy current resulting in
heating.
I.H. is generally done on crankshafts who have a high
percentage of carbon say about .45 to .48 percent.
34. CONCLUSION
During the Tenure I have Studied the Followings:-
Types of product
Diesel Traction Assembly
Specification Of WDM& Performance
Specification of WDG & Performance
Welding Shop
Machine Shop
Heat Treatment Shop
Engine Erection Shop
Sub Assembely Shop
THANK YOU!!!