Introduction of CYCO & Changyuan Spray Nozzles' QA System
1. Introduction to quality assurance
system for CYCO products
Li Ming
2019-4-25
https://ccnozzle.com
https://ccnozzle.com
2. Content
Quality assurance system
Company System Documents
Organization of the Quality Department
Main testing equipment
Product quality inspection process
https://ccnozzle.com
7. Organization of the Quality Department
Manager
Assistant Monitor
IQC IPQC
Measure
ment
room
Monitor
FQC OQC CS
DCC
05
https://ccnozzle.com
8. Sorts of testing equipments, Such as liquid density & impact force tester;
High pressure liquid flow rate testing bench, Laser particle size analyzer and
so on.
Water test machine
•9units
Coordinate
measuring machine
•1unit
Two-coordinate
meter
•2units
Salt fog testing
machine
•2units
Main testing equipment06
https://ccnozzle.com
9. Product quality inspection process
IQC
• Incoming
Inspection
Report
• Material
Report
IPQC
• First
checklist
• Inspection
Daily
Report
FQC
• Test
report
• Particle
Detection
Report
OQC
• Check
From the raw materials into the factory, process inspection, product
shipment and other key links, arrange special personnel to fully
monitor product quality.
07
https://ccnozzle.com
10. IQC:Incoming Quality Control
Frequency of inspection: 1 time/1
batch
Appearance
inspection
Dimention
inspection
Material
Confirmation
https://ccnozzle.com
11. IPQC:Input Process Quality Control
Frequency of inspection:
1time/2hours
Appearance
inspection
Dimention
inspection
Flow
capacity
Spray angle Thread Size
https://ccnozzle.com