SAFETY Projects
• As part of a follow-up for PM2 felt side coating
filter safety issue investigated possible causes
for resin build-up on PM2 filters
• Performed the Annual DOLPHIN chemical
audit for Material Prep and QA
Resin Build-up on PM2
• Investigated build-
up of resin on PM2
filter as a response
to recent back
injury
• Collected samples
of sub coat daily to
take readings on pH
and viscosity in
order to create a
base line data
Resin Build-up on PM2
• Created updating graphs that show pH and
viscosity over time
0
100
200
300
400
500
600
700
800
900
1000
5/30/2016 6/9/2016 6/19/2016 6/29/2016 7/9/2016 7/19/2016 7/29/2016 8/8/2016
Viscosity(cP)
Date
Loop Coating Viscosity
*Samples from PM2 Feltside Tank
*Red means build-up was
seen
Resin Build-up on PM2
5
5.5
6
6.5
7
7.5
8
8.5
5/30/2016 6/9/2016 6/19/2016 6/29/2016 7/9/2016 7/19/2016 7/29/2016 8/8/2016
pH
Date
Loop Coating pH
*Red means build-up was seen
*Samples from PM2 Feltside Tank
Resin Build-up on PM2
• Collected samples of sub-coat and resin on
day when there was build-up and sent to
Appleton for testing
FS Loop Sub-Coat Resin Build-Up Sample FS Return Sub-Coat
Dolphin Chemical Audit
• Investigated list of chemicals in question to
see if they were still used
• Initially 83 chemicals were unknown in
Material Prep and 11 were unknown in QA
Dolphin Chemical Audit
• After the investigation was complete, Matt and I had
ascertained information on all of the chemicals in
QA and 64 of the chemicals on the Material Prep list.
• List was then sent to Johnna Fries so chemicals could
be updated in DOLPHIN with SDSs or archived
QUALITY Projects
• Lead Kaizen to reduce/eliminate Roll
Mislabeling Complaints and Non-
Conformances
• Developed a Roll Quality Vertical Audit
Process
• Helped with Development of a Finished Roll
Quality/Splice Audit
• Worked to loosen the 20% Curl Reject Limit
for MM 4781 on PM3 and PM2
Kaizen for Stamping/Labeling
• Learned what a Kaizen
entailed from the CI
Department
• Investigated Non-
Conformances from the
last year about stamping
and labeling
• Learned how incredibly
valuable operator input
was as they helped
identify problems I would
have never seen
Kaizen for Stamping/Labeling
• At the Kaizen the root causes of the
Stamping/Labeling issue were identified
• Created a list of countermeasures to
reduce/eliminate the issue
– These included roll audits, creating SOP for roll
labeling, applying all CB roll labels at Head roll
station, informing operators on customer
complaints and NCs, and highlighting roll position
on belly tags
– Weekly meetings to monitor progress
Roll Quality Vertical Audit
• Creation of the Roll
Quality Vertical Audit
began with the idea of
raising awareness about
our current specs
• Then the major issues
were identified in order
to create an audit sheet
Roll Quality Vertical Audit
• Implementation of the
Audit involved
numerous trials and
modifications
• Creation of a record
system in order to
monitor progress of
the audit
• Carrying out the audits
themselves
Finished Roll Quality Audit
• This audit stemmed from a desire to inspect
splices
• Doug Guise’s old audit was found and
modified to meet new specs
• Audit is currently being trialed
Loosen 20% Curl Reject Limit on MM 4781
• Particular grades on
PM3 are seeing a
problem where in order
to get the 50% humidity
curl test to Target the
20% curl is being run in
pre-control
• Decided to focus on
MM 4781 for proposing
the change
Loosening 20% Curl Reject Limit
• Pulled data from June
2015 to present to
investigate where
exactly changes need
to be made
• Using histograms
created a proposal for
creating new lower
limits
Loosening 20% Curl Reject Limit
• Proposed new 20%
curl lower limits for
MM 4781
• Put in a formal
request for a spec
change
Other QUALITY Projects
• Helped monitor 20# Cream Bond to ensure it met
quality requirements
• Established collaborative testing program for
kCoF tester
• Looked into trends for the difference between
the 2 minute and 30 second TI
• Improved TSGs for the QA laboratory equipment
• Created defect books for each Paper Machine and
QA Lab
20# Cream Bond Quality
• Helped investigated complaints by C&J to
determine predicament
• Watched 20# Cream Bond run and inspected
splices during run
kCoF Testing Program
• Created to prevent
kCoF test from drifting
• Contacted Ellen
Roberts and involved
Appleton it testing
• Created sheet to
record and compare
test values from both
facilities
• Status-Starting this
month
2 Minute VS. 30 Second TI to Monitor Print
Speed
• Investigated benefit of a graph of the
difference between 2 minute and 30 second TI
• Decided difference graph was redundant if we
have 30 second and 2 minute graphs already
-20
-15
-10
-5
0
5
10
15
18-Sep-14 00:00 27-Dec-14 00:00 06-Apr-15 00:00 15-Jul-15 00:00 23-Oct-15 00:00 31-Jan-16 00:00 10-May-16 00:00 18-Aug-16 00:00
Difference for CB TI: 2 Min Minus 30 Sec
Improved TSGs for QA Lab
• Improved TSGs for
– Contact Angle Test
– Ink Penetration Size Test
– Mullen Burst Strength Test
– Stiffness Test
– Caliper Test
– kCoF Test
– Color Touch Test
– Scott Internal Bond Test
Defect Books
• Located any remaining defect books
• Filled Defect Books with defect sheets and put
them in proper locations for future use
What I Learned
• The importance of Safety
• The value of feedback
• The benefits associated with teamwork
• A understanding of what it is like to work in an
industrial environment

More Related Content

Viewers also liked

El futuro del retail - Documento Colaborativo de Foxize School
El futuro del retail - Documento Colaborativo de Foxize SchoolEl futuro del retail - Documento Colaborativo de Foxize School
El futuro del retail - Documento Colaborativo de Foxize SchoolLluis Serra
 
Why Google Classroom
Why Google Classroom Why Google Classroom
Why Google Classroom
Erifili Davis
 
REMC Connected Educator Series MACUL 2012 Panel
REMC Connected Educator Series MACUL 2012 PanelREMC Connected Educator Series MACUL 2012 Panel
REMC Connected Educator Series MACUL 2012 Panel
Dan Spencer
 
Introduction to Google Classroom
Introduction to Google Classroom Introduction to Google Classroom
Introduction to Google Classroom
Jkeigher
 
Google Classroom - Set Up and Tips for Teachers
Google Classroom - Set Up and Tips for TeachersGoogle Classroom - Set Up and Tips for Teachers
Google Classroom - Set Up and Tips for Teachers
John Sowash
 
Tutorial de Google Classroom
Tutorial de Google ClassroomTutorial de Google Classroom
Tutorial de Google Classroom
Rosa Liarte Alcaine
 
положення про платні послуги нво
положення про платні послуги нвоположення про платні послуги нво
положення про платні послуги нво
Alexandr Miroshnik
 
Pennsylvania College of Technology_2017 RCMC_4Year
Pennsylvania College of Technology_2017 RCMC_4YearPennsylvania College of Technology_2017 RCMC_4Year
Pennsylvania College of Technology_2017 RCMC_4YearRobert Jackson
 
Role Of Social Media in Recruitment
Role Of Social Media in RecruitmentRole Of Social Media in Recruitment
Role Of Social Media in Recruitment
Nspire Recruitment
 
Civil Engineer CV
Civil Engineer CVCivil Engineer CV
Civil Engineer CVAfzal Khan
 
031 033 zenoss50
031 033 zenoss50031 033 zenoss50
031 033 zenoss50
Tania Mildred Coro Coronado
 
Departament d'educacio
Departament d'educacioDepartament d'educacio
Departament d'educacio
Lluis Serra
 
игра путешествие по стране «занимательная биология»
игра путешествие по стране «занимательная биология»игра путешествие по стране «занимательная биология»
игра путешествие по стране «занимательная биология»
Вспомогательный образовательный сайт
 
Informe tendencias logísticas en eCommerce 2014
Informe tendencias logísticas en eCommerce 2014Informe tendencias logísticas en eCommerce 2014
Informe tendencias logísticas en eCommerce 2014
Lluis Serra
 

Viewers also liked (14)

El futuro del retail - Documento Colaborativo de Foxize School
El futuro del retail - Documento Colaborativo de Foxize SchoolEl futuro del retail - Documento Colaborativo de Foxize School
El futuro del retail - Documento Colaborativo de Foxize School
 
Why Google Classroom
Why Google Classroom Why Google Classroom
Why Google Classroom
 
REMC Connected Educator Series MACUL 2012 Panel
REMC Connected Educator Series MACUL 2012 PanelREMC Connected Educator Series MACUL 2012 Panel
REMC Connected Educator Series MACUL 2012 Panel
 
Introduction to Google Classroom
Introduction to Google Classroom Introduction to Google Classroom
Introduction to Google Classroom
 
Google Classroom - Set Up and Tips for Teachers
Google Classroom - Set Up and Tips for TeachersGoogle Classroom - Set Up and Tips for Teachers
Google Classroom - Set Up and Tips for Teachers
 
Tutorial de Google Classroom
Tutorial de Google ClassroomTutorial de Google Classroom
Tutorial de Google Classroom
 
положення про платні послуги нво
положення про платні послуги нвоположення про платні послуги нво
положення про платні послуги нво
 
Pennsylvania College of Technology_2017 RCMC_4Year
Pennsylvania College of Technology_2017 RCMC_4YearPennsylvania College of Technology_2017 RCMC_4Year
Pennsylvania College of Technology_2017 RCMC_4Year
 
Role Of Social Media in Recruitment
Role Of Social Media in RecruitmentRole Of Social Media in Recruitment
Role Of Social Media in Recruitment
 
Civil Engineer CV
Civil Engineer CVCivil Engineer CV
Civil Engineer CV
 
031 033 zenoss50
031 033 zenoss50031 033 zenoss50
031 033 zenoss50
 
Departament d'educacio
Departament d'educacioDepartament d'educacio
Departament d'educacio
 
игра путешествие по стране «занимательная биология»
игра путешествие по стране «занимательная биология»игра путешествие по стране «занимательная биология»
игра путешествие по стране «занимательная биология»
 
Informe tendencias logísticas en eCommerce 2014
Informe tendencias logísticas en eCommerce 2014Informe tendencias logísticas en eCommerce 2014
Informe tendencias logísticas en eCommerce 2014
 

Similar to End of the Summer Presentation_Alden

90915 03006 wp928-80 genuine toyota oil filter
90915 03006 wp928-80 genuine toyota oil filter90915 03006 wp928-80 genuine toyota oil filter
90915 03006 wp928-80 genuine toyota oil filter
Filter Expert Co.,Ltd.
 
2022 presentation on Caltrans sampling and test methods
2022 presentation on Caltrans sampling and test methods2022 presentation on Caltrans sampling and test methods
2022 presentation on Caltrans sampling and test methods
California Asphalt Pavement Association
 
VRI project presentation Spool Throughput 2013
VRI project presentation Spool Throughput 2013VRI project presentation Spool Throughput 2013
VRI project presentation Spool Throughput 2013
D9 Process Improvement
 
Standard Operating Procedures SOP for Prestressed Concrete Members facility.pdf
Standard Operating Procedures SOP for Prestressed Concrete Members facility.pdfStandard Operating Procedures SOP for Prestressed Concrete Members facility.pdf
Standard Operating Procedures SOP for Prestressed Concrete Members facility.pdf
ParmeshworVetwal1
 
Lean Six Sigma Projects
Lean Six Sigma ProjectsLean Six Sigma Projects
Lean Six Sigma Projects
Julian Kalac P.Eng
 
Watlow Malaysia - Monthly 4 BR September 2023.pptx
Watlow Malaysia - Monthly 4 BR September 2023.pptxWatlow Malaysia - Monthly 4 BR September 2023.pptx
Watlow Malaysia - Monthly 4 BR September 2023.pptx
ParabakaranBalasubra1
 
2022 asphalt compaction presentation by DingXin Cheng
2022 asphalt compaction presentation by DingXin Cheng2022 asphalt compaction presentation by DingXin Cheng
2022 asphalt compaction presentation by DingXin Cheng
California Asphalt Pavement Association
 
Stormwater Infrastructure Management-December 2015
Stormwater Infrastructure Management-December 2015Stormwater Infrastructure Management-December 2015
Stormwater Infrastructure Management-December 2015
Fairfax County
 
2023 CalAPA Spring Conference presentation by Cathrina Barros of Caltrans
2023 CalAPA Spring Conference presentation by Cathrina Barros of Caltrans2023 CalAPA Spring Conference presentation by Cathrina Barros of Caltrans
2023 CalAPA Spring Conference presentation by Cathrina Barros of Caltrans
California Asphalt Pavement Association
 
PRODUCTIVITY IMPROVEMENT OF PRE-TREATMENTS & POWDER COATING PROCESS.
PRODUCTIVITY IMPROVEMENT OF PRE-TREATMENTS & POWDER COATING PROCESS.PRODUCTIVITY IMPROVEMENT OF PRE-TREATMENTS & POWDER COATING PROCESS.
PRODUCTIVITY IMPROVEMENT OF PRE-TREATMENTS & POWDER COATING PROCESS.
Raheem Arif
 
BlueScape How to Create a CEQA Air Quality Analysis for Development Projects ...
BlueScape How to Create a CEQA Air Quality Analysis for Development Projects ...BlueScape How to Create a CEQA Air Quality Analysis for Development Projects ...
BlueScape How to Create a CEQA Air Quality Analysis for Development Projects ...
BlueScape
 
Asphalt Institute perspective on EPDs
Asphalt Institute perspective on EPDsAsphalt Institute perspective on EPDs
Asphalt Institute perspective on EPDs
California Asphalt Pavement Association
 
QIC-Summit_ITP-Presentation_Rev-1.0.pptx
QIC-Summit_ITP-Presentation_Rev-1.0.pptxQIC-Summit_ITP-Presentation_Rev-1.0.pptx
QIC-Summit_ITP-Presentation_Rev-1.0.pptx
ShubhamShukla221709
 
BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13
BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13
BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13
BlueScape
 
Coal Combustion Residuals: Understanding the Final Rule and Next Steps for El...
Coal Combustion Residuals: Understanding the Final Rule and Next Steps for El...Coal Combustion Residuals: Understanding the Final Rule and Next Steps for El...
Coal Combustion Residuals: Understanding the Final Rule and Next Steps for El...
ScottMadden, Inc.
 
Building best in-class quality in footwear manufacturing
Building best in-class quality in footwear manufacturingBuilding best in-class quality in footwear manufacturing
Building best in-class quality in footwear manufacturing
Tony Lopez
 
Iso final
Iso finalIso final
2023 CalAPA Spring Conference presentation by John Harvey on compaction of as...
2023 CalAPA Spring Conference presentation by John Harvey on compaction of as...2023 CalAPA Spring Conference presentation by John Harvey on compaction of as...
2023 CalAPA Spring Conference presentation by John Harvey on compaction of as...
California Asphalt Pavement Association
 
Jaynt singh (cv) (1)
Jaynt singh (cv) (1)Jaynt singh (cv) (1)
Jaynt singh (cv) (1)
Jayant Singh
 
Jaynt singh (cv) (1)
Jaynt singh (cv) (1)Jaynt singh (cv) (1)
Jaynt singh (cv) (1)
Jayant Singh
 

Similar to End of the Summer Presentation_Alden (20)

90915 03006 wp928-80 genuine toyota oil filter
90915 03006 wp928-80 genuine toyota oil filter90915 03006 wp928-80 genuine toyota oil filter
90915 03006 wp928-80 genuine toyota oil filter
 
2022 presentation on Caltrans sampling and test methods
2022 presentation on Caltrans sampling and test methods2022 presentation on Caltrans sampling and test methods
2022 presentation on Caltrans sampling and test methods
 
VRI project presentation Spool Throughput 2013
VRI project presentation Spool Throughput 2013VRI project presentation Spool Throughput 2013
VRI project presentation Spool Throughput 2013
 
Standard Operating Procedures SOP for Prestressed Concrete Members facility.pdf
Standard Operating Procedures SOP for Prestressed Concrete Members facility.pdfStandard Operating Procedures SOP for Prestressed Concrete Members facility.pdf
Standard Operating Procedures SOP for Prestressed Concrete Members facility.pdf
 
Lean Six Sigma Projects
Lean Six Sigma ProjectsLean Six Sigma Projects
Lean Six Sigma Projects
 
Watlow Malaysia - Monthly 4 BR September 2023.pptx
Watlow Malaysia - Monthly 4 BR September 2023.pptxWatlow Malaysia - Monthly 4 BR September 2023.pptx
Watlow Malaysia - Monthly 4 BR September 2023.pptx
 
2022 asphalt compaction presentation by DingXin Cheng
2022 asphalt compaction presentation by DingXin Cheng2022 asphalt compaction presentation by DingXin Cheng
2022 asphalt compaction presentation by DingXin Cheng
 
Stormwater Infrastructure Management-December 2015
Stormwater Infrastructure Management-December 2015Stormwater Infrastructure Management-December 2015
Stormwater Infrastructure Management-December 2015
 
2023 CalAPA Spring Conference presentation by Cathrina Barros of Caltrans
2023 CalAPA Spring Conference presentation by Cathrina Barros of Caltrans2023 CalAPA Spring Conference presentation by Cathrina Barros of Caltrans
2023 CalAPA Spring Conference presentation by Cathrina Barros of Caltrans
 
PRODUCTIVITY IMPROVEMENT OF PRE-TREATMENTS & POWDER COATING PROCESS.
PRODUCTIVITY IMPROVEMENT OF PRE-TREATMENTS & POWDER COATING PROCESS.PRODUCTIVITY IMPROVEMENT OF PRE-TREATMENTS & POWDER COATING PROCESS.
PRODUCTIVITY IMPROVEMENT OF PRE-TREATMENTS & POWDER COATING PROCESS.
 
BlueScape How to Create a CEQA Air Quality Analysis for Development Projects ...
BlueScape How to Create a CEQA Air Quality Analysis for Development Projects ...BlueScape How to Create a CEQA Air Quality Analysis for Development Projects ...
BlueScape How to Create a CEQA Air Quality Analysis for Development Projects ...
 
Asphalt Institute perspective on EPDs
Asphalt Institute perspective on EPDsAsphalt Institute perspective on EPDs
Asphalt Institute perspective on EPDs
 
QIC-Summit_ITP-Presentation_Rev-1.0.pptx
QIC-Summit_ITP-Presentation_Rev-1.0.pptxQIC-Summit_ITP-Presentation_Rev-1.0.pptx
QIC-Summit_ITP-Presentation_Rev-1.0.pptx
 
BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13
BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13
BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13
 
Coal Combustion Residuals: Understanding the Final Rule and Next Steps for El...
Coal Combustion Residuals: Understanding the Final Rule and Next Steps for El...Coal Combustion Residuals: Understanding the Final Rule and Next Steps for El...
Coal Combustion Residuals: Understanding the Final Rule and Next Steps for El...
 
Building best in-class quality in footwear manufacturing
Building best in-class quality in footwear manufacturingBuilding best in-class quality in footwear manufacturing
Building best in-class quality in footwear manufacturing
 
Iso final
Iso finalIso final
Iso final
 
2023 CalAPA Spring Conference presentation by John Harvey on compaction of as...
2023 CalAPA Spring Conference presentation by John Harvey on compaction of as...2023 CalAPA Spring Conference presentation by John Harvey on compaction of as...
2023 CalAPA Spring Conference presentation by John Harvey on compaction of as...
 
Jaynt singh (cv) (1)
Jaynt singh (cv) (1)Jaynt singh (cv) (1)
Jaynt singh (cv) (1)
 
Jaynt singh (cv) (1)
Jaynt singh (cv) (1)Jaynt singh (cv) (1)
Jaynt singh (cv) (1)
 

End of the Summer Presentation_Alden

  • 1. Summer 2016: Final Presentation Alden Anderson Technical Summer Intern 8/8/2016
  • 2. SAFETY Projects • As part of a follow-up for PM2 felt side coating filter safety issue investigated possible causes for resin build-up on PM2 filters • Performed the Annual DOLPHIN chemical audit for Material Prep and QA
  • 3. Resin Build-up on PM2 • Investigated build- up of resin on PM2 filter as a response to recent back injury • Collected samples of sub coat daily to take readings on pH and viscosity in order to create a base line data
  • 4. Resin Build-up on PM2 • Created updating graphs that show pH and viscosity over time 0 100 200 300 400 500 600 700 800 900 1000 5/30/2016 6/9/2016 6/19/2016 6/29/2016 7/9/2016 7/19/2016 7/29/2016 8/8/2016 Viscosity(cP) Date Loop Coating Viscosity *Samples from PM2 Feltside Tank *Red means build-up was seen
  • 5. Resin Build-up on PM2 5 5.5 6 6.5 7 7.5 8 8.5 5/30/2016 6/9/2016 6/19/2016 6/29/2016 7/9/2016 7/19/2016 7/29/2016 8/8/2016 pH Date Loop Coating pH *Red means build-up was seen *Samples from PM2 Feltside Tank
  • 6. Resin Build-up on PM2 • Collected samples of sub-coat and resin on day when there was build-up and sent to Appleton for testing FS Loop Sub-Coat Resin Build-Up Sample FS Return Sub-Coat
  • 7. Dolphin Chemical Audit • Investigated list of chemicals in question to see if they were still used • Initially 83 chemicals were unknown in Material Prep and 11 were unknown in QA
  • 8. Dolphin Chemical Audit • After the investigation was complete, Matt and I had ascertained information on all of the chemicals in QA and 64 of the chemicals on the Material Prep list. • List was then sent to Johnna Fries so chemicals could be updated in DOLPHIN with SDSs or archived
  • 9. QUALITY Projects • Lead Kaizen to reduce/eliminate Roll Mislabeling Complaints and Non- Conformances • Developed a Roll Quality Vertical Audit Process • Helped with Development of a Finished Roll Quality/Splice Audit • Worked to loosen the 20% Curl Reject Limit for MM 4781 on PM3 and PM2
  • 10. Kaizen for Stamping/Labeling • Learned what a Kaizen entailed from the CI Department • Investigated Non- Conformances from the last year about stamping and labeling • Learned how incredibly valuable operator input was as they helped identify problems I would have never seen
  • 11. Kaizen for Stamping/Labeling • At the Kaizen the root causes of the Stamping/Labeling issue were identified • Created a list of countermeasures to reduce/eliminate the issue – These included roll audits, creating SOP for roll labeling, applying all CB roll labels at Head roll station, informing operators on customer complaints and NCs, and highlighting roll position on belly tags – Weekly meetings to monitor progress
  • 12. Roll Quality Vertical Audit • Creation of the Roll Quality Vertical Audit began with the idea of raising awareness about our current specs • Then the major issues were identified in order to create an audit sheet
  • 13. Roll Quality Vertical Audit • Implementation of the Audit involved numerous trials and modifications • Creation of a record system in order to monitor progress of the audit • Carrying out the audits themselves
  • 14. Finished Roll Quality Audit • This audit stemmed from a desire to inspect splices • Doug Guise’s old audit was found and modified to meet new specs • Audit is currently being trialed
  • 15. Loosen 20% Curl Reject Limit on MM 4781 • Particular grades on PM3 are seeing a problem where in order to get the 50% humidity curl test to Target the 20% curl is being run in pre-control • Decided to focus on MM 4781 for proposing the change
  • 16. Loosening 20% Curl Reject Limit • Pulled data from June 2015 to present to investigate where exactly changes need to be made • Using histograms created a proposal for creating new lower limits
  • 17. Loosening 20% Curl Reject Limit • Proposed new 20% curl lower limits for MM 4781 • Put in a formal request for a spec change
  • 18. Other QUALITY Projects • Helped monitor 20# Cream Bond to ensure it met quality requirements • Established collaborative testing program for kCoF tester • Looked into trends for the difference between the 2 minute and 30 second TI • Improved TSGs for the QA laboratory equipment • Created defect books for each Paper Machine and QA Lab
  • 19. 20# Cream Bond Quality • Helped investigated complaints by C&J to determine predicament • Watched 20# Cream Bond run and inspected splices during run
  • 20. kCoF Testing Program • Created to prevent kCoF test from drifting • Contacted Ellen Roberts and involved Appleton it testing • Created sheet to record and compare test values from both facilities • Status-Starting this month
  • 21. 2 Minute VS. 30 Second TI to Monitor Print Speed • Investigated benefit of a graph of the difference between 2 minute and 30 second TI • Decided difference graph was redundant if we have 30 second and 2 minute graphs already -20 -15 -10 -5 0 5 10 15 18-Sep-14 00:00 27-Dec-14 00:00 06-Apr-15 00:00 15-Jul-15 00:00 23-Oct-15 00:00 31-Jan-16 00:00 10-May-16 00:00 18-Aug-16 00:00 Difference for CB TI: 2 Min Minus 30 Sec
  • 22. Improved TSGs for QA Lab • Improved TSGs for – Contact Angle Test – Ink Penetration Size Test – Mullen Burst Strength Test – Stiffness Test – Caliper Test – kCoF Test – Color Touch Test – Scott Internal Bond Test
  • 23. Defect Books • Located any remaining defect books • Filled Defect Books with defect sheets and put them in proper locations for future use