Presentation by Steve Healow of the Federal Highway Administration on "National Performance Management Measures" for the CalAPA Spring Asphalt Pavement Conference & Equipment Expo, April 20-21, 2016, in Ontario, CA.
Presentation by Steve Healow of the Federal Highway Administration on "National Performance Management Measures" for the CalAPA Spring Asphalt Pavement Conference & Equipment Expo, April 20-21, 2016, in Ontario, CA.
Google Classroom is a free, web-based platform that integrates G Suite for Education with G Suite services. This presentation gives you an overview of the strengths and benefits of using Google Classroom as well as ideas for making life easier for teachers and students.
Google Classroom - Set Up and Tips for TeachersJohn Sowash
For the first time, Google has designed a product for a specific industry. Fortunately for educators, that product is for them! Google Classroom is a brand new tool designed to help ease the burden of sharing and receiving assignments from students.
The excitement surrounding classroom has reached a fever pitch; teachers are ecstatic and can't wait to get their hands on classroom. The excitement may be contributing to inflated expectations, however. Classroom is not a complete classroom solution; it must be used alongside perennial favorites such as Edmodo, Hapara Teacher Dashboard, Moodle, etc.
Don't have access, but eager to see what classroom has to offer? Check out this sneak peak of Google Classroom including instructions on how to setup and manage your first class!
Recruitment Agencies act as an bridge between candidates and the organization. They work hard to deliver excellent results to both candidates and the clients. Nspire Recruitment is the leading IT Recruitment Agency in Australia. We established long term relation with the clients.
Байтуханова Жанар ученица 9 класса 13 лет
КГУ «Подгорненская основная школа»
Северо-Казахстанской области Кызылжарского района с.Подгорное
Руководитель: Козел Елена Павловна
Учитель химии и биологии
КГУ «Подгорненская основная школа»
At the California Asphalt Pavement Association (CalAPA) Fall Asphalt Pavement Conference held Oct. 27, 2022 in Sacramento, a presentation titled, "Caltrans Sampling and Test Methods Update" was delivered by Jackie Wong P.E., Chief of the Office of Central Laboratories – Caltrans METS; and Guadalupe Magana P.E., Chief, Asphalt Binder and Hot Mix Asphalt Branch- Caltrans METS. The presentation includes the latest on Caltrans test methods, including changes to the sample preparation procedures found in CT 125 and CT306, upcoming efforts to modify existing test methods and efforts to develop new test methods.
Include an overview of the Central Laboratory office and personnel.
As of September 2012 a spool manufacturer was required to supply 23,300 Spools by Jun 2013
Based on the current run-rate of 197 spools per week the spools manufacturer is forecasted to complete the full order of 23,300 Spools in Apr 2014, an estimated 10 months behind schedule
As the spool manufacturer was on the critical path for the LNG construction project, the delayed spools were a critical risk to first-gas target date
At the CalAPA Fall Asphalt Pavement Conference held Oct. 27, 2022 in Sacramento, a presentation on compaction of Asphalt Pavements was delivered by DingXin Cheng PhD, Director California Pavement Preservation Center (CP2). Pavement performance requires a proper compaction of the asphalt mixture. Our partners at CCPIC will provide an overview of the importance of pavement compaction and an overview of the roles of contractors and agency representatives to maximize the performance of the pavement.
Google Classroom is a free, web-based platform that integrates G Suite for Education with G Suite services. This presentation gives you an overview of the strengths and benefits of using Google Classroom as well as ideas for making life easier for teachers and students.
Google Classroom - Set Up and Tips for TeachersJohn Sowash
For the first time, Google has designed a product for a specific industry. Fortunately for educators, that product is for them! Google Classroom is a brand new tool designed to help ease the burden of sharing and receiving assignments from students.
The excitement surrounding classroom has reached a fever pitch; teachers are ecstatic and can't wait to get their hands on classroom. The excitement may be contributing to inflated expectations, however. Classroom is not a complete classroom solution; it must be used alongside perennial favorites such as Edmodo, Hapara Teacher Dashboard, Moodle, etc.
Don't have access, but eager to see what classroom has to offer? Check out this sneak peak of Google Classroom including instructions on how to setup and manage your first class!
Recruitment Agencies act as an bridge between candidates and the organization. They work hard to deliver excellent results to both candidates and the clients. Nspire Recruitment is the leading IT Recruitment Agency in Australia. We established long term relation with the clients.
Байтуханова Жанар ученица 9 класса 13 лет
КГУ «Подгорненская основная школа»
Северо-Казахстанской области Кызылжарского района с.Подгорное
Руководитель: Козел Елена Павловна
Учитель химии и биологии
КГУ «Подгорненская основная школа»
At the California Asphalt Pavement Association (CalAPA) Fall Asphalt Pavement Conference held Oct. 27, 2022 in Sacramento, a presentation titled, "Caltrans Sampling and Test Methods Update" was delivered by Jackie Wong P.E., Chief of the Office of Central Laboratories – Caltrans METS; and Guadalupe Magana P.E., Chief, Asphalt Binder and Hot Mix Asphalt Branch- Caltrans METS. The presentation includes the latest on Caltrans test methods, including changes to the sample preparation procedures found in CT 125 and CT306, upcoming efforts to modify existing test methods and efforts to develop new test methods.
Include an overview of the Central Laboratory office and personnel.
As of September 2012 a spool manufacturer was required to supply 23,300 Spools by Jun 2013
Based on the current run-rate of 197 spools per week the spools manufacturer is forecasted to complete the full order of 23,300 Spools in Apr 2014, an estimated 10 months behind schedule
As the spool manufacturer was on the critical path for the LNG construction project, the delayed spools were a critical risk to first-gas target date
At the CalAPA Fall Asphalt Pavement Conference held Oct. 27, 2022 in Sacramento, a presentation on compaction of Asphalt Pavements was delivered by DingXin Cheng PhD, Director California Pavement Preservation Center (CP2). Pavement performance requires a proper compaction of the asphalt mixture. Our partners at CCPIC will provide an overview of the importance of pavement compaction and an overview of the roles of contractors and agency representatives to maximize the performance of the pavement.
At the California Asphalt Pavement Association (CalAPA) Spring Asphalt Pavement Conference & Equipment Expo held on March 23-24, 2023 in Ontario, Calif., a presentation titled, "Caltrans Pavement Program – Incorporating Innovative and Proven Strategies for Sustainability and Efficiency" was delivered by
Cathrina Barros, P.E., Chief Office of Asphalt Pavements, Caltrans. Learn the latest from Caltrans on how Caltrans will update and publish future Standard books. Also, what changes should industry and agencies anticipate that will significantly change how pavements are constructed and accepted.
BlueScape How to Create a CEQA Air Quality Analysis for Development Projects ...BlueScape
This webinar by James Westbrook, President of BlueScape Environmental, provides an overview of how to create a CEQA Air Quality Analysis. The first section of the webinar discusses when an Air Quality Analysis must be completed under CEQA; project types including construction and operation phases; air pollutant emission sources and applicable CEQA significance thresholds; how to construct a conservative analysis while filling in assumption “holes;” review of project alternatives and mitigation requirements; the role of air agencies in CEQA review and relationship to other actions such as air permitting; special analysis cases; and strategies to work with agencies and the public throughout the air quality impact review process. The webinar is presented from the standpoint of CEQA air quality guidelines provided by the South Coast Air Quality Management District (SCAQMD).
The second part of the webinar presents a technical discussion on methods and tools used to complete air quality studies, including CalEEMod emission modeling software, CARB EMFAC and OFFROAD databases, and AERMOD and HARP2 impact modeling software. A case example for completing an air quality study for a commercial development using CalEEMod is presented.
James Westbrook can be reached at training@bluescapeinc.com or 877-486-9257. Please contact us for questions and support for how to create a CEQA Air Quality Analysis.
Presentation on Environmental Product Declarations (EPDs) delivered "virtually" by Chait Bhat, Ph.D., of the Asphalt Institute at the CalAPA EPD workshop on Oct. 25, 2023 in Sacramento.
BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13BlueScape
This webinar by James Westbrook at BlueScape describes the air permitting process for energy projects, from early planning and technical feasibility review to application submittal and permit negotiation. The webinar presents tips to avoid delays and move quickly, save money, and address issues and hurdles that can impact the project. Issues such as emission limits and BACT emission controls, offsets, Title V permitting, and modeling impacts are discussed. The presenter provides tips on how to conduct the permitting process to be successful, and maximize operational flexibility. Mr. Westbrook can be reached at 858-774-2009 for more information. For a video presentation go to youtube.com/watch?v=AB84GQORp2w. Also see www.bluescapeinc.com.
Coal Combustion Residuals: Understanding the Final Rule and Next Steps for El...ScottMadden, Inc.
In April 2015, the U.S. Environmental Protection Agency published its final coal combustion residuals (CCR) rule. The rule regulates the disposal of CCR from active electric generating units as nonhazardous waste by establishing minimal national criteria for landfills and surface impoundments. This rule becomes effective as owners and operators have historically lacked rigorous management of CCR sites. This white paper outlines a programmatic approach to build an effective compliance strategy and organizational capabilities to ensure proper and effective management of CCR sites.
For more information, please visit www.scottmadden.com.
At the California Asphalt Pavement Association (CalAPA) Spring Asphalt Pavement Conference & Equipment Expo held on March 23-24, 2023 in Ontario, Calif., a presentation titled, "Compaction of Asphalt Pavements" was delivered by John Harvey, PhD, Director – City and County Pavement Improvement Center (CCPIC).
Pavement performance requires a proper compaction of the asphalt mixture. Our partners at CCPIC will provide an overview of the importance of pavement compaction and an overview of the roles of contractors and agency representatives to maximize the performance of the pavement.
2. SAFETY Projects
• As part of a follow-up for PM2 felt side coating
filter safety issue investigated possible causes
for resin build-up on PM2 filters
• Performed the Annual DOLPHIN chemical
audit for Material Prep and QA
3. Resin Build-up on PM2
• Investigated build-
up of resin on PM2
filter as a response
to recent back
injury
• Collected samples
of sub coat daily to
take readings on pH
and viscosity in
order to create a
base line data
4. Resin Build-up on PM2
• Created updating graphs that show pH and
viscosity over time
0
100
200
300
400
500
600
700
800
900
1000
5/30/2016 6/9/2016 6/19/2016 6/29/2016 7/9/2016 7/19/2016 7/29/2016 8/8/2016
Viscosity(cP)
Date
Loop Coating Viscosity
*Samples from PM2 Feltside Tank
*Red means build-up was
seen
5. Resin Build-up on PM2
5
5.5
6
6.5
7
7.5
8
8.5
5/30/2016 6/9/2016 6/19/2016 6/29/2016 7/9/2016 7/19/2016 7/29/2016 8/8/2016
pH
Date
Loop Coating pH
*Red means build-up was seen
*Samples from PM2 Feltside Tank
6. Resin Build-up on PM2
• Collected samples of sub-coat and resin on
day when there was build-up and sent to
Appleton for testing
FS Loop Sub-Coat Resin Build-Up Sample FS Return Sub-Coat
7. Dolphin Chemical Audit
• Investigated list of chemicals in question to
see if they were still used
• Initially 83 chemicals were unknown in
Material Prep and 11 were unknown in QA
8. Dolphin Chemical Audit
• After the investigation was complete, Matt and I had
ascertained information on all of the chemicals in
QA and 64 of the chemicals on the Material Prep list.
• List was then sent to Johnna Fries so chemicals could
be updated in DOLPHIN with SDSs or archived
9. QUALITY Projects
• Lead Kaizen to reduce/eliminate Roll
Mislabeling Complaints and Non-
Conformances
• Developed a Roll Quality Vertical Audit
Process
• Helped with Development of a Finished Roll
Quality/Splice Audit
• Worked to loosen the 20% Curl Reject Limit
for MM 4781 on PM3 and PM2
10. Kaizen for Stamping/Labeling
• Learned what a Kaizen
entailed from the CI
Department
• Investigated Non-
Conformances from the
last year about stamping
and labeling
• Learned how incredibly
valuable operator input
was as they helped
identify problems I would
have never seen
11. Kaizen for Stamping/Labeling
• At the Kaizen the root causes of the
Stamping/Labeling issue were identified
• Created a list of countermeasures to
reduce/eliminate the issue
– These included roll audits, creating SOP for roll
labeling, applying all CB roll labels at Head roll
station, informing operators on customer
complaints and NCs, and highlighting roll position
on belly tags
– Weekly meetings to monitor progress
12. Roll Quality Vertical Audit
• Creation of the Roll
Quality Vertical Audit
began with the idea of
raising awareness about
our current specs
• Then the major issues
were identified in order
to create an audit sheet
13. Roll Quality Vertical Audit
• Implementation of the
Audit involved
numerous trials and
modifications
• Creation of a record
system in order to
monitor progress of
the audit
• Carrying out the audits
themselves
14. Finished Roll Quality Audit
• This audit stemmed from a desire to inspect
splices
• Doug Guise’s old audit was found and
modified to meet new specs
• Audit is currently being trialed
15. Loosen 20% Curl Reject Limit on MM 4781
• Particular grades on
PM3 are seeing a
problem where in order
to get the 50% humidity
curl test to Target the
20% curl is being run in
pre-control
• Decided to focus on
MM 4781 for proposing
the change
16. Loosening 20% Curl Reject Limit
• Pulled data from June
2015 to present to
investigate where
exactly changes need
to be made
• Using histograms
created a proposal for
creating new lower
limits
17. Loosening 20% Curl Reject Limit
• Proposed new 20%
curl lower limits for
MM 4781
• Put in a formal
request for a spec
change
18. Other QUALITY Projects
• Helped monitor 20# Cream Bond to ensure it met
quality requirements
• Established collaborative testing program for
kCoF tester
• Looked into trends for the difference between
the 2 minute and 30 second TI
• Improved TSGs for the QA laboratory equipment
• Created defect books for each Paper Machine and
QA Lab
19. 20# Cream Bond Quality
• Helped investigated complaints by C&J to
determine predicament
• Watched 20# Cream Bond run and inspected
splices during run
20. kCoF Testing Program
• Created to prevent
kCoF test from drifting
• Contacted Ellen
Roberts and involved
Appleton it testing
• Created sheet to
record and compare
test values from both
facilities
• Status-Starting this
month
21. 2 Minute VS. 30 Second TI to Monitor Print
Speed
• Investigated benefit of a graph of the
difference between 2 minute and 30 second TI
• Decided difference graph was redundant if we
have 30 second and 2 minute graphs already
-20
-15
-10
-5
0
5
10
15
18-Sep-14 00:00 27-Dec-14 00:00 06-Apr-15 00:00 15-Jul-15 00:00 23-Oct-15 00:00 31-Jan-16 00:00 10-May-16 00:00 18-Aug-16 00:00
Difference for CB TI: 2 Min Minus 30 Sec
22. Improved TSGs for QA Lab
• Improved TSGs for
– Contact Angle Test
– Ink Penetration Size Test
– Mullen Burst Strength Test
– Stiffness Test
– Caliper Test
– kCoF Test
– Color Touch Test
– Scott Internal Bond Test
23. Defect Books
• Located any remaining defect books
• Filled Defect Books with defect sheets and put
them in proper locations for future use
24. What I Learned
• The importance of Safety
• The value of feedback
• The benefits associated with teamwork
• A understanding of what it is like to work in an
industrial environment