SlideShare a Scribd company logo
1 of 5
Page 1 of 5
CCUURRRRIICCUULLUUMM VVIITTAAEE
HVAC QA/QC INSPECTOR
MOHAMMED ABDUL MUBEEN
S/OABDULWAHEED
HVAC QC at DAELIM JUBAILSAUDIARABIA(SADARACHEM-II)
PHONE NO: 0515242024
E-MAIL: mamubeen18@gmail.com
Seeking an establish career with your progressive company. I am ambitious to work in a challenging
environment, that can promote my abilities through achieving the task in a most qualitative and
accurate manner. With my ample working experience; I am sure that i will overcome any challenges or
problem incurred.
 Having experience more than 7 years as QA/QC Inspector, extensive inspection
experience with multinational companies in oil & gas plants and petrochemical,
power plants and all phases of bulding construction’s projects.
 During the work experience I have developed organizational skills in the computer
field. Having the full confident to handle the job with the help of the team.
 I have developed the communication skills with colleagues, effectiveness in working
under pressure either independently or part of a work team.
Skills:
 Team building skills
 Problem solving skills
 Computer skills including the ability to operate spreadsheet and word processing programs
 Ability to speak the local language
Personal Attributes:
 Be honest and trustworthy
 Be respectful
 Be flexible
Academic Achievement:
 3 years Diploma in Mechanical Engineering
 DIPLOMA in Non Destructive Testing LEVEL 11(RT, UT, MT, PT)
 DIPLOMA in Auto CAD 2008 (Level 1, Level 11, Level 111)
Page 2 of 5
Computer Achievement:
 Diploma in AutoCAD
 MS Office (MS-Word, MS-Excel, MS-Power Point)
Summary of Experience:
Company : DAELIM CONSTRUCTIONS
Client : SAUDI ARAMCO DOWARABIA. (SADARA)
Project : SADARA CHEM-II JUBAIL
Position : QC Inspector for HVAC
Duration : Since SEPTEMBER2013 to Till Date.
Company : Select Engineers PVT LTD
Project : Villa Projects.
Position : QC Inspector for HVAC, Plumbing, Piping.
Duration : March 2011 to June 2013
Company : Fluidteq Systems pvt ltd.
Project : High rise towers projects.
Position : Mechanical QC (HVAC /Mechanical/Piping)
Duration : December 2007 to November 2011
Page 3 of 5
HVAC job responsibilities:
As an HVAC QA/QC Inspector, i must be familiarized withthe ITP and checklists to be apply
during the raising RFI to the QCP
 Understand clearly the HVAC system drawing of the project.
 Checked and understand the HVAC equipment schedule plan, to know the equipment
specification and identification of location where to be install.
 During the receiving inspection RFI must be checkedthe documents like approved P.O,Delivery
note,certificatefrom the vendor of quality test, vendor approval and carefully checkthe equipment
from any damage during the transport delivery or factory damage.
 All Saudi Aramco project, HVAC installation must be followedthe nfa-90 (installation of Air
conditioning system, nfa-70 (national electric code) all HVAC equipment must be properly grounded
smacna-1995 (ductconstruction standards).
Coordinate to the construction site engineer before the inspection and reporting directly
to the QA/QC Manager.
 Review of approved drawings & specifications as per the company standards prior to any inspection
activity as to ensure any reworkactivity.
 Co ordinate weeakly with all disciplnes to avoid any discrepancies during construction activities.
 Surveillance at site daily, monitoring the constructionactivities as per the standards, detail
drawings,specifications and standards.
 Inspection of duct leakages are done by Light or Smoke test.
Fire dampers
Fire dampers reciving inspection as per project requirements
Motorized & curtain typefire dampers
Installation inspections of fire dampers
Battery room requirements.
 Exhaustfan
Material receiving inspection
Handling, storage and preservation inspection (weekly inspection)
Exhaust and supply fan installation inspection
Battery room HVAC requirements inspection
Essential operating facilities HVAC requirements inspection
Pressurized building HVAC requirements inspection
Communication facilities HVAC requirements inspection
Air moving /cooling equipment duct /pipe connection inspection
 AirhandlingUnit(AHU)
AHU receiving inspection
handling, storage and preservation inspection (weekly inspection)
Air moving /cooling equipment duct /pipe connection inspection
essential operating facilities HVAC requirements inspection
pressurized building HVAC requirements inspection
communication facilities HVAC requirements inspection
battery room HVAC requirements inspection
Page 4 of 5
 HVAC metal Ductsystem
Duct hangers and supports, metal ducts, duct insulation, duct accessories, Air terminal devices&
flexible connector,fire damper receiving inspection
Handling, storage and preservation inspection (weekly inspection)
Duct hangers and supports ,metal duct ,grease duct (serving type l hood or as Applicable
inspection)duct insulation, duct accessories Air terminal devices & flexible connector, fire damper
installation inspection.
Fire damper functionaltest
 Chilledwaterpiping
Piping receiving inspection
Chilled water piping layout and support installation inspection
Chilled water piping two-way and three way controlarrangement inspection
Chilled water piping hydro test inspection
Chilled water pipe insulation inspection
 Chilledwatersystem(chillerunit& chillerpumps)
Chilled water system components, chilled water pumps receiving inspection
Chilled water system components, chilled water pumps, handling, storage and preservation inspection
(weekly inspection)
Chilled water system components installation inspection
Chilled water pumps installation & alignment inspection
Chilled water system treatment
System testing, adjusting and balancing (tab)
 PackagedAirconditioningunit(PACU)system
PACU receiving inspection
Handling, storage and preservation inspection (weekly inspection)
Essential operating facilities HVAC requirements inspection
Pressurized building HVAC requirements inspection
Communication facilities HVAC requirements inspection
Battery room HVAC requirements inspection
Air moving /cooling equipment duct /pipe connection inspection
Condensate drain lay-outinspection
 Refrigerantpiping
Refrigerant piping receiving inspection
Air moving/cooling valveand apparatus arrangement installation Inspection
Refrigerant piping pressure test
Refrigerant piping vacuum testing
Pipe insulation inspection
 Airfiltrationdevicesand greasefilter
Filter receiving inspection
Filter handling, storage and preservation inspection (weekly inspection)
Pre-filter and final filter installation inspection
Chemical filter, grease filter installation inspection (if notified)
 Wall and window-mountedAirconditioners
Wall or window mounted Air conditioner material receiving inspection
Wall or window mounted Air conditioner handling, storage and Preservation inspection (weekly inspection)
Page 5 of 5
 A/C splitsystems –directexpansion(dx)type
Air cooledcondenser ,fan coil,receiving inspection
Air cooledcondenser, fan coil, handling, storage and preservation Inspection (weekly inspection)
Essential operating facilities HVAC requirements inspection
Pressurized building HVAC requirements inspection
Communication facilities HVAC requirements inspection
Battery room HVAC requirements inspection
Air moving /cooling equipment duct /pipe connection inspection
Condensate drain lay-outinspection
System testing ,adjusting and balancing (tab)
 (TAB)of HVAC systems
conductHVAC system testing, adjusting and balancing
HVAC system testing ,adjusting and balancing report
final inspection of HVAC system
PPeerrssoonnaall IInnffoorrmmaattiioonn::
 Nationality - Indian
 Marital Status - Single
 Language Known - English, Arabic, Hindi and other Indian language
 Religion - Muslim
 Date of Birth - 03/10/1985
I have self-confidence in my duty and I can assure you that if I have given an opportunity to prove my
abilities and always will assist for the growth of the organization.
Anticipating you find me eligible to offer my service to your esteemed organization.
Thanking you,
MOHAMMED ABDUL MUBEEN

More Related Content

What's hot

Validation of Heat ventilation air conditioning
Validation of Heat ventilation air conditioningValidation of Heat ventilation air conditioning
Validation of Heat ventilation air conditioningPrashant Tomar
 
Staying Ahead of the Audit Curve with Food Industry Process Audits
Staying Ahead of the Audit Curve with Food Industry Process AuditsStaying Ahead of the Audit Curve with Food Industry Process Audits
Staying Ahead of the Audit Curve with Food Industry Process AuditsAlchemy Systems
 
iso 9001 2008 Downstairs QC 9-2-15
iso 9001 2008 Downstairs QC  9-2-15 iso 9001 2008 Downstairs QC  9-2-15
iso 9001 2008 Downstairs QC 9-2-15 MICHAEL MORGAN
 
Michael Keeney--Resume2015-A
Michael Keeney--Resume2015-AMichael Keeney--Resume2015-A
Michael Keeney--Resume2015-AMichael Keeney
 
Quartz kitchen countertops quality control of gelandy
Quartz kitchen countertops quality control of gelandyQuartz kitchen countertops quality control of gelandy
Quartz kitchen countertops quality control of gelandyZu Hong Lee
 
Qualification of manufacturing equipment.
Qualification of manufacturing equipment.Qualification of manufacturing equipment.
Qualification of manufacturing equipment.KhushbooKunkulol
 
Validation of water
Validation of waterValidation of water
Validation of wateranilak123
 
Validation & calibration in pharma (M shahzad (PAKISTAN) 03325637049)
Validation & calibration in pharma (M shahzad (PAKISTAN) 03325637049)Validation & calibration in pharma (M shahzad (PAKISTAN) 03325637049)
Validation & calibration in pharma (M shahzad (PAKISTAN) 03325637049)Muhammad Shahzad
 
QA,QC INSPECTOR ANANDA RAM PRASATH.V RESUME
QA,QC INSPECTOR ANANDA RAM PRASATH.V RESUMEQA,QC INSPECTOR ANANDA RAM PRASATH.V RESUME
QA,QC INSPECTOR ANANDA RAM PRASATH.V RESUMEAnanda Ram Prasath
 
Support utilities validation.pptx (asmita magare)
Support utilities validation.pptx (asmita magare)Support utilities validation.pptx (asmita magare)
Support utilities validation.pptx (asmita magare)magareasmi
 
Sop Process validation protocol execution
Sop Process validation protocol executionSop Process validation protocol execution
Sop Process validation protocol executionanjali suhag
 
ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...
ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...
ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...Mark Mitchell
 

What's hot (20)

Validation of Heat ventilation air conditioning
Validation of Heat ventilation air conditioningValidation of Heat ventilation air conditioning
Validation of Heat ventilation air conditioning
 
Validation of hvac system
Validation of hvac systemValidation of hvac system
Validation of hvac system
 
Hvac manpreet singh naroo
Hvac  manpreet singh narooHvac  manpreet singh naroo
Hvac manpreet singh naroo
 
Staying Ahead of the Audit Curve with Food Industry Process Audits
Staying Ahead of the Audit Curve with Food Industry Process AuditsStaying Ahead of the Audit Curve with Food Industry Process Audits
Staying Ahead of the Audit Curve with Food Industry Process Audits
 
iso 9001 2008 Downstairs QC 9-2-15
iso 9001 2008 Downstairs QC  9-2-15 iso 9001 2008 Downstairs QC  9-2-15
iso 9001 2008 Downstairs QC 9-2-15
 
Statistical Pay Factors in California highway construction
Statistical Pay Factors in California highway constructionStatistical Pay Factors in California highway construction
Statistical Pay Factors in California highway construction
 
Michael Keeney--Resume2015-A
Michael Keeney--Resume2015-AMichael Keeney--Resume2015-A
Michael Keeney--Resume2015-A
 
Quartz kitchen countertops quality control of gelandy
Quartz kitchen countertops quality control of gelandyQuartz kitchen countertops quality control of gelandy
Quartz kitchen countertops quality control of gelandy
 
Ampule filling and_sealing_machine
Ampule filling and_sealing_machineAmpule filling and_sealing_machine
Ampule filling and_sealing_machine
 
Equipment validation of tablet compression ( machine)
Equipment validation of tablet compression ( machine)Equipment validation of tablet compression ( machine)
Equipment validation of tablet compression ( machine)
 
Qualification of manufacturing equipment.
Qualification of manufacturing equipment.Qualification of manufacturing equipment.
Qualification of manufacturing equipment.
 
Validation of water
Validation of waterValidation of water
Validation of water
 
Validation & calibration in pharma (M shahzad (PAKISTAN) 03325637049)
Validation & calibration in pharma (M shahzad (PAKISTAN) 03325637049)Validation & calibration in pharma (M shahzad (PAKISTAN) 03325637049)
Validation & calibration in pharma (M shahzad (PAKISTAN) 03325637049)
 
QA,QC INSPECTOR ANANDA RAM PRASATH.V RESUME
QA,QC INSPECTOR ANANDA RAM PRASATH.V RESUMEQA,QC INSPECTOR ANANDA RAM PRASATH.V RESUME
QA,QC INSPECTOR ANANDA RAM PRASATH.V RESUME
 
Support utilities validation.pptx (asmita magare)
Support utilities validation.pptx (asmita magare)Support utilities validation.pptx (asmita magare)
Support utilities validation.pptx (asmita magare)
 
Sop Process validation protocol execution
Sop Process validation protocol executionSop Process validation protocol execution
Sop Process validation protocol execution
 
Ganesan Plant Inspector_CV
Ganesan Plant Inspector_CVGanesan Plant Inspector_CV
Ganesan Plant Inspector_CV
 
ANAND CV
ANAND CVANAND CV
ANAND CV
 
Ikram _CV.
Ikram _CV.Ikram _CV.
Ikram _CV.
 
ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...
ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...
ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...
 

Viewers also liked

Goodmorning
GoodmorningGoodmorning
Goodmorningsabia31
 
Cosmology Group Presentation at York University
Cosmology Group Presentation at York UniversityCosmology Group Presentation at York University
Cosmology Group Presentation at York UniversityIkjyot Singh Kohli
 
20144221415 neuro pedagogia
20144221415 neuro pedagogia20144221415 neuro pedagogia
20144221415 neuro pedagogiamosansar
 
курс «історія середніх віків»
курс «історія середніх віків»курс «історія середніх віків»
курс «історія середніх віків»kusov
 
Ebook perancis animalia production
Ebook perancis animalia productionEbook perancis animalia production
Ebook perancis animalia productionDiniizzatiamalia23
 
Pràctica moviment dun cotxe
Pràctica moviment dun cotxePràctica moviment dun cotxe
Pràctica moviment dun cotxemosansar
 
LA MATÈRIA
LA MATÈRIALA MATÈRIA
LA MATÈRIAmosansar
 
MY PROFILE(FILEminimizer)(FILEminimizer)
MY PROFILE(FILEminimizer)(FILEminimizer)MY PROFILE(FILEminimizer)(FILEminimizer)
MY PROFILE(FILEminimizer)(FILEminimizer)yamen darwish
 
Guide for Dota 2
Guide for Dota 2 Guide for Dota 2
Guide for Dota 2 kvak333
 
Yhteiskunnallinen yritys - ratkaisu 2000-luvun haasteisiin, TEM julkaisu
Yhteiskunnallinen yritys - ratkaisu 2000-luvun haasteisiin, TEM julkaisuYhteiskunnallinen yritys - ratkaisu 2000-luvun haasteisiin, TEM julkaisu
Yhteiskunnallinen yritys - ratkaisu 2000-luvun haasteisiin, TEM julkaisuUusia Network Oy
 

Viewers also liked (16)

Zeg het met beelden
Zeg het met beeldenZeg het met beelden
Zeg het met beelden
 
CVclaversiegb7
CVclaversiegb7CVclaversiegb7
CVclaversiegb7
 
Goodmorning
GoodmorningGoodmorning
Goodmorning
 
Diff formula with audio1
Diff formula with audio1Diff formula with audio1
Diff formula with audio1
 
Cosmology Group Presentation at York University
Cosmology Group Presentation at York UniversityCosmology Group Presentation at York University
Cosmology Group Presentation at York University
 
20144221415 neuro pedagogia
20144221415 neuro pedagogia20144221415 neuro pedagogia
20144221415 neuro pedagogia
 
курс «історія середніх віків»
курс «історія середніх віків»курс «історія середніх віків»
курс «історія середніх віків»
 
Ebook perancis animalia production
Ebook perancis animalia productionEbook perancis animalia production
Ebook perancis animalia production
 
Presentation1
Presentation1Presentation1
Presentation1
 
La força
La forçaLa força
La força
 
Pràctica moviment dun cotxe
Pràctica moviment dun cotxePràctica moviment dun cotxe
Pràctica moviment dun cotxe
 
LA MATÈRIA
LA MATÈRIALA MATÈRIA
LA MATÈRIA
 
MY PROFILE(FILEminimizer)(FILEminimizer)
MY PROFILE(FILEminimizer)(FILEminimizer)MY PROFILE(FILEminimizer)(FILEminimizer)
MY PROFILE(FILEminimizer)(FILEminimizer)
 
Guide for Dota 2
Guide for Dota 2 Guide for Dota 2
Guide for Dota 2
 
Agriculture advances
Agriculture advances Agriculture advances
Agriculture advances
 
Yhteiskunnallinen yritys - ratkaisu 2000-luvun haasteisiin, TEM julkaisu
Yhteiskunnallinen yritys - ratkaisu 2000-luvun haasteisiin, TEM julkaisuYhteiskunnallinen yritys - ratkaisu 2000-luvun haasteisiin, TEM julkaisu
Yhteiskunnallinen yritys - ratkaisu 2000-luvun haasteisiin, TEM julkaisu
 

Similar to hvac new cv mubeen

INSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTORINSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTORRegu Mkc
 
Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)MUHAMMAD ASIF
 
E&I QA QC SUPERVISOR....ORGINAL 2
E&I QA QC  SUPERVISOR....ORGINAL 2E&I QA QC  SUPERVISOR....ORGINAL 2
E&I QA QC SUPERVISOR....ORGINAL 2mohammad tanweer
 
MD.NAFISUL HAQUE_original
MD.NAFISUL HAQUE_originalMD.NAFISUL HAQUE_original
MD.NAFISUL HAQUE_originalM.Nafis Haque
 
Jaynt singh (cv) (1)
Jaynt singh (cv) (1)Jaynt singh (cv) (1)
Jaynt singh (cv) (1)Jayant Singh
 
Work breakdown structure & project life cycle
Work breakdown structure & project life cycleWork breakdown structure & project life cycle
Work breakdown structure & project life cycleSayandeep Dasgupta
 
QA/QC INSPECTION ENGINEER
QA/QC INSPECTION ENGINEERQA/QC INSPECTION ENGINEER
QA/QC INSPECTION ENGINEERMOHAMMED ZUBAIR
 
sonu jaiswal resume 17.02.2017
sonu jaiswal resume  17.02.2017sonu jaiswal resume  17.02.2017
sonu jaiswal resume 17.02.2017sonu jaiswal
 
Resume of QA QC-Welding Engineer with 5+ years of exp
Resume of QA QC-Welding Engineer with 5+ years of expResume of QA QC-Welding Engineer with 5+ years of exp
Resume of QA QC-Welding Engineer with 5+ years of expVijay Raghavan
 
Saif Ali_original
Saif Ali_originalSaif Ali_original
Saif Ali_originalSaif Ali
 
CV Instrument Control Inspector QAQC
CV Instrument Control Inspector  QAQC CV Instrument Control Inspector  QAQC
CV Instrument Control Inspector QAQC Firoz Mohammad
 
QAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORQAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORMurugan Pillai
 
20200923 inside metal am webinar_laborelec
20200923 inside metal am webinar_laborelec20200923 inside metal am webinar_laborelec
20200923 inside metal am webinar_laborelecSirris
 

Similar to hvac new cv mubeen (20)

INSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTORINSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTOR
 
Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)
 
MOHD JAMAL AKTAR QA/QC
MOHD JAMAL AKTAR QA/QCMOHD JAMAL AKTAR QA/QC
MOHD JAMAL AKTAR QA/QC
 
E&I QA QC SUPERVISOR....ORGINAL 2
E&I QA QC  SUPERVISOR....ORGINAL 2E&I QA QC  SUPERVISOR....ORGINAL 2
E&I QA QC SUPERVISOR....ORGINAL 2
 
Resume_Inst. QC_Hasnat
Resume_Inst. QC_HasnatResume_Inst. QC_Hasnat
Resume_Inst. QC_Hasnat
 
MD.NAFISUL HAQUE_original
MD.NAFISUL HAQUE_originalMD.NAFISUL HAQUE_original
MD.NAFISUL HAQUE_original
 
Jaynt singh (cv) (1)
Jaynt singh (cv) (1)Jaynt singh (cv) (1)
Jaynt singh (cv) (1)
 
Work breakdown structure & project life cycle
Work breakdown structure & project life cycleWork breakdown structure & project life cycle
Work breakdown structure & project life cycle
 
QA/QC INSPECTION ENGINEER
QA/QC INSPECTION ENGINEERQA/QC INSPECTION ENGINEER
QA/QC INSPECTION ENGINEER
 
sonu jaiswal resume 17.02.2017
sonu jaiswal resume  17.02.2017sonu jaiswal resume  17.02.2017
sonu jaiswal resume 17.02.2017
 
PPT-on-false-air.ppt
PPT-on-false-air.pptPPT-on-false-air.ppt
PPT-on-false-air.ppt
 
Resume of QA QC-Welding Engineer with 5+ years of exp
Resume of QA QC-Welding Engineer with 5+ years of expResume of QA QC-Welding Engineer with 5+ years of exp
Resume of QA QC-Welding Engineer with 5+ years of exp
 
M Imran
M ImranM Imran
M Imran
 
Saif Ali_original
Saif Ali_originalSaif Ali_original
Saif Ali_original
 
CV Instrument Control Inspector QAQC
CV Instrument Control Inspector  QAQC CV Instrument Control Inspector  QAQC
CV Instrument Control Inspector QAQC
 
QAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORQAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTOR
 
G Butler - CV 2016
G Butler - CV 2016G Butler - CV 2016
G Butler - CV 2016
 
CV_Suhail
CV_SuhailCV_Suhail
CV_Suhail
 
CV - Prasath.V.R
CV - Prasath.V.RCV - Prasath.V.R
CV - Prasath.V.R
 
20200923 inside metal am webinar_laborelec
20200923 inside metal am webinar_laborelec20200923 inside metal am webinar_laborelec
20200923 inside metal am webinar_laborelec
 

hvac new cv mubeen

  • 1. Page 1 of 5 CCUURRRRIICCUULLUUMM VVIITTAAEE HVAC QA/QC INSPECTOR MOHAMMED ABDUL MUBEEN S/OABDULWAHEED HVAC QC at DAELIM JUBAILSAUDIARABIA(SADARACHEM-II) PHONE NO: 0515242024 E-MAIL: mamubeen18@gmail.com Seeking an establish career with your progressive company. I am ambitious to work in a challenging environment, that can promote my abilities through achieving the task in a most qualitative and accurate manner. With my ample working experience; I am sure that i will overcome any challenges or problem incurred.  Having experience more than 7 years as QA/QC Inspector, extensive inspection experience with multinational companies in oil & gas plants and petrochemical, power plants and all phases of bulding construction’s projects.  During the work experience I have developed organizational skills in the computer field. Having the full confident to handle the job with the help of the team.  I have developed the communication skills with colleagues, effectiveness in working under pressure either independently or part of a work team. Skills:  Team building skills  Problem solving skills  Computer skills including the ability to operate spreadsheet and word processing programs  Ability to speak the local language Personal Attributes:  Be honest and trustworthy  Be respectful  Be flexible Academic Achievement:  3 years Diploma in Mechanical Engineering  DIPLOMA in Non Destructive Testing LEVEL 11(RT, UT, MT, PT)  DIPLOMA in Auto CAD 2008 (Level 1, Level 11, Level 111)
  • 2. Page 2 of 5 Computer Achievement:  Diploma in AutoCAD  MS Office (MS-Word, MS-Excel, MS-Power Point) Summary of Experience: Company : DAELIM CONSTRUCTIONS Client : SAUDI ARAMCO DOWARABIA. (SADARA) Project : SADARA CHEM-II JUBAIL Position : QC Inspector for HVAC Duration : Since SEPTEMBER2013 to Till Date. Company : Select Engineers PVT LTD Project : Villa Projects. Position : QC Inspector for HVAC, Plumbing, Piping. Duration : March 2011 to June 2013 Company : Fluidteq Systems pvt ltd. Project : High rise towers projects. Position : Mechanical QC (HVAC /Mechanical/Piping) Duration : December 2007 to November 2011
  • 3. Page 3 of 5 HVAC job responsibilities: As an HVAC QA/QC Inspector, i must be familiarized withthe ITP and checklists to be apply during the raising RFI to the QCP  Understand clearly the HVAC system drawing of the project.  Checked and understand the HVAC equipment schedule plan, to know the equipment specification and identification of location where to be install.  During the receiving inspection RFI must be checkedthe documents like approved P.O,Delivery note,certificatefrom the vendor of quality test, vendor approval and carefully checkthe equipment from any damage during the transport delivery or factory damage.  All Saudi Aramco project, HVAC installation must be followedthe nfa-90 (installation of Air conditioning system, nfa-70 (national electric code) all HVAC equipment must be properly grounded smacna-1995 (ductconstruction standards). Coordinate to the construction site engineer before the inspection and reporting directly to the QA/QC Manager.  Review of approved drawings & specifications as per the company standards prior to any inspection activity as to ensure any reworkactivity.  Co ordinate weeakly with all disciplnes to avoid any discrepancies during construction activities.  Surveillance at site daily, monitoring the constructionactivities as per the standards, detail drawings,specifications and standards.  Inspection of duct leakages are done by Light or Smoke test. Fire dampers Fire dampers reciving inspection as per project requirements Motorized & curtain typefire dampers Installation inspections of fire dampers Battery room requirements.  Exhaustfan Material receiving inspection Handling, storage and preservation inspection (weekly inspection) Exhaust and supply fan installation inspection Battery room HVAC requirements inspection Essential operating facilities HVAC requirements inspection Pressurized building HVAC requirements inspection Communication facilities HVAC requirements inspection Air moving /cooling equipment duct /pipe connection inspection  AirhandlingUnit(AHU) AHU receiving inspection handling, storage and preservation inspection (weekly inspection) Air moving /cooling equipment duct /pipe connection inspection essential operating facilities HVAC requirements inspection pressurized building HVAC requirements inspection communication facilities HVAC requirements inspection battery room HVAC requirements inspection
  • 4. Page 4 of 5  HVAC metal Ductsystem Duct hangers and supports, metal ducts, duct insulation, duct accessories, Air terminal devices& flexible connector,fire damper receiving inspection Handling, storage and preservation inspection (weekly inspection) Duct hangers and supports ,metal duct ,grease duct (serving type l hood or as Applicable inspection)duct insulation, duct accessories Air terminal devices & flexible connector, fire damper installation inspection. Fire damper functionaltest  Chilledwaterpiping Piping receiving inspection Chilled water piping layout and support installation inspection Chilled water piping two-way and three way controlarrangement inspection Chilled water piping hydro test inspection Chilled water pipe insulation inspection  Chilledwatersystem(chillerunit& chillerpumps) Chilled water system components, chilled water pumps receiving inspection Chilled water system components, chilled water pumps, handling, storage and preservation inspection (weekly inspection) Chilled water system components installation inspection Chilled water pumps installation & alignment inspection Chilled water system treatment System testing, adjusting and balancing (tab)  PackagedAirconditioningunit(PACU)system PACU receiving inspection Handling, storage and preservation inspection (weekly inspection) Essential operating facilities HVAC requirements inspection Pressurized building HVAC requirements inspection Communication facilities HVAC requirements inspection Battery room HVAC requirements inspection Air moving /cooling equipment duct /pipe connection inspection Condensate drain lay-outinspection  Refrigerantpiping Refrigerant piping receiving inspection Air moving/cooling valveand apparatus arrangement installation Inspection Refrigerant piping pressure test Refrigerant piping vacuum testing Pipe insulation inspection  Airfiltrationdevicesand greasefilter Filter receiving inspection Filter handling, storage and preservation inspection (weekly inspection) Pre-filter and final filter installation inspection Chemical filter, grease filter installation inspection (if notified)  Wall and window-mountedAirconditioners Wall or window mounted Air conditioner material receiving inspection Wall or window mounted Air conditioner handling, storage and Preservation inspection (weekly inspection)
  • 5. Page 5 of 5  A/C splitsystems –directexpansion(dx)type Air cooledcondenser ,fan coil,receiving inspection Air cooledcondenser, fan coil, handling, storage and preservation Inspection (weekly inspection) Essential operating facilities HVAC requirements inspection Pressurized building HVAC requirements inspection Communication facilities HVAC requirements inspection Battery room HVAC requirements inspection Air moving /cooling equipment duct /pipe connection inspection Condensate drain lay-outinspection System testing ,adjusting and balancing (tab)  (TAB)of HVAC systems conductHVAC system testing, adjusting and balancing HVAC system testing ,adjusting and balancing report final inspection of HVAC system PPeerrssoonnaall IInnffoorrmmaattiioonn::  Nationality - Indian  Marital Status - Single  Language Known - English, Arabic, Hindi and other Indian language  Religion - Muslim  Date of Birth - 03/10/1985 I have self-confidence in my duty and I can assure you that if I have given an opportunity to prove my abilities and always will assist for the growth of the organization. Anticipating you find me eligible to offer my service to your esteemed organization. Thanking you, MOHAMMED ABDUL MUBEEN