1. Page 1 of 5
CCUURRRRIICCUULLUUMM VVIITTAAEE
HVAC QA/QC INSPECTOR
MOHAMMED ABDUL MUBEEN
S/OABDULWAHEED
HVAC QC at DAELIM JUBAILSAUDIARABIA(SADARACHEM-II)
PHONE NO: 0515242024
E-MAIL: mamubeen18@gmail.com
Seeking an establish career with your progressive company. I am ambitious to work in a challenging
environment, that can promote my abilities through achieving the task in a most qualitative and
accurate manner. With my ample working experience; I am sure that i will overcome any challenges or
problem incurred.
Having experience more than 7 years as QA/QC Inspector, extensive inspection
experience with multinational companies in oil & gas plants and petrochemical,
power plants and all phases of bulding construction’s projects.
During the work experience I have developed organizational skills in the computer
field. Having the full confident to handle the job with the help of the team.
I have developed the communication skills with colleagues, effectiveness in working
under pressure either independently or part of a work team.
Skills:
Team building skills
Problem solving skills
Computer skills including the ability to operate spreadsheet and word processing programs
Ability to speak the local language
Personal Attributes:
Be honest and trustworthy
Be respectful
Be flexible
Academic Achievement:
3 years Diploma in Mechanical Engineering
DIPLOMA in Non Destructive Testing LEVEL 11(RT, UT, MT, PT)
DIPLOMA in Auto CAD 2008 (Level 1, Level 11, Level 111)
2. Page 2 of 5
Computer Achievement:
Diploma in AutoCAD
MS Office (MS-Word, MS-Excel, MS-Power Point)
Summary of Experience:
Company : DAELIM CONSTRUCTIONS
Client : SAUDI ARAMCO DOWARABIA. (SADARA)
Project : SADARA CHEM-II JUBAIL
Position : QC Inspector for HVAC
Duration : Since SEPTEMBER2013 to Till Date.
Company : Select Engineers PVT LTD
Project : Villa Projects.
Position : QC Inspector for HVAC, Plumbing, Piping.
Duration : March 2011 to June 2013
Company : Fluidteq Systems pvt ltd.
Project : High rise towers projects.
Position : Mechanical QC (HVAC /Mechanical/Piping)
Duration : December 2007 to November 2011
3. Page 3 of 5
HVAC job responsibilities:
As an HVAC QA/QC Inspector, i must be familiarized withthe ITP and checklists to be apply
during the raising RFI to the QCP
Understand clearly the HVAC system drawing of the project.
Checked and understand the HVAC equipment schedule plan, to know the equipment
specification and identification of location where to be install.
During the receiving inspection RFI must be checkedthe documents like approved P.O,Delivery
note,certificatefrom the vendor of quality test, vendor approval and carefully checkthe equipment
from any damage during the transport delivery or factory damage.
All Saudi Aramco project, HVAC installation must be followedthe nfa-90 (installation of Air
conditioning system, nfa-70 (national electric code) all HVAC equipment must be properly grounded
smacna-1995 (ductconstruction standards).
Coordinate to the construction site engineer before the inspection and reporting directly
to the QA/QC Manager.
Review of approved drawings & specifications as per the company standards prior to any inspection
activity as to ensure any reworkactivity.
Co ordinate weeakly with all disciplnes to avoid any discrepancies during construction activities.
Surveillance at site daily, monitoring the constructionactivities as per the standards, detail
drawings,specifications and standards.
Inspection of duct leakages are done by Light or Smoke test.
Fire dampers
Fire dampers reciving inspection as per project requirements
Motorized & curtain typefire dampers
Installation inspections of fire dampers
Battery room requirements.
Exhaustfan
Material receiving inspection
Handling, storage and preservation inspection (weekly inspection)
Exhaust and supply fan installation inspection
Battery room HVAC requirements inspection
Essential operating facilities HVAC requirements inspection
Pressurized building HVAC requirements inspection
Communication facilities HVAC requirements inspection
Air moving /cooling equipment duct /pipe connection inspection
AirhandlingUnit(AHU)
AHU receiving inspection
handling, storage and preservation inspection (weekly inspection)
Air moving /cooling equipment duct /pipe connection inspection
essential operating facilities HVAC requirements inspection
pressurized building HVAC requirements inspection
communication facilities HVAC requirements inspection
battery room HVAC requirements inspection
4. Page 4 of 5
HVAC metal Ductsystem
Duct hangers and supports, metal ducts, duct insulation, duct accessories, Air terminal devices&
flexible connector,fire damper receiving inspection
Handling, storage and preservation inspection (weekly inspection)
Duct hangers and supports ,metal duct ,grease duct (serving type l hood or as Applicable
inspection)duct insulation, duct accessories Air terminal devices & flexible connector, fire damper
installation inspection.
Fire damper functionaltest
Chilledwaterpiping
Piping receiving inspection
Chilled water piping layout and support installation inspection
Chilled water piping two-way and three way controlarrangement inspection
Chilled water piping hydro test inspection
Chilled water pipe insulation inspection
Chilledwatersystem(chillerunit& chillerpumps)
Chilled water system components, chilled water pumps receiving inspection
Chilled water system components, chilled water pumps, handling, storage and preservation inspection
(weekly inspection)
Chilled water system components installation inspection
Chilled water pumps installation & alignment inspection
Chilled water system treatment
System testing, adjusting and balancing (tab)
PackagedAirconditioningunit(PACU)system
PACU receiving inspection
Handling, storage and preservation inspection (weekly inspection)
Essential operating facilities HVAC requirements inspection
Pressurized building HVAC requirements inspection
Communication facilities HVAC requirements inspection
Battery room HVAC requirements inspection
Air moving /cooling equipment duct /pipe connection inspection
Condensate drain lay-outinspection
Refrigerantpiping
Refrigerant piping receiving inspection
Air moving/cooling valveand apparatus arrangement installation Inspection
Refrigerant piping pressure test
Refrigerant piping vacuum testing
Pipe insulation inspection
Airfiltrationdevicesand greasefilter
Filter receiving inspection
Filter handling, storage and preservation inspection (weekly inspection)
Pre-filter and final filter installation inspection
Chemical filter, grease filter installation inspection (if notified)
Wall and window-mountedAirconditioners
Wall or window mounted Air conditioner material receiving inspection
Wall or window mounted Air conditioner handling, storage and Preservation inspection (weekly inspection)
5. Page 5 of 5
A/C splitsystems –directexpansion(dx)type
Air cooledcondenser ,fan coil,receiving inspection
Air cooledcondenser, fan coil, handling, storage and preservation Inspection (weekly inspection)
Essential operating facilities HVAC requirements inspection
Pressurized building HVAC requirements inspection
Communication facilities HVAC requirements inspection
Battery room HVAC requirements inspection
Air moving /cooling equipment duct /pipe connection inspection
Condensate drain lay-outinspection
System testing ,adjusting and balancing (tab)
(TAB)of HVAC systems
conductHVAC system testing, adjusting and balancing
HVAC system testing ,adjusting and balancing report
final inspection of HVAC system
PPeerrssoonnaall IInnffoorrmmaattiioonn::
Nationality - Indian
Marital Status - Single
Language Known - English, Arabic, Hindi and other Indian language
Religion - Muslim
Date of Birth - 03/10/1985
I have self-confidence in my duty and I can assure you that if I have given an opportunity to prove my
abilities and always will assist for the growth of the organization.
Anticipating you find me eligible to offer my service to your esteemed organization.
Thanking you,
MOHAMMED ABDUL MUBEEN