SlideShare a Scribd company logo
1 of 37
PRESENTATION ON:
PRESENTED BY,
EBEENA
ANCY
NAVYA
ALFIYA
ASWATHY
ARYA KRISHNAN
ANJALI
ARAFA
ATHIRA CHANDRAN
ABHIJITH
ARYA RAVEENDRAN
TOPICS
 INTRODUCTION
 PURPOSE
 IMPORTANT MODELS
 ECONOMIC ORDER QUANTITY (EOQ)
 GRAPH
 INTERPRETATION
 EXAMPLE
 ASSUMPTIONS
 ADVANTAGES
 DISADVANTAGES
 STOCK LEVEL AND TYPES
 SAFETY STOCK
 MINIMUM STOCK LEVEL
 MAXIMUM STOCK LEVEL
 AVERAGE STOCK LEVEL
 DANGER LEVEL
 REORER LEVEL
 STOCK LEVEL PROBLEM
 CONCLUSION
INTRODUCTION
One basic problem of
inventory management is to find
out the order quantity so that it
is most economical from overall operational point of
view. Here that problem lies in minimizing the two
conflicting costs, i.e. ordering cost and inventory
carrying cost.
Inventory models help to find out the order
quantity which minimizes the total costs(sum of
ordering costs and inventory carrying costs).
ORDERING COSTS
Ordering costs are the costs related to the
preparation of a supplier’s order, including the
cost of placing an order, inspection costs,
documentation costs, and others.
Ordering Cost = No. of orders * Ordering cost per unit
CARRYING COST
Carrying cost or Holding cost refers to the
total cost of holding inventory. This includes
warehousing costs such as rent, utilities and
salaries, financial costs such as opportunity cost,
and inventory costs related to perishability,
shrinkage (leakage) and insurance.
Carrying Cost = Avg. Order Quantity * Carrying Cost per Unit
PURPOSE
It helps business in determining the optimum
level of inventories that should be maintained in :
• Production process
• Managing frequency of ordering
• Deciding on quantity of goods or raw materials to
be stored
• Tracking flow of supply of raw materials and
goods to provide uninterrupted service to
customers without any delay in delivery.
IMPORTANT MODELS
INVENTORY MODELS
REORDER
POINT/LEVEL
SAFETY/BUFFER
STOCK
EOQ
ECONOMIC ORDER QUANTITY
(EOQ) MODEL
Economic order quantity (EOQ) is the ideal
order quantity a company should purchase for
its inventory.
EOQ refers to that quantity of materials to be
purchased at one time to optimise the cost
thereon.
This is done to minimize variable inventory
costs.
GRAPH
1. Size of the order increases, the ordering cost
of an item decreases
2. Size of the order increases, the carrying cost
of an item increases
3. Point at which ordering cost is equal to
carrying cost is called EOQ
4. At that intersection point, Total cost is at the
lowest level
INTERPRETATION
EQUATION
EOQ =
𝟐𝑸𝑶
𝑪
Where, Q= Annual Quantity
demanded
O= Ordering Cost per order
C = Carrying Cost per unit
EXAMPLE
The material DX is used uniformly throughout the
year. The data about annual requirement, ordering
cost and holding cost of this material is given
below:
Annual requirement: 2,400 units
Ordering cost: Rs.10 per order
Holding cost: Rs.0.30 per unit
Required: Determine the economic order quantity
(EOQ) of material DX using above data.
SOLUTION
EOQ =
𝟐𝑸𝑶
𝑪
The economic order quantity for material DX is 400 units.
Now, we can compute the number of orders to be placed per year, annual
ordering cost, annual holding cost as follows:
Number of orders per year = Annual demand/EOQ
= 2,400 units/400 units
= 6 orders per year
Ordering cost = Number or orders per year × Cost per order
= 6 orders × Rs.10
= Rs.60
Holding cost = Average units × Holding cost per unit
= (400/2) × 0.3
= Rs.60
ASSUMPTION
• The cost of the ordering remains constant.
• The demand rate for the year is known and evenly spread
throughout the year.
• The lead time is not fluctuating (lead time is the
time between the placement of an order and delivery).
• The purchasing price is constant for every item.
• Carrying cost is based on average inventory.
ADVANTAGES
• EOQ model gives the customized
recommendation regarding the most
economical number of units to order
• Helps to minimize the cost of inventory
• Mathematical approach is more reliable
• The use of formula is useful if you plan to use
computers for calculation purpose
• It provides a baseline for getting the best deal.
DISADVANTAGES
• Manual calculation takes time and also
expensive.
• EOQ is not applicable when demand is not
constant.
• Faulty basic information
• EOQ models are based on assumptions.
STOCK LEVELS OF MATERIALS
• Stock should be low as possible.
• Ensure the availability as and when it required.
• To maintain required level of material in store
at minimum cost , stock levels are fixed for
each item.
STOCK
LEVELS
MINIIMUM STOCK LEVEL
MAXIMUM STOCK LEVEL
AVERAGE STOCK LEVEL
DANGER LEVEL
REORDER STOCK LEVEL
SAFETY STOCK (SS) OR
MINIMUM STOCK LEVEL
• Also known as Buffer stock or Reserve stock.
• Safety stock is an additional quantity of an item
held in inventory in order to reduce the risk that
the item will be out of stock.
• Safety stock acts as a buffer in case the sales of an
item are greater than planned and/or the supplier
is unable to deliver additional units at the
expected time.
• There are additional holding costs associated with
safety stock.
NEED FOR SS
• Safety stock protects against unforeseen
variation in supply and/or demand
• To compensate forecast inaccuracies (only in
case demand is bigger than the forecast)
• Its purpose is to prevent disruptions in
manufacturing or deliveries
• Avoid stock outs to keep customer service and
satisfaction levels high
• Bulk purchase helps in reducing costs.
FORMULA
SAFETY STOCK = (Max. usage rate–Avg. usage rate)*lead time
SAFETY STOCK = REORDER LEVEL – (AVERAGE CONSUMPTION *
AVERAGE REORDER PERIOD)
EXAMPLE
ABC Ltd. is engaged in production of tires. It
purchases rims from DEL Ltd. an external
supplier. DEL Ltd. takes 10 days in
manufacturing and delivering an order. ABC's
requires 10,000 units of rims per year. Its
ordering cost is Rs.1,000 per order and its
carrying costs are Rs.3 per unit per year. The
maximum usage per day could be 50 unit.
Calculate safety stock.
SOLUTION
Maximum daily usage is 50 units (given)
Lead time is 10 days (given)
Average daily usage is 27.4 (10,000 annual
demand ÷ 365 days).
Safety Stock = (50-27.4) × 10 = 226 units
MAXIMUM STOCK LEVEL
• The maximum stock level is the quantity of
material above which the stock of an item
should not normally be allowed to go.
• Fixing this level helps to avoid the costs of
over stocking
MAXIMUM STOCK LEVEL = REORDER
LEVEL + REORDER QUANTITY – (MIN. CONSUMPTION *
MIN. REORDER PERIOD)
AVERAGE STOCK LEVEL
• It shows the average quantity of materials kept
in the store.
• This regarded as the average of maximum and
minimum stock level.
Average Stock Level=(Min. level + Max. level)/2
DANGER LEVEL
• Level set below the minimum stock level.
• Level at which the normal issue of materials
are stopped.
DANGER LEVEL = Average Consumption * Emergency
supply time
REORDER POINT / LEVEL
REORDER POINT
• Reorder Point (ROP), also known as reorder
level or Lead time.
• The point at which the store keeper makes a
fresh request for the purchase
• Generally, it lies between the Max. and Min.
level
FORMULA
• Reorder Point =lead time * Average
Usage + Safety Stock
• Reorder Point =Max. consumption
×Max. reorder period
PROBLEM
From the following data for the last 12 months
compute stock levels for component A.
• Max. usage in a month 300 units
• Min. usage in a month 200 units
• Avg. usage in a month 225 units
• Time lag for procurement of materials:
Max 6months, Min 2months, EOQ 750 Units.
SOLUTION
i. Reorder Level =max. Usage*max. Reorder Period
=300*6 =1800units
ii. Min Stock Level =Reorder Level –(Avg Usage * Avg
Reorder Period)
=1800 –(225*(6+2)/2) =900units
iii. Maximum Stock Level = Reorder Level + Reorder
Quantity – (Min. Consumption * Min. Reorder Period)
=1800+750-(200*2) =2150 Units
iv. Average Stock Level =(min. Level + Max. Level)/2
=900+1/2*750 =1275 Units
CONCLUSION
• In any business, make it big or small, we must understand
that taking good care of our inventory is very important.
• If we as managers do not understand the concept of good
inventory management, we must learn to be familiar with it
and its applications.
• One of the reasons for the failure of a business is its
inventory management. There are many ways to fight
failure, and the aforesaid inventory models can be used for
this.
• A truly effective inventory management system will
minimize the complexities involved in planning, executing
and controlling a supply chain network which is critical to
business success.
INVENTORY MODELS

More Related Content

What's hot

what is Inventory and its classification
what is Inventory and its classificationwhat is Inventory and its classification
what is Inventory and its classificationPriyanka Singh
 
Bullwhip effect ppt
Bullwhip effect pptBullwhip effect ppt
Bullwhip effect pptpulak126
 
material requirement planning
material requirement planningmaterial requirement planning
material requirement planningNaushii Khan
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planningAtif Ghayas
 
Inventory Management - a ppt for PGDM/MBA
Inventory Management - a ppt for PGDM/MBAInventory Management - a ppt for PGDM/MBA
Inventory Management - a ppt for PGDM/MBAAJ Raina
 
types of production system
types of production systemtypes of production system
types of production systemram4181
 
EOQ (Economic Order Quantity)
EOQ (Economic Order Quantity)EOQ (Economic Order Quantity)
EOQ (Economic Order Quantity)Varghesekutty CB
 
Cost associated with inventory
Cost associated with inventoryCost associated with inventory
Cost associated with inventoryDrAnurag Saxena
 
Supply chain drivers
Supply chain driversSupply chain drivers
Supply chain driversAnupam Basu
 
Inventory management
Inventory managementInventory management
Inventory managementsaurabhsabiba
 
MG 6863 UNIT II MAKE OR BUY DECISION
MG 6863 UNIT II MAKE OR BUY DECISIONMG 6863 UNIT II MAKE OR BUY DECISION
MG 6863 UNIT II MAKE OR BUY DECISIONAsha A
 
Inventory management
 Inventory management Inventory management
Inventory managementN M
 
Capacity planning ppt
Capacity planning pptCapacity planning ppt
Capacity planning pptGagan bhati
 
Inventory management
Inventory managementInventory management
Inventory managementRajThakuri
 

What's hot (20)

what is Inventory and its classification
what is Inventory and its classificationwhat is Inventory and its classification
what is Inventory and its classification
 
Inventory Management
Inventory Management Inventory Management
Inventory Management
 
Capacity planning
Capacity planning Capacity planning
Capacity planning
 
Bullwhip effect ppt
Bullwhip effect pptBullwhip effect ppt
Bullwhip effect ppt
 
material requirement planning
material requirement planningmaterial requirement planning
material requirement planning
 
Demand forecasting ppt
Demand forecasting pptDemand forecasting ppt
Demand forecasting ppt
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Inventory Management - a ppt for PGDM/MBA
Inventory Management - a ppt for PGDM/MBAInventory Management - a ppt for PGDM/MBA
Inventory Management - a ppt for PGDM/MBA
 
types of production system
types of production systemtypes of production system
types of production system
 
EOQ (Economic Order Quantity)
EOQ (Economic Order Quantity)EOQ (Economic Order Quantity)
EOQ (Economic Order Quantity)
 
Economies of scale
Economies of scaleEconomies of scale
Economies of scale
 
Facility location
Facility locationFacility location
Facility location
 
Cost associated with inventory
Cost associated with inventoryCost associated with inventory
Cost associated with inventory
 
Supply chain drivers
Supply chain driversSupply chain drivers
Supply chain drivers
 
Inventory management
Inventory managementInventory management
Inventory management
 
SUPPLY CHAIN STRATEGIES
SUPPLY CHAIN STRATEGIESSUPPLY CHAIN STRATEGIES
SUPPLY CHAIN STRATEGIES
 
MG 6863 UNIT II MAKE OR BUY DECISION
MG 6863 UNIT II MAKE OR BUY DECISIONMG 6863 UNIT II MAKE OR BUY DECISION
MG 6863 UNIT II MAKE OR BUY DECISION
 
Inventory management
 Inventory management Inventory management
Inventory management
 
Capacity planning ppt
Capacity planning pptCapacity planning ppt
Capacity planning ppt
 
Inventory management
Inventory managementInventory management
Inventory management
 

Similar to INVENTORY MODELS

Presentaci ã³n 1 eoq
Presentaci ã³n 1 eoqPresentaci ã³n 1 eoq
Presentaci ã³n 1 eoqJavi Dela
 
Inventory-Control-Models.pptx
Inventory-Control-Models.pptxInventory-Control-Models.pptx
Inventory-Control-Models.pptxssuser9cf4e3
 
Inventory models
Inventory modelsInventory models
Inventory modelsJavi Dela
 
Economic order quantity (eoq) model
Economic order quantity (eoq) modelEconomic order quantity (eoq) model
Economic order quantity (eoq) modelleizel altamia
 
Inventory Control and Replacement Analysis
Inventory Control and Replacement Analysis Inventory Control and Replacement Analysis
Inventory Control and Replacement Analysis Priyanshu
 
Inventory Management
Inventory Management Inventory Management
Inventory Management sean186595
 
Materials cost accounting
Materials cost accountingMaterials cost accounting
Materials cost accountingAchal Singhal
 
OM_4.ppt
OM_4.pptOM_4.ppt
OM_4.pptsengar3
 
Inventory control
Inventory controlInventory control
Inventory controlR A Shah
 
Inventory management
Inventory managementInventory management
Inventory managementshrutiairan
 
Bba 3274 qm week 7 inventory models
Bba 3274 qm week 7 inventory modelsBba 3274 qm week 7 inventory models
Bba 3274 qm week 7 inventory modelsStephen Ong
 
eMba ii pmom_unit-3.1 inventory management a
eMba ii pmom_unit-3.1 inventory management aeMba ii pmom_unit-3.1 inventory management a
eMba ii pmom_unit-3.1 inventory management aRai University
 
Inventory management
Inventory managementInventory management
Inventory managementankit@sahgal
 
INVENTORY MANAGEMENT.ppt
INVENTORY MANAGEMENT.pptINVENTORY MANAGEMENT.ppt
INVENTORY MANAGEMENT.pptShanthini28
 

Similar to INVENTORY MODELS (20)

Unit 3-inventory control
Unit 3-inventory controlUnit 3-inventory control
Unit 3-inventory control
 
Inventory control
Inventory controlInventory control
Inventory control
 
Inventory management1
Inventory management1Inventory management1
Inventory management1
 
Presentaci ã³n 1 eoq
Presentaci ã³n 1 eoqPresentaci ã³n 1 eoq
Presentaci ã³n 1 eoq
 
Inventory-Control-Models.pptx
Inventory-Control-Models.pptxInventory-Control-Models.pptx
Inventory-Control-Models.pptx
 
Ops5
Ops5Ops5
Ops5
 
Inventory models
Inventory modelsInventory models
Inventory models
 
Economic order quantity (eoq) model
Economic order quantity (eoq) modelEconomic order quantity (eoq) model
Economic order quantity (eoq) model
 
Inventory Control and Replacement Analysis
Inventory Control and Replacement Analysis Inventory Control and Replacement Analysis
Inventory Control and Replacement Analysis
 
Cycle inventory
Cycle inventoryCycle inventory
Cycle inventory
 
Inventory Management
Inventory Management Inventory Management
Inventory Management
 
Materials cost accounting
Materials cost accountingMaterials cost accounting
Materials cost accounting
 
OM_4.ppt
OM_4.pptOM_4.ppt
OM_4.ppt
 
Inventory control
Inventory controlInventory control
Inventory control
 
Inventory management
Inventory managementInventory management
Inventory management
 
Bba 3274 qm week 7 inventory models
Bba 3274 qm week 7 inventory modelsBba 3274 qm week 7 inventory models
Bba 3274 qm week 7 inventory models
 
eMba ii pmom_unit-3.1 inventory management a
eMba ii pmom_unit-3.1 inventory management aeMba ii pmom_unit-3.1 inventory management a
eMba ii pmom_unit-3.1 inventory management a
 
sunil chopra 1
sunil chopra 1sunil chopra 1
sunil chopra 1
 
Inventory management
Inventory managementInventory management
Inventory management
 
INVENTORY MANAGEMENT.ppt
INVENTORY MANAGEMENT.pptINVENTORY MANAGEMENT.ppt
INVENTORY MANAGEMENT.ppt
 

More from Navya Jayakumar

BREAK EVEN ANALYSIS GRAPH WITH EXPLANATION
BREAK EVEN ANALYSIS GRAPH WITH EXPLANATIONBREAK EVEN ANALYSIS GRAPH WITH EXPLANATION
BREAK EVEN ANALYSIS GRAPH WITH EXPLANATIONNavya Jayakumar
 
SERVICES OFFERED BY NBFC
SERVICES OFFERED BY NBFCSERVICES OFFERED BY NBFC
SERVICES OFFERED BY NBFCNavya Jayakumar
 
DETAILED PROJECT REPORT: STRUCTURE AND SCHEMES
DETAILED PROJECT REPORT: STRUCTURE AND SCHEMESDETAILED PROJECT REPORT: STRUCTURE AND SCHEMES
DETAILED PROJECT REPORT: STRUCTURE AND SCHEMESNavya Jayakumar
 
CORPORATE BOARD COMMITTEES
CORPORATE BOARD COMMITTEESCORPORATE BOARD COMMITTEES
CORPORATE BOARD COMMITTEESNavya Jayakumar
 
FORECASTING TECHNIQUES OR MODELS : BUSINESS ANALYTICS
FORECASTING TECHNIQUES OR MODELS : BUSINESS ANALYTICSFORECASTING TECHNIQUES OR MODELS : BUSINESS ANALYTICS
FORECASTING TECHNIQUES OR MODELS : BUSINESS ANALYTICSNavya Jayakumar
 
INDUSTRIAL SECTOR POLICIES OF INDIA
INDUSTRIAL SECTOR POLICIES OF INDIAINDUSTRIAL SECTOR POLICIES OF INDIA
INDUSTRIAL SECTOR POLICIES OF INDIANavya Jayakumar
 
TOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENTTOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENTNavya Jayakumar
 
NEGOTIABLE INSTRUMENTS E- PURSE TRUNCATION OF CHEQUE
NEGOTIABLE INSTRUMENTS E- PURSE TRUNCATION OF CHEQUENEGOTIABLE INSTRUMENTS E- PURSE TRUNCATION OF CHEQUE
NEGOTIABLE INSTRUMENTS E- PURSE TRUNCATION OF CHEQUENavya Jayakumar
 
STUDY OF PRODUCTION AND PROSPECTS OF EXPORT OF SPICES FROM INDIA
STUDY OF PRODUCTION AND PROSPECTS OF EXPORT OF SPICES FROM INDIA STUDY OF PRODUCTION AND PROSPECTS OF EXPORT OF SPICES FROM INDIA
STUDY OF PRODUCTION AND PROSPECTS OF EXPORT OF SPICES FROM INDIA Navya Jayakumar
 
SAMPLING ; SAMPLING TECHNIQUES – RANDOM SAMPLING (SIMPLE RANDOM SAMPLING)
SAMPLING ; SAMPLING TECHNIQUES – RANDOM SAMPLING  (SIMPLE RANDOM SAMPLING)SAMPLING ; SAMPLING TECHNIQUES – RANDOM SAMPLING  (SIMPLE RANDOM SAMPLING)
SAMPLING ; SAMPLING TECHNIQUES – RANDOM SAMPLING (SIMPLE RANDOM SAMPLING)Navya Jayakumar
 
GENERIC COMPETITIVE STRATEGIES
GENERIC COMPETITIVE  STRATEGIESGENERIC COMPETITIVE  STRATEGIES
GENERIC COMPETITIVE STRATEGIESNavya Jayakumar
 
EXTERNAL COMMERCIAL BORROWINGS
EXTERNAL COMMERCIAL BORROWINGSEXTERNAL COMMERCIAL BORROWINGS
EXTERNAL COMMERCIAL BORROWINGSNavya Jayakumar
 
Payment of bonus act, 1965
Payment of bonus act, 1965Payment of bonus act, 1965
Payment of bonus act, 1965Navya Jayakumar
 
CHANGE, RESISTANCE TO CHANGE, OVERCOME RESISTANCE TO CHANGE
CHANGE, RESISTANCE TO CHANGE, OVERCOME RESISTANCE TO CHANGECHANGE, RESISTANCE TO CHANGE, OVERCOME RESISTANCE TO CHANGE
CHANGE, RESISTANCE TO CHANGE, OVERCOME RESISTANCE TO CHANGENavya Jayakumar
 
Determinants of working capital
Determinants of working capitalDeterminants of working capital
Determinants of working capitalNavya Jayakumar
 

More from Navya Jayakumar (20)

BREAK EVEN ANALYSIS GRAPH WITH EXPLANATION
BREAK EVEN ANALYSIS GRAPH WITH EXPLANATIONBREAK EVEN ANALYSIS GRAPH WITH EXPLANATION
BREAK EVEN ANALYSIS GRAPH WITH EXPLANATION
 
SERVICES OFFERED BY NBFC
SERVICES OFFERED BY NBFCSERVICES OFFERED BY NBFC
SERVICES OFFERED BY NBFC
 
360 DEGREE FEEDBACK
360 DEGREE FEEDBACK360 DEGREE FEEDBACK
360 DEGREE FEEDBACK
 
DETAILED PROJECT REPORT: STRUCTURE AND SCHEMES
DETAILED PROJECT REPORT: STRUCTURE AND SCHEMESDETAILED PROJECT REPORT: STRUCTURE AND SCHEMES
DETAILED PROJECT REPORT: STRUCTURE AND SCHEMES
 
CORPORATE BOARD COMMITTEES
CORPORATE BOARD COMMITTEESCORPORATE BOARD COMMITTEES
CORPORATE BOARD COMMITTEES
 
FORECASTING TECHNIQUES OR MODELS : BUSINESS ANALYTICS
FORECASTING TECHNIQUES OR MODELS : BUSINESS ANALYTICSFORECASTING TECHNIQUES OR MODELS : BUSINESS ANALYTICS
FORECASTING TECHNIQUES OR MODELS : BUSINESS ANALYTICS
 
INDUSTRIAL SECTOR POLICIES OF INDIA
INDUSTRIAL SECTOR POLICIES OF INDIAINDUSTRIAL SECTOR POLICIES OF INDIA
INDUSTRIAL SECTOR POLICIES OF INDIA
 
TOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENTTOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENT
 
COMPENSATION
COMPENSATIONCOMPENSATION
COMPENSATION
 
NEGOTIABLE INSTRUMENTS
NEGOTIABLE INSTRUMENTSNEGOTIABLE INSTRUMENTS
NEGOTIABLE INSTRUMENTS
 
NEGOTIABLE INSTRUMENTS E- PURSE TRUNCATION OF CHEQUE
NEGOTIABLE INSTRUMENTS E- PURSE TRUNCATION OF CHEQUENEGOTIABLE INSTRUMENTS E- PURSE TRUNCATION OF CHEQUE
NEGOTIABLE INSTRUMENTS E- PURSE TRUNCATION OF CHEQUE
 
STUDY OF PRODUCTION AND PROSPECTS OF EXPORT OF SPICES FROM INDIA
STUDY OF PRODUCTION AND PROSPECTS OF EXPORT OF SPICES FROM INDIA STUDY OF PRODUCTION AND PROSPECTS OF EXPORT OF SPICES FROM INDIA
STUDY OF PRODUCTION AND PROSPECTS OF EXPORT OF SPICES FROM INDIA
 
SAMPLING ; SAMPLING TECHNIQUES – RANDOM SAMPLING (SIMPLE RANDOM SAMPLING)
SAMPLING ; SAMPLING TECHNIQUES – RANDOM SAMPLING  (SIMPLE RANDOM SAMPLING)SAMPLING ; SAMPLING TECHNIQUES – RANDOM SAMPLING  (SIMPLE RANDOM SAMPLING)
SAMPLING ; SAMPLING TECHNIQUES – RANDOM SAMPLING (SIMPLE RANDOM SAMPLING)
 
GENERIC COMPETITIVE STRATEGIES
GENERIC COMPETITIVE  STRATEGIESGENERIC COMPETITIVE  STRATEGIES
GENERIC COMPETITIVE STRATEGIES
 
EXTERNAL COMMERCIAL BORROWINGS
EXTERNAL COMMERCIAL BORROWINGSEXTERNAL COMMERCIAL BORROWINGS
EXTERNAL COMMERCIAL BORROWINGS
 
Payment of bonus act, 1965
Payment of bonus act, 1965Payment of bonus act, 1965
Payment of bonus act, 1965
 
CHANGE, RESISTANCE TO CHANGE, OVERCOME RESISTANCE TO CHANGE
CHANGE, RESISTANCE TO CHANGE, OVERCOME RESISTANCE TO CHANGECHANGE, RESISTANCE TO CHANGE, OVERCOME RESISTANCE TO CHANGE
CHANGE, RESISTANCE TO CHANGE, OVERCOME RESISTANCE TO CHANGE
 
NET PRESENT VALUE (NPV)
NET PRESENT VALUE (NPV)NET PRESENT VALUE (NPV)
NET PRESENT VALUE (NPV)
 
New pdt development ppt
New pdt development pptNew pdt development ppt
New pdt development ppt
 
Determinants of working capital
Determinants of working capitalDeterminants of working capital
Determinants of working capital
 

Recently uploaded

Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingCIToolkit
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsCIToolkit
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixCIToolkit
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insightWayne Abrahams
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineeringthomas851723
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchRashtriya Kisan Manch
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sectorthomas851723
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)jennyeacort
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramCIToolkit
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Reviewthomas851723
 
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...AgileNetwork
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentationmintusiprd
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Roomdivyansh0kumar0
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentationcraig524401
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证jdkhjh
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Nehwal
 

Recently uploaded (17)

Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield Metrics
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insight
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineering
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sector
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Review
 
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentation
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentation
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
 
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Servicesauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
 

INVENTORY MODELS

  • 1.
  • 2. PRESENTATION ON: PRESENTED BY, EBEENA ANCY NAVYA ALFIYA ASWATHY ARYA KRISHNAN ANJALI ARAFA ATHIRA CHANDRAN ABHIJITH ARYA RAVEENDRAN
  • 3. TOPICS  INTRODUCTION  PURPOSE  IMPORTANT MODELS  ECONOMIC ORDER QUANTITY (EOQ)  GRAPH  INTERPRETATION  EXAMPLE  ASSUMPTIONS  ADVANTAGES  DISADVANTAGES  STOCK LEVEL AND TYPES  SAFETY STOCK  MINIMUM STOCK LEVEL  MAXIMUM STOCK LEVEL  AVERAGE STOCK LEVEL  DANGER LEVEL  REORER LEVEL  STOCK LEVEL PROBLEM  CONCLUSION
  • 4. INTRODUCTION One basic problem of inventory management is to find out the order quantity so that it is most economical from overall operational point of view. Here that problem lies in minimizing the two conflicting costs, i.e. ordering cost and inventory carrying cost. Inventory models help to find out the order quantity which minimizes the total costs(sum of ordering costs and inventory carrying costs).
  • 5. ORDERING COSTS Ordering costs are the costs related to the preparation of a supplier’s order, including the cost of placing an order, inspection costs, documentation costs, and others. Ordering Cost = No. of orders * Ordering cost per unit
  • 6. CARRYING COST Carrying cost or Holding cost refers to the total cost of holding inventory. This includes warehousing costs such as rent, utilities and salaries, financial costs such as opportunity cost, and inventory costs related to perishability, shrinkage (leakage) and insurance. Carrying Cost = Avg. Order Quantity * Carrying Cost per Unit
  • 7. PURPOSE It helps business in determining the optimum level of inventories that should be maintained in : • Production process • Managing frequency of ordering • Deciding on quantity of goods or raw materials to be stored • Tracking flow of supply of raw materials and goods to provide uninterrupted service to customers without any delay in delivery.
  • 9.
  • 10. ECONOMIC ORDER QUANTITY (EOQ) MODEL Economic order quantity (EOQ) is the ideal order quantity a company should purchase for its inventory. EOQ refers to that quantity of materials to be purchased at one time to optimise the cost thereon. This is done to minimize variable inventory costs.
  • 11. GRAPH
  • 12. 1. Size of the order increases, the ordering cost of an item decreases 2. Size of the order increases, the carrying cost of an item increases 3. Point at which ordering cost is equal to carrying cost is called EOQ 4. At that intersection point, Total cost is at the lowest level INTERPRETATION
  • 13. EQUATION EOQ = 𝟐𝑸𝑶 𝑪 Where, Q= Annual Quantity demanded O= Ordering Cost per order C = Carrying Cost per unit
  • 14. EXAMPLE The material DX is used uniformly throughout the year. The data about annual requirement, ordering cost and holding cost of this material is given below: Annual requirement: 2,400 units Ordering cost: Rs.10 per order Holding cost: Rs.0.30 per unit Required: Determine the economic order quantity (EOQ) of material DX using above data.
  • 15. SOLUTION EOQ = 𝟐𝑸𝑶 𝑪 The economic order quantity for material DX is 400 units.
  • 16. Now, we can compute the number of orders to be placed per year, annual ordering cost, annual holding cost as follows: Number of orders per year = Annual demand/EOQ = 2,400 units/400 units = 6 orders per year Ordering cost = Number or orders per year × Cost per order = 6 orders × Rs.10 = Rs.60 Holding cost = Average units × Holding cost per unit = (400/2) × 0.3 = Rs.60
  • 17. ASSUMPTION • The cost of the ordering remains constant. • The demand rate for the year is known and evenly spread throughout the year. • The lead time is not fluctuating (lead time is the time between the placement of an order and delivery). • The purchasing price is constant for every item. • Carrying cost is based on average inventory.
  • 18. ADVANTAGES • EOQ model gives the customized recommendation regarding the most economical number of units to order • Helps to minimize the cost of inventory • Mathematical approach is more reliable • The use of formula is useful if you plan to use computers for calculation purpose • It provides a baseline for getting the best deal.
  • 19. DISADVANTAGES • Manual calculation takes time and also expensive. • EOQ is not applicable when demand is not constant. • Faulty basic information • EOQ models are based on assumptions.
  • 20. STOCK LEVELS OF MATERIALS • Stock should be low as possible. • Ensure the availability as and when it required. • To maintain required level of material in store at minimum cost , stock levels are fixed for each item.
  • 21. STOCK LEVELS MINIIMUM STOCK LEVEL MAXIMUM STOCK LEVEL AVERAGE STOCK LEVEL DANGER LEVEL REORDER STOCK LEVEL
  • 22.
  • 23. SAFETY STOCK (SS) OR MINIMUM STOCK LEVEL • Also known as Buffer stock or Reserve stock. • Safety stock is an additional quantity of an item held in inventory in order to reduce the risk that the item will be out of stock. • Safety stock acts as a buffer in case the sales of an item are greater than planned and/or the supplier is unable to deliver additional units at the expected time. • There are additional holding costs associated with safety stock.
  • 24. NEED FOR SS • Safety stock protects against unforeseen variation in supply and/or demand • To compensate forecast inaccuracies (only in case demand is bigger than the forecast) • Its purpose is to prevent disruptions in manufacturing or deliveries • Avoid stock outs to keep customer service and satisfaction levels high • Bulk purchase helps in reducing costs.
  • 25. FORMULA SAFETY STOCK = (Max. usage rate–Avg. usage rate)*lead time SAFETY STOCK = REORDER LEVEL – (AVERAGE CONSUMPTION * AVERAGE REORDER PERIOD)
  • 26. EXAMPLE ABC Ltd. is engaged in production of tires. It purchases rims from DEL Ltd. an external supplier. DEL Ltd. takes 10 days in manufacturing and delivering an order. ABC's requires 10,000 units of rims per year. Its ordering cost is Rs.1,000 per order and its carrying costs are Rs.3 per unit per year. The maximum usage per day could be 50 unit. Calculate safety stock.
  • 27. SOLUTION Maximum daily usage is 50 units (given) Lead time is 10 days (given) Average daily usage is 27.4 (10,000 annual demand ÷ 365 days). Safety Stock = (50-27.4) × 10 = 226 units
  • 28. MAXIMUM STOCK LEVEL • The maximum stock level is the quantity of material above which the stock of an item should not normally be allowed to go. • Fixing this level helps to avoid the costs of over stocking MAXIMUM STOCK LEVEL = REORDER LEVEL + REORDER QUANTITY – (MIN. CONSUMPTION * MIN. REORDER PERIOD)
  • 29. AVERAGE STOCK LEVEL • It shows the average quantity of materials kept in the store. • This regarded as the average of maximum and minimum stock level. Average Stock Level=(Min. level + Max. level)/2
  • 30. DANGER LEVEL • Level set below the minimum stock level. • Level at which the normal issue of materials are stopped. DANGER LEVEL = Average Consumption * Emergency supply time
  • 32. REORDER POINT • Reorder Point (ROP), also known as reorder level or Lead time. • The point at which the store keeper makes a fresh request for the purchase • Generally, it lies between the Max. and Min. level
  • 33. FORMULA • Reorder Point =lead time * Average Usage + Safety Stock • Reorder Point =Max. consumption ×Max. reorder period
  • 34. PROBLEM From the following data for the last 12 months compute stock levels for component A. • Max. usage in a month 300 units • Min. usage in a month 200 units • Avg. usage in a month 225 units • Time lag for procurement of materials: Max 6months, Min 2months, EOQ 750 Units.
  • 35. SOLUTION i. Reorder Level =max. Usage*max. Reorder Period =300*6 =1800units ii. Min Stock Level =Reorder Level –(Avg Usage * Avg Reorder Period) =1800 –(225*(6+2)/2) =900units iii. Maximum Stock Level = Reorder Level + Reorder Quantity – (Min. Consumption * Min. Reorder Period) =1800+750-(200*2) =2150 Units iv. Average Stock Level =(min. Level + Max. Level)/2 =900+1/2*750 =1275 Units
  • 36. CONCLUSION • In any business, make it big or small, we must understand that taking good care of our inventory is very important. • If we as managers do not understand the concept of good inventory management, we must learn to be familiar with it and its applications. • One of the reasons for the failure of a business is its inventory management. There are many ways to fight failure, and the aforesaid inventory models can be used for this. • A truly effective inventory management system will minimize the complexities involved in planning, executing and controlling a supply chain network which is critical to business success.