1. Project Overview
Project
IRPC UHV(Upstream Project for Hygiene
& Value Added Products) Project
Client
IRPC Public Co. LTD
Affiliate of PTT Thai National Petro Chemical Company
Overview
- EPC Lump Sum Turnkey
- ARDS 24,000BPSD / RFCC 20,000 BPSD
H2 Plant 20 MMSCFD / SRU 100 T/D
ERU (Ethylene Recovery Unit) / U&O, etc.
Overview Location
IRPC UHV Project
EBSM
1 / 2
ERU (Ethylene Recovery Unit) / U&O, etc.
Contractor Consortium (GS 60% : SK 40%)
Financing
Source
Client Own Fund
Contract
Amount
KRW 1,121 bn (GS E&C 673 bn)
Period 35 Months
IRPC Port
Thai, IRPC PRP
Thai, ATC
Aromatics
Thai, HMC PP
Saudi EVA
2010 ~ 2012
2005 ~ 2008
2007 ~ 2010
2010 ~ 2013
Refinery
Project
Experience
LSTK
LSTK
LSTK
LSTK
Payment
Raw
Material &
F/X Risk
• Overseas construction insurance
• Advanced payment(10%) and progress /
milestone payment
• Contingency cost for raw-material fluctuation
• Forward deal contracts for hedging F/X risk
2. Prospect
• IRPC UHV Project is a KRW 1,121 bn EPC
project, ordered by IRPC Public Co. LTD
(Affiliate of PTT Thai National Petro Chemical
Company) located at Rayong complex which is
180km away from Bangkok. Over the next 35
months, GS E&C with SK E&C will execute the
whole process of engineering, procurement
and construction. This project will contribute
to increase annual revenue by KRW 230 bn.
•Solid relationship built upon trust from the
successfully completed PTT and IRPC projects
2/2
<Oman, Sohar Aromatics Project>
successfully completed PTT and IRPC projects
(HMC PP, PTT LNG terminal and IRPC
Propylene), GS E&C was able to become a first
Korea EPC Contractor executing a DCC (Deep
Catalytic Cracking) process method Propylene
Project using high sulfur residue.
•GS E&C has proved its competitiveness as a
top tier EPC contractor in refinery plant and
with this DCC process method propylene
project experience, GS E&C expects to acquire
new projects from various clients throughout
the world.

More Related Content

What's hot (20)

Gas turbine driven compressors
Gas turbine driven compressorsGas turbine driven compressors
Gas turbine driven compressors
 
Aero engine accessories
Aero engine accessoriesAero engine accessories
Aero engine accessories
 
Artificial lift method
Artificial lift methodArtificial lift method
Artificial lift method
 
Q913 re1 w5 lec 17
Q913 re1 w5 lec 17Q913 re1 w5 lec 17
Q913 re1 w5 lec 17
 
Peronet LNG
Peronet LNGPeronet LNG
Peronet LNG
 
Factors affecting demand and supply of oil
Factors affecting demand and supply of oilFactors affecting demand and supply of oil
Factors affecting demand and supply of oil
 
Hydraulic fracturing
Hydraulic fracturingHydraulic fracturing
Hydraulic fracturing
 
ONGC traning report
ONGC traning report ONGC traning report
ONGC traning report
 
Unconventional Reservoirs Flow modelling challenges
Unconventional Reservoirs Flow modelling challengesUnconventional Reservoirs Flow modelling challenges
Unconventional Reservoirs Flow modelling challenges
 
140717 artificial lift
140717 artificial lift140717 artificial lift
140717 artificial lift
 
Q922+de1+l02 v1
Q922+de1+l02 v1Q922+de1+l02 v1
Q922+de1+l02 v1
 
Pump total basics
Pump total basicsPump total basics
Pump total basics
 
PUMPS+-
PUMPS+-PUMPS+-
PUMPS+-
 
Chemical eor
Chemical eorChemical eor
Chemical eor
 
Distillation
DistillationDistillation
Distillation
 
Deaerator -thermal power plants
Deaerator  -thermal power plantsDeaerator  -thermal power plants
Deaerator -thermal power plants
 
Actual-cycles
Actual-cyclesActual-cycles
Actual-cycles
 
Pump
PumpPump
Pump
 
Investment and decision analysis for petroleum exploration
Investment and decision analysis for petroleum explorationInvestment and decision analysis for petroleum exploration
Investment and decision analysis for petroleum exploration
 
Reservoir simulation
Reservoir simulation Reservoir simulation
Reservoir simulation
 

Viewers also liked

GREEN ABS@6th PAGEV Turkish Plastics Industry Congress
GREEN ABS@6th PAGEV Turkish Plastics Industry CongressGREEN ABS@6th PAGEV Turkish Plastics Industry Congress
GREEN ABS@6th PAGEV Turkish Plastics Industry Congressjakkawal permyanwanthana
 
Equations of State (Eos)
Equations of State (Eos) Equations of State (Eos)
Equations of State (Eos) Fertiglobe
 
1200 kv ultra high voltage transmission system by prannaya kumar giri & b...
1200 kv  ultra high voltage transmission system  by   prannaya kumar giri & b...1200 kv  ultra high voltage transmission system  by   prannaya kumar giri & b...
1200 kv ultra high voltage transmission system by prannaya kumar giri & b...Prannay Kumar Giri
 
Fundamentals of sdh
Fundamentals of sdhFundamentals of sdh
Fundamentals of sdhsreejithkt
 
Digital communication systems
Digital communication systemsDigital communication systems
Digital communication systemsNisreen Bashar
 

Viewers also liked (9)

Oman sndc eng
Oman sndc engOman sndc eng
Oman sndc eng
 
GREEN ABS@6th PAGEV Turkish Plastics Industry Congress
GREEN ABS@6th PAGEV Turkish Plastics Industry CongressGREEN ABS@6th PAGEV Turkish Plastics Industry Congress
GREEN ABS@6th PAGEV Turkish Plastics Industry Congress
 
Summer training
Summer trainingSummer training
Summer training
 
Project List
Project ListProject List
Project List
 
Equations of State (Eos)
Equations of State (Eos) Equations of State (Eos)
Equations of State (Eos)
 
1200 kv ultra high voltage transmission system by prannaya kumar giri & b...
1200 kv  ultra high voltage transmission system  by   prannaya kumar giri & b...1200 kv  ultra high voltage transmission system  by   prannaya kumar giri & b...
1200 kv ultra high voltage transmission system by prannaya kumar giri & b...
 
Sdh total final
Sdh total finalSdh total final
Sdh total final
 
Fundamentals of sdh
Fundamentals of sdhFundamentals of sdh
Fundamentals of sdh
 
Digital communication systems
Digital communication systemsDigital communication systems
Digital communication systems
 

Similar to Thai IRPC UHV Project ENG

Curriculum vitae Bhupat Kanani
Curriculum vitae Bhupat KananiCurriculum vitae Bhupat Kanani
Curriculum vitae Bhupat KananiBhupat Kanani
 
Curriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat KananiCurriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat KananiBhupat Kanani
 
Er.aad cv new 20151208
Er.aad cv new 20151208Er.aad cv new 20151208
Er.aad cv new 20151208AADARSH JILKA
 
A1 Company Profile Secure Supplies 1.pdf
A1 Company Profile Secure Supplies 1.pdfA1 Company Profile Secure Supplies 1.pdf
A1 Company Profile Secure Supplies 1.pdfDaniel Donatelli
 
Resume_BK,Song_linkedin
Resume_BK,Song_linkedinResume_BK,Song_linkedin
Resume_BK,Song_linkedinBK Song
 
Iran-EU Project Presentation- Investment, Joint Venture, Cooperation
Iran-EU Project Presentation- Investment, Joint Venture, CooperationIran-EU Project Presentation- Investment, Joint Venture, Cooperation
Iran-EU Project Presentation- Investment, Joint Venture, CooperationHCLA - LEGAL NETWORK
 
General Carbon Newsletter - April 2011
General Carbon Newsletter - April 2011General Carbon Newsletter - April 2011
General Carbon Newsletter - April 2011Rameez Shaikh
 
@RAJENDRA YADAV Resume_1
@RAJENDRA YADAV Resume_1@RAJENDRA YADAV Resume_1
@RAJENDRA YADAV Resume_1Rajendra Yadav
 
EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)
EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)
EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)MaxAlagoa
 
HPCL Shapoorji Environment Impact AssessmentA.pptx
HPCL Shapoorji Environment Impact AssessmentA.pptxHPCL Shapoorji Environment Impact AssessmentA.pptx
HPCL Shapoorji Environment Impact AssessmentA.pptxsohamsohamalways
 

Similar to Thai IRPC UHV Project ENG (20)

Curriculum vitae Bhupat Kanani
Curriculum vitae Bhupat KananiCurriculum vitae Bhupat Kanani
Curriculum vitae Bhupat Kanani
 
Curriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat KananiCurriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat Kanani
 
Cover letter 20 dec.2014
Cover letter 20 dec.2014Cover letter 20 dec.2014
Cover letter 20 dec.2014
 
Er.aad cv new 20151208
Er.aad cv new 20151208Er.aad cv new 20151208
Er.aad cv new 20151208
 
A1 Company Profile Secure Supplies 1.pdf
A1 Company Profile Secure Supplies 1.pdfA1 Company Profile Secure Supplies 1.pdf
A1 Company Profile Secure Supplies 1.pdf
 
Cpcl
CpclCpcl
Cpcl
 
Cpcl
CpclCpcl
Cpcl
 
Resume_BK,Song_linkedin
Resume_BK,Song_linkedinResume_BK,Song_linkedin
Resume_BK,Song_linkedin
 
R3 CV_GLG-doc
R3 CV_GLG-docR3 CV_GLG-doc
R3 CV_GLG-doc
 
CV_Sitthikorn P-(20-Jun-15)
CV_Sitthikorn P-(20-Jun-15)CV_Sitthikorn P-(20-Jun-15)
CV_Sitthikorn P-(20-Jun-15)
 
Iran-EU Project Presentation- Investment, Joint Venture, Cooperation
Iran-EU Project Presentation- Investment, Joint Venture, CooperationIran-EU Project Presentation- Investment, Joint Venture, Cooperation
Iran-EU Project Presentation- Investment, Joint Venture, Cooperation
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 
General Carbon Newsletter - April 2011
General Carbon Newsletter - April 2011General Carbon Newsletter - April 2011
General Carbon Newsletter - April 2011
 
Grangemouth CCS project, Stephen Kerr, Summit Power - UKCCSRC Strathclyde Bia...
Grangemouth CCS project, Stephen Kerr, Summit Power - UKCCSRC Strathclyde Bia...Grangemouth CCS project, Stephen Kerr, Summit Power - UKCCSRC Strathclyde Bia...
Grangemouth CCS project, Stephen Kerr, Summit Power - UKCCSRC Strathclyde Bia...
 
@RAJENDRA YADAV Resume_1
@RAJENDRA YADAV Resume_1@RAJENDRA YADAV Resume_1
@RAJENDRA YADAV Resume_1
 
EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)
EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)
EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)
 
Javed Sultan
Javed SultanJaved Sultan
Javed Sultan
 
Samih.CV docx
Samih.CV docxSamih.CV docx
Samih.CV docx
 
HPCL Shapoorji Environment Impact AssessmentA.pptx
HPCL Shapoorji Environment Impact AssessmentA.pptxHPCL Shapoorji Environment Impact AssessmentA.pptx
HPCL Shapoorji Environment Impact AssessmentA.pptx
 
Kona Rao -2015
Kona Rao  -2015Kona Rao  -2015
Kona Rao -2015
 

Thai IRPC UHV Project ENG

  • 1. GS E&C Consortium contracts KRW 1.1 trillion, IRPC UHV Project in Thailand. (Upstream Project for Hygiene & Value Added Products) INVESTOR RELATIONS Oct. 2012 www. gsconstir.co.kr
  • 2. 1. Project Overview Project IRPC UHV(Upstream Project for Hygiene & Value Added Products) Project Client IRPC Public Co. LTD Affiliate of PTT Thai National Petro Chemical Company Overview - EPC Lump Sum Turnkey - ARDS 24,000BPSD / RFCC 20,000 BPSD H2 Plant 20 MMSCFD / SRU 100 T/D ERU (Ethylene Recovery Unit) / U&O, etc. Overview Location IRPC UHV Project EBSM 1 / 2 ERU (Ethylene Recovery Unit) / U&O, etc. Contractor Consortium (GS 60% : SK 40%) Financing Source Client Own Fund Contract Amount KRW 1,121 bn (GS E&C 673 bn) Period 35 Months IRPC Port Thai, IRPC PRP Thai, ATC Aromatics Thai, HMC PP Saudi EVA 2010 ~ 2012 2005 ~ 2008 2007 ~ 2010 2010 ~ 2013 Refinery Project Experience LSTK LSTK LSTK LSTK Payment Raw Material & F/X Risk • Overseas construction insurance • Advanced payment(10%) and progress / milestone payment • Contingency cost for raw-material fluctuation • Forward deal contracts for hedging F/X risk
  • 3. 2. Prospect • IRPC UHV Project is a KRW 1,121 bn EPC project, ordered by IRPC Public Co. LTD (Affiliate of PTT Thai National Petro Chemical Company) located at Rayong complex which is 180km away from Bangkok. Over the next 35 months, GS E&C with SK E&C will execute the whole process of engineering, procurement and construction. This project will contribute to increase annual revenue by KRW 230 bn. •Solid relationship built upon trust from the successfully completed PTT and IRPC projects 2/2 <Oman, Sohar Aromatics Project> successfully completed PTT and IRPC projects (HMC PP, PTT LNG terminal and IRPC Propylene), GS E&C was able to become a first Korea EPC Contractor executing a DCC (Deep Catalytic Cracking) process method Propylene Project using high sulfur residue. •GS E&C has proved its competitiveness as a top tier EPC contractor in refinery plant and with this DCC process method propylene project experience, GS E&C expects to acquire new projects from various clients throughout the world.