SlideShare a Scribd company logo
1 of 12
---------------------------------------------------------------------------------------------------------------------------------
M Joni Daulay CURRICULUM VITAE
Phone: (0778)466027 Mobil: +628127013255
---------------------------------------------------------------------------------------------------------------------------------
PROFESSIONAL BIOGRAPHY
Name : M Joni Petroleum Eng.
Educational : University of Pembangunan Nasional “Veteran” UPN
Yogyakarta department of Mineral Technology, degree in
Petroleum Engineering (1994)
Nationality : Indonesian
Place/Date of birth : Berastagi, North Sumatera / 24 November 1965
Sex : Male
Marital Status : Married
Passport No : A 4334882 date of Expiry 05 Feb. 2018
Contact Address : Perumahan Legenda Malaka
Block J-1 No: 4 Batam Centre
Batam Indonesia
Phone Home: (0778) 466027
Mobile: (+62)8127013255
Email: mjonidaulay@yahoo.co.id
Profesional Abilities:
- Multi Discipline Inspector
- Authorized Piping Inspector API 570 Cert ID: 44899
- Welding Inspector CSWIP 3.1 Cert. No. 65903
- Pressure Vessel / Mechanical Inspector
- Painting Coating Inspector Indocor
- Radiographic Interpreter ASNT Level II
- MT/PT/UT ASNT Level II.
- Onshore/Offshore Pipe line Installation Inspection
- Pipe Mill Inspection
- OCTG Inspection
- Basic Health Safety and Environment
Special Training:
June 2014 : AWSHPP (Apply Workplace Safety and Health in PROCESS
PLANT) Ever Safe Consultants Pty Ltd Singapore Course Code:
ES-AWSHPP-E05714-0788 Exp. Date 25 June 2017
April 2013 : BOSIET & TSbB (Basic Offshore Safety Induction & Emergency
Training and Travel Safety by Boat) OPITO Course Code: 5707
Exp. Date 19 April 2017
June 2012 : API 510 Pressure Vessel Inspector Course by Ladwer Institute
June 2012 : Recertified API 570 Authorized Piping Inspector Cert ID: 44899
---------------------------------------------------------------------------------------------------------------------------------
Page 1 of 12
---------------------------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------------------------
M Joni Daulay CURRICULUM VITAE
Phone: (0778)466027 Mobil: +628127013255
---------------------------------------------------------------------------------------------------------------------------------
Exp date: 31 July 2018
April 2012 : Certified of WELDING INSPECTOR CSWIP 3.1 WIS 5
Conduct by TWI Cert. No. 65903 Exp date: 9 April 2017.
April 2012 : Certified MPI ASNT-TC-1A Level II
April 2012 : Certified DPI ASNT-TC-1A Level II
Feb 2012 : Certified Radiographic Film Interpretation (RI) And
Evaluation Level II ASNT-TC-1A
July 2011 : Sea Survival exp. Date: July 2014
June 2010 : Certified Process Piping ASME B31.3 conduct by Offshore
Technology Institute and Department of Manpower Republik
Indonesia
May 2010 : Certified PDMS Mechanical and Piping Design conduct by
Offshore Technology Institute and Department of Manpower
Republik Indonesia
April 2010 : Certified Pressure Vessel Design conduct by Offshore
Technology Institute and Department of Manpower Republik
Indonesia
March 2010 : Certified ISO 9001 : 2008 Series Overview and Analysis
conduct by PERA Neville Clarke
Sept 2007 : Certified NDT-Ultrasonic Testing Level II ASNT-TC-1A
May 2003 : Certified Painting/Coating Inspector Program conduct by
Indonesian Corrosion Association (INDOCOR)
May 2002 : Certified MIGAS Welding Inspector, conduct by Ikbal M-
APITINDO and Department of Manpower Republik Indonesia
April 1997 : Radiation Protection Officer by Atomic Energy Control
Bureau (BATAN) Indonesia
Feb 1995 : MPI ASNT-TC-1A Level II
Feb 1995 : DPI ASNT-TC-1A Level II
Summary Professional:
I am keenly, initiative, hardworking, good time management and able to work with
minimum supervision. I can gain not only for self-development, but also to be
able to contribute for company success. I have experiences as QA/QC over 15
years regarding to Fabrication and Construction Also Installation for Welding,
Piping, Pressure Vessel, Storage Tank, Pipe mill, OCTG & Rotary Drilling Pipe
Inspection, NDE, Painting/Coating, Pipeline & Sub-sea, Flexible Line and
Integrated Onshore Processing Facilities (OPF), FPSO, Offshore Structural
Platform Facility, Hydro/ Pneumatic testing, Precom and setting-up of
documentation for record traceability in Petroleum Industries accordance to ISO
Quality System and HSE, also familiar with the international code requirement
and application.
Together Everyone Achieve More
Professional Accountabilities:
---------------------------------------------------------------------------------------------------------------------------------
Page 2 of 12
---------------------------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------------------------
M Joni Daulay CURRICULUM VITAE
Phone: (0778)466027 Mobil: +628127013255
---------------------------------------------------------------------------------------------------------------------------------
To ensure effective construction quality control performance by the Project EPC and
this includes:
- Review all welding procedures (WPS) and procedure qualification records
(PQR’s) for acceptance.
- Review all welder qualification for compliance with project requirement.
- Review all welding material control, material segregation, traceability and PAMI
procedures, and PWHT and NDT procedures for compliances with project
requirement.
- Provide expertise on welding standard, techniques and methods as needed.
- Verify compliance with quality control procedures and system for welding, PWHT,
NDT, and material traceability control, including compliance with safety
requirements.
- To Witness welder qualification test (WQT), WPS and PQR testing, production
test plates testing.
- Witness selected NDT activities, review radiographs, and such.
- Verify welding consumables control, welding control records, certificates, and
such.
- Maintain records of all welding related document such as WPS, PQR, welding
tables, welder info repair rates, etc.
- Provide assistance to the mechanical discipline in witness inspection such as
flange faces or bolt torque.
- Review procedure for hydro testing, leak testing and perform a related work
activity in accordance with the approved procedure and specification.
- Review contractor quality system documentation, such as ITP’s and quality
control procedures.
- Verify relevant ITP and quality procedure are in place before start of work.
- Be pro-active in ensuring effective use of ITP and related document in all quality-
monitoring activities.
- Be pro-active in ensuring effective implementation of non-conformance and
deviation control system.
- Attend technical and quality assessment on sub-contractors and fabrication shop.
- Participate in quality audits.
- Provide FAT
- Provide daily/weekly report.
Professional/Project Experiences:
18. Company Employer: YAMGAZ (TPJC joint venture Technip, JGC and Chiyoda)
Position : Welding/Piping Inspector
Inclusive date : 16 January 2016 – 31 October 2016
Company Assignment/
Project Name : YAMAL LNG Plant Project to be located in Yamal Nenets
(Rusia)
---------------------------------------------------------------------------------------------------------------------------------
Page 3 of 12
---------------------------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------------------------
M Joni Daulay CURRICULUM VITAE
Phone: (0778)466027 Mobil: +628127013255
---------------------------------------------------------------------------------------------------------------------------------
Project Involved :
• Module Compressor A, Compressor B and Inlet
Location: PT. SMOE and PT and McDermott Batam
Indonesia
17. Company Employer: Exxon Mobil Singapore
Position : API 570 Inspector
Inclusive date : 3 June 2015 – 15 November 2015
Project Involved : Inspection and Maintenance
Location : Refinery Plant / Shipyard Rd 18 Pioneer Rd Singapore
16. Company Employer: SANTOS Pty. Ltd. E&P (PT.Indospec Asia Agency)
Position : Multi Discipline Inspector/Supervisor: QA/QC Welding,
Piping/Structural, Painting /Coating, Pipeline/Flexible Line
and Construction.
Inclusive date : 24 April 2013 – 20 May 2015
Company Assignment/
Project Name : Peluang field & FSO development Project
Project Involved :
• Conversion, Modification, Installation FSO MT. Surya Putra
Jaya and replace/first Anker chain Job.
Location: PT. Tri Karya Alam Tanjung Uncang, Batam and
Offshore Madura
• High Frequency Hot Induction Pipe Bend API 5L X65 SMLS
Location: Yeow Hwa Engineering PTE. LTD Singapore
• Pipe Mill 10” dia 12.7 mm WT API 5L X65 HFW/ERW
Location: PT. Bakrie Pipe Industries, Bekasi Jakarta
• Coating 3LPE (FBE + Adhesive + PE) 10” dia 12.7 mm WT
API 5L X65
Location: PT. Indal Steel Pipe Gresik East Java
• WPQT WPS 10” dia 12.7 mm WT API 5L X65 (GMAW root
and FCAW hot, filler, capping) for Mainline, RTTR Re
Through thckness Repair), RMTR (Re Mid Thickness
Repair), CR (Capping Repair), Anode Installation, Flexible
Line.
Location: Newcruz Shipbuilding & Engineering Pte Ltd
Swiber Singapore
• Installation Jacket Wellhead Platform & Peluang Pipeline10”
dia 12.7 mm WT API 5L X65: 17 Km
Location: Offshore Madura
15. Company Employer: SAIPEM Singapore (Sheffield Offshore Services Pty. Ltd
Agency)
Position : QA/QC Welding Inspector
Inclusive date : 25 Feb. 2013 – 23 May 2013
Company Assignment/
---------------------------------------------------------------------------------------------------------------------------------
Page 4 of 12
---------------------------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------------------------
M Joni Daulay CURRICULUM VITAE
Phone: (0778)466027 Mobil: +628127013255
---------------------------------------------------------------------------------------------------------------------------------
Project Name : Bien Dong 1 Development Project
Petro Vietnam Vessel SEMAC1
• CRA Manual Welding Double Joint Fabrication PipeLine 20
Km:
Location: Saipem Indonesia Karimun Base
14. Company Employer: Conoco Phillips Ltd (PT. Velosi Java Mandiri Agency)
Position : Representative QA/QC Piping Fabrication, Expeditor and
Painting
Inclusive date : August. 2012 – 20 Feb. 2013
Company Assignment/
Project Name : EPC Rawa Modification LTRO Project Palembang
South of Sumatera
Location: Barata Workshop Cilegon and Site Palembang
13. Company Employer: Nippon Steel Engineering Singapore (Oceaneering
Agency)
Position : Coating Inspector
Inclusive date : Nov. 2011 – 30 March 2012
Company Assignment/
Project Name : Total South Mahakam Field Development Phase 1
& 2
Project Involved :
• Field Joint Coating Pipe Line 70 Km:
Location: Kuroshio 1 East Kalimantan
• Preparation and Trial FJC: HSS/HBE and SPU
Su To Trang Project, Vietnam
Location: OJS Batam
12. Company Employer: SANTOS (Sampang) Pty. Ltd. E&P (PT. Mafhindo Utama
Agency)
Position : Multi Discipline Inspector / Supervisor: QA/QC Welding,
Piping, Painting/Coating and Supervision Construction.
Inclusive date : 01 April 2011 – Oct. 2011
Company Assignment/
Project Name : Wortel Field Development Project
Project Involved :
• Reviewed MPS/ITP for PQT and Production FBE, Asphalt
Enamel, Concrete Weight Coating, NeoPrene and Anode
Coating 10” Dia.
Location: PT. Indal Steel Pipe Gresik
• Piping Blanket Construction Service for Various
Development Oyong Modification and Production Barge
Modification
Location: PKP- Bangun Sarana Baja Gresik
• Welhead Structure Jacket Fabrication Wortel Platform and
Welhead Structure Jacket/Flexible line Fabrication Oyong
extension Platform
---------------------------------------------------------------------------------------------------------------------------------
Page 5 of 12
---------------------------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------------------------
M Joni Daulay CURRICULUM VITAE
Phone: (0778)466027 Mobil: +628127013255
---------------------------------------------------------------------------------------------------------------------------------
Location: PT. PAL Indonesia, Surabaya
11. Company Employer: PT. Timas Suplindo Jakarta
Position : Representative QA/QC Welding/Coating
Inclusive date : 01 March 2011 – 31 March 2011
Company Assignment/
Project Name : TSB Field Development Project – Kangean Energy
Indonesia
Project Involved :
• PQT and Production Enamel Asphalt and Concrete Coating
18”&20” Dia:
Location: PT. Bredero Shaw Indonesia Batam
10. Company Employer: PT. Saipem Indonesia
Position : QA/QC Welding Inspector
Inclusive date : Feb. – Nov. 2010
Company Assignment/
Project Name : Gajah Baru EPCI Project - Premier Oil Natuna
Sea B.V.
Project Involved :
• Glycol Regeneration Package:
 Glycol Flush Drum, Glycol Surge Drum, Glycol Carbon
Filter, Glycol Cartride Filter, Glycol Still Column, Glycol
Reboiler, Piping, Structural Skid & platform
• Produced Water Treatment Package:
 Degassing Drum, Deoiler, Piping ans Structural skid base
Location: PT. Profab Batam
• Instrument Air Compressor Package
• Instrument Air Dryer Package
• Instrument Air Nitrogen Generator Package:
• Lifting and Arrangement/Load Test Spreader Bar
Location: GlobalTech Engineering Pte. Ltd. Singapore,
Optimal Instrumentation & Engineering Services Singapore,
SOON Steel International Singapore, KTL Offshore
Singapore
• Helicopter Refueling Package:
 Aviation Fuel Transportable Tanks, Pressure Vessel
Tanks, Aviation Fuel Filling Pump Unit, Aviation Fuel
Dispensing Unit, Filter Separator, Water Monitor, Piping,
Structural frame base
Location: Wilmax Engineering Pte. Ltd. Singapore
• Inspection Fire and Safety Equipment
Location: Oakwell Engineering International Pte. Ltd.
Singapore
• Pipeline Installation Aids Fabrication
---------------------------------------------------------------------------------------------------------------------------------
Page 6 of 12
---------------------------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------------------------
M Joni Daulay CURRICULUM VITAE
Phone: (0778)466027 Mobil: +628127013255
---------------------------------------------------------------------------------------------------------------------------------
 Start up Head, Laydown head, Dewatering pig Receiver,
Buckle Detector Gauge Plate / Arrangement, Temporary
Dewatering Pig Launcher, Flange Protection Shroud,
Abandonment & Recovery Head, Lifting Arrangement/
Spreader Bar
Location: PT. Viking Engineering. Tanjung Uncang Batam
• High Frequency Induction Pipe Bend API 5L X65 SMLS
Location: Yeow Hwa Engineering PTE. LTD Singapore
• Jacket Installation Aids Modified/Fabricated
 Flooding Manifold, Buoyancy Tank Cradles, Levelling
Cross Beams, Ballerina Platform, Bear Cage Supports,
Upending Clamp Spacer, Hammer Sleeve Spacer for
Conductor Pipe 36” OD
Location: PT. SMOE Indonesia Batam
9. Company Employer: PT. GERMANISCHER LLOYD
Certification Authority (CA)
Position : QA/QC Welding Inspector
Inclusive date : Dec. 2009-Feb. 2010
Company Assignment: TOTAL Thailand E&P/PTT
Project Involved/Location:
• Project Bongkot 4A Central Facilities QPS and
Flare Tripod
 PT. Gunanusa Utama Fabricators Cilegon
 SSH Corporation Ltd Singapore Visual Pipe Inspection
 Professional Testing Services Singapore Mechanical
Testing
 DNV Technology Centre Singapore Mechanical Testing
8. Company Employer: SANTOS (Sampang) Pty. Ltd. (PT. Mafhindo Utama
Agency)
Inclusive date : Feb. 2007-Dec. 2009
Position : Multi Discipline Inspector /Supervisor: QA/QC Welding,
Piping, Painting/Coating and Supervision Construction.
Project Name : Oyong Field Development Project
Project Involved :
• Modification, start Up and Shut down of FPSO Sea
Good 101
• Oyong Development Project Phase II
Pipe Line Offshore 60 Km Sampang Madura to Pasuruan
and Onshore Processing Facilities (OPF) Grati Pasuruan
East Java
 Fabrication Piping, Structural, Pressure Vessel: HP and
LP Flare KO Drum, Produced Water Degassing Vessel,
Instrument Air Receiver, Plant Air Receiver, Tank
---------------------------------------------------------------------------------------------------------------------------------
Page 7 of 12
---------------------------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------------------------
M Joni Daulay CURRICULUM VITAE
Phone: (0778)466027 Mobil: +628127013255
---------------------------------------------------------------------------------------------------------------------------------
Location PT. PAL Indonesia Surabaya
 Conducting Slab Casting / HRC Coil for pipe Production
Location: PT. Krakatau Steel Cilegon
 Pipe Mill
Location: PT. Bakrie Pipe Industries, Bekasi
 Coating Pipe FBE, Asphalt Enamel and Concrete Weight
Coating and Anode Install
Location Bredero Shaw Batam
 Pressure Vessel: Produced Water Degassing Vessel,
Separator, Instrument Air Receiver, Air Cooler, Shell and
Tubes Heat Exchanger
Location: PT. Heat Exchangers Indonesia
 Metering Control Panel General Arrangement
Location: PT. Heat Exchangers Specialist PTE LTD
Singapore
 Coating NeoPrene Pipe Riser
Location: Trelleborg Hercules Pte Ltd Singapore
 Hot Induction Bend Pipe
Location: Yeow Hwa Engineering PTE LTD Singapore
 FBE Pipe Bends
Location: FBE Coating Pte. Ltd. Singapore
 Pig Launcher/Receiver and Inspection Pressure Vessel:
HP Flare KO Drum, LP Flare KO Drum, Produced Water
Degassing Vessel, 1st and 2nd stage Separator,
Instrument Air Receiver, Plant Air Receiver
Location: PT. Profab Batam
 Construction Installation / PreCom-Commisioning Pipe
Line, Flexible line Sampang Madura to Pasuruan
Offshore 60 Km (Field Joint Coating used Heat Shrink
Sleeve Canusa service wrap and Infill material
Polyurethane Foam)
Location: Sampang Madura Sea Offshore to Pasuruan
Onshore
 Construction and Fabrication Onshore Processing
Facilities (OPF)
Location: Grati Pasuruan East Java
Company Assignment: Total E&P Indonesie
Project Name : Sisi Nubi Phase 1 Development Project
Position : QA/QC Welding and Pipe Line Inspector
Project Involved/Location:
• Pipeline Certification offshore East Kalimantan Indonesia
7. Company Employer: PT. GERMANISCHER LLOYD
Position : QA/QC Senior Welding and Coating Inspector
---------------------------------------------------------------------------------------------------------------------------------
Page 8 of 12
---------------------------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------------------------
M Joni Daulay CURRICULUM VITAE
Phone: (0778)466027 Mobil: +628127013255
---------------------------------------------------------------------------------------------------------------------------------
Inclusive date : May 2005-Dec. 2006
Project Involved/Location:
• Project PT. Perusahaan Gas Negara (Persero)
Tbk. PIPELINE South Sumatera – West Java Phase II
Welded Pipe 32” OD
 Pipe Mill Inspector (PQT and Production)
 PT. KHI Pipe Industries (Krakatau Steel Group)
Cilegon
 PT. SPINDO PASURUAN East Java Indonesia
 PT. INDAL STEEL PIPE GRESIK East Java
Indonesia
 Coating Inspector (PQT and Production)
 PT. Bredero Shaw Batam Indonesia
 PT. SPINDO PASURUAN East Java Indonesia (assist
Spindo first use application FBE External-Internal and
3LPE (FBE + Adhesive + Polyethylene)
 PT. INDAL STEEL PIPE GRESIK East Java
Indonesia (assist Indal first use application FBE
External-Internal and Polyethylene)
 Construction Installation Pipe Line Offshore
Location: Labuhan Maringgai – Muara Bekasi Indonesia
163 Km
6. Company Employer: PT. PUNJ LLOYD INDONESIA
Position : QA/QC Painting/Coating Inspector
Inclusive date : Jan-May 2005
Project Involved/Location:
• TOTAL E&P INDONESIE TUNU FIELD
DEVELOPMENT PROJECT Phase-9/EPSC-2 for PIPE
LINE, Trunk Lines Installations
 Aerial Pipe Line and Hook Up
 Installation of Ø 8”/2” TN W22 to MNP
 Installation of Ø 20”/2” GTS Y to MNP
 Installation of Ø 8”/2” GTS AC to Scrapper AC
 Painting in Fabrication Sungai Purun
 Field Joint Coating Polypropylene, Polyurethane, HDPE
(FBE+PU+PE) and Anode Install
Location: Mahakam Delta region of East-Kalimantan,
Indonesia on Fabrication and Offshore
5. Company Employer: SIGMAKALON Pte. Ltd.(SIGMA COATINGS)
Singapore
Position : Technical Service / Painting Inspector
Inclusive date : Dec. 2003-Dec. 2004
• Batam/Singapore
4. Company Employer: MOODY INDONESIA
---------------------------------------------------------------------------------------------------------------------------------
Page 9 of 12
---------------------------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------------------------
M Joni Daulay CURRICULUM VITAE
Phone: (0778)466027 Mobil: +628127013255
---------------------------------------------------------------------------------------------------------------------------------
Position : QA/QC Welding Inspector
Inclusive date : August-Dec. 2003
Project Involved/Location:
• Conoco Belanak Project
 Measuring Dimensional Ovality and Local Out of
Roudness (LOOR) and Rapair Bare Pipe
Location: Bredero Price Indonesia Yard Batam
3. Company Employer: BETA ENGINEERING Pte Ltd Kabil.
Position : QA/QC Welding Inspector
Inclusive date : Feb. 2002–August 2003
Project Involved/Location:
• Production Facilities Project BARRACUDA Crude
Oil Fields PETROBRAS P-43 Santa Fe International Corp
P2003 RIG
 Piping and Structural
Location: Kabil Batam
2. Company Employer: PT. SEKAWAN EKA SEJATI (SES)
Inspection Technical Service
Position : Representative Batam
OCTG Tubular Service Inspection Offshore &
Onshore, Maintenance Casing-Tubing and Rotary Drilling
Equipment Inspection.
Inclusive date : Jan. 2001–Feb. 2002
Project Involved : Maxus, Exspan Nusantara, Tubetech, Kondur
Petroleum S.A, Lapindo, Vico.
1. Company Employer: PT. RADIANT UTAMA INTERISCO
(Inspection Technical Service)
Position : QC OCTG Inspector, Protection Radiation Officer and
NDT Inspection
Inclusive date : Jan. 1995–Dec. 2000
Project Involved : Rotary Drilling Inspection, OCTG Inspection, Tubular
Services, Pressure Vessel Inspection, Tank Inspection, Pipe
Line Inspection, Piping and Structure Inspection, Pipe Mill
Inspection, Painting/Coating Inspection
Project Involved/Location:
Maxus, Arco, Unocal, Exspan Sumatera and
Kalimantan, Suribor, Exxon Mobil Oil, Hulliburton, Total
Indonesie,PT. Citra Tubindo Tbk, PT. Purna Bina Nusa, PT.
Pipa Mas Putih, PT. Hymindo, PT. Patraindo Nusa Pertiwi
OCTG Inspector, PT. Kartika Yasa Sarana OCTG Inspector,
PT. Hydrill, PT. Hytech OCTG Inspector, ABB Vetco Gray,
Jray Mc Dermott Indonesia, PT. Nippon Steel Batam, PT.
Bredero Price Indonesia, PT. Profab, PT. Kvaerner Oilfield
Product of Indonesia (KOPI), PT. Toyo Kanetsu Indonesia,
PT. Babcock & Wilcox Indonesia (BVVI).
---------------------------------------------------------------------------------------------------------------------------------
Page 10 of 12
---------------------------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------------------------
M Joni Daulay CURRICULUM VITAE
Phone: (0778)466027 Mobil: +628127013255
---------------------------------------------------------------------------------------------------------------------------------
References:
-PT. Timas Suplindo Jakarta
Office Phone: +62-21-3522828
Mr. Loga Sundar: QC Manager
-PT. Saipem Indonesia
Office Phone: +62-21-30022412
Mrs. Henny S Herwahyuni: Senior Inspector Coordinator
Mr. Fabien Rabot: QA/QC Manager
-PT. Wide & Pin
Sentra Menteng blok MN/71 CBN Bintaro Jaya Sektor VII Jakarta 15224
Office Phone: (021)7459434
H. Harijaya: Senior Inspector Coordinator
-PT. Mafhindo Utama
Wisma Harun, Jl. Raya Pasar Minggu No. 2i Jakarta Selatan 12780 Indonesia
Phone 062-021 7943783, 7943785
- Harun Alrasyid Direktur Utama, Agus S, Supri Sarwanto, Johan I
- Mr. Ihsanuddin Toha HP: +622191618927
- Mr. Supriyanto HP: 0811959812
-Santos Pty.Ltd Jakarta Indonesia: QA/QC and Construction Manager
- Mr. Hercules HP: 08121044509
-Germanischer Lloyd Nusantara - Indonesia
Office Phone: +62 021 53679201
- Haryo Wiryono MSc, MEng
Director Deputy / General Manager Oil and Gas Division
for PGN Pipe Line Project, South Sumatera-West Java Phase II
HP: (+62) 811 193 210
Phone: (021)53679201
-Mr. Achmad Zakky Ridwan
-PT. Punj Lloyd Indonesia
Office Phone: +62 054 1682360
Mr. Shiva QA/QC Manager: HP 08125530741
-Sofyan. TS
Director& Founder Yayasan Pendidikan “IKBAL-M-YOS”BATAM
Maritime Technology Institute Foundation Batam
HP: 0811-702794, Phone: (+62)778-412757
-Lindung Silalahi, Msc.
President Director of Staris Giros Indonesia
Coating Consultant and Independent Coating Inspector
NACE Certificate No. 3841
HP: 08159046956
-Drs. James Richard A.
President Dirctor, PT. Sekawan Eka Sejati
Jl Citarum no 6 Cideng Barat Jakarta
Phone: (+62-21-3844265 HP: 0811969049
-PT. Radiant Utama, OCTG Inspection Division
Jl. Kapten Tandean no: 24 Jakarta
- Budi Oetomo General Manager
- Muhammad Yaqub, Agus Salim ASNT level III, Nuzirman HP: 0818947337
---------------------------------------------------------------------------------------------------------------------------------
Page 11 of 12
---------------------------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------------------------
M Joni Daulay CURRICULUM VITAE
Phone: (0778)466027 Mobil: +628127013255
---------------------------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------------------------
Page 12 of 12
---------------------------------------------------------------------------------------------------------------------------------

More Related Content

Similar to Updated CV QAQC M Joni Daulay - DNVGL

Similar to Updated CV QAQC M Joni Daulay - DNVGL (20)

P.s.santhosh kumar (resume).doc
P.s.santhosh kumar (resume).docP.s.santhosh kumar (resume).doc
P.s.santhosh kumar (resume).doc
 
Mani cv
Mani   cvMani   cv
Mani cv
 
TAHA MARAR C.V
TAHA MARAR C.VTAHA MARAR C.V
TAHA MARAR C.V
 
Project report1
Project report1Project report1
Project report1
 
Azhar to amity_2
Azhar to amity_2Azhar to amity_2
Azhar to amity_2
 
Modelling for Strategic Design - IxDA Berlin 09/2013
Modelling for Strategic Design - IxDA Berlin 09/2013Modelling for Strategic Design - IxDA Berlin 09/2013
Modelling for Strategic Design - IxDA Berlin 09/2013
 
Elvis joy cv- mechanical engineer, primavera p6 hvac
Elvis joy  cv- mechanical engineer, primavera p6 hvacElvis joy  cv- mechanical engineer, primavera p6 hvac
Elvis joy cv- mechanical engineer, primavera p6 hvac
 
Resume
ResumeResume
Resume
 
Resume_Rakesh
Resume_RakeshResume_Rakesh
Resume_Rakesh
 
Amit_Barjibhe - cv
Amit_Barjibhe - cvAmit_Barjibhe - cv
Amit_Barjibhe - cv
 
Introduction
IntroductionIntroduction
Introduction
 
OMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cvOMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cv
 
Prashant_cv[1]
Prashant_cv[1]Prashant_cv[1]
Prashant_cv[1]
 
In building-solution-for-mobile-network
In building-solution-for-mobile-networkIn building-solution-for-mobile-network
In building-solution-for-mobile-network
 
Universal Engineers, Ahmedabad, CNC machined part
Universal Engineers, Ahmedabad, CNC machined partUniversal Engineers, Ahmedabad, CNC machined part
Universal Engineers, Ahmedabad, CNC machined part
 
Dawn Marine 2016 Catalog
Dawn Marine 2016 CatalogDawn Marine 2016 Catalog
Dawn Marine 2016 Catalog
 
Dawn Marine 2016 Catalog
Dawn Marine 2016 CatalogDawn Marine 2016 Catalog
Dawn Marine 2016 Catalog
 
Mih[.CV2013updated
Mih[.CV2013updatedMih[.CV2013updated
Mih[.CV2013updated
 
Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanical
 
NSUK_PROJECT_1
NSUK_PROJECT_1NSUK_PROJECT_1
NSUK_PROJECT_1
 

Updated CV QAQC M Joni Daulay - DNVGL

  • 1. --------------------------------------------------------------------------------------------------------------------------------- M Joni Daulay CURRICULUM VITAE Phone: (0778)466027 Mobil: +628127013255 --------------------------------------------------------------------------------------------------------------------------------- PROFESSIONAL BIOGRAPHY Name : M Joni Petroleum Eng. Educational : University of Pembangunan Nasional “Veteran” UPN Yogyakarta department of Mineral Technology, degree in Petroleum Engineering (1994) Nationality : Indonesian Place/Date of birth : Berastagi, North Sumatera / 24 November 1965 Sex : Male Marital Status : Married Passport No : A 4334882 date of Expiry 05 Feb. 2018 Contact Address : Perumahan Legenda Malaka Block J-1 No: 4 Batam Centre Batam Indonesia Phone Home: (0778) 466027 Mobile: (+62)8127013255 Email: mjonidaulay@yahoo.co.id Profesional Abilities: - Multi Discipline Inspector - Authorized Piping Inspector API 570 Cert ID: 44899 - Welding Inspector CSWIP 3.1 Cert. No. 65903 - Pressure Vessel / Mechanical Inspector - Painting Coating Inspector Indocor - Radiographic Interpreter ASNT Level II - MT/PT/UT ASNT Level II. - Onshore/Offshore Pipe line Installation Inspection - Pipe Mill Inspection - OCTG Inspection - Basic Health Safety and Environment Special Training: June 2014 : AWSHPP (Apply Workplace Safety and Health in PROCESS PLANT) Ever Safe Consultants Pty Ltd Singapore Course Code: ES-AWSHPP-E05714-0788 Exp. Date 25 June 2017 April 2013 : BOSIET & TSbB (Basic Offshore Safety Induction & Emergency Training and Travel Safety by Boat) OPITO Course Code: 5707 Exp. Date 19 April 2017 June 2012 : API 510 Pressure Vessel Inspector Course by Ladwer Institute June 2012 : Recertified API 570 Authorized Piping Inspector Cert ID: 44899 --------------------------------------------------------------------------------------------------------------------------------- Page 1 of 12 ---------------------------------------------------------------------------------------------------------------------------------
  • 2. --------------------------------------------------------------------------------------------------------------------------------- M Joni Daulay CURRICULUM VITAE Phone: (0778)466027 Mobil: +628127013255 --------------------------------------------------------------------------------------------------------------------------------- Exp date: 31 July 2018 April 2012 : Certified of WELDING INSPECTOR CSWIP 3.1 WIS 5 Conduct by TWI Cert. No. 65903 Exp date: 9 April 2017. April 2012 : Certified MPI ASNT-TC-1A Level II April 2012 : Certified DPI ASNT-TC-1A Level II Feb 2012 : Certified Radiographic Film Interpretation (RI) And Evaluation Level II ASNT-TC-1A July 2011 : Sea Survival exp. Date: July 2014 June 2010 : Certified Process Piping ASME B31.3 conduct by Offshore Technology Institute and Department of Manpower Republik Indonesia May 2010 : Certified PDMS Mechanical and Piping Design conduct by Offshore Technology Institute and Department of Manpower Republik Indonesia April 2010 : Certified Pressure Vessel Design conduct by Offshore Technology Institute and Department of Manpower Republik Indonesia March 2010 : Certified ISO 9001 : 2008 Series Overview and Analysis conduct by PERA Neville Clarke Sept 2007 : Certified NDT-Ultrasonic Testing Level II ASNT-TC-1A May 2003 : Certified Painting/Coating Inspector Program conduct by Indonesian Corrosion Association (INDOCOR) May 2002 : Certified MIGAS Welding Inspector, conduct by Ikbal M- APITINDO and Department of Manpower Republik Indonesia April 1997 : Radiation Protection Officer by Atomic Energy Control Bureau (BATAN) Indonesia Feb 1995 : MPI ASNT-TC-1A Level II Feb 1995 : DPI ASNT-TC-1A Level II Summary Professional: I am keenly, initiative, hardworking, good time management and able to work with minimum supervision. I can gain not only for self-development, but also to be able to contribute for company success. I have experiences as QA/QC over 15 years regarding to Fabrication and Construction Also Installation for Welding, Piping, Pressure Vessel, Storage Tank, Pipe mill, OCTG & Rotary Drilling Pipe Inspection, NDE, Painting/Coating, Pipeline & Sub-sea, Flexible Line and Integrated Onshore Processing Facilities (OPF), FPSO, Offshore Structural Platform Facility, Hydro/ Pneumatic testing, Precom and setting-up of documentation for record traceability in Petroleum Industries accordance to ISO Quality System and HSE, also familiar with the international code requirement and application. Together Everyone Achieve More Professional Accountabilities: --------------------------------------------------------------------------------------------------------------------------------- Page 2 of 12 ---------------------------------------------------------------------------------------------------------------------------------
  • 3. --------------------------------------------------------------------------------------------------------------------------------- M Joni Daulay CURRICULUM VITAE Phone: (0778)466027 Mobil: +628127013255 --------------------------------------------------------------------------------------------------------------------------------- To ensure effective construction quality control performance by the Project EPC and this includes: - Review all welding procedures (WPS) and procedure qualification records (PQR’s) for acceptance. - Review all welder qualification for compliance with project requirement. - Review all welding material control, material segregation, traceability and PAMI procedures, and PWHT and NDT procedures for compliances with project requirement. - Provide expertise on welding standard, techniques and methods as needed. - Verify compliance with quality control procedures and system for welding, PWHT, NDT, and material traceability control, including compliance with safety requirements. - To Witness welder qualification test (WQT), WPS and PQR testing, production test plates testing. - Witness selected NDT activities, review radiographs, and such. - Verify welding consumables control, welding control records, certificates, and such. - Maintain records of all welding related document such as WPS, PQR, welding tables, welder info repair rates, etc. - Provide assistance to the mechanical discipline in witness inspection such as flange faces or bolt torque. - Review procedure for hydro testing, leak testing and perform a related work activity in accordance with the approved procedure and specification. - Review contractor quality system documentation, such as ITP’s and quality control procedures. - Verify relevant ITP and quality procedure are in place before start of work. - Be pro-active in ensuring effective use of ITP and related document in all quality- monitoring activities. - Be pro-active in ensuring effective implementation of non-conformance and deviation control system. - Attend technical and quality assessment on sub-contractors and fabrication shop. - Participate in quality audits. - Provide FAT - Provide daily/weekly report. Professional/Project Experiences: 18. Company Employer: YAMGAZ (TPJC joint venture Technip, JGC and Chiyoda) Position : Welding/Piping Inspector Inclusive date : 16 January 2016 – 31 October 2016 Company Assignment/ Project Name : YAMAL LNG Plant Project to be located in Yamal Nenets (Rusia) --------------------------------------------------------------------------------------------------------------------------------- Page 3 of 12 ---------------------------------------------------------------------------------------------------------------------------------
  • 4. --------------------------------------------------------------------------------------------------------------------------------- M Joni Daulay CURRICULUM VITAE Phone: (0778)466027 Mobil: +628127013255 --------------------------------------------------------------------------------------------------------------------------------- Project Involved : • Module Compressor A, Compressor B and Inlet Location: PT. SMOE and PT and McDermott Batam Indonesia 17. Company Employer: Exxon Mobil Singapore Position : API 570 Inspector Inclusive date : 3 June 2015 – 15 November 2015 Project Involved : Inspection and Maintenance Location : Refinery Plant / Shipyard Rd 18 Pioneer Rd Singapore 16. Company Employer: SANTOS Pty. Ltd. E&P (PT.Indospec Asia Agency) Position : Multi Discipline Inspector/Supervisor: QA/QC Welding, Piping/Structural, Painting /Coating, Pipeline/Flexible Line and Construction. Inclusive date : 24 April 2013 – 20 May 2015 Company Assignment/ Project Name : Peluang field & FSO development Project Project Involved : • Conversion, Modification, Installation FSO MT. Surya Putra Jaya and replace/first Anker chain Job. Location: PT. Tri Karya Alam Tanjung Uncang, Batam and Offshore Madura • High Frequency Hot Induction Pipe Bend API 5L X65 SMLS Location: Yeow Hwa Engineering PTE. LTD Singapore • Pipe Mill 10” dia 12.7 mm WT API 5L X65 HFW/ERW Location: PT. Bakrie Pipe Industries, Bekasi Jakarta • Coating 3LPE (FBE + Adhesive + PE) 10” dia 12.7 mm WT API 5L X65 Location: PT. Indal Steel Pipe Gresik East Java • WPQT WPS 10” dia 12.7 mm WT API 5L X65 (GMAW root and FCAW hot, filler, capping) for Mainline, RTTR Re Through thckness Repair), RMTR (Re Mid Thickness Repair), CR (Capping Repair), Anode Installation, Flexible Line. Location: Newcruz Shipbuilding & Engineering Pte Ltd Swiber Singapore • Installation Jacket Wellhead Platform & Peluang Pipeline10” dia 12.7 mm WT API 5L X65: 17 Km Location: Offshore Madura 15. Company Employer: SAIPEM Singapore (Sheffield Offshore Services Pty. Ltd Agency) Position : QA/QC Welding Inspector Inclusive date : 25 Feb. 2013 – 23 May 2013 Company Assignment/ --------------------------------------------------------------------------------------------------------------------------------- Page 4 of 12 ---------------------------------------------------------------------------------------------------------------------------------
  • 5. --------------------------------------------------------------------------------------------------------------------------------- M Joni Daulay CURRICULUM VITAE Phone: (0778)466027 Mobil: +628127013255 --------------------------------------------------------------------------------------------------------------------------------- Project Name : Bien Dong 1 Development Project Petro Vietnam Vessel SEMAC1 • CRA Manual Welding Double Joint Fabrication PipeLine 20 Km: Location: Saipem Indonesia Karimun Base 14. Company Employer: Conoco Phillips Ltd (PT. Velosi Java Mandiri Agency) Position : Representative QA/QC Piping Fabrication, Expeditor and Painting Inclusive date : August. 2012 – 20 Feb. 2013 Company Assignment/ Project Name : EPC Rawa Modification LTRO Project Palembang South of Sumatera Location: Barata Workshop Cilegon and Site Palembang 13. Company Employer: Nippon Steel Engineering Singapore (Oceaneering Agency) Position : Coating Inspector Inclusive date : Nov. 2011 – 30 March 2012 Company Assignment/ Project Name : Total South Mahakam Field Development Phase 1 & 2 Project Involved : • Field Joint Coating Pipe Line 70 Km: Location: Kuroshio 1 East Kalimantan • Preparation and Trial FJC: HSS/HBE and SPU Su To Trang Project, Vietnam Location: OJS Batam 12. Company Employer: SANTOS (Sampang) Pty. Ltd. E&P (PT. Mafhindo Utama Agency) Position : Multi Discipline Inspector / Supervisor: QA/QC Welding, Piping, Painting/Coating and Supervision Construction. Inclusive date : 01 April 2011 – Oct. 2011 Company Assignment/ Project Name : Wortel Field Development Project Project Involved : • Reviewed MPS/ITP for PQT and Production FBE, Asphalt Enamel, Concrete Weight Coating, NeoPrene and Anode Coating 10” Dia. Location: PT. Indal Steel Pipe Gresik • Piping Blanket Construction Service for Various Development Oyong Modification and Production Barge Modification Location: PKP- Bangun Sarana Baja Gresik • Welhead Structure Jacket Fabrication Wortel Platform and Welhead Structure Jacket/Flexible line Fabrication Oyong extension Platform --------------------------------------------------------------------------------------------------------------------------------- Page 5 of 12 ---------------------------------------------------------------------------------------------------------------------------------
  • 6. --------------------------------------------------------------------------------------------------------------------------------- M Joni Daulay CURRICULUM VITAE Phone: (0778)466027 Mobil: +628127013255 --------------------------------------------------------------------------------------------------------------------------------- Location: PT. PAL Indonesia, Surabaya 11. Company Employer: PT. Timas Suplindo Jakarta Position : Representative QA/QC Welding/Coating Inclusive date : 01 March 2011 – 31 March 2011 Company Assignment/ Project Name : TSB Field Development Project – Kangean Energy Indonesia Project Involved : • PQT and Production Enamel Asphalt and Concrete Coating 18”&20” Dia: Location: PT. Bredero Shaw Indonesia Batam 10. Company Employer: PT. Saipem Indonesia Position : QA/QC Welding Inspector Inclusive date : Feb. – Nov. 2010 Company Assignment/ Project Name : Gajah Baru EPCI Project - Premier Oil Natuna Sea B.V. Project Involved : • Glycol Regeneration Package:  Glycol Flush Drum, Glycol Surge Drum, Glycol Carbon Filter, Glycol Cartride Filter, Glycol Still Column, Glycol Reboiler, Piping, Structural Skid & platform • Produced Water Treatment Package:  Degassing Drum, Deoiler, Piping ans Structural skid base Location: PT. Profab Batam • Instrument Air Compressor Package • Instrument Air Dryer Package • Instrument Air Nitrogen Generator Package: • Lifting and Arrangement/Load Test Spreader Bar Location: GlobalTech Engineering Pte. Ltd. Singapore, Optimal Instrumentation & Engineering Services Singapore, SOON Steel International Singapore, KTL Offshore Singapore • Helicopter Refueling Package:  Aviation Fuel Transportable Tanks, Pressure Vessel Tanks, Aviation Fuel Filling Pump Unit, Aviation Fuel Dispensing Unit, Filter Separator, Water Monitor, Piping, Structural frame base Location: Wilmax Engineering Pte. Ltd. Singapore • Inspection Fire and Safety Equipment Location: Oakwell Engineering International Pte. Ltd. Singapore • Pipeline Installation Aids Fabrication --------------------------------------------------------------------------------------------------------------------------------- Page 6 of 12 ---------------------------------------------------------------------------------------------------------------------------------
  • 7. --------------------------------------------------------------------------------------------------------------------------------- M Joni Daulay CURRICULUM VITAE Phone: (0778)466027 Mobil: +628127013255 ---------------------------------------------------------------------------------------------------------------------------------  Start up Head, Laydown head, Dewatering pig Receiver, Buckle Detector Gauge Plate / Arrangement, Temporary Dewatering Pig Launcher, Flange Protection Shroud, Abandonment & Recovery Head, Lifting Arrangement/ Spreader Bar Location: PT. Viking Engineering. Tanjung Uncang Batam • High Frequency Induction Pipe Bend API 5L X65 SMLS Location: Yeow Hwa Engineering PTE. LTD Singapore • Jacket Installation Aids Modified/Fabricated  Flooding Manifold, Buoyancy Tank Cradles, Levelling Cross Beams, Ballerina Platform, Bear Cage Supports, Upending Clamp Spacer, Hammer Sleeve Spacer for Conductor Pipe 36” OD Location: PT. SMOE Indonesia Batam 9. Company Employer: PT. GERMANISCHER LLOYD Certification Authority (CA) Position : QA/QC Welding Inspector Inclusive date : Dec. 2009-Feb. 2010 Company Assignment: TOTAL Thailand E&P/PTT Project Involved/Location: • Project Bongkot 4A Central Facilities QPS and Flare Tripod  PT. Gunanusa Utama Fabricators Cilegon  SSH Corporation Ltd Singapore Visual Pipe Inspection  Professional Testing Services Singapore Mechanical Testing  DNV Technology Centre Singapore Mechanical Testing 8. Company Employer: SANTOS (Sampang) Pty. Ltd. (PT. Mafhindo Utama Agency) Inclusive date : Feb. 2007-Dec. 2009 Position : Multi Discipline Inspector /Supervisor: QA/QC Welding, Piping, Painting/Coating and Supervision Construction. Project Name : Oyong Field Development Project Project Involved : • Modification, start Up and Shut down of FPSO Sea Good 101 • Oyong Development Project Phase II Pipe Line Offshore 60 Km Sampang Madura to Pasuruan and Onshore Processing Facilities (OPF) Grati Pasuruan East Java  Fabrication Piping, Structural, Pressure Vessel: HP and LP Flare KO Drum, Produced Water Degassing Vessel, Instrument Air Receiver, Plant Air Receiver, Tank --------------------------------------------------------------------------------------------------------------------------------- Page 7 of 12 ---------------------------------------------------------------------------------------------------------------------------------
  • 8. --------------------------------------------------------------------------------------------------------------------------------- M Joni Daulay CURRICULUM VITAE Phone: (0778)466027 Mobil: +628127013255 --------------------------------------------------------------------------------------------------------------------------------- Location PT. PAL Indonesia Surabaya  Conducting Slab Casting / HRC Coil for pipe Production Location: PT. Krakatau Steel Cilegon  Pipe Mill Location: PT. Bakrie Pipe Industries, Bekasi  Coating Pipe FBE, Asphalt Enamel and Concrete Weight Coating and Anode Install Location Bredero Shaw Batam  Pressure Vessel: Produced Water Degassing Vessel, Separator, Instrument Air Receiver, Air Cooler, Shell and Tubes Heat Exchanger Location: PT. Heat Exchangers Indonesia  Metering Control Panel General Arrangement Location: PT. Heat Exchangers Specialist PTE LTD Singapore  Coating NeoPrene Pipe Riser Location: Trelleborg Hercules Pte Ltd Singapore  Hot Induction Bend Pipe Location: Yeow Hwa Engineering PTE LTD Singapore  FBE Pipe Bends Location: FBE Coating Pte. Ltd. Singapore  Pig Launcher/Receiver and Inspection Pressure Vessel: HP Flare KO Drum, LP Flare KO Drum, Produced Water Degassing Vessel, 1st and 2nd stage Separator, Instrument Air Receiver, Plant Air Receiver Location: PT. Profab Batam  Construction Installation / PreCom-Commisioning Pipe Line, Flexible line Sampang Madura to Pasuruan Offshore 60 Km (Field Joint Coating used Heat Shrink Sleeve Canusa service wrap and Infill material Polyurethane Foam) Location: Sampang Madura Sea Offshore to Pasuruan Onshore  Construction and Fabrication Onshore Processing Facilities (OPF) Location: Grati Pasuruan East Java Company Assignment: Total E&P Indonesie Project Name : Sisi Nubi Phase 1 Development Project Position : QA/QC Welding and Pipe Line Inspector Project Involved/Location: • Pipeline Certification offshore East Kalimantan Indonesia 7. Company Employer: PT. GERMANISCHER LLOYD Position : QA/QC Senior Welding and Coating Inspector --------------------------------------------------------------------------------------------------------------------------------- Page 8 of 12 ---------------------------------------------------------------------------------------------------------------------------------
  • 9. --------------------------------------------------------------------------------------------------------------------------------- M Joni Daulay CURRICULUM VITAE Phone: (0778)466027 Mobil: +628127013255 --------------------------------------------------------------------------------------------------------------------------------- Inclusive date : May 2005-Dec. 2006 Project Involved/Location: • Project PT. Perusahaan Gas Negara (Persero) Tbk. PIPELINE South Sumatera – West Java Phase II Welded Pipe 32” OD  Pipe Mill Inspector (PQT and Production)  PT. KHI Pipe Industries (Krakatau Steel Group) Cilegon  PT. SPINDO PASURUAN East Java Indonesia  PT. INDAL STEEL PIPE GRESIK East Java Indonesia  Coating Inspector (PQT and Production)  PT. Bredero Shaw Batam Indonesia  PT. SPINDO PASURUAN East Java Indonesia (assist Spindo first use application FBE External-Internal and 3LPE (FBE + Adhesive + Polyethylene)  PT. INDAL STEEL PIPE GRESIK East Java Indonesia (assist Indal first use application FBE External-Internal and Polyethylene)  Construction Installation Pipe Line Offshore Location: Labuhan Maringgai – Muara Bekasi Indonesia 163 Km 6. Company Employer: PT. PUNJ LLOYD INDONESIA Position : QA/QC Painting/Coating Inspector Inclusive date : Jan-May 2005 Project Involved/Location: • TOTAL E&P INDONESIE TUNU FIELD DEVELOPMENT PROJECT Phase-9/EPSC-2 for PIPE LINE, Trunk Lines Installations  Aerial Pipe Line and Hook Up  Installation of Ø 8”/2” TN W22 to MNP  Installation of Ø 20”/2” GTS Y to MNP  Installation of Ø 8”/2” GTS AC to Scrapper AC  Painting in Fabrication Sungai Purun  Field Joint Coating Polypropylene, Polyurethane, HDPE (FBE+PU+PE) and Anode Install Location: Mahakam Delta region of East-Kalimantan, Indonesia on Fabrication and Offshore 5. Company Employer: SIGMAKALON Pte. Ltd.(SIGMA COATINGS) Singapore Position : Technical Service / Painting Inspector Inclusive date : Dec. 2003-Dec. 2004 • Batam/Singapore 4. Company Employer: MOODY INDONESIA --------------------------------------------------------------------------------------------------------------------------------- Page 9 of 12 ---------------------------------------------------------------------------------------------------------------------------------
  • 10. --------------------------------------------------------------------------------------------------------------------------------- M Joni Daulay CURRICULUM VITAE Phone: (0778)466027 Mobil: +628127013255 --------------------------------------------------------------------------------------------------------------------------------- Position : QA/QC Welding Inspector Inclusive date : August-Dec. 2003 Project Involved/Location: • Conoco Belanak Project  Measuring Dimensional Ovality and Local Out of Roudness (LOOR) and Rapair Bare Pipe Location: Bredero Price Indonesia Yard Batam 3. Company Employer: BETA ENGINEERING Pte Ltd Kabil. Position : QA/QC Welding Inspector Inclusive date : Feb. 2002–August 2003 Project Involved/Location: • Production Facilities Project BARRACUDA Crude Oil Fields PETROBRAS P-43 Santa Fe International Corp P2003 RIG  Piping and Structural Location: Kabil Batam 2. Company Employer: PT. SEKAWAN EKA SEJATI (SES) Inspection Technical Service Position : Representative Batam OCTG Tubular Service Inspection Offshore & Onshore, Maintenance Casing-Tubing and Rotary Drilling Equipment Inspection. Inclusive date : Jan. 2001–Feb. 2002 Project Involved : Maxus, Exspan Nusantara, Tubetech, Kondur Petroleum S.A, Lapindo, Vico. 1. Company Employer: PT. RADIANT UTAMA INTERISCO (Inspection Technical Service) Position : QC OCTG Inspector, Protection Radiation Officer and NDT Inspection Inclusive date : Jan. 1995–Dec. 2000 Project Involved : Rotary Drilling Inspection, OCTG Inspection, Tubular Services, Pressure Vessel Inspection, Tank Inspection, Pipe Line Inspection, Piping and Structure Inspection, Pipe Mill Inspection, Painting/Coating Inspection Project Involved/Location: Maxus, Arco, Unocal, Exspan Sumatera and Kalimantan, Suribor, Exxon Mobil Oil, Hulliburton, Total Indonesie,PT. Citra Tubindo Tbk, PT. Purna Bina Nusa, PT. Pipa Mas Putih, PT. Hymindo, PT. Patraindo Nusa Pertiwi OCTG Inspector, PT. Kartika Yasa Sarana OCTG Inspector, PT. Hydrill, PT. Hytech OCTG Inspector, ABB Vetco Gray, Jray Mc Dermott Indonesia, PT. Nippon Steel Batam, PT. Bredero Price Indonesia, PT. Profab, PT. Kvaerner Oilfield Product of Indonesia (KOPI), PT. Toyo Kanetsu Indonesia, PT. Babcock & Wilcox Indonesia (BVVI). --------------------------------------------------------------------------------------------------------------------------------- Page 10 of 12 ---------------------------------------------------------------------------------------------------------------------------------
  • 11. --------------------------------------------------------------------------------------------------------------------------------- M Joni Daulay CURRICULUM VITAE Phone: (0778)466027 Mobil: +628127013255 --------------------------------------------------------------------------------------------------------------------------------- References: -PT. Timas Suplindo Jakarta Office Phone: +62-21-3522828 Mr. Loga Sundar: QC Manager -PT. Saipem Indonesia Office Phone: +62-21-30022412 Mrs. Henny S Herwahyuni: Senior Inspector Coordinator Mr. Fabien Rabot: QA/QC Manager -PT. Wide & Pin Sentra Menteng blok MN/71 CBN Bintaro Jaya Sektor VII Jakarta 15224 Office Phone: (021)7459434 H. Harijaya: Senior Inspector Coordinator -PT. Mafhindo Utama Wisma Harun, Jl. Raya Pasar Minggu No. 2i Jakarta Selatan 12780 Indonesia Phone 062-021 7943783, 7943785 - Harun Alrasyid Direktur Utama, Agus S, Supri Sarwanto, Johan I - Mr. Ihsanuddin Toha HP: +622191618927 - Mr. Supriyanto HP: 0811959812 -Santos Pty.Ltd Jakarta Indonesia: QA/QC and Construction Manager - Mr. Hercules HP: 08121044509 -Germanischer Lloyd Nusantara - Indonesia Office Phone: +62 021 53679201 - Haryo Wiryono MSc, MEng Director Deputy / General Manager Oil and Gas Division for PGN Pipe Line Project, South Sumatera-West Java Phase II HP: (+62) 811 193 210 Phone: (021)53679201 -Mr. Achmad Zakky Ridwan -PT. Punj Lloyd Indonesia Office Phone: +62 054 1682360 Mr. Shiva QA/QC Manager: HP 08125530741 -Sofyan. TS Director& Founder Yayasan Pendidikan “IKBAL-M-YOS”BATAM Maritime Technology Institute Foundation Batam HP: 0811-702794, Phone: (+62)778-412757 -Lindung Silalahi, Msc. President Director of Staris Giros Indonesia Coating Consultant and Independent Coating Inspector NACE Certificate No. 3841 HP: 08159046956 -Drs. James Richard A. President Dirctor, PT. Sekawan Eka Sejati Jl Citarum no 6 Cideng Barat Jakarta Phone: (+62-21-3844265 HP: 0811969049 -PT. Radiant Utama, OCTG Inspection Division Jl. Kapten Tandean no: 24 Jakarta - Budi Oetomo General Manager - Muhammad Yaqub, Agus Salim ASNT level III, Nuzirman HP: 0818947337 --------------------------------------------------------------------------------------------------------------------------------- Page 11 of 12 ---------------------------------------------------------------------------------------------------------------------------------
  • 12. --------------------------------------------------------------------------------------------------------------------------------- M Joni Daulay CURRICULUM VITAE Phone: (0778)466027 Mobil: +628127013255 --------------------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------------------- Page 12 of 12 ---------------------------------------------------------------------------------------------------------------------------------