SlideShare a Scribd company logo
1 of 14
Download to read offline
CURRICULUM VITAE
Mr.SURAMONTRI ROTTONG
Address:
770 Soi.Sukchan, Makekong
Muang, Samutsongkram 75000
Mobile Phone +66 86 897 2258
Home Phone +66 34 713 129
E-mail : Suramontri@yahoo.com.sg, Suramontri@gmail.com
Position to apply for Planning Engineer
EDUCATION BACKGROUND
SCHOOL / UNIVERSITY
1) Samutsongkram Technical College Secondary (Technical Course) 1985 – 1987
2) Rajamangla Institute of Technology
North Bangkok Campus Machinist (Diploma) 1987 – 1989
3) Rajapark College Industrial Engineer 2004 - 2006
TRAINING / SEMINAR
1. LAN / NETWARE 4.10 FOR (Administration)
2. LAN / NETWARE 3.12 AND INSTALL SERVER
3. LINE NETWORK
4. Microsoft Access
5. Foxpro
6. Visual Basic
7. Microsoft Offices
8. MS Project
9. Primavera P3 and P6
10. AutoCaD
____________________________________________________________________________________________
Company / Address Position Date
AMEC – FOSTER WHEELER Planning Eng. (Oct, 14 – Nov, 16 )
(Singapore DSME Yard)
ZADCO UPPER ZAKUM 750 ISLANDS SURFACE FACILITIES PROJECT – EPC2
 Monitors Module Fabrication Yards.
 China BOMESC Fabrication 5 Modules for Power Substation
 Indonesia SIEMENS Fabrication 12 Modules for MTR (Module Technical Room) 1,200 Tons.
 Singapore DYNA-MAC Fabrication 14 Modules for PAU (Pre-Assembly Unit) 10,000 Tons.
- Prepare KPI and weekly progress report
 Steelwork status
 Fabrication status
 Steelwork erection
 Pipework erection
 Overview of module progress and pictorial view
- Liaise between Contractor planning team regarding claimed progress and slippage.
- Analysis of shop fabrication data, both piping and structural. Providing Project Manager reports
per shipment and module.
Company / Address Position Date
Kellogg Brown & Root (KBR) Planning Eng. (Feb, 11 – Jul, 14)
(Korea HHI Yard Ulsan)
Gorgon LNG Downstream Project
The Greater Gorgon Area is located 200km offshore of the northwest coast of Western Australia and contains
in excess of 40 trillion cubic feet of recoverable natural gas.
- 16.5m Manhours (EPC)
- 200K Tonnes overall
- 97K Tonnes of structure steel
- 97,000 Pipe Spools
- 1.5m meters cable
- 51 Module
JOB DESCRIPTION
 Schedule analysis including development of 8 week lookahead schedules. Creating What if scenarios
based on current fabrication status, structural and piping, predicting on site start date.
 Liaise between Sub-Contract planning team regarding claimed progress and slippage.
 Analysis of shop fabrication data, both piping and structural. Providing superintendents reports per
shipment and module.
 Yard progress verification: analysis of Sub-Contract claimed progress against company verified
progress.
 Baseline schedule slippage reports including: MIR slippage, shop fabrication, footing and yard
assembly dates, impact to RFL dates caused by slippage.
 Summary 8 week look-ahead report communicated to senior management.
 Attend Primary Yard progress meetings and communicate planning progress and issues.
 Compile daily progress report consisting of the following details: tonnage, support no. diameter inch,
spool no.
 Prepare s curves for steelwork and piping supports and DB on a weekly basis and forecasted
requirements
 Prepare weekly progress report
 Steelwork status
 Fabrication status
 Steelwork erection
 Pipework erection
 Overview of module progress and pictorial view
____________________________________________________________________________________________
Company / Address Position Date
Bechtel International, Inc., Planning Eng. (Sep, 11 – Feb, 12)
(Thailand)
Project QCLNG Project
 QC LNG is a multibillion-dollar EPC contact won by OG&C on Feb 5, 2010 - possibly the largest Lump Sum Turn Key
LNG job that Bechtel has taken on!
 Two LNG trains are being developed on Curtis Island, Queensland, AU on a 270-hectare site surrounded by an
environmental buffer zone. They are to produce approximately 8.46 MTPA (million metric tons per year) of liquefied
natural gas utilising the ConocoPhillips Optimised Cascade Process.
 First LNG to use Coal Seam Gas from the Surat Basin in eastern Australia. The gas will be delivered through a 380km
buried pipeline to Gladstone.
 Modules Fabrication at Sriracha Job Site Chonburi Thailand Module Type
 14 Cryogenic Rack, Propane Chiller
 8 Propane Condenser
 14 ISBL Piperack
 44 OSBL Piperack & Jetty Modules
Total Manhouse 6,500,000 Weight 46,641 Tonnes
JOB DESCRIPTION
 Programmed of Work , Progress “S” Curve, Manpower histogram (By trade).
 Monitoring actual of progress comparing with BOQ
 Maintain and update Project schedule
 Work variation and forecast volume
 Project S-Curve, Milestone schedule, 3 week look ahead program
 Critical Shipment follow up and recovery plan preparation
 Evaluate and produce Weekly progressive report, manning report
 Monthly progressive / Critical milestone report and update P6
 Scheduling time period of bid proposal.
____________________________________________________________________________________________
Company / Address Position Date
SNC Lavalin Thermal Power Planning Eng. (Sep, 10 – Aug,11)
(Jordan)
Project : Iraq Fast Track Project (4x125 MW) Base on Jordan (Amman)
JOB DESCRIPTION
 Programmed of Work , Progress “S” Curve, Manpower histogram (By trade).
 Monitoring actual of progress comparing with BOQ
 Maintain and update Project schedule
 Work variation and forecast volume
 Project S-Curve, Milestone schedule, 3 week look ahead program
 Critical Shipment follow up and recovery plan preparation
 Evaluate and produce Weekly progressive report, manning report
 Monthly progressive / Critical milestone report and update P3
 Scheduling time period of bid proposal.
____________________________________________________________________________________________
Company / Address Position Date
Foster Wheeler International Corporation Planning Eng. (Nov, 09 – Sep, 10)
Thailand Operations
JOB DESCRIPTION
Project : Thailand Propylene Oxide Project Owner is Dow Chemical Thailand, Ltd.
Total of Man- hours 5,221,876
 Yard progress verification: analysis of Sub-Contract claimed progress against FWW verified CMS
progress.
 Programmed of Work , Progress “S” Curve, Manpower histogram (By trade).
 Progress, Man-hour & Productivity Report , Progress Evaluation Summary Report.
 Three Week Look-ahead schedule, Weekly Manpower / Man-hour Report.
 Analysis of shop fabrication data, both piping and structural. The purpose of the level 4 Category
Schedule is to set up an overall monthly project status.
 Prepare weekly progress report
 Steelwork status
 Fabrication status
 Steelwork erection
 Pipework erection
 Overview of module progress and pictorial view
____________________________________________________________________________________________
Company / Address Position Date
Foster Wheeler International Corporation Planning Eng. (Dec, 07 – Nov, 09)
Thailand Operations
JOB DESCRIPTION
Project : Pluto LNG Project Western Australia Onshore Pre-Assemblies of Module Thailand
Owner is Woodside Burrup Pty Ltd.
261 Preassemblies
Weights ranging from 10 Te to over 1,700 Te.
Combined circa gross weight of 49,000 Te.
138 PAR’s gross weight 26,000 Te
76 PAS’s gross weight 3,000 Te
47 PAU’s gross weight 20,000 Te
Circa weights and Quantities:
30,600 Te Steelwork
670,000 WDI Pipe
7,000 M Hot Insulation
19,000 M Cold Insulation
270,000 M Electrical & Instrument Cable
7,250 No. Instruments
325 No. Equipment
 Schedule analysis including development of 8 week lookahead schedules. Creating What if scenarios
based on current fabrication status, structural and piping, predicting on site start date.
 Liaise between Sub-Contract planning team regarding claimed progress and slippage.
 Analysis of shop fabrication data, both piping and structural. Providing FWW superintendents reports
per shipment and module.
 Yard progress verification: analysis of Sub-Contract claimed progress against FWW verified
progress.
 Baseline schedule slippage reports including: MIR slippage, shop fabrication, footing and yard
assembly dates, impact to RFL dates caused by slippage.
 Summary 8 week look-ahead report communicated to FWW senior management.
 Attend Primary Yard progress meetings and communicate planning progress and issues.
 Compile daily progress report consisting of the following details: tonnage, support no. diameter inch,
spool no.
 Prepare s curves for steelwork and piping supports and DB on a weekly basis and forecasted
requirements
 Prepare weekly progress report
 Steelwork status
 Fabrication status
 Steelwork erection
 Pipework erection
 Overview of module progress and pictorial view
 Implement P.E superintendent fortnightly lookaheads and analysis on work fronts by priority and
review resource levels.
 Develop Sub-Contract weekly schedule and implement good planning practices.
 Compile planning procedures when applicable to incorporate into Sub-Contract Project Measurement
Procedure i.e GTG’s.
____________________________________________________________________________________________
Company / Address Position Date
IHI (Ishikawajima-Harima Planning Engineer (July,07 – Dec,07)
Heavy Industries Co.,Ltd.)
JOB DESCRIPTION
Project QATAR GAS II (ONSHORE PROJECT LNG STORAGE 5 TANKS)
Owner is Chiyoda Corporation and Technip France Joint Venture (CTJV).
140,000 m³ the tanks have an outer diameter of 78 m and are about 40 m high. The 80 cm thick walls are
horizontally post-tensioned using 19x0.62" while12 strand tendons Ø 0.62" were used for the vertical post-
tensioning.
- Monitoring actual of progress comparing with BOQ
- Maintain and update Project schedule
- Work variation and forecast volume
- Project S-Curve, Milestone schedule, 3 week look ahead program
- Critical Shipment follow up and recovery plan preparation
- Evaluate and produce Weekly progressive report, manning report
- Monthly progressive / Critical milestone report and update P3
- Scheduling time period of bid proposal.
____________________________________________________________________________________________
Company / Address Position Date
CUEL Company Ltd, Planning Engineer (Jun,03 – Jun,07)
JOB DESCRIPTION
Platform Phase 25 – Phase 32, Plocc 2
Owner is Chevron
 Maintain and update Project schedule
 Work variation and forecast volume
 Project S-Curve, Milestone schedule, 3 week look ahead program
 Critical Shipment follow up and recovery plan preparation
 Evaluate and produce Weekly progressive report, manning report
 Monthly progressive / Critical milestone report
 Scheduling time period of bid proposal.
____________________________________________________________________________________________
Company / Address Position Date
Thai Jurong Engineering Ltd. Project Planning Coordinator (April-2000)-(Jun-2003)
JOB DESCRIPTION
I had worked for TJEL for various projects.
MTC Technical Testing Center.
The New Bangkok International Airport Project for section PLB with ShinMaywa, Japan.
My Job Duties are
 Coordinates with Project Site
 Makes Project Schedule by MS-Project and s-curve
 Cost Control key in all cost report to project manager.
 Update Progress by Primavera soft ware.
 Planning manpower, Equipment and cost and make monthly report to ITO
____________________________________________________________________________________________
Company / Address Position Date
HIAP SENG SINGAPORE Planning Eng. (JAN-1999)–(JAN-2000)
SINGAPORE
JOB DESCRIPTION
 Make planning and schedule to Project Manager.
 Record Progress. SALAYA Project, SOP Project
____________________________________________________________________________________________
Company / Address Position Date
THAI NEPCO COMPANY LIMITED Planning July, 1998 to 1999
JOB DESCRIPTION
PROJECT
Power Plant Rojana Project (Ayuttaya) 122 MW combined cycle,
SAHA Cogeneration (Chonburi) 122 MW combined cycle
 Make planning and schedule to Project Manager.
 Update Progress
____________________________________________________________________________________________
Company / Address Position Date
PRIL Pacific Resources Int. Ltd. Scheduling Sep. 1996 to July 1998
Fomosa, Plastic Group.
Mailiao, Yulin, Taiwan R.O.C.
PROJECT QUANTITY
1. T001 – FBM6TOAO, PVC Silo Tanks, 28 Sets 28,283 TONS
2. T002 – BZUMTO3O, Utility Tank 9 Sets 559 TONS
3. T003 – SM-1, Piping, CSPPOAE & CUCPOAE 134,808 DB
4. T004 – DOZMTOII, DOP, Storage Tank 26 Sets 18,000 TONS
5. T005 – SR11 – Shin – Kang Fabrication Shop 100,877 DB
6. T006 – EH9MT020, Storage Tank 3 sets 161 TONS
7. T007 – V63PZPPOPAE, Utility Pipe Rack 530 Km. 663,203 DB
8. T008 – BQ4MT020, Storage Tank 18 Sets 1,473 TONS
JOB DESCRIPTION
 Update Progress and schedule, monthly report
____________________________________________________________________________________________
Company / Address Position Date
PAE(Thailand) Public Company Limited MMS Jan 1993 to Sep. 1996
JOB DESCRIPTION
 Update Progress and schedule
 Material control
____________________________________________________________________________________________
Company / Address Position Date
Bechtel International, Inc. (Kuwait) Operator Sep. 1991 to Dec. 1992
A – PROJECT
1. Project (AL – AWADA) To put our a fire in the oil well, Firefighter, (after gulf war)
2. Project (AL – TAMEER) Maintain refinery, oil well (after gulf war)
3. Flow line Project, Pipeline
JOB DESCRIPTION
 Duties and Responsibilities.
 Input material data, Control
 Input schedule record
CURRICULUM VITA Suramontri (Planning)
CURRICULUM VITA Suramontri (Planning)
CURRICULUM VITA Suramontri (Planning)
CURRICULUM VITA Suramontri (Planning)
CURRICULUM VITA Suramontri (Planning)
CURRICULUM VITA Suramontri (Planning)
CURRICULUM VITA Suramontri (Planning)
CURRICULUM VITA Suramontri (Planning)

More Related Content

What's hot

Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016
ehsan nazeer
 
CV of Charlemagne Cartel Celo_2017
CV of Charlemagne Cartel Celo_2017CV of Charlemagne Cartel Celo_2017
CV of Charlemagne Cartel Celo_2017
Charlemagne Celo
 
Abi Ninan Joseph cv 10-01-2016
Abi Ninan Joseph cv  10-01-2016Abi Ninan Joseph cv  10-01-2016
Abi Ninan Joseph cv 10-01-2016
Abi Joseph
 
RESUME-MOHAN MUKUND
RESUME-MOHAN MUKUNDRESUME-MOHAN MUKUND
RESUME-MOHAN MUKUND
Mukund Mohan
 
RashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashidFaruqi_Resume_Current
RashidFaruqi_Resume_Current
Rashid Faruqi
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Nirav Mistry
 
AVS Krishna Resume
AVS Krishna ResumeAVS Krishna Resume
AVS Krishna Resume
Krishna avs
 

What's hot (20)

Suresh Profile
Suresh ProfileSuresh Profile
Suresh Profile
 
Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016
 
CV of Charlemagne Cartel Celo_2017
CV of Charlemagne Cartel Celo_2017CV of Charlemagne Cartel Celo_2017
CV of Charlemagne Cartel Celo_2017
 
CV at 2015 Aug
CV at 2015 AugCV at 2015 Aug
CV at 2015 Aug
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineer
 
Ben-Coleman II
Ben-Coleman IIBen-Coleman II
Ben-Coleman II
 
RizwanKhan CV
RizwanKhan CVRizwanKhan CV
RizwanKhan CV
 
Resume
ResumeResume
Resume
 
Abi Ninan Joseph cv 10-01-2016
Abi Ninan Joseph cv  10-01-2016Abi Ninan Joseph cv  10-01-2016
Abi Ninan Joseph cv 10-01-2016
 
khalid mowafy CV
khalid mowafy CVkhalid mowafy CV
khalid mowafy CV
 
Roberto Guevara-CV
Roberto Guevara-CVRoberto Guevara-CV
Roberto Guevara-CV
 
RESUME-MOHAN MUKUND
RESUME-MOHAN MUKUNDRESUME-MOHAN MUKUND
RESUME-MOHAN MUKUND
 
Hossam CV-FEB2016
Hossam CV-FEB2016Hossam CV-FEB2016
Hossam CV-FEB2016
 
Ravi Resume
Ravi ResumeRavi Resume
Ravi Resume
 
CV - Hassan-Planning
CV - Hassan-PlanningCV - Hassan-Planning
CV - Hassan-Planning
 
SUYOG_2015
SUYOG_2015SUYOG_2015
SUYOG_2015
 
RashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashidFaruqi_Resume_Current
RashidFaruqi_Resume_Current
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
 
SamarKantiBarua
SamarKantiBaruaSamarKantiBarua
SamarKantiBarua
 
AVS Krishna Resume
AVS Krishna ResumeAVS Krishna Resume
AVS Krishna Resume
 

Viewers also liked (12)

Semana 03 fuentes_del_derecho
Semana 03 fuentes_del_derechoSemana 03 fuentes_del_derecho
Semana 03 fuentes_del_derecho
 
Microprocesadores
MicroprocesadoresMicroprocesadores
Microprocesadores
 
Euvg dps
Euvg dpsEuvg dps
Euvg dps
 
Magzine final
Magzine finalMagzine final
Magzine final
 
Manifesto-version-finale
Manifesto-version-finaleManifesto-version-finale
Manifesto-version-finale
 
Descubrimientos de algunos Cientificos
Descubrimientos de algunos CientificosDescubrimientos de algunos Cientificos
Descubrimientos de algunos Cientificos
 
In the industry #2: Starbucks Coffee
In the industry #2: Starbucks CoffeeIn the industry #2: Starbucks Coffee
In the industry #2: Starbucks Coffee
 
Aspectos éTicos De La GestióN Del Cuidado
Aspectos éTicos De La GestióN Del CuidadoAspectos éTicos De La GestióN Del Cuidado
Aspectos éTicos De La GestióN Del Cuidado
 
Fox incaico por Carolina Alba
Fox incaico por Carolina AlbaFox incaico por Carolina Alba
Fox incaico por Carolina Alba
 
Magazine 2
Magazine 2Magazine 2
Magazine 2
 
Tesis pedro corregida 2016
Tesis pedro corregida 2016Tesis pedro corregida 2016
Tesis pedro corregida 2016
 
Gènero yumbo
Gènero yumboGènero yumbo
Gènero yumbo
 

Similar to CURRICULUM VITA Suramontri (Planning)

CV SAIF UR REHMAN
CV SAIF UR REHMANCV SAIF UR REHMAN
CV SAIF UR REHMAN
Saif kharal
 
Resume - Kedar Borgaonkar -6-Apr-16
Resume - Kedar Borgaonkar -6-Apr-16Resume - Kedar Borgaonkar -6-Apr-16
Resume - Kedar Borgaonkar -6-Apr-16
Kedar Borgaonkar
 
M. Obeidat- IPP3 Sr.Performance & Efficiency engineer
M. Obeidat- IPP3 Sr.Performance &  Efficiency engineerM. Obeidat- IPP3 Sr.Performance &  Efficiency engineer
M. Obeidat- IPP3 Sr.Performance & Efficiency engineer
Mohammed Obeidat, I.A
 
ayed cv.newest one 23.11.2011
ayed cv.newest one 23.11.2011ayed cv.newest one 23.11.2011
ayed cv.newest one 23.11.2011
Iyad Hassan
 
CV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerCV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning Engineer
Sankar Sundaram PMP
 
Civil QA&QC Inspector Updated Resume
Civil  QA&QC Inspector Updated ResumeCivil  QA&QC Inspector Updated Resume
Civil QA&QC Inspector Updated Resume
Murugan murugan
 
Suvajit_Resume
Suvajit_ResumeSuvajit_Resume
Suvajit_Resume
Jit Roy
 
Mantena Neeladri varma_original
Mantena Neeladri varma_originalMantena Neeladri varma_original
Mantena Neeladri varma_original
Neeladri varma
 
CV_Tarun Kumar Behera
CV_Tarun Kumar BeheraCV_Tarun Kumar Behera
CV_Tarun Kumar Behera
Tarun Behera
 
Planning Engineer CV Faizan
Planning Engineer CV FaizanPlanning Engineer CV Faizan
Planning Engineer CV Faizan
Faizan Ahmed
 
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
John Raj BE, MBA
 
Abdul Basit Resume
Abdul Basit ResumeAbdul Basit Resume
Abdul Basit Resume
Abdul Basit
 

Similar to CURRICULUM VITA Suramontri (Planning) (20)

CV SAIF UR REHMAN
CV SAIF UR REHMANCV SAIF UR REHMAN
CV SAIF UR REHMAN
 
CV Shray Jain
CV Shray Jain CV Shray Jain
CV Shray Jain
 
khawar Resume
khawar Resumekhawar Resume
khawar Resume
 
M.Saravanan - Resume
M.Saravanan - ResumeM.Saravanan - Resume
M.Saravanan - Resume
 
Resume - Kedar Borgaonkar -6-Apr-16
Resume - Kedar Borgaonkar -6-Apr-16Resume - Kedar Borgaonkar -6-Apr-16
Resume - Kedar Borgaonkar -6-Apr-16
 
M. Obeidat- IPP3 Sr.Performance & Efficiency engineer
M. Obeidat- IPP3 Sr.Performance &  Efficiency engineerM. Obeidat- IPP3 Sr.Performance &  Efficiency engineer
M. Obeidat- IPP3 Sr.Performance & Efficiency engineer
 
Resume (2)
Resume (2)Resume (2)
Resume (2)
 
ayed cv.newest one 23.11.2011
ayed cv.newest one 23.11.2011ayed cv.newest one 23.11.2011
ayed cv.newest one 23.11.2011
 
CV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerCV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning Engineer
 
Civil QA&QC Inspector Updated Resume
Civil  QA&QC Inspector Updated ResumeCivil  QA&QC Inspector Updated Resume
Civil QA&QC Inspector Updated Resume
 
Suvajit_Resume
Suvajit_ResumeSuvajit_Resume
Suvajit_Resume
 
Mantena Neeladri varma_original
Mantena Neeladri varma_originalMantena Neeladri varma_original
Mantena Neeladri varma_original
 
CV_Tarun Kumar Behera
CV_Tarun Kumar BeheraCV_Tarun Kumar Behera
CV_Tarun Kumar Behera
 
Resume.
Resume.Resume.
Resume.
 
Planning Engineer CV Faizan
Planning Engineer CV FaizanPlanning Engineer CV Faizan
Planning Engineer CV Faizan
 
Udayalikumar _CV_10.05.16
Udayalikumar _CV_10.05.16Udayalikumar _CV_10.05.16
Udayalikumar _CV_10.05.16
 
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
 
Abdul basit resume
Abdul basit resumeAbdul basit resume
Abdul basit resume
 
Abdul Basit Resume
Abdul Basit ResumeAbdul Basit Resume
Abdul Basit Resume
 
ketul
ketulketul
ketul
 

CURRICULUM VITA Suramontri (Planning)

  • 1. CURRICULUM VITAE Mr.SURAMONTRI ROTTONG Address: 770 Soi.Sukchan, Makekong Muang, Samutsongkram 75000 Mobile Phone +66 86 897 2258 Home Phone +66 34 713 129 E-mail : Suramontri@yahoo.com.sg, Suramontri@gmail.com Position to apply for Planning Engineer EDUCATION BACKGROUND SCHOOL / UNIVERSITY 1) Samutsongkram Technical College Secondary (Technical Course) 1985 – 1987 2) Rajamangla Institute of Technology North Bangkok Campus Machinist (Diploma) 1987 – 1989 3) Rajapark College Industrial Engineer 2004 - 2006 TRAINING / SEMINAR 1. LAN / NETWARE 4.10 FOR (Administration) 2. LAN / NETWARE 3.12 AND INSTALL SERVER 3. LINE NETWORK 4. Microsoft Access 5. Foxpro 6. Visual Basic 7. Microsoft Offices 8. MS Project 9. Primavera P3 and P6 10. AutoCaD ____________________________________________________________________________________________ Company / Address Position Date AMEC – FOSTER WHEELER Planning Eng. (Oct, 14 – Nov, 16 ) (Singapore DSME Yard) ZADCO UPPER ZAKUM 750 ISLANDS SURFACE FACILITIES PROJECT – EPC2  Monitors Module Fabrication Yards.  China BOMESC Fabrication 5 Modules for Power Substation  Indonesia SIEMENS Fabrication 12 Modules for MTR (Module Technical Room) 1,200 Tons.  Singapore DYNA-MAC Fabrication 14 Modules for PAU (Pre-Assembly Unit) 10,000 Tons. - Prepare KPI and weekly progress report  Steelwork status  Fabrication status  Steelwork erection  Pipework erection  Overview of module progress and pictorial view - Liaise between Contractor planning team regarding claimed progress and slippage. - Analysis of shop fabrication data, both piping and structural. Providing Project Manager reports per shipment and module.
  • 2. Company / Address Position Date Kellogg Brown & Root (KBR) Planning Eng. (Feb, 11 – Jul, 14) (Korea HHI Yard Ulsan) Gorgon LNG Downstream Project The Greater Gorgon Area is located 200km offshore of the northwest coast of Western Australia and contains in excess of 40 trillion cubic feet of recoverable natural gas. - 16.5m Manhours (EPC) - 200K Tonnes overall - 97K Tonnes of structure steel - 97,000 Pipe Spools - 1.5m meters cable - 51 Module JOB DESCRIPTION  Schedule analysis including development of 8 week lookahead schedules. Creating What if scenarios based on current fabrication status, structural and piping, predicting on site start date.  Liaise between Sub-Contract planning team regarding claimed progress and slippage.  Analysis of shop fabrication data, both piping and structural. Providing superintendents reports per shipment and module.  Yard progress verification: analysis of Sub-Contract claimed progress against company verified progress.  Baseline schedule slippage reports including: MIR slippage, shop fabrication, footing and yard assembly dates, impact to RFL dates caused by slippage.  Summary 8 week look-ahead report communicated to senior management.  Attend Primary Yard progress meetings and communicate planning progress and issues.  Compile daily progress report consisting of the following details: tonnage, support no. diameter inch, spool no.  Prepare s curves for steelwork and piping supports and DB on a weekly basis and forecasted requirements  Prepare weekly progress report  Steelwork status  Fabrication status  Steelwork erection  Pipework erection  Overview of module progress and pictorial view ____________________________________________________________________________________________ Company / Address Position Date Bechtel International, Inc., Planning Eng. (Sep, 11 – Feb, 12) (Thailand) Project QCLNG Project  QC LNG is a multibillion-dollar EPC contact won by OG&C on Feb 5, 2010 - possibly the largest Lump Sum Turn Key LNG job that Bechtel has taken on!  Two LNG trains are being developed on Curtis Island, Queensland, AU on a 270-hectare site surrounded by an environmental buffer zone. They are to produce approximately 8.46 MTPA (million metric tons per year) of liquefied natural gas utilising the ConocoPhillips Optimised Cascade Process.  First LNG to use Coal Seam Gas from the Surat Basin in eastern Australia. The gas will be delivered through a 380km buried pipeline to Gladstone.  Modules Fabrication at Sriracha Job Site Chonburi Thailand Module Type  14 Cryogenic Rack, Propane Chiller  8 Propane Condenser  14 ISBL Piperack  44 OSBL Piperack & Jetty Modules Total Manhouse 6,500,000 Weight 46,641 Tonnes
  • 3. JOB DESCRIPTION  Programmed of Work , Progress “S” Curve, Manpower histogram (By trade).  Monitoring actual of progress comparing with BOQ  Maintain and update Project schedule  Work variation and forecast volume  Project S-Curve, Milestone schedule, 3 week look ahead program  Critical Shipment follow up and recovery plan preparation  Evaluate and produce Weekly progressive report, manning report  Monthly progressive / Critical milestone report and update P6  Scheduling time period of bid proposal. ____________________________________________________________________________________________ Company / Address Position Date SNC Lavalin Thermal Power Planning Eng. (Sep, 10 – Aug,11) (Jordan) Project : Iraq Fast Track Project (4x125 MW) Base on Jordan (Amman) JOB DESCRIPTION  Programmed of Work , Progress “S” Curve, Manpower histogram (By trade).  Monitoring actual of progress comparing with BOQ  Maintain and update Project schedule  Work variation and forecast volume  Project S-Curve, Milestone schedule, 3 week look ahead program  Critical Shipment follow up and recovery plan preparation  Evaluate and produce Weekly progressive report, manning report  Monthly progressive / Critical milestone report and update P3  Scheduling time period of bid proposal. ____________________________________________________________________________________________ Company / Address Position Date Foster Wheeler International Corporation Planning Eng. (Nov, 09 – Sep, 10) Thailand Operations JOB DESCRIPTION Project : Thailand Propylene Oxide Project Owner is Dow Chemical Thailand, Ltd. Total of Man- hours 5,221,876  Yard progress verification: analysis of Sub-Contract claimed progress against FWW verified CMS progress.  Programmed of Work , Progress “S” Curve, Manpower histogram (By trade).  Progress, Man-hour & Productivity Report , Progress Evaluation Summary Report.  Three Week Look-ahead schedule, Weekly Manpower / Man-hour Report.  Analysis of shop fabrication data, both piping and structural. The purpose of the level 4 Category Schedule is to set up an overall monthly project status.  Prepare weekly progress report  Steelwork status  Fabrication status  Steelwork erection  Pipework erection  Overview of module progress and pictorial view ____________________________________________________________________________________________
  • 4. Company / Address Position Date Foster Wheeler International Corporation Planning Eng. (Dec, 07 – Nov, 09) Thailand Operations JOB DESCRIPTION Project : Pluto LNG Project Western Australia Onshore Pre-Assemblies of Module Thailand Owner is Woodside Burrup Pty Ltd. 261 Preassemblies Weights ranging from 10 Te to over 1,700 Te. Combined circa gross weight of 49,000 Te. 138 PAR’s gross weight 26,000 Te 76 PAS’s gross weight 3,000 Te 47 PAU’s gross weight 20,000 Te Circa weights and Quantities: 30,600 Te Steelwork 670,000 WDI Pipe 7,000 M Hot Insulation 19,000 M Cold Insulation 270,000 M Electrical & Instrument Cable 7,250 No. Instruments 325 No. Equipment  Schedule analysis including development of 8 week lookahead schedules. Creating What if scenarios based on current fabrication status, structural and piping, predicting on site start date.  Liaise between Sub-Contract planning team regarding claimed progress and slippage.  Analysis of shop fabrication data, both piping and structural. Providing FWW superintendents reports per shipment and module.  Yard progress verification: analysis of Sub-Contract claimed progress against FWW verified progress.  Baseline schedule slippage reports including: MIR slippage, shop fabrication, footing and yard assembly dates, impact to RFL dates caused by slippage.  Summary 8 week look-ahead report communicated to FWW senior management.  Attend Primary Yard progress meetings and communicate planning progress and issues.  Compile daily progress report consisting of the following details: tonnage, support no. diameter inch, spool no.  Prepare s curves for steelwork and piping supports and DB on a weekly basis and forecasted requirements  Prepare weekly progress report  Steelwork status  Fabrication status  Steelwork erection  Pipework erection  Overview of module progress and pictorial view  Implement P.E superintendent fortnightly lookaheads and analysis on work fronts by priority and review resource levels.  Develop Sub-Contract weekly schedule and implement good planning practices.  Compile planning procedures when applicable to incorporate into Sub-Contract Project Measurement Procedure i.e GTG’s. ____________________________________________________________________________________________ Company / Address Position Date IHI (Ishikawajima-Harima Planning Engineer (July,07 – Dec,07)
  • 5. Heavy Industries Co.,Ltd.) JOB DESCRIPTION Project QATAR GAS II (ONSHORE PROJECT LNG STORAGE 5 TANKS) Owner is Chiyoda Corporation and Technip France Joint Venture (CTJV). 140,000 m³ the tanks have an outer diameter of 78 m and are about 40 m high. The 80 cm thick walls are horizontally post-tensioned using 19x0.62" while12 strand tendons Ø 0.62" were used for the vertical post- tensioning. - Monitoring actual of progress comparing with BOQ - Maintain and update Project schedule - Work variation and forecast volume - Project S-Curve, Milestone schedule, 3 week look ahead program - Critical Shipment follow up and recovery plan preparation - Evaluate and produce Weekly progressive report, manning report - Monthly progressive / Critical milestone report and update P3 - Scheduling time period of bid proposal. ____________________________________________________________________________________________ Company / Address Position Date CUEL Company Ltd, Planning Engineer (Jun,03 – Jun,07) JOB DESCRIPTION Platform Phase 25 – Phase 32, Plocc 2 Owner is Chevron  Maintain and update Project schedule  Work variation and forecast volume  Project S-Curve, Milestone schedule, 3 week look ahead program  Critical Shipment follow up and recovery plan preparation  Evaluate and produce Weekly progressive report, manning report  Monthly progressive / Critical milestone report  Scheduling time period of bid proposal. ____________________________________________________________________________________________ Company / Address Position Date Thai Jurong Engineering Ltd. Project Planning Coordinator (April-2000)-(Jun-2003) JOB DESCRIPTION I had worked for TJEL for various projects. MTC Technical Testing Center. The New Bangkok International Airport Project for section PLB with ShinMaywa, Japan. My Job Duties are  Coordinates with Project Site  Makes Project Schedule by MS-Project and s-curve  Cost Control key in all cost report to project manager.  Update Progress by Primavera soft ware.  Planning manpower, Equipment and cost and make monthly report to ITO ____________________________________________________________________________________________ Company / Address Position Date HIAP SENG SINGAPORE Planning Eng. (JAN-1999)–(JAN-2000) SINGAPORE
  • 6. JOB DESCRIPTION  Make planning and schedule to Project Manager.  Record Progress. SALAYA Project, SOP Project ____________________________________________________________________________________________ Company / Address Position Date THAI NEPCO COMPANY LIMITED Planning July, 1998 to 1999 JOB DESCRIPTION PROJECT Power Plant Rojana Project (Ayuttaya) 122 MW combined cycle, SAHA Cogeneration (Chonburi) 122 MW combined cycle  Make planning and schedule to Project Manager.  Update Progress ____________________________________________________________________________________________ Company / Address Position Date PRIL Pacific Resources Int. Ltd. Scheduling Sep. 1996 to July 1998 Fomosa, Plastic Group. Mailiao, Yulin, Taiwan R.O.C. PROJECT QUANTITY 1. T001 – FBM6TOAO, PVC Silo Tanks, 28 Sets 28,283 TONS 2. T002 – BZUMTO3O, Utility Tank 9 Sets 559 TONS 3. T003 – SM-1, Piping, CSPPOAE & CUCPOAE 134,808 DB 4. T004 – DOZMTOII, DOP, Storage Tank 26 Sets 18,000 TONS 5. T005 – SR11 – Shin – Kang Fabrication Shop 100,877 DB 6. T006 – EH9MT020, Storage Tank 3 sets 161 TONS 7. T007 – V63PZPPOPAE, Utility Pipe Rack 530 Km. 663,203 DB 8. T008 – BQ4MT020, Storage Tank 18 Sets 1,473 TONS JOB DESCRIPTION  Update Progress and schedule, monthly report ____________________________________________________________________________________________ Company / Address Position Date PAE(Thailand) Public Company Limited MMS Jan 1993 to Sep. 1996 JOB DESCRIPTION  Update Progress and schedule  Material control ____________________________________________________________________________________________ Company / Address Position Date Bechtel International, Inc. (Kuwait) Operator Sep. 1991 to Dec. 1992 A – PROJECT 1. Project (AL – AWADA) To put our a fire in the oil well, Firefighter, (after gulf war) 2. Project (AL – TAMEER) Maintain refinery, oil well (after gulf war) 3. Flow line Project, Pipeline JOB DESCRIPTION  Duties and Responsibilities.  Input material data, Control  Input schedule record