Work Description
Prepare the programme, ie : Baseline, Tender & Revised incorporate contract 
requirement, ie: Resources & Cost loading, Analysis Report, Plan Value Curve & 
Resources Histogram.
Monitoring and updating progress of works and Milestone tracking
Bachelor s Degree (Hons) Civil Engineering, UTM (2005)
Personal Information
Monitoring and updating  progress of works and Milestone tracking.
Presenting current progress, often with visual aids such as bar chart and
S curve.
Co‐ordinate with the site personnel, subcontractors and client throughout the
process, making adjustments to projects if necessary.
Conducted / Participated the Planning and Production meeting with
subcontractors & site personnel.
 Date of Birth :
16th July 1979
 Age
37 years old
Work Experience                                   (12 years in Planning/ Scheduling)
WCT Holding Berhad (Jun 2013 – Present)
Analysis of various reports ie: daily, weekly, monthly & preparation of
Management & client information reports.
Compiling the Extension Of Time (EOT) evidence and prepare the EOT document
 Marital Status
Married
 Nationality
Malaysia
WCT Holding Berhad (Jun 2013 – Present)
Assistant Manager (Planning) Jun 2015 ‐ Present
Senior Planning Engineer – Jun 2013 to May 2015
Tun Razak Exchange : Contract 1 (Earthworks), Contract Lendlease 1MDB JV
& Contract 2 (Infra, Tunnel & Elevated Road) worth MYR 1.1 billion.
4th Lane PLUS Highway Package E, Nilai to Seremban worth  MYR 390 million.
Add d V l
 Address:
No.26, Jalan 24/KU 11,
Taman Desa Kencana,
Meru, 42150 Klang,
Selangor
Ahmad Zaki Resources Berhad (Sep 2008 – May 2013)
Senior Planning Engineer cum. Acting Construction Manager
Klang Valley Mass Rapid Transit (KVMRT) Project  worth MYR 760 million.
HQ‐ Panning Dept.(Operation) ‐ Pre Tender Planning/ Scheduling.
East Coast Highway Package 9C, Terengganu worth MYR 125 million.
Added Value
•Knowledgeable in Planning/ 
Scheduling for Highway, 
Trackworks & Building.
•Guide junior planner on 
scheduling the programme
Cekapadu Sdn.Bhd (Oct 2005 – Aug 2008)
Planner cum. Project Engineer/ Asst. Project Manager
Police Quarters,Kuala Kangsar,Perak worth MYR 60 million.
Upgrading Kolej MARA,Kuala Nerang,Kedah worth  MYR 15 million.
Tazal Corporation Sdn .Bhd (Mar 2004 ‐ Sep 2005)
scheduling the programme 
and assist on the
programme troubleshoot.
•Comply with SHE & QAQC
Requirement.
•Active Members in 
www.planningplanet.com &
Planner cum. Site Engineer
International Student Hostel No.9,UIAM worth  MYR 40 million 
Availability
Immediately after notice 
period of 2 months
Skills
 Primavera P6 to P8
 MS Project 2000, 2003, 2007 and 2010
 MS Office
 AutoCAD
www.PMSite.com
Contact Me Performance Competency
 Positive Attitude
 Punctuality
 Creative and Innovative
 Responsive 
 Precise
 Good Analytical
 Accountable in Nature
 Multi‐ Tasking
+60 19 2094246
mzmr5879@gmail.com

More Related Content

What's hot (20)

Saravanan V
Saravanan VSaravanan V
Saravanan V
 
Eng.ahmed_Yousef CV
Eng.ahmed_Yousef   CVEng.ahmed_Yousef   CV
Eng.ahmed_Yousef CV
 
Schoonraad Resume - 2016
Schoonraad Resume - 2016Schoonraad Resume - 2016
Schoonraad Resume - 2016
 
Ahmed salem abd a c vl10 (Autosaved) (Repaired)
Ahmed salem abd a c vl10 (Autosaved) (Repaired)Ahmed salem abd a c vl10 (Autosaved) (Repaired)
Ahmed salem abd a c vl10 (Autosaved) (Repaired)
 
Civil Engineer Job Description Template by Bayt.com
Civil Engineer Job Description Template by Bayt.comCivil Engineer Job Description Template by Bayt.com
Civil Engineer Job Description Template by Bayt.com
 
Eng.Mohamed Sayed Resume R3
Eng.Mohamed Sayed Resume R3Eng.Mohamed Sayed Resume R3
Eng.Mohamed Sayed Resume R3
 
Ahmed Aboul Azm
Ahmed Aboul AzmAhmed Aboul Azm
Ahmed Aboul Azm
 
CV_Mohamed-Nas
CV_Mohamed-NasCV_Mohamed-Nas
CV_Mohamed-Nas
 
Resume_Sherif El-Sherif
Resume_Sherif El-SherifResume_Sherif El-Sherif
Resume_Sherif El-Sherif
 
AHMED C.V 2016
AHMED C.V  2016AHMED C.V  2016
AHMED C.V 2016
 
KhaledAlnajada 01-July-2015
KhaledAlnajada 01-July-2015KhaledAlnajada 01-July-2015
KhaledAlnajada 01-July-2015
 
CV
CVCV
CV
 
khaled CV 01
khaled CV 01khaled CV 01
khaled CV 01
 
C V Eng_Hisham AlRefaey_ Senior Civil Eng.
C V Eng_Hisham AlRefaey_ Senior Civil Eng.C V Eng_Hisham AlRefaey_ Senior Civil Eng.
C V Eng_Hisham AlRefaey_ Senior Civil Eng.
 
Ahmed Shakshouk
Ahmed ShakshoukAhmed Shakshouk
Ahmed Shakshouk
 
Ahmed Adel Mohamed Nasser
Ahmed Adel Mohamed NasserAhmed Adel Mohamed Nasser
Ahmed Adel Mohamed Nasser
 
Rowida CV
Rowida CV Rowida CV
Rowida CV
 
ENG Gamal CV
ENG Gamal CVENG Gamal CV
ENG Gamal CV
 
Career path may 2019
Career path   may 2019Career path   may 2019
Career path may 2019
 
Mohamed_Huseiny CV-2016+exp.cert
Mohamed_Huseiny CV-2016+exp.certMohamed_Huseiny CV-2016+exp.cert
Mohamed_Huseiny CV-2016+exp.cert
 

Similar to Cv mmr 11052016

Mohanad MansourCivil Engineer
Mohanad MansourCivil EngineerMohanad MansourCivil Engineer
Mohanad MansourCivil EngineerMohanad Mansour
 
IRJET- Redevelopment of Structure with the Help of Building Information M...
IRJET-  	  Redevelopment of Structure with the Help of Building Information M...IRJET-  	  Redevelopment of Structure with the Help of Building Information M...
IRJET- Redevelopment of Structure with the Help of Building Information M...IRJET Journal
 
Multi sites construction management and supervision - Oracle Primavera P6 Co...
Multi sites construction management and supervision  - Oracle Primavera P6 Co...Multi sites construction management and supervision  - Oracle Primavera P6 Co...
Multi sites construction management and supervision - Oracle Primavera P6 Co...p6academy
 
Sainuddden alanthi
Sainuddden alanthiSainuddden alanthi
Sainuddden alanthisainu9740
 
Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...
Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...
Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...satish kumar
 
experience letters in canada dubai bangladesh singapore.PDF
experience letters in canada  dubai bangladesh singapore.PDFexperience letters in canada  dubai bangladesh singapore.PDF
experience letters in canada dubai bangladesh singapore.PDFMohammad Zakir Hussain, PMP,CSO
 
Ahmed M. Osman_CV_2016
Ahmed M. Osman_CV_2016Ahmed M. Osman_CV_2016
Ahmed M. Osman_CV_2016Ahmed zakria
 
Role of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction ProjectRole of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction ProjectIOSR Journals
 

Similar to Cv mmr 11052016 (20)

CURRICULAM VITAE - M
CURRICULAM VITAE - MCURRICULAM VITAE - M
CURRICULAM VITAE - M
 
Mohanad MansourCivil Engineer
Mohanad MansourCivil EngineerMohanad MansourCivil Engineer
Mohanad MansourCivil Engineer
 
Resume _ Sahabuddin Seikh
Resume _ Sahabuddin SeikhResume _ Sahabuddin Seikh
Resume _ Sahabuddin Seikh
 
C.V
C.VC.V
C.V
 
Humaid Al Sharji SCC_CV
Humaid Al Sharji SCC_CVHumaid Al Sharji SCC_CV
Humaid Al Sharji SCC_CV
 
Shahzad Sikandaruk
Shahzad SikandarukShahzad Sikandaruk
Shahzad Sikandaruk
 
IRJET- Redevelopment of Structure with the Help of Building Information M...
IRJET-  	  Redevelopment of Structure with the Help of Building Information M...IRJET-  	  Redevelopment of Structure with the Help of Building Information M...
IRJET- Redevelopment of Structure with the Help of Building Information M...
 
RAED CV
RAED CVRAED CV
RAED CV
 
Mohammad .Afzaal
Mohammad .AfzaalMohammad .Afzaal
Mohammad .Afzaal
 
Mohammad .afzaal
Mohammad .afzaalMohammad .afzaal
Mohammad .afzaal
 
2016-CV
2016-CV2016-CV
2016-CV
 
eng.abdi cv22
eng.abdi  cv22eng.abdi  cv22
eng.abdi cv22
 
Yenimi CV Version 2
Yenimi CV Version 2Yenimi CV Version 2
Yenimi CV Version 2
 
Multi sites construction management and supervision - Oracle Primavera P6 Co...
Multi sites construction management and supervision  - Oracle Primavera P6 Co...Multi sites construction management and supervision  - Oracle Primavera P6 Co...
Multi sites construction management and supervision - Oracle Primavera P6 Co...
 
Sainuddden alanthi
Sainuddden alanthiSainuddden alanthi
Sainuddden alanthi
 
Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...
Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...
Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...
 
experience letters in canada dubai bangladesh singapore.PDF
experience letters in canada  dubai bangladesh singapore.PDFexperience letters in canada  dubai bangladesh singapore.PDF
experience letters in canada dubai bangladesh singapore.PDF
 
Ahmed M. Osman_CV_2016
Ahmed M. Osman_CV_2016Ahmed M. Osman_CV_2016
Ahmed M. Osman_CV_2016
 
CV new
CV newCV new
CV new
 
Role of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction ProjectRole of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction Project
 

Recently uploaded

Study of Computer Hardware System using Block Diagram
Study of Computer Hardware System using Block DiagramStudy of Computer Hardware System using Block Diagram
Study of Computer Hardware System using Block DiagramChandrakantDivate1
 
analog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxanalog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxKarpagam Institute of Teechnology
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...josephjonse
 
Databricks Generative AI Fundamentals .pdf
Databricks Generative AI Fundamentals  .pdfDatabricks Generative AI Fundamentals  .pdf
Databricks Generative AI Fundamentals .pdfVinayVadlagattu
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Danikor Product Catalog- Screw Feeder.pdf
Danikor Product Catalog- Screw Feeder.pdfDanikor Product Catalog- Screw Feeder.pdf
Danikor Product Catalog- Screw Feeder.pdfthietkevietthinh
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementDr. Deepak Mudgal
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesChandrakantDivate1
 
Degrees of freedom for the robots 1.pptx
Degrees of freedom for the robots 1.pptxDegrees of freedom for the robots 1.pptx
Degrees of freedom for the robots 1.pptxMostafa Mahmoud
 
Dr Mrs A A Miraje C Programming PPT.pptx
Dr Mrs A A Miraje C Programming PPT.pptxDr Mrs A A Miraje C Programming PPT.pptx
Dr Mrs A A Miraje C Programming PPT.pptxProfAAMiraje
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 
Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfKira Dess
 
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfInstruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfEr.Sonali Nasikkar
 
Dynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptxDynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptxMustafa Ahmed
 
Computer Graphics - Windowing and Clipping
Computer Graphics - Windowing and ClippingComputer Graphics - Windowing and Clipping
Computer Graphics - Windowing and ClippingChandrakantDivate1
 
Fundamentals of Internet of Things (IoT) Part-2
Fundamentals of Internet of Things (IoT) Part-2Fundamentals of Internet of Things (IoT) Part-2
Fundamentals of Internet of Things (IoT) Part-2ChandrakantDivate1
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxMustafa Ahmed
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...archanaece3
 

Recently uploaded (20)

Study of Computer Hardware System using Block Diagram
Study of Computer Hardware System using Block DiagramStudy of Computer Hardware System using Block Diagram
Study of Computer Hardware System using Block Diagram
 
analog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxanalog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptx
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
Databricks Generative AI Fundamentals .pdf
Databricks Generative AI Fundamentals  .pdfDatabricks Generative AI Fundamentals  .pdf
Databricks Generative AI Fundamentals .pdf
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Danikor Product Catalog- Screw Feeder.pdf
Danikor Product Catalog- Screw Feeder.pdfDanikor Product Catalog- Screw Feeder.pdf
Danikor Product Catalog- Screw Feeder.pdf
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To Curves
 
Degrees of freedom for the robots 1.pptx
Degrees of freedom for the robots 1.pptxDegrees of freedom for the robots 1.pptx
Degrees of freedom for the robots 1.pptx
 
Dr Mrs A A Miraje C Programming PPT.pptx
Dr Mrs A A Miraje C Programming PPT.pptxDr Mrs A A Miraje C Programming PPT.pptx
Dr Mrs A A Miraje C Programming PPT.pptx
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdf
 
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfInstruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
 
Dynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptxDynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptx
 
Computer Graphics - Windowing and Clipping
Computer Graphics - Windowing and ClippingComputer Graphics - Windowing and Clipping
Computer Graphics - Windowing and Clipping
 
Fundamentals of Internet of Things (IoT) Part-2
Fundamentals of Internet of Things (IoT) Part-2Fundamentals of Internet of Things (IoT) Part-2
Fundamentals of Internet of Things (IoT) Part-2
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...
 

Cv mmr 11052016

  • 1. MUHAMMAD MUZAMMIR BIN ROSLI A S S I S T A N T M A N A G E R ( P L A N N I N G ) Qualification Bachelor's Degree (Hons) Civil Engineering UTM (2005) Work Description Prepare the programme, ie : Baseline, Tender & Revised incorporate contract  requirement, ie: Resources & Cost loading, Analysis Report, Plan Value Curve &  Resources Histogram. Monitoring and updating progress of works and Milestone tracking Bachelor s Degree (Hons) Civil Engineering, UTM (2005) Personal Information Monitoring and updating  progress of works and Milestone tracking. Presenting current progress, often with visual aids such as bar chart and S curve. Co‐ordinate with the site personnel, subcontractors and client throughout the process, making adjustments to projects if necessary. Conducted / Participated the Planning and Production meeting with subcontractors & site personnel.  Date of Birth : 16th July 1979  Age 37 years old Work Experience                                   (12 years in Planning/ Scheduling) WCT Holding Berhad (Jun 2013 – Present) Analysis of various reports ie: daily, weekly, monthly & preparation of Management & client information reports. Compiling the Extension Of Time (EOT) evidence and prepare the EOT document  Marital Status Married  Nationality Malaysia WCT Holding Berhad (Jun 2013 – Present) Assistant Manager (Planning) Jun 2015 ‐ Present Senior Planning Engineer – Jun 2013 to May 2015 Tun Razak Exchange : Contract 1 (Earthworks), Contract Lendlease 1MDB JV & Contract 2 (Infra, Tunnel & Elevated Road) worth MYR 1.1 billion. 4th Lane PLUS Highway Package E, Nilai to Seremban worth  MYR 390 million. Add d V l  Address: No.26, Jalan 24/KU 11, Taman Desa Kencana, Meru, 42150 Klang, Selangor Ahmad Zaki Resources Berhad (Sep 2008 – May 2013) Senior Planning Engineer cum. Acting Construction Manager Klang Valley Mass Rapid Transit (KVMRT) Project  worth MYR 760 million. HQ‐ Panning Dept.(Operation) ‐ Pre Tender Planning/ Scheduling. East Coast Highway Package 9C, Terengganu worth MYR 125 million. Added Value •Knowledgeable in Planning/  Scheduling for Highway,  Trackworks & Building. •Guide junior planner on  scheduling the programme Cekapadu Sdn.Bhd (Oct 2005 – Aug 2008) Planner cum. Project Engineer/ Asst. Project Manager Police Quarters,Kuala Kangsar,Perak worth MYR 60 million. Upgrading Kolej MARA,Kuala Nerang,Kedah worth  MYR 15 million. Tazal Corporation Sdn .Bhd (Mar 2004 ‐ Sep 2005) scheduling the programme  and assist on the programme troubleshoot. •Comply with SHE & QAQC Requirement. •Active Members in  www.planningplanet.com & Planner cum. Site Engineer International Student Hostel No.9,UIAM worth  MYR 40 million  Availability Immediately after notice  period of 2 months Skills  Primavera P6 to P8  MS Project 2000, 2003, 2007 and 2010  MS Office  AutoCAD www.PMSite.com Contact Me Performance Competency  Positive Attitude  Punctuality  Creative and Innovative  Responsive   Precise  Good Analytical  Accountable in Nature  Multi‐ Tasking +60 19 2094246 mzmr5879@gmail.com