experience letters in canada dubai bangladesh singapore.PDF
1. CTI Building Supply
To whom it may concern
This letter is to confirm that Mohammad Zakir Hussain has been working with Canadian Trade
lnternational Supply as a Construction Cost Estimator since January 27th 2OI4.
Few of his job responsibilities:
. Interpreted inquiry documents, specifications and design drawings and application of the information
to prepare the estimate.
. Coordinated with project(s) designers to confirm the overall scope of work.
' Monitored and controlled the quality and grades of materials and equipment to remain with the
project budget.
. Supervised the take-off of material quantities, assembled the estimate data and coordinated pricing,
with estimating department team members.
. Prepared cost study information, cost(s) evaluation and assigned designer in the selection of
economical design options.
' Produced final cost estimate summaries and analysed estimate for scope, pricing, completeness.
. Visit site for monitoring the quality issues and determining the quantity take-off (30% of the duties
in the field )
Should you have any further questions, you can contact me at skumar@envirowav.net
e€^ t{"'
Sameer Kumar
Human Resources
2. Employment Letter
May27,2074
Employee lD:003
To Whom lt May Concern:
This letter is to verify that Mohammad Zakir Hussain is employed with Global Village Construction
Itd.
Mohammad Zakir Hussain's employment details are as follows:
Employment Type: Full-Time (40% time spent on site)
Employment Status: Active, Permanent
Position Title: Construction Cost Estimator
Start Date: May OL,2OI2
Finish Date: Dec 30, 201.3
Salary/Wage: S 35,000.00 Annually
Few of his major responsibilities are as follows:
. Interpreted inquiry documents, specifications and design drawings and application of the
information to prepare the estimate.
. Coordinated with project(s) designers to confirm the overall scope of work.
. Monitored and controlled the quality and grades of materials and equipment to remain with the
project budget.
' Supervised the take-off of material quantities, assembled the estimate data and coordinated
pricing, with estimating department team mernbers.
. Prepared cost study information, cost(s) evaluation and assigned designer in the selection of
economical design options.
. Produced final cost estimate summaries and analysed estimate for scope, pricing, completeness.
lf you require additional information, please do not hesitate to contact Mijda Mouhamad, email:
info@slobalvillasecons.com
Yours Sincerely,
Mijda Mouhamed
cEo
3. KHANSAHEB CIVIL ENGINEERING L.L.C.
Construction Division
Al Rashidya
P.O.Box2716
Dubai, United Arab Emirates
.t.l.i a4f .t.eJ I ArrL{J, :, -l..4-ll-i
nlrl ,r1*llL4l
4+-Ltl!1
YV-,!..o4
;r-:ll a-l-Jl .:l;L)t ._:r
+vl t YAo YYo / L YAo AY00
+1Vl t YAo V0Y1
kcehodxb@khansaheb.ae
www.kha nsa heb.ae
TO WHOM IT MAY CONCERN
This is to certifu that Architect Mohammad Zakir Hussain has been working with Khansaheb Civil
Engineering L.L.C, UAE as Architect Designer @mployee No 14439) since April 2007 ta December
2009.
The scope of duties of Mr. Mohammad Zakir Hussain includes supervising, checking of drawings and
designing of residential and commercial projects. He is also involved in the following works:
. Coordination of all drawings.
' Production of all work shop drawings to a high technical and aesthetical sandard.
. Assisting with material selection and compliance.
. Ensuring drawing and material submittals are made to programme and are recorded.
I Assist with monitoring as well as controlling subcontractor's engineering progress against
prograrnme.
. Attend contribute and report at progress and design meetings.
Throughout his service in Khansaheb Civil Engineering L.L.C, Mr. Mohammad Zakir Hussain has
shown to be a responsible and well disciplined officer. He has played an integral part in the work force
bV guiding the younger colleagues. The orperience he has gained here will help him becoming a more
maturedprofessional. I wish him all success in his career.
T
F
E
w
,a
E
w
-<Ian J Gordon
Group General Manager
+e71 4 285 7251 / 4 285 8255
+971 4 285 7539
kcehodxb@khansaheb.ae
www. kha nsa heb.ae
4. lfR MTc Properties Ltd.
Dhoko chomber Building (2nd Floor), 65-66, Motiiheel c/A, Dhoko-.l000, Bonglodesh.
Tel :9562390, 95683.l3 Fox : 880-2-9568395 E-moil : modino@globol-bd.ner
Date: 06.02.2005
TO WHOM IT MAY CONCERN
This is to certifo that Mohammad Zakir Hussain, Present address: 80/J,
Giasudding FyA, Dhaka University Campus, Dhaka Universi$, Dhaka-1000 &
Permanent adress : Khada, Shorankhola, Bagerhat, Bangladesh is serving our
organization as an Architect from 1o June 2002 - till now. His main duties are
Conceptualize, Design, Supervise and Monitoring etc.
His details job descriptions are given below:
Through consultation with the owner or his/her designated representative
ascertain the project requirements and determine type, style and purpose of
renovations or new building construction being considered.
t Conceptualize and design buildings.
t Prepare sketches and models for client.
) Prepare Schematic Design Studies consisting of drawings and other
documents
illustrating the scale and relationship of the project components.
t Based on the approved Schematic Design Studies, Prepare the Design
Development Documents. The Design Development Documents consist of
scaled drawings and other documents to finalize and describe the size and
character of the entire Project as to structural, plumbing, drainage, utilities,
mechanical and electrical systems, materials and such other essential
elements as may be appropriate.
t Describing building materials.
t Based on the Design Development Documents, prepare the Working
Drawings and Specifications setting forth in detail the requirements for the
construction of the entire project including the necessary bidding information.
Preparation of bidding forms the conditions of the contract and the forms of
Agreement between the Owner and the Contractor (s).
Page No' 1
5. llR MTc Properties Ltd.
Dhoko Chomber Building (2nd Floor), 65-66, Moiiiheel C/A, Dhoko-'l 000, Bonglodesh.
Tel:9562390, 9568313 Fox : 880-2-9568395 E-moil : modino@globol-bd.net
+ Advise the Owner of any adjustments to previous statements of Probable
Construction Cost indicated by the Changes in requirements or general
market conditions.
i Assist the Owner in filing the required documents for obtaining building
permits or approval from government authorities having jurisdiction over the
Project.
t Following the Owner's acceptance of the Construction Documents and the
latest staiement of Probable Construction Cost, assist the Owner in obtaining
bids or negotiated proposals, and in awarding and preparing construction
contracts.
+ As the representative of the Owner, advise and continually consult the Owner
during the Gonstruction Phase.
, Visits to the site to familiarize himself / herself with the general progress and
quality of the construction work and to determine whether or not the work is
proceeding in accordance with the Contract Documents'
rt Review and approve shop drawing, samples, and other submissions of the
Contractor only for conformity with the design concept of the project and for
compliance with the information given in the Contract Documents.
t Conduct inspections to determine the dates of substantial and final
completion; review written guarantees and related documents submitted by
the Contractor; and shall issue a final Certificate for Payment.
t Conduct Feasibility Studies and financial Projects.
His is very much creative person on his main job area.
lwish him successful in his life.
IXYN-MKhandakar ShamsulAlam
General Manager
Page No- 2
6. /'
a
HOUSING &
DErELOPMENT
BOARD
Date : 05, May 2AAz
This is to ce*ify that Mohammad Zakjr Hussain is serving our organization as an
Technical Ofiicer (Architectural Department) from 21 May 1996 to 21. May
2M2. His main duties are designing, updating monitoring etc.
His detailsjob descriptions are given below:
Job organizing Planning, Designing and Checking of various Housing and
development Board (HDB) high- rise apartments in Singapore.
Processing of sketches and preparation of drawings for submission to
stetutory boards and various government department fcrr building plan
approval.
Processing of public housing project to ensure compliance with the building
and fire regulation, co-ordination of addition and alternation works within
HDB residential commercial and industrial project.
Preparation of various addition / alteration and repair and re-decoration
working drawing for tender.
@ Responsible for.job assigned in the absence of supervising senior architect.
% Liaise with senior architect and other departments on technical metters
related to the work under their charge.
@ Participation in quality control circle activities (QCC).
Page 1
, Publi* Sewi** f*r the *f st Qsxturv * Xxc*ll*ne* in Fublic Service
ta2
(ffi
Y CONCERN
7. [D
HOUSING &
DEVELOPMENT
BOARD
The role of HDB is multi-faceted with diverse functions and wide ranging
responsibilities. It has long been associated with the planning and development of
neM towns and housing estates in Singapore, including the upgrading and
redevelopment of older estates to meet the needs of the population. As at 1998,
HDB has develop more than 20 new towns, which consisted of more than
760,000 residential properties, and about 32,0A0 commercial and industrial
properties, Being the public housing authority with the mission of providing
affordable housing of high quality, its basic strategy for success is teamwork.
Mohammad Zakir Flussain, as member of this team, has diligently been
performing his duties with high professional standards.
Throughout his service in HDB, Mohamm ad ZaEv Hussain has shown to be a
responsible and well-disciplined offices. He has played an integral part in the
work force by guiding the younger colleagues. The experience he has gained here
witl help him becoming a more matured professional. I wish him all success in
his career.
MD. ASADUZ.ZAIT{AN
SENIOR PRINCIPAL ARCHITECT
ARCHITECTURAL DEPARTMENT
HOUSING & DEVELOPMENT BOARD
Page 2 to 2
q Public Sewice far th* 21st **ntusv * ffxe*llcnce in Fublic Sewi*e