Botrous Fayek Ayoub CURRICULUM VITAE
Civil Engineering Department
Address : Al Barsha 1 next of Emirates Mall – Dubai, U.A.E.
Email : eng_botrous_85@hotmail.com.
Mobile : +971-529339375, +2- 01091303240. (I will be available in U.A.E from 5-11 to 2-12)
Nationality : Egyptian.
Military Status : Exempting from the military service .
Gender : Male.
Residence : Egypt and accepting to move inside or outside Egypt.
Marital Status : Single.
Date of Birth : 5 – 8 – 1985.
CAREER SPECITALTY
Project control, Planning, Quantity Survey, Execution and Project Management
EDUCATION
University : Ain Shams .
Faculty of Engineering, B.Sc of Civil Department .
Year of Graduation : 2009 .
COURSES
 PMP Preparation Course - At Human Capital Management .
 Primavera 6 - At Faculty of engineering, Cairo University.
 AutoCAD ( 2D ) - At Faculty of engineering, Cairo University.
 SAP 2000 - At Faculty of engineering, Cairo University.
EXPERIENCE IN
 Preparing the Construction Program for the Project .
 Preparing the Cash Flow, S-Curve & Labor Histogram for the Project .
 Preparing all Progress reports to control the project.
 Preparing the Shop-drawing for the site works.
 Preparing Measurement sheets for the Project .
 Estimated Quantities for B.O.Q .( Bill Of Quantities )
 Providing all Substantiations for V.O. ( Variation Orders ).
 Providing all Substantiations for Claims E.O.T. ( Extension Of Time ) .
 Handling the site as a Project Engineer.
 Supervising construction works ( High Rise Buildings (45 m), Hotel, School , College (
Gypsum Cavity Walls + Precast Slabs + Concrete ),Water Structures, Steel shade)
EMPLOYMENTEXPERIENCE
 Gulf Experience (SULTANATE OFOMAN )
 2014 - 2015 Worked In Arkan Majan International LLC - As A Site Engineer & Acting As
A Project Engineer.
Project : Construction of Classrooms – Al Mussanaha Technical College.
Total budget : 1.50 million OMR.
Project : 25 Classrooms – Al Ansab School.
Total budget : 1.70 million OMR.
Responsibilities:
 Preparing the material list for the project.
 Review and analysis of productivity based on input from project teams and forecasting of
all cost elements on the project, including changes.
 Responsible for checking the shop-drawing for the site works.
 Preparing all the project invoices for client and subcontractor.
 Preparing breakdown for new items with price and quantity details.
 Responsible for checking the final account measurement sheets with all attached
documents.
 Responsible for the development of activities, logic, and resources of the project master
schedule covering all phases of the project life cycle, Conceptual, Detail engineering,
Procurement, Construction and Handing over.
 Preparing periodic management reports and facilitates project team meetings including
Cost, Schedule, and Trending discussions.
 Attending progress review meetings with clients.
 Responsible for checking Daily, Weekly and Monthly progress Report.
 Update the time schedule for the project as per my site inspection.
 Local Experience ( EGYPT )
 From 1- 2016 Until Now Worked In SIAC - As A Planning Engineer.
Responsibilities:
 Review and critique Construction Programs and their up-dates.
 Determines critical-path activities.
 Provide analysis consultants and contractor schedules and progress reports.
 Determining presence of concurrent delay & consequent disruption etc.
 Review Contractor productivity and determine likely causes of delay.
 Developing progress monitoring system like Manpower Histogram, Progress S-curves and
Cash Flow.
 Integrates inter-discipline schedule requirements and constraints to establish logical work
sequences for assigned disciplines or specialties.
 Reviews and assesses the work sequences with the total project plan.
 Establishes and implements methods for determining activity durations within assigned
disciplines or specialties.
 Develops quantity release and/or installation curves for assigned disciplines/areas or
specialties.
 Reviews and approves invoice verification for payment based on cost-loaded schedules, as
required.
 Develops specific project codes of accounts and work breakdown structures, and
recommends appropriate modifications and revisions for new work items assigned.
 Identifies analyses and monitors schedule deviations for assigned disciplines or specialties
including subcontractor submittals and recommends corrective action/work-around
solutions for project considerations.
 Identifies and reports activities that have a critical or potential impact on the schedule and
prepares and presents the Critical Items Action Report.
 Developing project budget forecast cash flow and produces regular cost reports.
 Reviewing invoices / timesheets and certifying payments.
 Control of change order, variations to contracts, work instruction control.
 2013 - 2014 Worked In Petra construction Company - As A Technical Office Engineer.
Responsibilities:
 Prepare piling contracts and nominated sub-contracts for tender and contract formalization
 Preparing the Shop-drawing for the site works.
 Attend onsite and consultants’ meetings and liaise with clients, architects and associate
consultants in the administration of projects
 Interpret engineering drawings and specifications to calculate project costs
 Measure and take off quantities for architectural and structural work elements
 Administer pre and post contract and consultancy work
 Assess variation orders, prepare interim valuations, cost plans and budget studies
 Compile contract documents for execution
 Understand and adhere to the statutory building regulations
 Undertake cost analysis for repair and maintenance of project work
 Allocate work to subcontractors
 Analyze outcomes and write detailed progress reports
 Valuing completed work and arrange payments
 2013 - 2014 Worked In TBFC Office ( Part Time ) - As A Planning Engineer .
 2008 - 2012 Worked In Karasco Construction Company – As A Site Engineer.
Projects : High Rise Buildings. Total budget: 3.60 million $/Building.
Sunny Days Hotel . Total budget: 8.30 million $
SKILLS
 Fluent in Arabic and Very Good in English .
 Primavera (P6).
 AutoCAD.
 SAP 2000 – ETABS- SAFE - CSI Column .
 Office ( Excel - Word - Outlook ) .
 Presentations Skills .
 Egyptian driving license .
 Reasoning, Listening, Ability to learn, Cooperative, Creative, Dependable, Working under pressure ,
Organized and Problem Solving .
REFERENCES
References available on request.

C.V

  • 1.
    Botrous Fayek AyoubCURRICULUM VITAE Civil Engineering Department Address : Al Barsha 1 next of Emirates Mall – Dubai, U.A.E. Email : eng_botrous_85@hotmail.com. Mobile : +971-529339375, +2- 01091303240. (I will be available in U.A.E from 5-11 to 2-12) Nationality : Egyptian. Military Status : Exempting from the military service . Gender : Male. Residence : Egypt and accepting to move inside or outside Egypt. Marital Status : Single. Date of Birth : 5 – 8 – 1985. CAREER SPECITALTY Project control, Planning, Quantity Survey, Execution and Project Management EDUCATION University : Ain Shams . Faculty of Engineering, B.Sc of Civil Department . Year of Graduation : 2009 . COURSES  PMP Preparation Course - At Human Capital Management .  Primavera 6 - At Faculty of engineering, Cairo University.  AutoCAD ( 2D ) - At Faculty of engineering, Cairo University.  SAP 2000 - At Faculty of engineering, Cairo University. EXPERIENCE IN  Preparing the Construction Program for the Project .  Preparing the Cash Flow, S-Curve & Labor Histogram for the Project .  Preparing all Progress reports to control the project.  Preparing the Shop-drawing for the site works.  Preparing Measurement sheets for the Project .  Estimated Quantities for B.O.Q .( Bill Of Quantities )  Providing all Substantiations for V.O. ( Variation Orders ).  Providing all Substantiations for Claims E.O.T. ( Extension Of Time ) .  Handling the site as a Project Engineer.  Supervising construction works ( High Rise Buildings (45 m), Hotel, School , College ( Gypsum Cavity Walls + Precast Slabs + Concrete ),Water Structures, Steel shade)
  • 2.
    EMPLOYMENTEXPERIENCE  Gulf Experience(SULTANATE OFOMAN )  2014 - 2015 Worked In Arkan Majan International LLC - As A Site Engineer & Acting As A Project Engineer. Project : Construction of Classrooms – Al Mussanaha Technical College. Total budget : 1.50 million OMR. Project : 25 Classrooms – Al Ansab School. Total budget : 1.70 million OMR. Responsibilities:  Preparing the material list for the project.  Review and analysis of productivity based on input from project teams and forecasting of all cost elements on the project, including changes.  Responsible for checking the shop-drawing for the site works.  Preparing all the project invoices for client and subcontractor.  Preparing breakdown for new items with price and quantity details.  Responsible for checking the final account measurement sheets with all attached documents.  Responsible for the development of activities, logic, and resources of the project master schedule covering all phases of the project life cycle, Conceptual, Detail engineering, Procurement, Construction and Handing over.  Preparing periodic management reports and facilitates project team meetings including Cost, Schedule, and Trending discussions.  Attending progress review meetings with clients.  Responsible for checking Daily, Weekly and Monthly progress Report.  Update the time schedule for the project as per my site inspection.  Local Experience ( EGYPT )  From 1- 2016 Until Now Worked In SIAC - As A Planning Engineer. Responsibilities:  Review and critique Construction Programs and their up-dates.  Determines critical-path activities.  Provide analysis consultants and contractor schedules and progress reports.  Determining presence of concurrent delay & consequent disruption etc.  Review Contractor productivity and determine likely causes of delay.  Developing progress monitoring system like Manpower Histogram, Progress S-curves and Cash Flow.  Integrates inter-discipline schedule requirements and constraints to establish logical work sequences for assigned disciplines or specialties.  Reviews and assesses the work sequences with the total project plan.  Establishes and implements methods for determining activity durations within assigned disciplines or specialties.  Develops quantity release and/or installation curves for assigned disciplines/areas or specialties.  Reviews and approves invoice verification for payment based on cost-loaded schedules, as required.  Develops specific project codes of accounts and work breakdown structures, and recommends appropriate modifications and revisions for new work items assigned.
  • 3.
     Identifies analysesand monitors schedule deviations for assigned disciplines or specialties including subcontractor submittals and recommends corrective action/work-around solutions for project considerations.  Identifies and reports activities that have a critical or potential impact on the schedule and prepares and presents the Critical Items Action Report.  Developing project budget forecast cash flow and produces regular cost reports.  Reviewing invoices / timesheets and certifying payments.  Control of change order, variations to contracts, work instruction control.  2013 - 2014 Worked In Petra construction Company - As A Technical Office Engineer. Responsibilities:  Prepare piling contracts and nominated sub-contracts for tender and contract formalization  Preparing the Shop-drawing for the site works.  Attend onsite and consultants’ meetings and liaise with clients, architects and associate consultants in the administration of projects  Interpret engineering drawings and specifications to calculate project costs  Measure and take off quantities for architectural and structural work elements  Administer pre and post contract and consultancy work  Assess variation orders, prepare interim valuations, cost plans and budget studies  Compile contract documents for execution  Understand and adhere to the statutory building regulations  Undertake cost analysis for repair and maintenance of project work  Allocate work to subcontractors  Analyze outcomes and write detailed progress reports  Valuing completed work and arrange payments  2013 - 2014 Worked In TBFC Office ( Part Time ) - As A Planning Engineer .  2008 - 2012 Worked In Karasco Construction Company – As A Site Engineer. Projects : High Rise Buildings. Total budget: 3.60 million $/Building. Sunny Days Hotel . Total budget: 8.30 million $ SKILLS  Fluent in Arabic and Very Good in English .  Primavera (P6).  AutoCAD.  SAP 2000 – ETABS- SAFE - CSI Column .  Office ( Excel - Word - Outlook ) .  Presentations Skills .  Egyptian driving license .  Reasoning, Listening, Ability to learn, Cooperative, Creative, Dependable, Working under pressure , Organized and Problem Solving . REFERENCES References available on request.