SlideShare a Scribd company logo
1 of 5
1
CURRICULUM VITAE
M.SURESH
Mobile: +965- 50202787 / 23821607
Email ID:msuresh2@gmail.com
CAREER OBJECTIVE:
Seeking a good prospect as a Sr. Land Surveyor in a growth oriented organization
where my professional skills can be utilized and enhanced while contributing
substantially to my organization through dedication, hard work and sincerity.
SUMMARY
 Total Professional Experience : 20 Years (Abroad)
 Fields of Experience : Oil/Gas &Petrochemical Industries
 Line of Experience : Civil, Pipeline& Infra structures
 Professional Qualification : Diploma in Civil Draughtsmanship
(ITI),Certificate
Professional Experience
-Topographic surveys for small and large scale mapping
- Survey control net establishing (traversing and leveling), with adjustments and calculations
- Construction surveys, layout for the buildings, benchmarks, axis and all surveying works on
site
-Property boundary surveys
-Surveys for underground conduits and other facilities.
- Calculations, sketches and records supporting survey activities.
- Independent surveys to given instructions
- Familiarity with Total Stations, GPS, Theodolites, levels, and related PC programs
- Calibration of survey equipment
- Stakeout alignment and preparing new IP’s as per site situation
- As built survey
- Data processing
- IT literacy
- Good communication, follow-up and reporting
- Capability to lead a team, self motivation, result orientation
SKILLS:
 Excellent background in Land Surveying/Topographic Surveying in the Oil/Gas Industries,
maintenance and rehabilitation works that includes quantity estimates prior to preparation
of new work orders.
 Familiar to Operate Latest Surveying Instruments & Software’s in the Industries like Total
Station, GPS and Digital Dumpy level, and experiences in Topographic & Dimensional
Control Surveying in in the Oil/Gas & Petrochemical Industries (Onshore/Offshore.)
 Computer literate and familiar in operating Windows XP professional and Vista based
software’s such as MS Word, Excel, Internet and other windows application plus AutoCAD
2D & 3D 2007 to 2015, SDR and Survey Software.
 Familiar in trouble shooting minor errors of automatic Level and Total Station. Able to
calibrate the Total station to the highest degree of accuracy by checking and adjusting Plate
and Circular level, Tilt sensor, and Optical plummet.
 Download and process GPS field data collection to computer. Apply adjustment in
accordance to project standard and specification.
2
 Configuration and orientation of some drawings with different scale and convert it to true
or project coordinates for surveyor’sreference prior to commencement of any construction
activities.
• Proven Initiative and can work with minimal supervision.
• Computer / Software Knowledge
Operating Systems : Windows XP/Windows 2007
Software : AutoCAD-2000 to 20015/
MicrostationV8.1/QGIS & PDMS MS Office
packages/ 3Dmax,(Basic)
Supplementary Information:
 Attend Training Program on GIS, REMOTE SENSING & GPS APPLICATION IN CIVIL
ENGINEERING bySchool of Engineering Cochin University of Science and Technology
 IOSH Managing Safely Course attended and certificate obtained
 PTW holder (Permit To Work) Permit system within the ADMA-OPCO in Das Island
 SEC (Skilled Evaluation Certificate) Obtained from Building & Construction Authority
Singapore.
Oil Field / Offshore Training Course attended
 General Safety induction by ADMA- OPCO (Das Island) ZADCO (Zikhu Island) UAE
 General Safety Induction by Basic Fire Fighting Course By ADMA- OPCO, (Das Island)
 Breathing Apparatus usage Course by ADMA- OPCO, Das Island, UAE
 Permit To Work System (PTW) Training By ADMA- OPCO, Das Island, UAE
 H2S (Hydrogen Sulphide) awareness by ADGAS, Das Island, UAE
EMPLOYMENTRECORD:
POSITION : Snr. LAND SURVEYOR CUM DRAUGHSTMAN
COMPANY : KUWAIT OIL COMPANY (KOC)
PROJECT : REMOTE HEADER MANIFOLDS FOR ALL GC'S IN SEK Area
INCLUSIVE DATE : MARCH 15, 2014 – TILL DATE
DUTIES AND RESPONSIBILITIES:
 Carrying out GPS & conventional surveys on different projects related to Oil/Gas
exploration at KOC gathering centers, Pipelines, booster stations export facilities, oil storage
tank, telecommunication facilities, oil field road system, effluent water disposal lines,gas
management center and offshore facilities.
 Participated in designing, site preparation,and execution of different projects, which are
assigned to the company.
 Coordinate with design team to find appropriate locations for site office, new pipeline
routes for upcoming project.
 Using latest Survey instruments: GPS (Global Positioning System) Total Station and levelling
instrument.
 Carried out all type of surveys such as Topographic, Traverse, As-Built and Layout
construction survey for Oil field Projects in particular for pipe line survey.
 Participated in the installation of crude recovery unit of gathering centers, identified and
located oil wells and other construction work proposed by KOC. Conducted site visit with all
departments.
 Supervised mechanical group of employees and arranged required materials, machinery
and equipment.
 Conduct safety meetings every week , make employees aware of precaution to be taken
during work performance.
 Prepared daily/weekly/monthly reports and action to be taken in future.
3
POSITION : Snr. LAND SURVEYOR/ DIMENSIONAL CONTROL SURVEYOR
COMPANY : PETROFAC INT’L (UAE)
PROJECT : SHETLAND GAS PLANT LAGGAN-TORMORE, Scotland UK
Project,
INCLUSIVE DATE : APRIL 07, 2012 – OCTOBER15, 2013
DUTIES AND RESPONSIBILITIES:To provide dimensional control services to the end client,
Total E&P UK. The project is to fabricate PARs and PAUs for an onshore LNG plant and good
dimensional control is required to ensure correct placement of these modules on site and that
piping interfaces are in the correct location to allow “single weld hook up” when the modules
are placed in position on Laggan-Toremore.
 Check critical dimensions of the fabricated structures before and after
Welding/installation/erection to have better control of dimensions of the offshore
structures.
 Perform dimensional survey upon fit-up and subsequent after welding for primary
structures of PARs and PAUs.
 Control and monitor progressively the dimension, alignment & distortion in various stages
of sub-assemblies and erection/installation forming of the PARs & PAUs.
 Checking Alignment of equipment’s Horizontal & Vertical, Pumps, Filters & Drum, and
preparing survey reports.
 Discussion/joint inspection with client & third party to have right and common
understanding of rules, specifications and tolerances for the as built structures.
 Preparing dimensional reports after inspection of the fabricated structures and to submit
the same to the client/third party for review/acceptance and to ensure proper
documentation.
 Responsible to generate the Dimensional Reports and get it witnessed by client and 3rd
party and obtained approval on the reports.
 Control and monitor progressively the dimension, alignment & distortion in various stages
of subassemblies and erection/installation forming of the Pipe racks & other offshore
structures.
POSITION : Snr. LAND SURVEYOR
COMPANY : COSTAIN ABU DHABI COMPANI, (U.A.E/ DAS ISLAND)
PROJECT : BURIED PIPELINE REPLACEMENT PROJECT (BPR)
INCLUSIVE DATE : FEBRUARY 22,2009 – FEBRUARY 22,2012
DUTIES AND RESPONSIBILITIES:
 Establishing new survey controls points and doing topographical survey for construction
purpose prior to commencement of work w/ engineers/consultants approval.
 Counter check and study survey reference points (coordinates and levels),demarcation
points, plot limits and grids prior to execution of works
 Conduct traverse loop use as permanent control points and well marked and protected such
they remain undisturbed before giving it to the sub-contractors.
 Ensure all design coordinates are mapped accurately against the outline specifications in
order to meet the design and construction requirements.
 Prepare design coordinates and elevations base on approved drawing, use for the asst. land
surveyor to set out on the site.
 Set out columns, walls, bolts, grid lines, and other location needed to set out during the
construction such as bolts, reflected ceiling.
 Conduct as built on every completed works to check if the location of constructed are in line
with the design specification.
4
 Check the location, elevation and all survey work done by the subcontractor to ensure
survey work is base on the approved plan.
POSITION : Snr.LAND SURVEYOR
COMPANY : KUWAIT OIL COMPANY (KOC)
PROJECT : PIPELINE REPAIR SERVICES IN SEK, WK & NK Areas
INCLUSIVE DATE : MAY 11, 2003 – APRIL 16,2008
DUTIES AND RESPONSIBILITIES:
 Establishing new survey controls points and doing topographical survey.
 Setting out points and level marking for construction purpose prior to commencement of
work with engineers/consultants approval.
 Processing field data (GPS &TOTAL STATION) and data conversion (Latitude Longitude,&
UTM).Designing Pipe line route
 Survey the exact location of the existing pipelines corridor on ground and update it the
existing drawings.
 Construction supervision, installation and inspection of piping works and other
construction activities.
 Preparation of basic layout drawings for piping and other related facilities as per the
detailed site survey.
 Ensure all precision surveillance instruments are calibrated, handled with care and
properly maintained and stored in a suitable manner.
 Perform office works for submission of report of completed structure and Prepare As built
drawing.
POSITION :Snr. LAND SURVEYOR
COMPANY : GAMMON CONSTRUCTION (Singapore)
INCLUSIVE DATE: APRIL ‘2001APRIL ‘2003
DUTIES & RESPONSIBILITIES
 Established Project controls (horizontal and vertical control) using GPS & Total station and
automatic Level
 Carried out detailed topographic survey over the existing built-up and open terrain areas
using latest technology of Total Station-Sokkia Power Set 230R.
 Counter check and study survey reference points (coordinates and levels),demarcation
points, plot limits and grids prior to execution of works
 Carried out precise traverse& leveling of control station particularly for new and major
construction projects.
 Setting out line and grade of buildings, roads, pipelines, underground cables, working
piles, bore-holes, property corners, building foundation, and other construction boundaries.
 Undertook as built survey of over ground and underground service utilities such as electric,
telephone, pipelines and water lines.
 Conducts monitoring survey with respect to movement or eccentricity of secant
 Checked actual verticality of steel columns at every floors of BURC project (steel structure
tower) in order to determine the discrepancies against the design.
POSITION : SITE SURVEYOR
COMPANY : M/S AL-SUWAIDI (K.S.A)
DURATION : SEPT. ‘1994- MAY. 2000
DUTIES AND RESPONSIBILITIES:
 Established Project controls (horizontal and vertical control) using GPS & Total station and
automatic Level
5
 Set out of pipe racks foundation and pre cast foundation wall.
 Positioning and setting elevation foundation of concrete leans or pipe rack.
 Established the position of housing based on the designed plan.
 Established control point such as Horizontal and vertical control.
 Conduct topographic maps of all the existing within the project site.
 Prepare topographic maps.
 Monitor the construction of building using level and total station.
 Established the designated position of the designed line and elevation of the new pipes and
manholes
 Prepare the required data for the proposed pumping station for sewer and potable water
and irrigation water system
 Lay out the proposed diversion pipes and manholes referring to their exact location and
elevation.
PERSONAL INFORMATION:
Date of birth : March 16, 1972
Marital status : Married
Language Known : English, Hindi, Tamil & Malayalam
Driving license :
:
Valid driving license (Kuwait)
Valid driving license (India)
Passport detail (Number : M0404072)
Place of issue : Cochin (India)
Date of issue : 24-08-2014
Date of expire : 23-08-2024
Permanent address
Thaithara House/ ThekkekaraP.O/Moncompu/ Alappuzha District/ Kerala
State/ India /Pin code:688503
EDUCATIONAL ATTAINMENT:
1991 – 1993 : ITI (National Trade Certificate)
Certificate Awarded by Government of India (NCVT)
1988 – 1990 : Pre-Degre (+2)/University of Kerala, India
1987 : Passed Secondary School Leaving Certificate from
Kerala Board Examination. Govt. of Kerala
Declaration:
I hereby declare that all the above-furnished details are true and correct to the best belief of
my knowledge.
Yours Truly
M.SURESH

More Related Content

What's hot

ihsan CV - structural design engineer
ihsan CV - structural design engineerihsan CV - structural design engineer
ihsan CV - structural design engineerihsan ullah
 
Resume Saeed Ahmad Tunnel Engineer (Design and Construction)
Resume Saeed Ahmad Tunnel Engineer (Design and Construction)Resume Saeed Ahmad Tunnel Engineer (Design and Construction)
Resume Saeed Ahmad Tunnel Engineer (Design and Construction)SAEED AHMAD
 
Civil Engineer Resume
 Civil Engineer Resume Civil Engineer Resume
Civil Engineer ResumeRavi Kumar
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Amir Mohammed
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)Mohammad Khan
 
CV_CIVIL ENGINEER_JOEMAR
CV_CIVIL ENGINEER_JOEMARCV_CIVIL ENGINEER_JOEMAR
CV_CIVIL ENGINEER_JOEMARJoemar Ramos
 
CV-SAJAN LAND SURVEYOR 15-07-15
CV-SAJAN LAND SURVEYOR 15-07-15CV-SAJAN LAND SURVEYOR 15-07-15
CV-SAJAN LAND SURVEYOR 15-07-15Sajan Vijayan
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
Land Surveyor cv Masood ( ls-ok - j16-1)
Land Surveyor cv Masood  ( ls-ok - j16-1)Land Surveyor cv Masood  ( ls-ok - j16-1)
Land Surveyor cv Masood ( ls-ok - j16-1)muhammadmasood75
 
Rameez - Site Engineer - CV
Rameez - Site Engineer - CVRameez - Site Engineer - CV
Rameez - Site Engineer - CVRameez K
 
Mehtab zaidi planning engineer cv
Mehtab zaidi planning engineer cvMehtab zaidi planning engineer cv
Mehtab zaidi planning engineer cvMehtab Zaidi
 

What's hot (20)

ihsan CV - structural design engineer
ihsan CV - structural design engineerihsan CV - structural design engineer
ihsan CV - structural design engineer
 
Resume Saeed Ahmad Tunnel Engineer (Design and Construction)
Resume Saeed Ahmad Tunnel Engineer (Design and Construction)Resume Saeed Ahmad Tunnel Engineer (Design and Construction)
Resume Saeed Ahmad Tunnel Engineer (Design and Construction)
 
Quantity Surveyor CV
Quantity Surveyor CVQuantity Surveyor CV
Quantity Surveyor CV
 
HUM-Surveyor-CV
HUM-Surveyor-CVHUM-Surveyor-CV
HUM-Surveyor-CV
 
Tanveer Sr Planning Engineer
Tanveer Sr Planning EngineerTanveer Sr Planning Engineer
Tanveer Sr Planning Engineer
 
Iftekhar Civil Engineer CV
Iftekhar Civil Engineer CVIftekhar Civil Engineer CV
Iftekhar Civil Engineer CV
 
Civil Engineer Resume
 Civil Engineer Resume Civil Engineer Resume
Civil Engineer Resume
 
Civil engineer
Civil engineerCivil engineer
Civil engineer
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)
 
CV Updated
CV UpdatedCV Updated
CV Updated
 
Senior Surveyor CV
Senior Surveyor CV Senior Surveyor CV
Senior Surveyor CV
 
CV_CIVIL ENGINEER_JOEMAR
CV_CIVIL ENGINEER_JOEMARCV_CIVIL ENGINEER_JOEMAR
CV_CIVIL ENGINEER_JOEMAR
 
CV Site Engineer Civil
CV Site Engineer CivilCV Site Engineer Civil
CV Site Engineer Civil
 
CV-SAJAN LAND SURVEYOR 15-07-15
CV-SAJAN LAND SURVEYOR 15-07-15CV-SAJAN LAND SURVEYOR 15-07-15
CV-SAJAN LAND SURVEYOR 15-07-15
 
my CV PDF
my CV PDFmy CV PDF
my CV PDF
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
Land Surveyor cv Masood ( ls-ok - j16-1)
Land Surveyor cv Masood  ( ls-ok - j16-1)Land Surveyor cv Masood  ( ls-ok - j16-1)
Land Surveyor cv Masood ( ls-ok - j16-1)
 
Rameez - Site Engineer - CV
Rameez - Site Engineer - CVRameez - Site Engineer - CV
Rameez - Site Engineer - CV
 
Mehtab zaidi planning engineer cv
Mehtab zaidi planning engineer cvMehtab zaidi planning engineer cv
Mehtab zaidi planning engineer cv
 

Similar to Land surveyor (20)

Amjad survey inspector
Amjad survey inspectorAmjad survey inspector
Amjad survey inspector
 
Naveed Asif C.V Updated
Naveed Asif C.V UpdatedNaveed Asif C.V Updated
Naveed Asif C.V Updated
 
Dileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar Kaviti
Dileep Kumar Kaviti
 
NY_ CV
NY_ CVNY_ CV
NY_ CV
 
GOPAL
GOPALGOPAL
GOPAL
 
Survey Engr
Survey EngrSurvey Engr
Survey Engr
 
inayat ur rahman cv 1
inayat ur rahman cv 1inayat ur rahman cv 1
inayat ur rahman cv 1
 
KANNAN RESUME
KANNAN RESUMEKANNAN RESUME
KANNAN RESUME
 
UPDATED RESUME
UPDATED RESUMEUPDATED RESUME
UPDATED RESUME
 
RESUME DJT van der Merwe
RESUME DJT van der MerweRESUME DJT van der Merwe
RESUME DJT van der Merwe
 
Rahman cv
Rahman cvRahman cv
Rahman cv
 
Bio Data Sukdeb Samanta
Bio Data Sukdeb SamantaBio Data Sukdeb Samanta
Bio Data Sukdeb Samanta
 
Manish Ray - CV
Manish Ray - CVManish Ray - CV
Manish Ray - CV
 
MADHU CV
MADHU CVMADHU CV
MADHU CV
 
Surveyor cv
Surveyor cvSurveyor cv
Surveyor cv
 
MADHU CV
MADHU CVMADHU CV
MADHU CV
 
r_1
r_1r_1
r_1
 
RAMASAMY NACE CP LEVEL II ENGINEER
RAMASAMY NACE CP LEVEL II ENGINEERRAMASAMY NACE CP LEVEL II ENGINEER
RAMASAMY NACE CP LEVEL II ENGINEER
 
Resume dharmendra
Resume dharmendraResume dharmendra
Resume dharmendra
 
Mantena Neeladri varma_original
Mantena Neeladri varma_originalMantena Neeladri varma_original
Mantena Neeladri varma_original
 

Recently uploaded

System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
Cooling Tower SERD pH drop issue (11 April 2024) .pptx
Cooling Tower SERD pH drop issue (11 April 2024) .pptxCooling Tower SERD pH drop issue (11 April 2024) .pptx
Cooling Tower SERD pH drop issue (11 April 2024) .pptxmamansuratman0253
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communicationpanditadesh123
 
BSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptxBSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptxNiranjanYadav41
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptxmohitesoham12
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Romil Mishra
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 

Recently uploaded (20)

System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
Cooling Tower SERD pH drop issue (11 April 2024) .pptx
Cooling Tower SERD pH drop issue (11 April 2024) .pptxCooling Tower SERD pH drop issue (11 April 2024) .pptx
Cooling Tower SERD pH drop issue (11 April 2024) .pptx
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communication
 
BSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptxBSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptx
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptx
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 

Land surveyor

  • 1. 1 CURRICULUM VITAE M.SURESH Mobile: +965- 50202787 / 23821607 Email ID:msuresh2@gmail.com CAREER OBJECTIVE: Seeking a good prospect as a Sr. Land Surveyor in a growth oriented organization where my professional skills can be utilized and enhanced while contributing substantially to my organization through dedication, hard work and sincerity. SUMMARY  Total Professional Experience : 20 Years (Abroad)  Fields of Experience : Oil/Gas &Petrochemical Industries  Line of Experience : Civil, Pipeline& Infra structures  Professional Qualification : Diploma in Civil Draughtsmanship (ITI),Certificate Professional Experience -Topographic surveys for small and large scale mapping - Survey control net establishing (traversing and leveling), with adjustments and calculations - Construction surveys, layout for the buildings, benchmarks, axis and all surveying works on site -Property boundary surveys -Surveys for underground conduits and other facilities. - Calculations, sketches and records supporting survey activities. - Independent surveys to given instructions - Familiarity with Total Stations, GPS, Theodolites, levels, and related PC programs - Calibration of survey equipment - Stakeout alignment and preparing new IP’s as per site situation - As built survey - Data processing - IT literacy - Good communication, follow-up and reporting - Capability to lead a team, self motivation, result orientation SKILLS:  Excellent background in Land Surveying/Topographic Surveying in the Oil/Gas Industries, maintenance and rehabilitation works that includes quantity estimates prior to preparation of new work orders.  Familiar to Operate Latest Surveying Instruments & Software’s in the Industries like Total Station, GPS and Digital Dumpy level, and experiences in Topographic & Dimensional Control Surveying in in the Oil/Gas & Petrochemical Industries (Onshore/Offshore.)  Computer literate and familiar in operating Windows XP professional and Vista based software’s such as MS Word, Excel, Internet and other windows application plus AutoCAD 2D & 3D 2007 to 2015, SDR and Survey Software.  Familiar in trouble shooting minor errors of automatic Level and Total Station. Able to calibrate the Total station to the highest degree of accuracy by checking and adjusting Plate and Circular level, Tilt sensor, and Optical plummet.  Download and process GPS field data collection to computer. Apply adjustment in accordance to project standard and specification.
  • 2. 2  Configuration and orientation of some drawings with different scale and convert it to true or project coordinates for surveyor’sreference prior to commencement of any construction activities. • Proven Initiative and can work with minimal supervision. • Computer / Software Knowledge Operating Systems : Windows XP/Windows 2007 Software : AutoCAD-2000 to 20015/ MicrostationV8.1/QGIS & PDMS MS Office packages/ 3Dmax,(Basic) Supplementary Information:  Attend Training Program on GIS, REMOTE SENSING & GPS APPLICATION IN CIVIL ENGINEERING bySchool of Engineering Cochin University of Science and Technology  IOSH Managing Safely Course attended and certificate obtained  PTW holder (Permit To Work) Permit system within the ADMA-OPCO in Das Island  SEC (Skilled Evaluation Certificate) Obtained from Building & Construction Authority Singapore. Oil Field / Offshore Training Course attended  General Safety induction by ADMA- OPCO (Das Island) ZADCO (Zikhu Island) UAE  General Safety Induction by Basic Fire Fighting Course By ADMA- OPCO, (Das Island)  Breathing Apparatus usage Course by ADMA- OPCO, Das Island, UAE  Permit To Work System (PTW) Training By ADMA- OPCO, Das Island, UAE  H2S (Hydrogen Sulphide) awareness by ADGAS, Das Island, UAE EMPLOYMENTRECORD: POSITION : Snr. LAND SURVEYOR CUM DRAUGHSTMAN COMPANY : KUWAIT OIL COMPANY (KOC) PROJECT : REMOTE HEADER MANIFOLDS FOR ALL GC'S IN SEK Area INCLUSIVE DATE : MARCH 15, 2014 – TILL DATE DUTIES AND RESPONSIBILITIES:  Carrying out GPS & conventional surveys on different projects related to Oil/Gas exploration at KOC gathering centers, Pipelines, booster stations export facilities, oil storage tank, telecommunication facilities, oil field road system, effluent water disposal lines,gas management center and offshore facilities.  Participated in designing, site preparation,and execution of different projects, which are assigned to the company.  Coordinate with design team to find appropriate locations for site office, new pipeline routes for upcoming project.  Using latest Survey instruments: GPS (Global Positioning System) Total Station and levelling instrument.  Carried out all type of surveys such as Topographic, Traverse, As-Built and Layout construction survey for Oil field Projects in particular for pipe line survey.  Participated in the installation of crude recovery unit of gathering centers, identified and located oil wells and other construction work proposed by KOC. Conducted site visit with all departments.  Supervised mechanical group of employees and arranged required materials, machinery and equipment.  Conduct safety meetings every week , make employees aware of precaution to be taken during work performance.  Prepared daily/weekly/monthly reports and action to be taken in future.
  • 3. 3 POSITION : Snr. LAND SURVEYOR/ DIMENSIONAL CONTROL SURVEYOR COMPANY : PETROFAC INT’L (UAE) PROJECT : SHETLAND GAS PLANT LAGGAN-TORMORE, Scotland UK Project, INCLUSIVE DATE : APRIL 07, 2012 – OCTOBER15, 2013 DUTIES AND RESPONSIBILITIES:To provide dimensional control services to the end client, Total E&P UK. The project is to fabricate PARs and PAUs for an onshore LNG plant and good dimensional control is required to ensure correct placement of these modules on site and that piping interfaces are in the correct location to allow “single weld hook up” when the modules are placed in position on Laggan-Toremore.  Check critical dimensions of the fabricated structures before and after Welding/installation/erection to have better control of dimensions of the offshore structures.  Perform dimensional survey upon fit-up and subsequent after welding for primary structures of PARs and PAUs.  Control and monitor progressively the dimension, alignment & distortion in various stages of sub-assemblies and erection/installation forming of the PARs & PAUs.  Checking Alignment of equipment’s Horizontal & Vertical, Pumps, Filters & Drum, and preparing survey reports.  Discussion/joint inspection with client & third party to have right and common understanding of rules, specifications and tolerances for the as built structures.  Preparing dimensional reports after inspection of the fabricated structures and to submit the same to the client/third party for review/acceptance and to ensure proper documentation.  Responsible to generate the Dimensional Reports and get it witnessed by client and 3rd party and obtained approval on the reports.  Control and monitor progressively the dimension, alignment & distortion in various stages of subassemblies and erection/installation forming of the Pipe racks & other offshore structures. POSITION : Snr. LAND SURVEYOR COMPANY : COSTAIN ABU DHABI COMPANI, (U.A.E/ DAS ISLAND) PROJECT : BURIED PIPELINE REPLACEMENT PROJECT (BPR) INCLUSIVE DATE : FEBRUARY 22,2009 – FEBRUARY 22,2012 DUTIES AND RESPONSIBILITIES:  Establishing new survey controls points and doing topographical survey for construction purpose prior to commencement of work w/ engineers/consultants approval.  Counter check and study survey reference points (coordinates and levels),demarcation points, plot limits and grids prior to execution of works  Conduct traverse loop use as permanent control points and well marked and protected such they remain undisturbed before giving it to the sub-contractors.  Ensure all design coordinates are mapped accurately against the outline specifications in order to meet the design and construction requirements.  Prepare design coordinates and elevations base on approved drawing, use for the asst. land surveyor to set out on the site.  Set out columns, walls, bolts, grid lines, and other location needed to set out during the construction such as bolts, reflected ceiling.  Conduct as built on every completed works to check if the location of constructed are in line with the design specification.
  • 4. 4  Check the location, elevation and all survey work done by the subcontractor to ensure survey work is base on the approved plan. POSITION : Snr.LAND SURVEYOR COMPANY : KUWAIT OIL COMPANY (KOC) PROJECT : PIPELINE REPAIR SERVICES IN SEK, WK & NK Areas INCLUSIVE DATE : MAY 11, 2003 – APRIL 16,2008 DUTIES AND RESPONSIBILITIES:  Establishing new survey controls points and doing topographical survey.  Setting out points and level marking for construction purpose prior to commencement of work with engineers/consultants approval.  Processing field data (GPS &TOTAL STATION) and data conversion (Latitude Longitude,& UTM).Designing Pipe line route  Survey the exact location of the existing pipelines corridor on ground and update it the existing drawings.  Construction supervision, installation and inspection of piping works and other construction activities.  Preparation of basic layout drawings for piping and other related facilities as per the detailed site survey.  Ensure all precision surveillance instruments are calibrated, handled with care and properly maintained and stored in a suitable manner.  Perform office works for submission of report of completed structure and Prepare As built drawing. POSITION :Snr. LAND SURVEYOR COMPANY : GAMMON CONSTRUCTION (Singapore) INCLUSIVE DATE: APRIL ‘2001APRIL ‘2003 DUTIES & RESPONSIBILITIES  Established Project controls (horizontal and vertical control) using GPS & Total station and automatic Level  Carried out detailed topographic survey over the existing built-up and open terrain areas using latest technology of Total Station-Sokkia Power Set 230R.  Counter check and study survey reference points (coordinates and levels),demarcation points, plot limits and grids prior to execution of works  Carried out precise traverse& leveling of control station particularly for new and major construction projects.  Setting out line and grade of buildings, roads, pipelines, underground cables, working piles, bore-holes, property corners, building foundation, and other construction boundaries.  Undertook as built survey of over ground and underground service utilities such as electric, telephone, pipelines and water lines.  Conducts monitoring survey with respect to movement or eccentricity of secant  Checked actual verticality of steel columns at every floors of BURC project (steel structure tower) in order to determine the discrepancies against the design. POSITION : SITE SURVEYOR COMPANY : M/S AL-SUWAIDI (K.S.A) DURATION : SEPT. ‘1994- MAY. 2000 DUTIES AND RESPONSIBILITIES:  Established Project controls (horizontal and vertical control) using GPS & Total station and automatic Level
  • 5. 5  Set out of pipe racks foundation and pre cast foundation wall.  Positioning and setting elevation foundation of concrete leans or pipe rack.  Established the position of housing based on the designed plan.  Established control point such as Horizontal and vertical control.  Conduct topographic maps of all the existing within the project site.  Prepare topographic maps.  Monitor the construction of building using level and total station.  Established the designated position of the designed line and elevation of the new pipes and manholes  Prepare the required data for the proposed pumping station for sewer and potable water and irrigation water system  Lay out the proposed diversion pipes and manholes referring to their exact location and elevation. PERSONAL INFORMATION: Date of birth : March 16, 1972 Marital status : Married Language Known : English, Hindi, Tamil & Malayalam Driving license : : Valid driving license (Kuwait) Valid driving license (India) Passport detail (Number : M0404072) Place of issue : Cochin (India) Date of issue : 24-08-2014 Date of expire : 23-08-2024 Permanent address Thaithara House/ ThekkekaraP.O/Moncompu/ Alappuzha District/ Kerala State/ India /Pin code:688503 EDUCATIONAL ATTAINMENT: 1991 – 1993 : ITI (National Trade Certificate) Certificate Awarded by Government of India (NCVT) 1988 – 1990 : Pre-Degre (+2)/University of Kerala, India 1987 : Passed Secondary School Leaving Certificate from Kerala Board Examination. Govt. of Kerala Declaration: I hereby declare that all the above-furnished details are true and correct to the best belief of my knowledge. Yours Truly M.SURESH