1. MOHAMMAD HUMAUN KABIR
E| humaunfmq@gmail.com, mohammad.kabir.2@aramco.com, Aramco Login ID| kabirmh M| +96 599608896
Page 1 of 5 Aug 14, 2016
RESUME,MOHAMMADHUMAUNKABIR
CAREER SUMMARY:
More than 11 years working with construction and quality system.
Excellent understanding and implementation skills in quality system implementation.
Worked for Oil & Gas, LNG, Onshore Pipeline, Plant Piping, Well head piping, Structural, Barge, CS Dredger, Ship and
Ferry Fabrication etc.
Skill and experience in Welding Engineering, Welding, Mechanical & Coating Inspection, Third Party Inspection(Saudi
Aramco PID), Supervision and Documentation.
EDUCATIONAL QUALIFICATION:
B. Sc. In Mechanical Engineering, 2005,
Dhaka University of Engineering &Technology (DUET), Gazipur, Bangladesh.
PROFESSIONAL QUALIFICATION:
Certified Welding Inspector (CSWIP 3.1), Certificate No: 89075, Date of Expiry: 19 June 2019
Painting Inspector BGAS-CSWIP Grade 2, ID #: 577275, Certificate#: 29025, Date of Expiry: 5 July 2017
ASNT Level 2 RT, UT, MT, PT, Date Expiry: 26-Nov-2017
SAUDI ARAMCO Approved Coating Inspector along with SAP # 7 0 0 0 9 6 6 3
D A T E O F B IR T H: M A RCH - 0 1 - 1 9 8 0
PROFESSIONAL EXPERIENCE:
Position: SAUDI ARAMCO INSPECTION DEPARTMENT (ID PROJECT INSPECTOR/SUPERVISOR)
Project Duration: Jan 2016 to till now.
Contractor Name: Construction Technical Services Arabia, KSA
Owner Name: Saudi Aramco
Project Name: 56’’ DODSAL Master Gas System Expansion Phase 1(PS 11 to Yanbu NGL, Rabigh, Jeddah), KSA.
Job Responsibilities:
Receive, Review and Approve contractor submitted various work procedure within project scope of work.
Obtain DRR no, Prepare DRR and send back this DRR to contractor.
Resolve site issue daily basis.
Assist SAPMT in enforcing, recommending and interpreting Saudi Aramco standard and specification.
Review contractor submitted quality personnel resume according to SCH Q, conducted interview & approve them.
Monitoring & verifying both Saudi Aramco supplied & Contractor Supplied material receiving according to IFC and
verify 9 CAT/SAP No. and MTC/MTR as per applicable Saudi Aramco and International Standard.
Monitor & Surveillance Inspection for material storage, Handling system & make sure newly arrived material,
Inspected and accepted material, Quarantine material are segregated in their designated area.
Review and Approve contractor submitted WPS/WQT/JCC for welder or weld operator.
Review contractor submitted welder / welding operator JCC logbook. Logbook for all approved WPS as per
process, materials and services to be used. Logbook for pressure gauge, relief valve, pressure recorder.
Temperature recorder calibration certificate to be used in Hydrostatic test.
Review contractor submitted two week look ahead schedule.
Review contractor submitted Weekly welder repair rate report, weekly and cumulative weld status report.
Monitor & Surveillance Inspection of weld material to be welded, welding consumables verification & storage,
joint preparation, joint fit-up, welding processes, equipment calibration and completed weld for conformance to
Saudi Aramco standard, procedures and international code, Sand blasting & Painting activity, Temperature Tie-in.
Monitor pipe stringing, Cold pipe bending, Spool Installation, Gasket Installation, Valve field hydrostatic test, Valve
Installation & Bolt torqueing.
Monitor internal cleaning of pipe lines and piping, internal gauging of pipe lines and selecting of gauging plate.
Monitoring to close “A” punch items prior to commence hydrostatic test.
Review & Approve Lowering package, Hydrostatic test package, Tie-in package, hot tap package, Cold cut package.
Witnessing of Holiday test, Hydrostatic test for pipelines and piping.
Review contractor Submitted Check list & Test reports etc.
Make logbook entry (Violation, Proactive, General comments) in QMIS and close them.
2. Page 2 of 5 Aug 14, 2016
SaudiAramco:CompanyGeneralUse
RESUME,MOHAMMADHUMAUNKABIR
Surveillance Inspection for different type of Lay-up activities as per project requirements.
Closing MPCS YES and NO punch items to route the MCC.
Position: SAUDI ARAMCO Approved QC Mehhanical,Coating, Insulation, Fireproofing Inspector
Project Duration: July 2014 to Jan 2016
Agency Name: North Road Engineering & Consultants, Khobar, KSA
Contractor Name: SK Engineering Ltd, KSA.
Sub-Contractor: Global Suhaimi Company Ltd. KSA
Client Name: Saudi Aramco
Project Name: WASIT Gas Plant, Khursaniah, KSA.
Position: SAUDI ARAMCO Approved QC Mechanical & Coating Inspector
Project Duration: Feb 2013 to June 2014
Agency Name: North Road Engineering Consultants, Khobar, KSA
Contractor Name: Suedrohrbau Saudi Arabia Ltd (SRB, EPC Company), KSA.
Client Name: Saudi Aramco
Project Name: SHY1 Loop 2 & Loop 3 Project, KSA.
Job Responsibilities:
Assure the complete and correct execution of the approved Project Quality Plane & safe working
procedure (SWP).
Visual checks of incoming materials to ensure freedom from mechanical damage. Review of material Document,
specification & Purchase Order Requirement. Arrange and monitor preservation of accept materials. Confirmations
of material traceability. Technical report writing for non-conforming materials. Check the sand grit chemical analysis
report.
Ensure all reports that are required, are completed in a timely manner and are filed.
Responsible for valve station, pump station and GOSP remaining job, transition area, above ground coating and
underground coating at field and fabrication shop with documentation.
Responsible for color code & Stenciling of pipes for LPG line.
Responsible for Micro tunneling casing pipe and carrier pipeline blasting & Painting with Holiday testing at required
voltage, Shop coating activity like material receiving, storage, handling, Blasting, In-process, Primer, Intermediate,
Top coat.
Check the Hi-Temperature coating system and Low temperature coating system.
Monitor and Handle PP (Personnel Protection) Coating system like THERMAL INSULATION COATING that is
MASCOAT.
Properly check HOT and COLD INSULATION system that is material receiving, storage, handling, rock wool,
cladding etc.
Check the fireproofing material receiving, storage, Handling system and correct application Avikote fireproofing
system that is surface preparation, stud pin fixing, wire mesh, and application of epoxy mastic top coat.
Work with various paint system that is, Inorganic zinc epoxy, zinc rich epoxy, Hi-build epoxy, epoxy mastic,
Phenolic epoxy, Polyurethane epoxy, silicon coating, hi-temp coating, bituminous epoxy, coal tar epoxy etc.
Responsible for surface preparation and STOPAC application on the girth weld area, Patch repair and Holiday testing
at required voltage.
Perform in-process and final inspection of coating and painting activities that includes verification of blasting
materials to be used. Inspection and testing of coating/ painting equipment, visual inspection and verify surface
profile of metal surface prior to metal surface prior to coating/ painting after blasting/cleaning.
Conduct visual inspection on coated/painted surface and verify the wet and dry film thickness. Pressure record and
sub-contractors represent & Holiday testing.
Monitoring the Painter and blaster activity and conduct them test for new blaster or painter and retest after their ID
expired.
Responsible for all punch list (MCC) item and make them close with ARAMCO PID and PMT.
Coordinate with client and contractor’s representative on daily basis to resolve any quality problems or issues.
Preparation and compilation of quality reports/records and other quality related document for activity acceptance
and final project handover. Assist and perform other function as may be directed by QA-QC Supervisor & Manager.
Review of quality issues and issuance of NCR & Resolving NCR
Preparation and compilation of quality reports/records and other quality related documents for activity acceptance
and final project handover
3. Page 3 of 5 Aug 14, 2016
SaudiAramco:CompanyGeneralUse
RESUME,MOHAMMADHUMAUNKABIR
Position: Assistant Manager
Project Duration: Dec 2011 to Jan 2013
Company Name: Western Marine Shipyard ltd, Chittagong, Bangladesh.
Project Name: Stella bulk carrier ship, Grona Bulk carrier ship, Nurjahan oil carrier ship, Ferry.
Job Responsibilities:
Review project scope of work, IFC, project documentation, Welding Procedure Specification, Procedure Qualification
Record, Welder qualification test & Approval record.
Witness welder qualification test and visual inspection of welding, mechanical test, NDT, Hydro test, PWHT, PMI, Ferrite
test and verifying the test report whereas applicable.
Verifying NDT requirement, required joint for NDT was selected, completed and accepted (RT, UT, MT, and PT).
Carrying out Inspections during Material Incoming. Check Vendor name, Product name, Batch number, Date of
Manufacture, appropriate stock number & the shelf life, Mill Certificates/MTC of Painting Materials.
Witnessing different type of mechanical test (tensile, nick break test, bend test, fillet test & hardness test etc.)
Inspection of painting & insulation activities. Worked with Protective coating (mastic epoxy, zinc rich epoxy, amide cured
epoxy etc.), Pickling & Passivation, Fire Proofing (Intumescent), Anti-Skid paint systems.
Position: SAUDI ARAMCO Approved QC Mechanical & Coating Inspector
Project Duration: June 2010 to Dec 2011
Company Name: Faysal M. Qahtani Sons Co. (FMQ, EPC Company)
Client Name: Saudi Aramco
Project Name: Crude Oil Pipeline to Riyadh Refinery; EWRR-1, KSA.
Position: SAUDI ARAMCO Approved QC Mechanical & Coating Inspector Project
Duration: May 2009 to June 2010
Company Name: Faysal M. Qahtani Sons Co. (FMQ, EPC Company)
Client Name: Saudi Aramco
Project Name: 36” TIE-IN Fadhili crude oil project, KSA.
Position: SAUDI ARAMCO Approved QC Mechanical & Coating Inspector
Project Duration: Nov 2008 to May 2009
Company Name: Faysal M. Qahtani Sons Co. (FMQ, EPC Company)
Client Name: Saudi Aramco.
Project Name: Maintain potential project, Hawaiah & Haradh, KSA.
Position: SAUDI ARAMCO Approved QC Welding & Coating Inspector
Project Duration: Sept 2007 to Oct 2008
Company Name: Faysal M. Qahtani Sons Co. (FMQ, EPC Company)
Client Name: Saudi Aramco
Project Name: 6” Tanajib gas Plant Pipe line project, Safaniyah water injection project, KSA.
Position: QC Mechanical / Welding Inspector.
Project Duration: May 2007 to Sept 2007
Company Name: Faysal M. Qahtani Sons Co. (FMQ, EPC Company)
Client Name: Saudi Aramco
Project Name: Fadhili Oil well and Water well project, KSA.
Job Responsibilities:
Develop Quality Control Plan (QCP), ITP within the format of corporate QMIS.
Initiate work instructions as necessary for the enhancement of quality.
Implement the Project specification and standards to follow quality.
Prepare WPS, PQR, and JCC. Witnessing PQR, WQT and offer to third party inspector.
4. Page 4 of 5 Aug 14, 2016
SaudiAramco:CompanyGeneralUse
RESUME,MOHAMMADHUMAUNKABIR
Inspection of received material, fit-up, In-process, Visual inspection of weld joint.
Maintain log book for approved WPS and qualified Welder.
Verifying the JCC (job clearance card) for welder & qualification requirements for NDT technician.
Check the method of Pre-heat applied prior to tack weld.
Carried out repairs according to repair WPS. Prepare and maintain welding reports and welder’s performance record.
Prepare Weekly weld repair rate report, Cumulative weld status report, Updating NCR log book along with monthly
status report, 2 weeks look ahead schedule, Updated QA/QC Organization chart and submit all to SAUDI ARAMCO prior
to ARAMCO weekly progress meeting.
Inspection and Witnessing of Tie-in, Temperature Tie-In & Hot Tape activities.
Prepare package for weld joint while required NDT in lieu of hydrostatic test
Prepare NDE request and NDE schedule for NDE crews. Witnessing of PT & MT. Monitoring RT & RT reports.
Verifying Auto UT & Manual UT to cross check with each method’s.
Preparation of weld map for piping and Pipe line & red line drawings conforming to QMS.
Flange Joint Inspection, Gasket Verification and Bolt Torqueing Inspection as per SAUDI ARAMCO standard.
Witnessing of internal cleaning for Trunk line, Well head piping, and Flow Line & Drain line.
Preparation of Hydro test, Hot Tap, Pneumatic test, Tie-in Package conforming to QMS.
In case of nonconformity prepares NCR and resolve the issues related to it.
Responsible for Line walkthrough prior to hydro test. Prepare Pre-test Punch list.
Witnessing of Calibration for Pressure Gauges, Relief Valves, Pressure & Temperature recorder to be used in Hydro
testing.
Inspection and Witnessing of Hot Tap Test, Hydrostatic Test, Valve test, PWHT, PMI, Vacuum test, tensile test, Bend test.
Inspection of Surface preparation, Coating activities.
Perform field installation of Canusa-CPS (Wrapid Bond System) products on weld joints.
Ensuring that the inspections and Test are carried out and documented in accordance with the Quality control plans.
Tracking and Monitoring the Punch List Items and Closing those, if rectified.
Preparation and compilation of quality reports / records, checklist and other quality related document for activity
acceptance and final project handover.
Coordinate with Client and contractor’s representative on daily basis to resolve any quality problems or issues.
Assist and perform other function as may be directed by QA-QC Manager.
Position: Assistant Engineer
Duration: June 2005 to May 2007
Company Name: Max Automobile Bangladesh Ltd. Dhaka, Bangladesh.
Managing work force and schedule works to meet the deadline of Fabrication and Site erection activities.
Deliver the fabrication production (Cutting, Welding, Painting & insulation) conforming to client
Specification/Standard.
Preventive Maintenance of the equipment/machinery and maintenance on breakdown.
Co-ordinate with material department & supplier to maintain the material as required at shop.
Generate manpower reports.
Carry out work conforming Environmental, Occupational & Health and Safety standards.
Schedule, supervise and control the execution of work and updates the work.
Supervise and Control of Design & Drawing of all steel structure, metal economy design, Die design and marking.
Coordinate project activities with the responsible engineers in the function support teams of contract
management, quality control, time control and cost control.
Attend regular project meetings and weekly meetings with owner/client.
Design, Fabrication & Erection of any Steel Structural frame, Erection of Grantee Crane, Hot Working & Cold Working
process of Steel Products.
Heat Treatment Process (like annealing, Normalizing, Quenching Hardening, Tempering) of any Steel Products.
Surface Treatment Process (like Flame or Torch hardening, Carburizing, Cyaniding, and Coating) of any Steel
Products.
Galvanizing of Steel Products.
Forging and thermite welding of Steel.
5. Page 5 of 5 Aug 14, 2016
SaudiAramco:CompanyGeneralUse
RESUME,MOHAMMADHUMAUNKABIR
SEMINAR AND TRAININGS:
CSWIP 3.1 Welding Inspection, June 12-18, 2014,
TATA, TWI India, Hyderabad, India.
BGAS-CSWIP Painting Inspection, Grade 2, July 1 to 5, 2007, Certificate No: 12UH/577275,
TWI Gulf, Manama, Bahrain.
Industrial Technology on Mechanical Engineering, 15th
December 1999 to 15th
Feb, 2000,
Training Institute for Bangladesh Industrial Technical Assistance Corporation (BITAC), Chittagong, Bangladesh.
Safety Orientation, December 1, 2007, Ju’aymah Gas Plant, Saudi Aramco.
Safety Orientation, Feb 18, 2016, DODSAL Camp 1, 56” Mater Gas Expansion Project phase 1, Saudi Aramco.
Seminar on IMO Performance Standard for Protective Coating for dedicated seawater ballast tank in all types of ships and
double-side skin spaces of bulk carriers, Chittagong, Bangladesh.
A S N T L E V E L I I P r ep ar at or y Se m in ar . Seminar held in Dammam, KSA. On Sep-15 to October-15, 2011.
Emergency Procedure, P.P.E. and Fire Extinguisher, July 17, 2007, Technical Training Department, FMQ Sons Co. Abqaiq,
Saudi Arabia.
Basic ISO 9000, July 18, 2007, Technical Training Department, FMQ Sons Co. Abqaiq, Saudi Arabia.
SKILLS:
Supervision, Managing Internal and External customer of an Organization, Computer Aided/Manual Design and Drafting,
Operation and Maintenance of Industrial Mechanical Equipment.
MS Office/Desktop Applications, Assembling PC, Windows install and troubleshooting.
Light vehicle Driving, KSA
LANGUAGES:
English (Advance), Bengali (Native), Hindi/Urdu (Verbal).
REFERENCE:
ABDULLAH QARANY
Project Engineer IV
East-West Pipeline Projects Department
Master Gas Pipeline Projects Division – Western Region
Tel: 0545500453, Email: abdullah.qarany@aramco.com