SlideShare a Scribd company logo
1 of 3
RESUME
Suvajit Roy.
Bally Durgapur, Howrah
P.O- Bally, Dist- Howrah.
Pin- 711205
Contact: 09820635928 & 8305654504
Home- (033) 2671-3756 E-mail: jitsuva@yahoo.co.in
PROJECT ENGINEER
PROFILEPROFILE :-:-
 An articulate mechanical engineer with over 09 years of experience across the project execution and
production. Currently spearheading as Asst. Engineer with McNally Bharat Engineering Co. Ltd
since October 2011.
 Demonstrated capabilities in handling the entire domain of project management activities including
Project planning and scheduling, Technical Coordination, and Supervision.
 Offering comprehensive experience in architecting critical projects. Enriched with the latest trends
and techniques and a wide range of skills in Project Management, Quality Initiatives, Technology,
Critical Thinking, Troubleshooting, Problem Analysis and Resolution.
 Proven Project & People Management skills, proficient in managing widely-divergent,
simultaneously occurring projects within agreed cost / time lines, by using strong organizational
skills, out-of-the-box thinking, and innovative problem solving abilities.
 Focused and hardworking professional equipped with thorough knowledge and technical
understanding coupled with an analytic bent of mind and confident to take challenging assignments.
Possess excellent spoken and written communication skills.
Core Competencies :-
Project Execution  Site Management  Inspection  Material Management  Detail Engineering.
PROFESSIONAL EXPERIENCEPROFESSIONAL EXPERIENCE :-:-
MCNALLY BHARAT ENGINEERING CO. LTD. May’ 2016 - present
Senior. Engineer
Presently posted at NTPC –Vindhyachal (M.P) for CHP project, stage- V. All the construction activities including
Structure & utility piping works.
 Drawing up a detailed project plan, cost estimates, cost-benefit analysis to ascertain technical & commercial
Viability.
 Managing & actively coordinating with sub-contractors for smooth flow of activities, preparing deviation & daily
& monthly progress reports.
 Interacting with clients to understand their specific requirements & executing projects accordingly.
 Material, Equipment Requisition & Material Reconciliation; implementing cost reduction measures to contain
Expenditure within budgetary provisions.
 Planning and executing Site activities with available resources and manpower, and further
Achieving the optimum results for customer satisfaction.
 Managing Day to day co-ordination and regular inspection activities of project along with Project Consultant and
Project In charge.
 Providing On-site Service activities to ensure completion of project within the time & cost parameters.
 Monitoring & Arranging required work front to the contractors regularly.
 Generating periodic reports to monitor the progress of work and carried out value added analysis of the reports to
Monitor the progress of work on various performance parameters.
 Providing final approval of engineering calculations & Final approval of drawings.
Projects:
Project Name Oil & Gas Project CDU-4 (Crude Distillation Unit)
Client Engineers India Limited. (Mumbai)
Duration Sept’ 2013 - May’2016
Summary  Fabrication, erection & sand blasting of structural steel of about 9665mt. which includes
Technological structures, Pipe racks, circular platforms, handrails, ladders and its gratings.
Checking of erection schemes at a height upto 65m by wearing safety belts and other safety
harness. Completed the lifting by 150T Demag AC435 crane. Allocating the job task to
subcontractor supervisor and analyzing the general arrangement drawings of structure for
mobilization of manpower for the work involved.
 Provide approved engineering drawings, structural plans, erection schemes to carry out the
process.
 Defining scope of work, planning the construction activities for timely and smooth completion of
project.
 Finalizing the work permits, risk assessment sheet and request papers like scaffolding check list,
crane check list for allocating the task.
 Erection of U/G piping of about 60000 inch mtr.
 Lines are completed as per isometrics & ensure all isos are cleared.
Project Name STOCK HOUSE -BLAST FURNACE #5 (FOR 4.2MTPA EXPANSION PROJECT)
Client Tata Project Ltd. (Rourkela)
Duration Oct’2011- Sept’2013
Summary  Erection of 8000 MT of structural steel for Stock House and Gallery.
 Maintaining, updating and monitoring the drawing records, specifications and documentation.
 Prepare and follow up of ‘LOOK AHAED SCHEDULE’ in consultation with reporting manager.
Larsen and Tubro Ltd Nov 2008- Sept’ 2011
Engineer- Execution Department
Project Name- 2X500 MW Koderma Thermal Power Project.
Client- BHEL
Summary
 Fabrication & Erection of 13000 MT structural steel for 2x500 MW Power plant.
 Maintaining, updating and monitoring the drawing records, specifications and documentation.
 Awareness on process safety management & safety procedures of onsite emergency response.
 Involved in planning plant maintenance activities shut down/non shutdown jobs and assessment
For performance of equipments and calculating their downtime and preparing reports for failure.
 Efficiently prepared MIS reports, debit notes, monthly reports for incoming materials, material
Identification report, Dispatch report and Production report.
 Generating Weekly/Monthly reports for Fabrication,Erection & supply for client & management
Review.
TECHNO FAB MFG.LTD. (Kolkata) Oct’ 2007- Oct’ 2008
Engineer- Mechanical Department.
PAMI METALS PVT.LTD. (Howrah) Oct’ 2005- Sept’2007
Engineer- Mechanical Department.
EDUCATIONAL & PROFESSIONAL CREDENTIALSEDUCATIONAL & PROFESSIONAL CREDENTIALS :-:-
Diploma in Mechanical, 2005
Central Tool Room & Training Center.(65%)
SOFTWARE SKILLS :-
 MS word/ Excel /AutoCAD.
Got certificate in best safety engineer by Tata Project Ltd & McNally Bharat Engineering Co.
PERSONAL INFORMATION :-
Name : Suvajit Roy.
Father’s Name : Dipak Roy.
Sex : Male
Date of Birth : 06/09/1984
Marital Status : Married
Nationality : Indian
Languages Known : English & Hindi
Expected CTC : Negotiable
DECLARATION :-
I do here by declare that all statements stated above are correct to the best of my Knowledge and belief.
Date: 21 July 2016
Place: Mumbai SUVAJIT ROY

More Related Content

What's hot

October 2015 resume kingshook
October 2015 resume kingshookOctober 2015 resume kingshook
October 2015 resume kingshookkingshook mondal
 
Piping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarPiping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarSandip Karmakar
 
Mantena Neeladri varma_original
Mantena Neeladri varma_originalMantena Neeladri varma_original
Mantena Neeladri varma_originalNeeladri varma
 
Mechanical Engineer-Juffrie
Mechanical Engineer-JuffrieMechanical Engineer-Juffrie
Mechanical Engineer-JuffrieJuffrie Cuevas
 
Abdul Azeem(Mechanical Engineer ) -CV
Abdul Azeem(Mechanical Engineer ) -CVAbdul Azeem(Mechanical Engineer ) -CV
Abdul Azeem(Mechanical Engineer ) -CVMOHAMMED ABDUL AZEEM
 
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) Mudassir Nazar Dabilkar
 
Resume - Senior Projects Planner / Schedule
Resume - Senior Projects Planner / ScheduleResume - Senior Projects Planner / Schedule
Resume - Senior Projects Planner / Schedulesaieq
 
Francisco Cortez Resume 2015
Francisco Cortez Resume 2015Francisco Cortez Resume 2015
Francisco Cortez Resume 2015Francisco Cortez
 
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1John Raj BE, MBA
 
Asim_Siraj__Mechanical_updated
Asim_Siraj__Mechanical_updatedAsim_Siraj__Mechanical_updated
Asim_Siraj__Mechanical_updatedasim siraj
 
MEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANANMEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANANSUDARSANAN NANU
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant
 

What's hot (20)

October 2015 resume kingshook
October 2015 resume kingshookOctober 2015 resume kingshook
October 2015 resume kingshook
 
Piping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarPiping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip Karmakar
 
Mantena Neeladri varma_original
Mantena Neeladri varma_originalMantena Neeladri varma_original
Mantena Neeladri varma_original
 
Mechanical Engineer-Juffrie
Mechanical Engineer-JuffrieMechanical Engineer-Juffrie
Mechanical Engineer-Juffrie
 
Abdul Azeem(Mechanical Engineer ) -CV
Abdul Azeem(Mechanical Engineer ) -CVAbdul Azeem(Mechanical Engineer ) -CV
Abdul Azeem(Mechanical Engineer ) -CV
 
RESUME-1
RESUME-1RESUME-1
RESUME-1
 
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
 
Mahesh - Resume (3)
Mahesh -   Resume (3)Mahesh -   Resume (3)
Mahesh - Resume (3)
 
Resume - Senior Projects Planner / Schedule
Resume - Senior Projects Planner / ScheduleResume - Senior Projects Planner / Schedule
Resume - Senior Projects Planner / Schedule
 
Francisco Cortez Resume 2015
Francisco Cortez Resume 2015Francisco Cortez Resume 2015
Francisco Cortez Resume 2015
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
SNM CV NEW-1
SNM CV NEW-1SNM CV NEW-1
SNM CV NEW-1
 
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
 
Asim_Siraj__Mechanical_updated
Asim_Siraj__Mechanical_updatedAsim_Siraj__Mechanical_updated
Asim_Siraj__Mechanical_updated
 
Piping Engineer CV
Piping Engineer CVPiping Engineer CV
Piping Engineer CV
 
Amitav Sahoo-CV
Amitav Sahoo-CVAmitav Sahoo-CV
Amitav Sahoo-CV
 
MEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANANMEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANAN
 
Resume
ResumeResume
Resume
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docx
 
Nithin-CV
Nithin-CVNithin-CV
Nithin-CV
 

Viewers also liked

TPS_CORPORATE PRESENTATION
TPS_CORPORATE PRESENTATIONTPS_CORPORATE PRESENTATION
TPS_CORPORATE PRESENTATIONJulie Renaud
 
Mengulang sejarah si moncong putih
Mengulang sejarah si moncong putihMengulang sejarah si moncong putih
Mengulang sejarah si moncong putihWarok Nggalek
 
Materi TIK kelas 9 "Menambah animasi,sound,dan movies"
Materi TIK kelas 9 "Menambah animasi,sound,dan movies"Materi TIK kelas 9 "Menambah animasi,sound,dan movies"
Materi TIK kelas 9 "Menambah animasi,sound,dan movies"nurfatimahnj19_9B
 
How is testing different in a DevOps agile team. A perspective from the team.
How is testing different in a DevOps agile team. A perspective from the team.How is testing different in a DevOps agile team. A perspective from the team.
How is testing different in a DevOps agile team. A perspective from the team.TEST Huddle
 
LA VALORACIÓN DE LA PRUEBA DE INTERROGATORIO. Autor: Cristian Contreras Rojas...
LA VALORACIÓN DE LA PRUEBA DE INTERROGATORIO. Autor: Cristian Contreras Rojas...LA VALORACIÓN DE LA PRUEBA DE INTERROGATORIO. Autor: Cristian Contreras Rojas...
LA VALORACIÓN DE LA PRUEBA DE INTERROGATORIO. Autor: Cristian Contreras Rojas...Marcial Pons Argentina
 
El notario, su formacion juridica y profesional
El notario, su formacion juridica y profesionalEl notario, su formacion juridica y profesional
El notario, su formacion juridica y profesionalRosaura Macz
 
Electricity billing-system-screens
Electricity billing-system-screensElectricity billing-system-screens
Electricity billing-system-screensFreeprojectz
 
Social Network Theory & Analysis
Social Network Theory & Analysis Social Network Theory & Analysis
Social Network Theory & Analysis Susan Chesley Fant
 
Maisyarah (xii ips 2)
Maisyarah (xii ips 2)Maisyarah (xii ips 2)
Maisyarah (xii ips 2)Paarief Udin
 
Power Point en la Educacion
Power Point en la EducacionPower Point en la Educacion
Power Point en la Educacionjdiazcedept
 

Viewers also liked (12)

Audit terhadap siklus pendapatan Ringkasan
Audit terhadap siklus pendapatan RingkasanAudit terhadap siklus pendapatan Ringkasan
Audit terhadap siklus pendapatan Ringkasan
 
TPS_CORPORATE PRESENTATION
TPS_CORPORATE PRESENTATIONTPS_CORPORATE PRESENTATION
TPS_CORPORATE PRESENTATION
 
Mengulang sejarah si moncong putih
Mengulang sejarah si moncong putihMengulang sejarah si moncong putih
Mengulang sejarah si moncong putih
 
Materi TIK kelas 9 "Menambah animasi,sound,dan movies"
Materi TIK kelas 9 "Menambah animasi,sound,dan movies"Materi TIK kelas 9 "Menambah animasi,sound,dan movies"
Materi TIK kelas 9 "Menambah animasi,sound,dan movies"
 
Kapita fix2
Kapita fix2Kapita fix2
Kapita fix2
 
How is testing different in a DevOps agile team. A perspective from the team.
How is testing different in a DevOps agile team. A perspective from the team.How is testing different in a DevOps agile team. A perspective from the team.
How is testing different in a DevOps agile team. A perspective from the team.
 
LA VALORACIÓN DE LA PRUEBA DE INTERROGATORIO. Autor: Cristian Contreras Rojas...
LA VALORACIÓN DE LA PRUEBA DE INTERROGATORIO. Autor: Cristian Contreras Rojas...LA VALORACIÓN DE LA PRUEBA DE INTERROGATORIO. Autor: Cristian Contreras Rojas...
LA VALORACIÓN DE LA PRUEBA DE INTERROGATORIO. Autor: Cristian Contreras Rojas...
 
El notario, su formacion juridica y profesional
El notario, su formacion juridica y profesionalEl notario, su formacion juridica y profesional
El notario, su formacion juridica y profesional
 
Electricity billing-system-screens
Electricity billing-system-screensElectricity billing-system-screens
Electricity billing-system-screens
 
Social Network Theory & Analysis
Social Network Theory & Analysis Social Network Theory & Analysis
Social Network Theory & Analysis
 
Maisyarah (xii ips 2)
Maisyarah (xii ips 2)Maisyarah (xii ips 2)
Maisyarah (xii ips 2)
 
Power Point en la Educacion
Power Point en la EducacionPower Point en la Educacion
Power Point en la Educacion
 

Similar to Suvajit_Resume (20)

Manoj resume
Manoj resumeManoj resume
Manoj resume
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
Resume Gp
Resume GpResume Gp
Resume Gp
 
Resume Gp
Resume GpResume Gp
Resume Gp
 
Krishna Updated Resume
Krishna Updated ResumeKrishna Updated Resume
Krishna Updated Resume
 
Resume Gp
Resume GpResume Gp
Resume Gp
 
Updated CV
Updated CVUpdated CV
Updated CV
 
CV
CVCV
CV
 
Anson 090316
Anson 090316Anson 090316
Anson 090316
 
RESUME BHAGATSINH VERMA
RESUME BHAGATSINH VERMA RESUME BHAGATSINH VERMA
RESUME BHAGATSINH VERMA
 
Ready for new opportunities
Ready for new opportunities Ready for new opportunities
Ready for new opportunities
 
Resume_-_Sourav_Sengupta
Resume_-_Sourav_SenguptaResume_-_Sourav_Sengupta
Resume_-_Sourav_Sengupta
 
Shanmukharao K_resume
Shanmukharao K_resumeShanmukharao K_resume
Shanmukharao K_resume
 
MY PROFILE
MY PROFILEMY PROFILE
MY PROFILE
 
cv@sanjaychaubey REV
cv@sanjaychaubey REVcv@sanjaychaubey REV
cv@sanjaychaubey REV
 
cv@sanjaychaubey REV
cv@sanjaychaubey REVcv@sanjaychaubey REV
cv@sanjaychaubey REV
 
Christian Lee Jumamil
Christian Lee JumamilChristian Lee Jumamil
Christian Lee Jumamil
 
Resume
ResumeResume
Resume
 
CV SAIF UR REHMAN
CV SAIF UR REHMANCV SAIF UR REHMAN
CV SAIF UR REHMAN
 
Tarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CVTarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CV
 

Suvajit_Resume

  • 1. RESUME Suvajit Roy. Bally Durgapur, Howrah P.O- Bally, Dist- Howrah. Pin- 711205 Contact: 09820635928 & 8305654504 Home- (033) 2671-3756 E-mail: jitsuva@yahoo.co.in PROJECT ENGINEER PROFILEPROFILE :-:-  An articulate mechanical engineer with over 09 years of experience across the project execution and production. Currently spearheading as Asst. Engineer with McNally Bharat Engineering Co. Ltd since October 2011.  Demonstrated capabilities in handling the entire domain of project management activities including Project planning and scheduling, Technical Coordination, and Supervision.  Offering comprehensive experience in architecting critical projects. Enriched with the latest trends and techniques and a wide range of skills in Project Management, Quality Initiatives, Technology, Critical Thinking, Troubleshooting, Problem Analysis and Resolution.  Proven Project & People Management skills, proficient in managing widely-divergent, simultaneously occurring projects within agreed cost / time lines, by using strong organizational skills, out-of-the-box thinking, and innovative problem solving abilities.  Focused and hardworking professional equipped with thorough knowledge and technical understanding coupled with an analytic bent of mind and confident to take challenging assignments. Possess excellent spoken and written communication skills. Core Competencies :- Project Execution  Site Management  Inspection  Material Management  Detail Engineering. PROFESSIONAL EXPERIENCEPROFESSIONAL EXPERIENCE :-:- MCNALLY BHARAT ENGINEERING CO. LTD. May’ 2016 - present Senior. Engineer Presently posted at NTPC –Vindhyachal (M.P) for CHP project, stage- V. All the construction activities including Structure & utility piping works.  Drawing up a detailed project plan, cost estimates, cost-benefit analysis to ascertain technical & commercial Viability.  Managing & actively coordinating with sub-contractors for smooth flow of activities, preparing deviation & daily & monthly progress reports.  Interacting with clients to understand their specific requirements & executing projects accordingly.  Material, Equipment Requisition & Material Reconciliation; implementing cost reduction measures to contain Expenditure within budgetary provisions.  Planning and executing Site activities with available resources and manpower, and further Achieving the optimum results for customer satisfaction.  Managing Day to day co-ordination and regular inspection activities of project along with Project Consultant and Project In charge.  Providing On-site Service activities to ensure completion of project within the time & cost parameters.  Monitoring & Arranging required work front to the contractors regularly.  Generating periodic reports to monitor the progress of work and carried out value added analysis of the reports to Monitor the progress of work on various performance parameters.  Providing final approval of engineering calculations & Final approval of drawings. Projects: Project Name Oil & Gas Project CDU-4 (Crude Distillation Unit) Client Engineers India Limited. (Mumbai) Duration Sept’ 2013 - May’2016 Summary  Fabrication, erection & sand blasting of structural steel of about 9665mt. which includes
  • 2. Technological structures, Pipe racks, circular platforms, handrails, ladders and its gratings. Checking of erection schemes at a height upto 65m by wearing safety belts and other safety harness. Completed the lifting by 150T Demag AC435 crane. Allocating the job task to subcontractor supervisor and analyzing the general arrangement drawings of structure for mobilization of manpower for the work involved.  Provide approved engineering drawings, structural plans, erection schemes to carry out the process.  Defining scope of work, planning the construction activities for timely and smooth completion of project.  Finalizing the work permits, risk assessment sheet and request papers like scaffolding check list, crane check list for allocating the task.  Erection of U/G piping of about 60000 inch mtr.  Lines are completed as per isometrics & ensure all isos are cleared. Project Name STOCK HOUSE -BLAST FURNACE #5 (FOR 4.2MTPA EXPANSION PROJECT) Client Tata Project Ltd. (Rourkela) Duration Oct’2011- Sept’2013 Summary  Erection of 8000 MT of structural steel for Stock House and Gallery.  Maintaining, updating and monitoring the drawing records, specifications and documentation.  Prepare and follow up of ‘LOOK AHAED SCHEDULE’ in consultation with reporting manager. Larsen and Tubro Ltd Nov 2008- Sept’ 2011 Engineer- Execution Department Project Name- 2X500 MW Koderma Thermal Power Project. Client- BHEL Summary  Fabrication & Erection of 13000 MT structural steel for 2x500 MW Power plant.  Maintaining, updating and monitoring the drawing records, specifications and documentation.  Awareness on process safety management & safety procedures of onsite emergency response.  Involved in planning plant maintenance activities shut down/non shutdown jobs and assessment For performance of equipments and calculating their downtime and preparing reports for failure.  Efficiently prepared MIS reports, debit notes, monthly reports for incoming materials, material Identification report, Dispatch report and Production report.  Generating Weekly/Monthly reports for Fabrication,Erection & supply for client & management Review. TECHNO FAB MFG.LTD. (Kolkata) Oct’ 2007- Oct’ 2008 Engineer- Mechanical Department. PAMI METALS PVT.LTD. (Howrah) Oct’ 2005- Sept’2007 Engineer- Mechanical Department. EDUCATIONAL & PROFESSIONAL CREDENTIALSEDUCATIONAL & PROFESSIONAL CREDENTIALS :-:- Diploma in Mechanical, 2005 Central Tool Room & Training Center.(65%) SOFTWARE SKILLS :-  MS word/ Excel /AutoCAD.
  • 3. Got certificate in best safety engineer by Tata Project Ltd & McNally Bharat Engineering Co. PERSONAL INFORMATION :- Name : Suvajit Roy. Father’s Name : Dipak Roy. Sex : Male Date of Birth : 06/09/1984 Marital Status : Married Nationality : Indian Languages Known : English & Hindi Expected CTC : Negotiable DECLARATION :- I do here by declare that all statements stated above are correct to the best of my Knowledge and belief. Date: 21 July 2016 Place: Mumbai SUVAJIT ROY