SlideShare a Scribd company logo
1 of 10
CURRICULUM VITAE – Mohamad Khalid NAWAWI
Page 1 of 10
PRIVATE ADDRESS.
No. 50 Jalan Wan Empok 1,
Bandar Baru Seri Petaling,
57000 Kuala Lumpur,
MALAYSIA.
HP : +6019-773 8149 and
+6013-272 4341
Email : mknawawi@gmail.com or mknawawi@yahoo.com or khalid.emepmi@gmail.com
PERSONAL DETAILS
Date of Birth : 18 January 1963.
Nationality : Malaysian.
Marital Status : Married.
Qualification : Diploma in Building, ITM Shah Alam, Malaysia, 1989 &
Ba. Degree in Quantity Surveying, Corllins University, USA.
Language Proficiency : Fluent in English and Bahasa Malaysia (Written and Oral).
PERSONAL PROFILE – SENIOR COST CONTROL / QUANTITY SURVEYOR
Twenty four (24) years of working experience in projects Cost & Contracts Administration
and Project Services with both Malaysia’s leading fabricators and international operators of
onshore and offshore Oil & Gas facilities. Fully computer literate, both supervisory and
hands on.
Achievements and strengths include:
 Oil and gas knowledge and background at senior executive and managerial levels.
 Change Order administration, MTO review and preparation, and cost estimation.
 Project cost budgeting, reporting and controlling for major projects incorporating design,
fabrication, installation & hook-up, and start up activities.
 Experience for monitoring, estimating, verifying and issuing work release for offshore
hook-up work pack.
 Tender management for major and minor subcontracts for a multitude of disciplines not
limited to Structural, Piping, Electrical & Instrumentation, heavy lifts, transportation and
installation.
 Strong communication and interaction skills with various levels of people from different
back grounds and nationalities.
CAREER SUMMARY – Major Clients
ExxonMobil Berhad. Sarawak Shell Berhad.
Talisman Energy Malaysia Ltd. NIPPON Oil Exploration (M) Ltd.
Petronas Carigali Sdn Bhd. Malaysia Shipyard & Engineering Sdn. Bhd.
Carimin Engineering Sdn Berhad. PUB Singapore Ltd.
Shimizu Corporation Berhad Energoproject Malaysia Sdn. Bhd.
CURRICULUM VITAE – Mohamad Khalid NAWAWI
Page 2 of 10
1. Employer : ExxonMobil Exploration and Production Malaysia Inc.
Period Covered : July 2013 until present.
Position : Quantity Surveyor (Offshore).
Projects Involved : Tapis EOR Brownfield Modification and Retrofit for
(Tapis Alfa, Tapis Bravo, Tapis Charlie and Tapis Delta)
Contract Value : Compensation on Reimbursable Cost Basis.
Assigned for Offshore Quantity Surveyor to Ta EOR Brownfield Modification and Retrofit
Project. The tasks covers for:-
 Verifying all manpower, Equipment and Consumable Offshore which includes
monitor, record, sign off and report changes not limited to the following:
 Check and verify any additional modification for installation are original Contractor
scope due to fault in design & fabrication stage.
 Monitor and record data relating to Site Instructions to
i). Ensure material requirements are identified early and tracked by Planning
and
ii). Overall costs are estimated and, where necessary to, a negative back-charge
reimburse cost to Main Contract Cost.
 Monitor all punch list data to ensure that materials are identified, are tracked by
planning and overall costs estimated and, where necessary, back-charge documents
are prepared to support a negative back-charge VO to be submitted to Main
Contractor.
 Monitor any transfer of work-scope, materials and/or construction equipment
between contractors in order that costs can be reconciled at a later date.
 Ensure that construction sub-contractors (scaffolding / habitats / bolt tensioning etc)
are recording time and associated costs to the correct cost center.
2. Employer : Carimin Engineering Services Sdn Bhd
Period Covered : January 2010 ~ June 2013.
Position : Senior Quantity Surveyor / Cost Controller.
Projects Involved :
a). July 2011 ~ Jun 2013 : Petronas CARIGALI Project.
Provision for Hook-Up and Commissioning for SKO
o LUTONG, BARAM & BAKAU Pipeline Rejuvenation
Project,
o KINABALU Gas Development,
o SAMARANG Metering Project Development
Contract Value : RM 800M (Lump Sum & Provisional Sum Contract).
Attached to Project Management Team and reporting directly to Project Director with the
following responsibilities:
Roles and Responsibilities:
CURRICULUM VITAE – Mohamad Khalid NAWAWI
Page 3 of 10
 Manage Contract administration / commercial matters with Client including but not
limited to submitting Work Order Proposal, invoicing, Change Order administration,
correspondences and Final Doc.
 Prepare and maintained Project Cost Budget and Cost Projection structures for the
whole project duration until close-out. Prepared monthly cost reports and analysis for
review by various departments including Project Manager, Managing Director /
General Manager.
 Coordinate with relevant departments for Change Order administrations and potential
claims to clients including recognizing the changes, justifying the request for Change
Order, MTO preparation, cost estimation and final submission and discussion with
Client.
 Prepare Monthly Accrual Report of work-in-progress for submission of Monthly
Progress Claims and invoicing to Clients till approval.
 Advised Project Manager and project team personnel on contractual aspects of the
project and coordinates with client for execution especially those having cost and
schedule impacts on the project.
 Check, evaluate, monitors, verify and processed subcontractor’s progress claims and
Change Orders in accordance with Subcontract Document. Assist Project Manager
and team members in resolving conflicts with regards to contractual issues.
b). Jan 2010 ~ June 2011 : Talisman Malaysia Limited Project.
Provision of Hook-Up and Commissioning Services for
PM3 CAA (Northern Fields) and PM305 (Southern Fields)
o MRU: MRU for BOA Platform and BRA Platform.
o WHAM: WHAM for BOA Platform, BOC Platform, BRB
 Platform, BRC Platform, BRD Platform, BKA
Platform,
 BKC Platform, BSA Platform and BTA Platform.
o FLOWLINES: FLOWLINES for BOA Platform, BOB
Platform, BOC Platform and BOD Platform.
Contract Value : RM 120 Million (Onshore U.Rate & Offshore Time Rate).
Attached to Project Management Team (Office) and reporting directly to Project Manager
Hook-Up with the following responsibilities:
Roles and Responsibilities:
 To develop a detail procedure for Managing Project Cost Structure through a Cost
Account Codes Directory with the appropriate Work Breakdown Structures and to
implement with Accounts Department to charge costs according to allocation system.
 Manages Contract administration / commercial matters with Client including but not
limited to submitting Work Release Proposal, invoicing, Change Order administration,
correspondences and Final Doc.
 Coordinates all activities related to Hook Up operations between site office in
Kemaman, Offshore and head office in Kuala Lumpur, Malaysia encompassing
processing of Work Pack, Site Instruction, Purchase Requisitions and Purchase
Orders, Project Team manpower planning and logistics and miscellaneous project
services work.
CURRICULUM VITAE – Mohamad Khalid NAWAWI
Page 4 of 10
 Subcontract Administration with local Hook-Up Subcontractors, Suppliers,
Transportation and Installation Schedule, mainly based in the Offshore and
Kemaman Yard Fabrication.
 Prepares, analyzes and presents monthly Project Cost Report and cost forecast
including identifying corrective actions for cost controlling to the HOD & GM.
 Maintains various daily reports for offshore activities for overall work coordination and
cost reimbursement from client.
 Monitors, reviews and recommends for approval Project expenditures.
3. Employer : Talisman Malaysia Limited.
Period Covered : January 2008 ~ Dec 2009.
Position : Senior Quantity Surveyor / Cost Engineer.
Projects Involved : Provision of Hook-Up and Commissioning Services
Northern Field Project for Bunga Orkid, BO-A, BO-B,
BO-C and BO-D and monitoring on Offshore
Commissioning Works for BOA Central Processing
Platform for of PM3 CAA Development Project.
Contract Value : RM 170 Million (Onshore U. Rate & Offshore Time Rate)
Attached to Project Management Team (Office) and reporting directly to Project Manager
Hook-Up with the following responsibilities:
Roles and Responsibilities:
 Prepare Cost Estimate for Purchase Requisition.
 Review and verification Work Release Proposal (WRP) from Contractor and prepare
Final Work Release (WR) amount for Management approval.
 Review and submit for Management approval Contractor’s Claims and Change
Orders, followed with necessary documentation review and verification for payment
of the same.
 Manage proper documentation for Work Pack (WP) issue, Purchase Requisition (PR)
Cost, Work Release (WR) issued and invoice from Contractor.
 Review and comment Minutes of Meeting, Progress Reports, Value of Work Done
(VOWD) and prepare project Cost Forecasts.
 Assist and advise PM and other Project Team members on various Contractual
issues and matters including drafting of official letters, instructions and notifications in
line with Contract requirements and Terms & Conditions.
Other Roles:
Has been assigned for Offshore Quantity Surveyor to Bunga Orkid Project for HUC &
Commissioning scope. The tasks covers Offshore Change Control Administrator of
which includes monitor, record, sign off and report changes not limited to the following:
 Check “Site Instructions” and additional “job cards / work packs” raised to determine
that they are either:
i). Additional work-scope over and above from original contractual base scope or
ii). Original contractual scope not completed by the Main Contractor and has to
be completed by others Contractor and back-charged to Main Contractor.
 Monitor and record data relating to Site Instructions to:
i). Ensure material requirements are identified early and tracked by Planning
CURRICULUM VITAE – Mohamad Khalid NAWAWI
Page 5 of 10
and
ii). Overall costs are estimated and, where necessary, a negative back-charge
VO is prepared for deduction to Main Contractor Cost.
 Monitor all punch list data to ensure that materials are identified, are tracked by
planning and overall costs estimated and, where necessary, back-charge documents
are prepared to support a negative back-charge VO to be submitted to Main
Contractor.
 Monitor any transfer of work-scope, materials and/or construction equipment
between contractors in order that costs can be reconciled at a later date.
 Ensure that construction sub-contractors (scaffolding / habitats / bolt tensioning etc)
are recording time and associated costs to the correct cost centre i.e. Main
Contractor Carry-Over, BOA base scope, WHRP base scope and Operations.
 Ensure that Vendor Representatives record time and associated costs to the correct
cost center and record and catalogue any down time caused by vendor package
deficiencies that have a direct cost impact on the schedule.
 Monitor and record vessel utilization and costs i.e. Talisman Operations / Talisman
Projects / Main Contractor of supply vessel, accommodation vessel etc.
4. Employer : Sarawak Shell Berhad.
Period Covered : February 2005 ~ December 2007.
Position : Project Cost Engineer.
Projects Involved :
i) Feb 2005 ~ Mar 2006 : Fabrication of E11P-B Topsides Project – Fabrication of
MSF North and South, Bridge, Vent Boom, Module 1 and
Module 2 (Bottom and Top).
Contract Value : RM 80 Million (E.P.C. Lump Sum Contract).
ii) Apr 2006 ~ Dec 2007 : Pre-fabricated steel module forming part of F13-E
Offshore Gas Processing Facility, overall size measuring
approximately 3.00m X 36.00m X 30.00m high, made of
carbon steel tubular, beam and plate and complete with
pre-installed mechanical, electrical and instrumentation
equipment and other appurtenances.
Contract Value : RM 150 Million (E.P.C. Lump Sum Contract).
Attached to Project Management Team (Site) and reporting directly to Company Site
Representative (CSR) with the following responsibilities:
Roles and Responsibilities:
 Preparation and issue of instructions to Contractor for project services, recording
instructions, tracking and invoice checking for such instructions.
 Review and submit for Management approval Contractor’s claims and Change
Orders, followed with necessary documentation review and verification for payment
of the same.
 Review and verification of Contractor’s Monthly Payment Certificates and invoices.
 Review and comment Minutes of Meeting, Progress Reports, Value of Work Done
(VOWD) and prepare project Cost Forecasts.
 Assist and advise Company Site Representative and other Project Team members
CURRICULUM VITAE – Mohamad Khalid NAWAWI
Page 6 of 10
on various Contractual issues and matters including drafting of official letters,
instructions and notifications in line with Contract requirements and Terms &
Conditions.
5. Employer : Malaysia Shipyard & Engineering Sdn. Bhd.
Period Covered : April 2001 ~ January 2005.
Position : Senior Technical Executive (Contract Administration).
Projects Involved :
i) Oct 2001 ~ Nov 2003 : Fabrication, Hook Up and Commissioning of Helang
Central Platform (HCP) Integrated Topsides Project for
NIPPON Oil Exploration (M) Ltd.
Contract Value : RM 240 Million (E.P.C. Lump Sum Contract)
ii) Jun 2003 ~ Nov 2003 : Helang Development and Operation for Provision of
Interim Onshore and Offshore Operational Support
Personnel to Assist Nippon.
Contract Value : RM 120 Million (Provisional Sum Contract)
iii) Dec 2003 ~ Jan 2005 : Fabrication for 9 Modules of (2,000 MT) ERHA(FPSO).
Floating Production Storage Offloading E & I Building for
Exxon Mobil.
Contract Value : RM 100 Million (E.P.C. Lump Sum Contract).
Attached to Project Management Team and reporting directly to Project Manager with
the following responsibilities:
Roles and Responsibilities:
 Made necessary preparation for the execution of applicable fabrication Contract upon
award including organizing and reviewing all pertinent documents and executing the
finalization of all outstanding issues regarding the Contract Price and Scope of Work
with Client.
 Prepare and maintain Project Cost Budget and Cost Projection structures for the
whole project duration until close-out. Prepared monthly cost reports and analysis for
review by various company, heads of departments including Managing Director /
General Manager, Project Manager and Group Directors.
 Coordinate with relevant departments for Change Order administrations and potential
claims to clients including recognizing the changes, justifying the request for Change
Order, MTO preparation, cost estimation and final submission and discussion with
client.
 Prepare Monthly Valuation Statements of work-in-progress for submission of Monthly
Progress Claims and invoicing to Clients. This duty includes collecting and compiling
necessary data and back-up documents in accordance with Contract Invoicing
procedures.
 Advise Project Manager and project team personnel on contractual aspects of the
project and coordinates with client for execution especially those having cost and
schedule impacts on the project.
 Check, evaluate, monitors, verify and process subcontractor’s progress claims and
Change Orders in accordance with Subcontract Document. Assist Project Manager
and team members in resolving conflicts with regards to contractual issues.
 Prepared project close-out reports that documented all project history, background,
experiences, lessons learnt and proposals for improvement for review of company
CEO, Directors and Clients.
CURRICULUM VITAE – Mohamad Khalid NAWAWI
Page 7 of 10
Other Roles:
 Involved in Company’s business re-structuring exercise with the intention of
increasing company’s productivity and profitability and developing Company’s
mission and vision.
 Subcontracting management including pre-qualifying subcontractors, preparation of
tenders, evaluation & award and post award management
6. Employer : Binnie & Partners (Singapore) Consulting Engineering.
Period Covered : April 1998 ~ March 2001.
Position : Site Quantity Surveyor.
Projects Involved : Civil & Building Works for Johor River Waterworks
Extension Scheme Stage 4 & 5 for PUB Singapore at
Kota Tinggi, Johor.
Contract Value : S$ 200 Million (Unit Rate Contract).
Attached to Project Management Team and reported directly to Company Site
Representative (CSR) with the following responsibilities:
Roles and Responsibilities:
 Close coordination between the various contractors and interfaces (between main
contractor & M&E contractor) including pipe and valve, inspection materials supply
and approval.
 Monitoring the progress, site evaluation, checking and verifying contractor claim.
 Checking, verifying, preparing and submitting final measurement to the client until
completion.
 Budget estimating.
 Site evaluation.
 Final account.
7. Employer : Shimizu Corporation (Main Contractor).
Period Covered : June 1995 ~ March 1998.
Position : Site Quantity Surveyor.
Projects Involved : Construction for Bridge Links Malaysia and Singapore
Between Kampong Ladang in Johor and Tuas in
Singapore.
Contract Value : RM 540 Million (Unit Rate Contract).
Reported directly to Project Manager Contract for Project Construction of Bridge Links
Malaysia and Singapore between Kampong Ladang in Johor and Tuas in Singapore that
include the following duties:
Roles and responsibilities:
 Prepare & handle progress claim to consultant.
 Monitor and finalize change order (Site Instruction) to consultant.
 Monitor and prepare final measurement and final account to consultant and client.
CURRICULUM VITAE – Mohamad Khalid NAWAWI
Page 8 of 10
 Handle and check sub-contractor claim.
 Check all variation claims by sub-contractor against contract and advice.
 Prepare final account for sub-contractors.
 Monitor progress report and progress photograph.
 Tendering and contract documentation.
8. Employer : Malaysia Shipyard and Engineering Sdn Bhd.
Period Covered : April1994 ~ May 1995.
Position : Cost Control / Quantity Surveyor.
Projects Involved : Duyong Jacket, MSF & Bridge and Dulang Water
Injection and Gas Compression Module.
Contract Value : RM 230 Million (E.P.C Lump Sum Contract).
Attached to Project Management Team and reporting directly to Project Manager with
the following responsibilities
Roles and responsibilities:
 Contract Documentation.
 Monitor the milestone progress payment and variation claims.
 Monitor, maintain record and finalize all change orders issued by client against the
change proposals.
 Advise PMT of its contractual obligation with clients.
 Advise PMT of its contractual obligation with sub-contractors.
 Monitor and check sub-contractors progress claim.
 Check all variation claims by sub-contractors against contract and advice.
 Prepare final accounts for sub-contractors.
9. Employer : Abdullah Atan Associate (QS Consultant).
Period Covered : September 1992 ~ March 1994.
Position : Site Quantity Surveyor.
Projects Involved : Construction of Mosque, at Uda Johor Bahru.
Contract Value : RM 10 Million (E.P.C Lump Sum Contract).
Attached to Project Management Team as Site Quantity Surveyor with the following
responsibilities:
Roles and Responsibilities:
 Monitoring the progress, site evaluation, checking and verifying contractor claim.
 Checking, verifying, preparing and submitting final measurement to the client until
completion.
 Budget estimating.
 Site evaluation.
 Final account.
CURRICULUM VITAE – Mohamad Khalid NAWAWI
Page 9 of 10
10. Employer : Energoproject Malaysia Sdn. Bhd.
Period Covered : December 1989 ~ August 1992.
Position : Site Quantity Surveyor.
Projects Involved : Construction for Main Outdoor Stadium and Ramps
Package, Shah Alam Sports Complex at Shah Alam,
Selangor.
Contract Value : RM 540 Million (Unit Rate Contract).
Reported directly to Project Manager Contract for Project Construction for Main Stadium
and Ramps Package, Shah Alam Sports Complex at Shah Alam, Selangor that include
the following duties:
Roles and responsibilities:
 Prepare & handle progress claim to consultant.
 Monitor and finalize change order (Site Instruction) to consultant.
 Monitor and prepare final measurement and final account to consultant and client.
 Handle and check sub-contractor claim and check all variation claims by sub-
contractor against contract and advice.
 Prepare final account for sub-contractors.
 Monitor progress report and progress photograph.
 Tendering and contract documentation.
CURRICULUM VITAE – Mohamad Khalid NAWAWI
Page 10 of 10
COURSES AND TRAINING ATTENDED:
Date Course / Training Title Facilitator
March 10, 1990 Computing Mara Institute of
Technology
March 10, 1990 Site Surveying Mara Institute of
Technology
April 13 - 16,
2004
Supervisory Development Program TG Consult Sdn. Bhd.
March 17 & 18,
2007
Information System Strategy OCTAGON Petroleum
Technology
April 14 & 15,
2007
Petroleum Engineering OCTAGON Petroleum
Technology
May 19 & 20,
2007
Asset Management Integrity, HSE &
Economics
OCTAGON Petroleum
Technology
June 16 & 17,
2007
Plant Layout Development & 3D Application OCTAGON Petroleum
Technology
July 14 & 15,
2007
Quality Management OCTAGON Petroleum
Technology M
August 25 & 26,
2007
Project Planning, Management & Cost
Control
OCTAGON Petroleum
Technology
January 26 & 27,
2008
Process Engineering OCTAGON Petroleum
Technology
July 26 & 27,
2008
Flow Diagram and Heat Material Balance OCTAGON Petroleum
Technology
March 28 & 29,
2009
Instrument and Control Design OCTAGON Petroleum
Technology
November 8 & 9,
2009
Process Equipment and Piping Design OCTAGON Petroleum
Technology
January 13, 2011
Occupational Safety & Health (OSHA 94,
FMA 67 & Regulations PSMA 84 &
HIRARC)
Square Three Sdn Bhd
Aug 12, 2013 Offshore Safety Sea Survival SEQU
Aug 12, 2013
Basic Fire Fighting & Self Rescue & Basic
Life Support
SEQU
Aug 12, 2013 Helicopter Underwater Escape Training SEQU
REFERENCE.
1. Omar Bin A. Rahman.
Project Manager HUC Department,
Talisman Malaysia Limited,
Level 25, Menara Citibank,
165 Jalan Ampang 50450.
H/P No.: +6012-205 5146.
DL . : 03-2055 2912.
2. Mohamad Ali Gohar Rahman
Project Manager (International Project).
Level 23, Tower 2,
Petronas Twin Towers,
Kuala Lumpur City Centre.
50088 Kuala Lumpur.
H/P No.: +6012-276 3534

More Related Content

What's hot (20)

Ayman_C.V. ( ass.contract manager.)
Ayman_C.V.           ( ass.contract manager.)Ayman_C.V.           ( ass.contract manager.)
Ayman_C.V. ( ass.contract manager.)
 
Paul Brown - CV - LI - Sep 2016
Paul Brown - CV - LI - Sep 2016Paul Brown - CV - LI - Sep 2016
Paul Brown - CV - LI - Sep 2016
 
Pathway guide quantity_surveying_construction_dwl_pt
Pathway guide quantity_surveying_construction_dwl_ptPathway guide quantity_surveying_construction_dwl_pt
Pathway guide quantity_surveying_construction_dwl_pt
 
updated cv hossam lotfy 30-12-2015
updated cv hossam lotfy 30-12-2015updated cv hossam lotfy 30-12-2015
updated cv hossam lotfy 30-12-2015
 
Homer CV - CA2
Homer CV - CA2Homer CV - CA2
Homer CV - CA2
 
Van herrera cv
Van herrera   cvVan herrera   cv
Van herrera cv
 
07-12-2014m
07-12-2014m07-12-2014m
07-12-2014m
 
Rao Yagitila CV
Rao Yagitila CVRao Yagitila CV
Rao Yagitila CV
 
Sxsw 2011 construction enviroment
Sxsw 2011 construction enviromentSxsw 2011 construction enviroment
Sxsw 2011 construction enviroment
 
Brief_CV_Nahedh
Brief_CV_NahedhBrief_CV_Nahedh
Brief_CV_Nahedh
 
SYED NAHAR's RESUME
SYED NAHAR's RESUMESYED NAHAR's RESUME
SYED NAHAR's RESUME
 
RIJO GEORGE CV
RIJO GEORGE CVRIJO GEORGE CV
RIJO GEORGE CV
 
Ravi kumar-CV 2015
Ravi kumar-CV 2015Ravi kumar-CV 2015
Ravi kumar-CV 2015
 
Senior Quantity Surveyor Engineer ....
Senior Quantity Surveyor Engineer ....Senior Quantity Surveyor Engineer ....
Senior Quantity Surveyor Engineer ....
 
Sanjeewa_CV updated on 23.02.2016
Sanjeewa_CV  updated on 23.02.2016Sanjeewa_CV  updated on 23.02.2016
Sanjeewa_CV updated on 23.02.2016
 
Amr. 2015....
Amr. 2015....Amr. 2015....
Amr. 2015....
 
Construction Project Process Flow
Construction Project Process FlowConstruction Project Process Flow
Construction Project Process Flow
 
2017 Updated CV - Essam Harby
2017 Updated  CV - Essam Harby2017 Updated  CV - Essam Harby
2017 Updated CV - Essam Harby
 
M Sahar CV-Updated
M Sahar CV-UpdatedM Sahar CV-Updated
M Sahar CV-Updated
 
Amol-KulkarniResume
Amol-KulkarniResumeAmol-KulkarniResume
Amol-KulkarniResume
 

Similar to EPC Contract - M. Khalid Quantity Surveyor 2015

Similar to EPC Contract - M. Khalid Quantity Surveyor 2015 (20)

ALAA Y ABUGHAIDAH
ALAA Y ABUGHAIDAHALAA Y ABUGHAIDAH
ALAA Y ABUGHAIDAH
 
Mohannad Al Twait-CV1
Mohannad Al Twait-CV1Mohannad Al Twait-CV1
Mohannad Al Twait-CV1
 
Resume - Nermeen Atef sam
Resume - Nermeen Atef samResume - Nermeen Atef sam
Resume - Nermeen Atef sam
 
Quantity Surveyor - Riyas AM
Quantity Surveyor - Riyas AMQuantity Surveyor - Riyas AM
Quantity Surveyor - Riyas AM
 
Mohamed khamis
Mohamed khamisMohamed khamis
Mohamed khamis
 
Senior Subcontracts officer-Mehadi
Senior Subcontracts officer-MehadiSenior Subcontracts officer-Mehadi
Senior Subcontracts officer-Mehadi
 
Abdul Ghafoor (SQS) ( )
Abdul Ghafoor (SQS) ( )Abdul Ghafoor (SQS) ( )
Abdul Ghafoor (SQS) ( )
 
CV-Rajkumar 23.11.2016
CV-Rajkumar 23.11.2016CV-Rajkumar 23.11.2016
CV-Rajkumar 23.11.2016
 
CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015
 
Sarmad CV_Oct'16
Sarmad CV_Oct'16Sarmad CV_Oct'16
Sarmad CV_Oct'16
 
Donald Buchanan CV
Donald Buchanan CVDonald Buchanan CV
Donald Buchanan CV
 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated Resume
 
Rafeek's CV
Rafeek's CV Rafeek's CV
Rafeek's CV
 
RESUME
RESUMERESUME
RESUME
 
Eng's Nisar CV for Sr QS & Contract Engineer
Eng's Nisar CV for Sr QS & Contract EngineerEng's Nisar CV for Sr QS & Contract Engineer
Eng's Nisar CV for Sr QS & Contract Engineer
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)
 
P.M
P.MP.M
P.M
 
Safnas_QS_Resume
Safnas_QS_ResumeSafnas_QS_Resume
Safnas_QS_Resume
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2
 
C.V
C.VC.V
C.V
 

EPC Contract - M. Khalid Quantity Surveyor 2015

  • 1. CURRICULUM VITAE – Mohamad Khalid NAWAWI Page 1 of 10 PRIVATE ADDRESS. No. 50 Jalan Wan Empok 1, Bandar Baru Seri Petaling, 57000 Kuala Lumpur, MALAYSIA. HP : +6019-773 8149 and +6013-272 4341 Email : mknawawi@gmail.com or mknawawi@yahoo.com or khalid.emepmi@gmail.com PERSONAL DETAILS Date of Birth : 18 January 1963. Nationality : Malaysian. Marital Status : Married. Qualification : Diploma in Building, ITM Shah Alam, Malaysia, 1989 & Ba. Degree in Quantity Surveying, Corllins University, USA. Language Proficiency : Fluent in English and Bahasa Malaysia (Written and Oral). PERSONAL PROFILE – SENIOR COST CONTROL / QUANTITY SURVEYOR Twenty four (24) years of working experience in projects Cost & Contracts Administration and Project Services with both Malaysia’s leading fabricators and international operators of onshore and offshore Oil & Gas facilities. Fully computer literate, both supervisory and hands on. Achievements and strengths include:  Oil and gas knowledge and background at senior executive and managerial levels.  Change Order administration, MTO review and preparation, and cost estimation.  Project cost budgeting, reporting and controlling for major projects incorporating design, fabrication, installation & hook-up, and start up activities.  Experience for monitoring, estimating, verifying and issuing work release for offshore hook-up work pack.  Tender management for major and minor subcontracts for a multitude of disciplines not limited to Structural, Piping, Electrical & Instrumentation, heavy lifts, transportation and installation.  Strong communication and interaction skills with various levels of people from different back grounds and nationalities. CAREER SUMMARY – Major Clients ExxonMobil Berhad. Sarawak Shell Berhad. Talisman Energy Malaysia Ltd. NIPPON Oil Exploration (M) Ltd. Petronas Carigali Sdn Bhd. Malaysia Shipyard & Engineering Sdn. Bhd. Carimin Engineering Sdn Berhad. PUB Singapore Ltd. Shimizu Corporation Berhad Energoproject Malaysia Sdn. Bhd.
  • 2. CURRICULUM VITAE – Mohamad Khalid NAWAWI Page 2 of 10 1. Employer : ExxonMobil Exploration and Production Malaysia Inc. Period Covered : July 2013 until present. Position : Quantity Surveyor (Offshore). Projects Involved : Tapis EOR Brownfield Modification and Retrofit for (Tapis Alfa, Tapis Bravo, Tapis Charlie and Tapis Delta) Contract Value : Compensation on Reimbursable Cost Basis. Assigned for Offshore Quantity Surveyor to Ta EOR Brownfield Modification and Retrofit Project. The tasks covers for:-  Verifying all manpower, Equipment and Consumable Offshore which includes monitor, record, sign off and report changes not limited to the following:  Check and verify any additional modification for installation are original Contractor scope due to fault in design & fabrication stage.  Monitor and record data relating to Site Instructions to i). Ensure material requirements are identified early and tracked by Planning and ii). Overall costs are estimated and, where necessary to, a negative back-charge reimburse cost to Main Contract Cost.  Monitor all punch list data to ensure that materials are identified, are tracked by planning and overall costs estimated and, where necessary, back-charge documents are prepared to support a negative back-charge VO to be submitted to Main Contractor.  Monitor any transfer of work-scope, materials and/or construction equipment between contractors in order that costs can be reconciled at a later date.  Ensure that construction sub-contractors (scaffolding / habitats / bolt tensioning etc) are recording time and associated costs to the correct cost center. 2. Employer : Carimin Engineering Services Sdn Bhd Period Covered : January 2010 ~ June 2013. Position : Senior Quantity Surveyor / Cost Controller. Projects Involved : a). July 2011 ~ Jun 2013 : Petronas CARIGALI Project. Provision for Hook-Up and Commissioning for SKO o LUTONG, BARAM & BAKAU Pipeline Rejuvenation Project, o KINABALU Gas Development, o SAMARANG Metering Project Development Contract Value : RM 800M (Lump Sum & Provisional Sum Contract). Attached to Project Management Team and reporting directly to Project Director with the following responsibilities: Roles and Responsibilities:
  • 3. CURRICULUM VITAE – Mohamad Khalid NAWAWI Page 3 of 10  Manage Contract administration / commercial matters with Client including but not limited to submitting Work Order Proposal, invoicing, Change Order administration, correspondences and Final Doc.  Prepare and maintained Project Cost Budget and Cost Projection structures for the whole project duration until close-out. Prepared monthly cost reports and analysis for review by various departments including Project Manager, Managing Director / General Manager.  Coordinate with relevant departments for Change Order administrations and potential claims to clients including recognizing the changes, justifying the request for Change Order, MTO preparation, cost estimation and final submission and discussion with Client.  Prepare Monthly Accrual Report of work-in-progress for submission of Monthly Progress Claims and invoicing to Clients till approval.  Advised Project Manager and project team personnel on contractual aspects of the project and coordinates with client for execution especially those having cost and schedule impacts on the project.  Check, evaluate, monitors, verify and processed subcontractor’s progress claims and Change Orders in accordance with Subcontract Document. Assist Project Manager and team members in resolving conflicts with regards to contractual issues. b). Jan 2010 ~ June 2011 : Talisman Malaysia Limited Project. Provision of Hook-Up and Commissioning Services for PM3 CAA (Northern Fields) and PM305 (Southern Fields) o MRU: MRU for BOA Platform and BRA Platform. o WHAM: WHAM for BOA Platform, BOC Platform, BRB  Platform, BRC Platform, BRD Platform, BKA Platform,  BKC Platform, BSA Platform and BTA Platform. o FLOWLINES: FLOWLINES for BOA Platform, BOB Platform, BOC Platform and BOD Platform. Contract Value : RM 120 Million (Onshore U.Rate & Offshore Time Rate). Attached to Project Management Team (Office) and reporting directly to Project Manager Hook-Up with the following responsibilities: Roles and Responsibilities:  To develop a detail procedure for Managing Project Cost Structure through a Cost Account Codes Directory with the appropriate Work Breakdown Structures and to implement with Accounts Department to charge costs according to allocation system.  Manages Contract administration / commercial matters with Client including but not limited to submitting Work Release Proposal, invoicing, Change Order administration, correspondences and Final Doc.  Coordinates all activities related to Hook Up operations between site office in Kemaman, Offshore and head office in Kuala Lumpur, Malaysia encompassing processing of Work Pack, Site Instruction, Purchase Requisitions and Purchase Orders, Project Team manpower planning and logistics and miscellaneous project services work.
  • 4. CURRICULUM VITAE – Mohamad Khalid NAWAWI Page 4 of 10  Subcontract Administration with local Hook-Up Subcontractors, Suppliers, Transportation and Installation Schedule, mainly based in the Offshore and Kemaman Yard Fabrication.  Prepares, analyzes and presents monthly Project Cost Report and cost forecast including identifying corrective actions for cost controlling to the HOD & GM.  Maintains various daily reports for offshore activities for overall work coordination and cost reimbursement from client.  Monitors, reviews and recommends for approval Project expenditures. 3. Employer : Talisman Malaysia Limited. Period Covered : January 2008 ~ Dec 2009. Position : Senior Quantity Surveyor / Cost Engineer. Projects Involved : Provision of Hook-Up and Commissioning Services Northern Field Project for Bunga Orkid, BO-A, BO-B, BO-C and BO-D and monitoring on Offshore Commissioning Works for BOA Central Processing Platform for of PM3 CAA Development Project. Contract Value : RM 170 Million (Onshore U. Rate & Offshore Time Rate) Attached to Project Management Team (Office) and reporting directly to Project Manager Hook-Up with the following responsibilities: Roles and Responsibilities:  Prepare Cost Estimate for Purchase Requisition.  Review and verification Work Release Proposal (WRP) from Contractor and prepare Final Work Release (WR) amount for Management approval.  Review and submit for Management approval Contractor’s Claims and Change Orders, followed with necessary documentation review and verification for payment of the same.  Manage proper documentation for Work Pack (WP) issue, Purchase Requisition (PR) Cost, Work Release (WR) issued and invoice from Contractor.  Review and comment Minutes of Meeting, Progress Reports, Value of Work Done (VOWD) and prepare project Cost Forecasts.  Assist and advise PM and other Project Team members on various Contractual issues and matters including drafting of official letters, instructions and notifications in line with Contract requirements and Terms & Conditions. Other Roles: Has been assigned for Offshore Quantity Surveyor to Bunga Orkid Project for HUC & Commissioning scope. The tasks covers Offshore Change Control Administrator of which includes monitor, record, sign off and report changes not limited to the following:  Check “Site Instructions” and additional “job cards / work packs” raised to determine that they are either: i). Additional work-scope over and above from original contractual base scope or ii). Original contractual scope not completed by the Main Contractor and has to be completed by others Contractor and back-charged to Main Contractor.  Monitor and record data relating to Site Instructions to: i). Ensure material requirements are identified early and tracked by Planning
  • 5. CURRICULUM VITAE – Mohamad Khalid NAWAWI Page 5 of 10 and ii). Overall costs are estimated and, where necessary, a negative back-charge VO is prepared for deduction to Main Contractor Cost.  Monitor all punch list data to ensure that materials are identified, are tracked by planning and overall costs estimated and, where necessary, back-charge documents are prepared to support a negative back-charge VO to be submitted to Main Contractor.  Monitor any transfer of work-scope, materials and/or construction equipment between contractors in order that costs can be reconciled at a later date.  Ensure that construction sub-contractors (scaffolding / habitats / bolt tensioning etc) are recording time and associated costs to the correct cost centre i.e. Main Contractor Carry-Over, BOA base scope, WHRP base scope and Operations.  Ensure that Vendor Representatives record time and associated costs to the correct cost center and record and catalogue any down time caused by vendor package deficiencies that have a direct cost impact on the schedule.  Monitor and record vessel utilization and costs i.e. Talisman Operations / Talisman Projects / Main Contractor of supply vessel, accommodation vessel etc. 4. Employer : Sarawak Shell Berhad. Period Covered : February 2005 ~ December 2007. Position : Project Cost Engineer. Projects Involved : i) Feb 2005 ~ Mar 2006 : Fabrication of E11P-B Topsides Project – Fabrication of MSF North and South, Bridge, Vent Boom, Module 1 and Module 2 (Bottom and Top). Contract Value : RM 80 Million (E.P.C. Lump Sum Contract). ii) Apr 2006 ~ Dec 2007 : Pre-fabricated steel module forming part of F13-E Offshore Gas Processing Facility, overall size measuring approximately 3.00m X 36.00m X 30.00m high, made of carbon steel tubular, beam and plate and complete with pre-installed mechanical, electrical and instrumentation equipment and other appurtenances. Contract Value : RM 150 Million (E.P.C. Lump Sum Contract). Attached to Project Management Team (Site) and reporting directly to Company Site Representative (CSR) with the following responsibilities: Roles and Responsibilities:  Preparation and issue of instructions to Contractor for project services, recording instructions, tracking and invoice checking for such instructions.  Review and submit for Management approval Contractor’s claims and Change Orders, followed with necessary documentation review and verification for payment of the same.  Review and verification of Contractor’s Monthly Payment Certificates and invoices.  Review and comment Minutes of Meeting, Progress Reports, Value of Work Done (VOWD) and prepare project Cost Forecasts.  Assist and advise Company Site Representative and other Project Team members
  • 6. CURRICULUM VITAE – Mohamad Khalid NAWAWI Page 6 of 10 on various Contractual issues and matters including drafting of official letters, instructions and notifications in line with Contract requirements and Terms & Conditions. 5. Employer : Malaysia Shipyard & Engineering Sdn. Bhd. Period Covered : April 2001 ~ January 2005. Position : Senior Technical Executive (Contract Administration). Projects Involved : i) Oct 2001 ~ Nov 2003 : Fabrication, Hook Up and Commissioning of Helang Central Platform (HCP) Integrated Topsides Project for NIPPON Oil Exploration (M) Ltd. Contract Value : RM 240 Million (E.P.C. Lump Sum Contract) ii) Jun 2003 ~ Nov 2003 : Helang Development and Operation for Provision of Interim Onshore and Offshore Operational Support Personnel to Assist Nippon. Contract Value : RM 120 Million (Provisional Sum Contract) iii) Dec 2003 ~ Jan 2005 : Fabrication for 9 Modules of (2,000 MT) ERHA(FPSO). Floating Production Storage Offloading E & I Building for Exxon Mobil. Contract Value : RM 100 Million (E.P.C. Lump Sum Contract). Attached to Project Management Team and reporting directly to Project Manager with the following responsibilities: Roles and Responsibilities:  Made necessary preparation for the execution of applicable fabrication Contract upon award including organizing and reviewing all pertinent documents and executing the finalization of all outstanding issues regarding the Contract Price and Scope of Work with Client.  Prepare and maintain Project Cost Budget and Cost Projection structures for the whole project duration until close-out. Prepared monthly cost reports and analysis for review by various company, heads of departments including Managing Director / General Manager, Project Manager and Group Directors.  Coordinate with relevant departments for Change Order administrations and potential claims to clients including recognizing the changes, justifying the request for Change Order, MTO preparation, cost estimation and final submission and discussion with client.  Prepare Monthly Valuation Statements of work-in-progress for submission of Monthly Progress Claims and invoicing to Clients. This duty includes collecting and compiling necessary data and back-up documents in accordance with Contract Invoicing procedures.  Advise Project Manager and project team personnel on contractual aspects of the project and coordinates with client for execution especially those having cost and schedule impacts on the project.  Check, evaluate, monitors, verify and process subcontractor’s progress claims and Change Orders in accordance with Subcontract Document. Assist Project Manager and team members in resolving conflicts with regards to contractual issues.  Prepared project close-out reports that documented all project history, background, experiences, lessons learnt and proposals for improvement for review of company CEO, Directors and Clients.
  • 7. CURRICULUM VITAE – Mohamad Khalid NAWAWI Page 7 of 10 Other Roles:  Involved in Company’s business re-structuring exercise with the intention of increasing company’s productivity and profitability and developing Company’s mission and vision.  Subcontracting management including pre-qualifying subcontractors, preparation of tenders, evaluation & award and post award management 6. Employer : Binnie & Partners (Singapore) Consulting Engineering. Period Covered : April 1998 ~ March 2001. Position : Site Quantity Surveyor. Projects Involved : Civil & Building Works for Johor River Waterworks Extension Scheme Stage 4 & 5 for PUB Singapore at Kota Tinggi, Johor. Contract Value : S$ 200 Million (Unit Rate Contract). Attached to Project Management Team and reported directly to Company Site Representative (CSR) with the following responsibilities: Roles and Responsibilities:  Close coordination between the various contractors and interfaces (between main contractor & M&E contractor) including pipe and valve, inspection materials supply and approval.  Monitoring the progress, site evaluation, checking and verifying contractor claim.  Checking, verifying, preparing and submitting final measurement to the client until completion.  Budget estimating.  Site evaluation.  Final account. 7. Employer : Shimizu Corporation (Main Contractor). Period Covered : June 1995 ~ March 1998. Position : Site Quantity Surveyor. Projects Involved : Construction for Bridge Links Malaysia and Singapore Between Kampong Ladang in Johor and Tuas in Singapore. Contract Value : RM 540 Million (Unit Rate Contract). Reported directly to Project Manager Contract for Project Construction of Bridge Links Malaysia and Singapore between Kampong Ladang in Johor and Tuas in Singapore that include the following duties: Roles and responsibilities:  Prepare & handle progress claim to consultant.  Monitor and finalize change order (Site Instruction) to consultant.  Monitor and prepare final measurement and final account to consultant and client.
  • 8. CURRICULUM VITAE – Mohamad Khalid NAWAWI Page 8 of 10  Handle and check sub-contractor claim.  Check all variation claims by sub-contractor against contract and advice.  Prepare final account for sub-contractors.  Monitor progress report and progress photograph.  Tendering and contract documentation. 8. Employer : Malaysia Shipyard and Engineering Sdn Bhd. Period Covered : April1994 ~ May 1995. Position : Cost Control / Quantity Surveyor. Projects Involved : Duyong Jacket, MSF & Bridge and Dulang Water Injection and Gas Compression Module. Contract Value : RM 230 Million (E.P.C Lump Sum Contract). Attached to Project Management Team and reporting directly to Project Manager with the following responsibilities Roles and responsibilities:  Contract Documentation.  Monitor the milestone progress payment and variation claims.  Monitor, maintain record and finalize all change orders issued by client against the change proposals.  Advise PMT of its contractual obligation with clients.  Advise PMT of its contractual obligation with sub-contractors.  Monitor and check sub-contractors progress claim.  Check all variation claims by sub-contractors against contract and advice.  Prepare final accounts for sub-contractors. 9. Employer : Abdullah Atan Associate (QS Consultant). Period Covered : September 1992 ~ March 1994. Position : Site Quantity Surveyor. Projects Involved : Construction of Mosque, at Uda Johor Bahru. Contract Value : RM 10 Million (E.P.C Lump Sum Contract). Attached to Project Management Team as Site Quantity Surveyor with the following responsibilities: Roles and Responsibilities:  Monitoring the progress, site evaluation, checking and verifying contractor claim.  Checking, verifying, preparing and submitting final measurement to the client until completion.  Budget estimating.  Site evaluation.  Final account.
  • 9. CURRICULUM VITAE – Mohamad Khalid NAWAWI Page 9 of 10 10. Employer : Energoproject Malaysia Sdn. Bhd. Period Covered : December 1989 ~ August 1992. Position : Site Quantity Surveyor. Projects Involved : Construction for Main Outdoor Stadium and Ramps Package, Shah Alam Sports Complex at Shah Alam, Selangor. Contract Value : RM 540 Million (Unit Rate Contract). Reported directly to Project Manager Contract for Project Construction for Main Stadium and Ramps Package, Shah Alam Sports Complex at Shah Alam, Selangor that include the following duties: Roles and responsibilities:  Prepare & handle progress claim to consultant.  Monitor and finalize change order (Site Instruction) to consultant.  Monitor and prepare final measurement and final account to consultant and client.  Handle and check sub-contractor claim and check all variation claims by sub- contractor against contract and advice.  Prepare final account for sub-contractors.  Monitor progress report and progress photograph.  Tendering and contract documentation.
  • 10. CURRICULUM VITAE – Mohamad Khalid NAWAWI Page 10 of 10 COURSES AND TRAINING ATTENDED: Date Course / Training Title Facilitator March 10, 1990 Computing Mara Institute of Technology March 10, 1990 Site Surveying Mara Institute of Technology April 13 - 16, 2004 Supervisory Development Program TG Consult Sdn. Bhd. March 17 & 18, 2007 Information System Strategy OCTAGON Petroleum Technology April 14 & 15, 2007 Petroleum Engineering OCTAGON Petroleum Technology May 19 & 20, 2007 Asset Management Integrity, HSE & Economics OCTAGON Petroleum Technology June 16 & 17, 2007 Plant Layout Development & 3D Application OCTAGON Petroleum Technology July 14 & 15, 2007 Quality Management OCTAGON Petroleum Technology M August 25 & 26, 2007 Project Planning, Management & Cost Control OCTAGON Petroleum Technology January 26 & 27, 2008 Process Engineering OCTAGON Petroleum Technology July 26 & 27, 2008 Flow Diagram and Heat Material Balance OCTAGON Petroleum Technology March 28 & 29, 2009 Instrument and Control Design OCTAGON Petroleum Technology November 8 & 9, 2009 Process Equipment and Piping Design OCTAGON Petroleum Technology January 13, 2011 Occupational Safety & Health (OSHA 94, FMA 67 & Regulations PSMA 84 & HIRARC) Square Three Sdn Bhd Aug 12, 2013 Offshore Safety Sea Survival SEQU Aug 12, 2013 Basic Fire Fighting & Self Rescue & Basic Life Support SEQU Aug 12, 2013 Helicopter Underwater Escape Training SEQU REFERENCE. 1. Omar Bin A. Rahman. Project Manager HUC Department, Talisman Malaysia Limited, Level 25, Menara Citibank, 165 Jalan Ampang 50450. H/P No.: +6012-205 5146. DL . : 03-2055 2912. 2. Mohamad Ali Gohar Rahman Project Manager (International Project). Level 23, Tower 2, Petronas Twin Towers, Kuala Lumpur City Centre. 50088 Kuala Lumpur. H/P No.: +6012-276 3534