The resume is for Syed Nahar Bin Syed Ibrahim, seeking a position as a Lead Quantity Surveyor. He has over 25 years of experience in pre- and post-contract work with contractors, cost consultants, project management, and clients. His expertise includes all aspects of cost consultancy from project inception to completion. He has comprehensive knowledge of various contract types and documentation with experience in construction projects in Malaysia and internationally.
1. RESUME
SYED NAHAR BIN SYED IBRAHIM
OBJECTIVE and RESUME SUMMARY
To obtain a position as Lead Quantity Surveyor with fast growing companies where
experience and education can be most utilized. Having 25++ years of Pre & Post contract
experience with contractor,cost consultant, project
Management and clients. My expertise includes all aspects of cost consultancy services
from inception to completion of the project.Proficiency in Microsoft Office,(Excel,Power Point
and MS-Project) and knowledgeable in FIDIC.Comprehensive knowledge of various types of
contracts, subcontracts,tender and documentation with working experience in construction
industry,both local and international project, mostly in road&highways,residential&
buildings,hospital,airport,hotel,waste water treatment plant, university,intergrated modern
waste management system&structural steelwork.
MY KEY SKILLS
Cost Estimating, Quantity Surveying, Cost Control
PERSONAL DETAILS
I/C No : 630922-02-5949
Current Address : K-07-25, Kenaria Kondo, Taman Sri Kenari, Sg. Ramal Baru 43000
Kajang, Selangor.
Tel. No. : + 60146644439 & +60146447464
Age : 51 years old
Marital Status : Married
Religion : Islam
Race : Malay
Nationality : Malaysian
Sex : Male
Health : Excellent
E-mail : artpaktuan@yahoo.com
2. Skype Id : syednahar.syedibrahim & syed.nahar
Languages and Writing : Bahasa Malaysia / English - proficient in both
ACADEMIC QUALIFICATIONS
1982 – 1986
Universiti Teknologi Mara, Shah Alam, Selangor.
Diploma Quantity Surveying.
1978 – 1979
Sultan Abdul Hamid College, Alor Setar, Kedah.
Sijil Pelajaran Malaysia
1975 – 1977
Sekolah Menengah Darulaman, Alor Setar, Kedah.
Sijil Rendah Pelajaran
COMPUTER SKILLS
MS Excel, MSWord, MS- Power Point,MS-Project,Primawera ,MS- Office & Lotus 123
OTHER
KNOWLEDGE IN FIDIC AND CONTRACT LAW
WORKING EXPERIENCES
April 2014 – Present
Senior Quantity Surveyor - TUCK SIN ENGINEERING AND CONSTRUCTION SDN BHD
Scope of works:
1. Preparation of tender pricing.
2. Handling contract administration.
3. Preparation of taking-off and Bills of Quantities
4. Conducting site valuation and attending site meetings.
5. Preparation of progress claim.
3. 6. Re-measurement for Variation Works.
7. Preparation of final claims.
8. Preparation of Sub-contractors’ LA
9. Preparation of Sub-contractors’ Payment Certificate
10. Preparation of Sub-contractors’ Final Account
11. Take a lead in contract dept.
October 2010 – Feb 2014
Senior Project Quantity Surveyor cum Site Supervisor , Consortium of St.Marine Engineering Pte Ltd
and QAF Brunei
Intergrated Waste Management System- Project for Brunei Darussalam government.
Scope of works:
1. In charge of all relatedmattersoncontractual worksand reportingtocompany’sdirector.
2. Take a leadincontract dept.
3. Involvedinpre &post contract exercises.Prepare tendertoclientand sub-contractoron
relatedworks.
4. Liase withConsultantoncontractual,progressclaimandV.Oworks.
5. Site valuationworksandsite measurement.
6. Prepare tendertosub-contractoronall relatedworks.
7. Takingoff works.
8. Prepare claimstosub-contractorand Client.
9. Preparationsof final qtyandfinal accountfor sub-contractors.
10. Preparingandanalysingcostingfortenders.
11. Providingadvice oncontractual claims.
12. Processthe necessaryprojectinsurance claims.
13. Understandingthe implicationsonhealth&safetyregulations.
14. Manage all cost relatingtobuildings&civil engineeringprojectsfromcalculationtothe final
figures.
15. Responsible forestablishingasystemof financial control onamonthlybasisforreporting &
forecastingcostagainstallowance.
16. Monitor& reportproductionandwaste
17. Directlycontribute tothe resolutionof Contractual matters.
18. Directlycontribute tothe preparationof subcontractenquiries&ensuresthatthe necessary
qualitymanagementsystemsrequirementsare includedwithinthe sub-contractagreement.
Project Handled
Integrated Modern Waste Management System forBrunei DarussalamGovernment.
Contract sum- BND68 MILLION
4. July 2009 - Dec 2009 ( EMPLOYED FOR 6 MONTHS CONTRACT BASIS)
Senior Estimating Engineer, Seconded to Saudi Arabian Oil (ARAMCO) - Ranhill Bersekutu Saudi
Limited.
- Have been attached to Oger International’s Office in Paris for one month to evaluate,
assessments and negotiation of subcontract awarded.
Scope of works:
1. To prepare estimates for variation/additional works for Aramco's (Client) approval.
2. To substantiate for additional/variation works with costing details and breakdown for approved
estimates.
3. To compile all joint measurement sheet (JMS) of workdone on variation/additional works.
4. To complete special assignments as instructed by Aramco's Representative.
5. Preparing back-charges to subcontractors.
6. Preparations of final qty and final account for sucontractors.
7. Prepare and reporting of cash flow to Business Administrator.
Projects handled
1. King Abdullah University of Science and Technology, Thuwal, Jeddah, Saudi Arabia.
Contract Sum - SAR 20 Billion
July 2009 - Dec 2009
June 1997 - June 2009
Senior Quantity Surveyor cum Safety And Health Officer , UEM Construction Sdn Bhd
Scope of works:
1. To prepare monthly progress claim to the Employer and Sub-contractor
2. To submit all new rates for additional/variation works with costing details and breakdown
3. To compile all joint measurement sheet (JMS) of workdone to prepare claim
4. To prepare final accounts statement after received the CPC from the employer
5. To prepare status of financial progress vs actual physical progress report to HQ
6. Doing Pre-Contract Works - submission of tender.
Projects handled
1. Third Lane Widening Between Rawang and Tanjung Malim - Package 3A
Contract Sum - RM 135,000,000.00
November 2005 – Present
5. 2. PLUS Heavy Repair - Maintenance of North South Expressway
Contract Sum - RM 60,000,000.00
September 2001 - November 2005
3. Turnkey Project - Lahad Datu Hospital, Sabah.
Contract Sum - RM 268,000,000.00
June 1999 - September 2001
4. Putrajaya Interchange - 8.9 Km Link Road From ELITE Interchange to Cyberjaya
Contract Sum - RM 236,000,000.00
June 1997 - June 1999
May 1996 - June 1997
Quantity Surveyor cum Safety and Health Officer, Jasatera Bhd
Scope of works:
1. To prepare monthly progress claim to the Employer and Sub-contractor
2. To submit all new rates for additional works/variation works with costing details/breakdown
3. To compile all joint measurement sheet (JMS) of workdone to prepare claim
4. To prepare final accounts statement after received the CPC from the employer
5. To prepare status of financial progress vs actual physical progress report to HQ
6. Dual role as a Safety and Health Officer.
Projects handled
1. Waste Water Treatment Plant at KLIA.
Contract Sum - RM 50,000,000.00
June 1994 - May 1996
Quantity Surveyor cum Site Agent, WRL Sdn Bhd
Scope of works:
1. To prepare monthly progress claim to the Sub-contractor
2. Doing Pre-Contract Works - submission of tender.
3. Site Agent's role
4. Taking-off for procurement and ordering of material.
Projects handled
1. Sub-Structure Works for PKNS Complex at Bandar Baru Bangi, Selangor.
Contract Sum - RM 7,000,000.00
6. 2. Dyeing Factory at Rawang Integrated Park, Rawang, Selangor.
Contract Sum - RM 3,000,000.00
December 1992 - June 1994
Quantity Surveyor, GB Construction Sdn Bhd
Scope of works:
1. Doing Pre-Contract Works - submission of tender.
2. To prepare monthly progress claim to the Employer and Sub-contractor
3. To compile all joint measurement sheet (JMS) of workdone to prepare claim
4. To prepare Monthly Progress Report
Projects handled
1. Toll Plaza Works at Taiping North, PLUS Highway.
Contract Sum - RM 5,000,000.00
March 1992 - December 1992
Assistant Quantity Surveyor, Nik Farid Dan Loh Sdn
Scope of works:
1. Site Quantity Surveyor's role.
2. To check and verify Joint Measurement Sheet on workdone quantity on site.
3. To compile all joint measurement sheet (JMS) of workdone to hq.
4. To record any variation order on site and report to hq.
5. To advise Client's Rep. on contractual issue.
Projects handled
1. Six Star Super Deluxe Hotel at Teluk Datai Resort, Pulau Langkawi, Kedah.
Contract Sum - RM 300,000,000.00
July 1990 - March 1992
Quantity Surveying Executive, Antah Biwater JV
Scope of works:
1. Site Quantity Surveyor's role.
2. To check and verify Joint Measurement Sheet on workdone quantity (provisional) on sites
3. To assist Quantity Surveyor on Final Measurement quantity.
Projects handled
1. Malaysian Rural Water Supply Scheme.
7. Total Contract Sum - RM 2.4 Billion
May 1989 - July 1991
Assistant Quantity Surveyor, Sime UEP Development Sdn Bhd
Scope of works:
1. To prepare monthly progress claim to the Sub-contractor
2. To check and verify workdone quantity on sites
3. To prepare minute of meeting for Sub-Contractor's Meeting.
4. To call for quotations for sub-packages and doing tender evaluation for Management
Approval.
Projects handled
1. In-house Construction of 79 Units Bungalow at Phase 59, UEP Subang Jaya.
Contract Sum - RM 100,000,000.00
REFEREE:
1. FAZLAN BIN OTHMAN
MANAGING DIRECTOR – FUTUREFORM (B) SDN BHD
TEL: +6737171869
2. SYAHRUDDIN BIN TANWIL
SENIOR QUANTITY SURVEYOR – STSE ENGINEERING& SERVICES (BRUNEI) SDN BHD
TEL: +6738185108
3. MOHD KHARIS BIN CHE’IBRAHIM
CONTRACT MANAGER – UEM SDN BHD
TEL: +60135218508