Quantity Surveyor with 7 years of overall professional experience in High rise building, Insfrastructure, Oil and Gas, water
supply, Sewerage, Air port projects with a detailed knowledge of construction methods & practices and having 5 years of
experience in GCC countries, seeking a challenging position in the field of building construction, infrastructure or Oil & Gas.
Professional Qualifications
 Studying for M.Sc. Project Management in Construction
(2016-2017).
University of Salford, Manchester, UK.
 B.Sc. (Honors) in Mechanical Engineering (2005-2009).
University of Ruhuna, Galle, Sri Lanka.
Key Skills
• Fast learner in field of quantity surveying and engineering.
• Sound knowledge & hands-on experience in Pre and Post Contract administration including preparation of
Bill of Quantities; cost comparisons, Preliminary estimation, interim valuations and claims etc.
• Sound knowledge on construction methods & practices in Mechanical, Electrical & Civil engineering
installations of building, water supply and field of oil & gas.
• Sound knowledge in FIDIC conditions of contracts and Oman Standard conditions of contracts.
• Sound knowledge in Principles of Measurement International (POMI-1979).
• Expert in communication and interpersonal skills.
• Ability to manage time effectively.
• Ability to work in pressurized and stressful situations.
• Expert judgment and decision making skills.
Professional Experience
1. Position Quantity Surveyor (September 2014 to Date)
Trans Gulf International Electro-Mechanical W.L.L.
P.O. Box. 47132, Doha, Qatar.
Involved Projects and Responsibilities (Post contract Quantity Surveying).
Projects.
1. Msheireb Down Town Doha. – Phase 2 (QAR 485 million).
Responsibilities.
• Identifying the variation for the works.
• Guide the junior Quantity Surveyors in order to get measurements for the variations, and give the
technical clarification required for the team.
Page 1 of 5
• Notify, Submit cost variations and Negotiation with cost consultants.
• Assessment and settlement of Sub-Contract’s variations/claims.
2. Position Quantity Surveyor – CIVIL/MEP (September 2011 to September
2014)
(Current Employment) Oman Shapoorji Construction Co. (OSCO) LLC.
P.O. Box 1347, Post Code 112, Ruwi, Sultanate of Oman.
(OSCO is building and infrastructure construction company commenced operations in Oman
during 1975 and has over 39 years of experience in Civil contract and electro-mechanical contract
works in the building construction in entire Oman).
Involved Projects and Responsibilities (Post contract Quantity Surveying).
Projects.
1. Residential Villa at Al Khoud for H.H Sayyid Shihab Bin Tariq Al Said. (R.O. 4 million).
2. Radisson Blu Hotel & Resort at Sohar.(R.O. 4 million).
3. Government Project at Sohar.(R.O. 0.5 million).
Responsibilities.
• Preparing monthly Interim Payment Applications.
• Taking off quantities (For interim payment applications/ final valuations/ procurement) for electro-
mechanical services.
• Participating for the meeting with cost consultants.
• Preparing cost implications/submissions for additional works/Variations.
• Submitting monthly cost & sale statements.
• Preparation of cash flow statements, anticipated final account, Cost to complete, Cost sale reconciliation
statements.
• Work very close with the project team to ensure that measurements, variations and contractual matters are
properly recorded and notified.
• Examine, control and evaluate sub-contractors invoices and preparing subcontractors and suppliers
payment certificates.
Involved Duties and Responsibilities (Pre contract Estimation).
• Take off quantities for Electro-Mechanical & Civil services to prepare & submit the priced Bill of
Quantity based on proposed drawings provided by the client.
• Review of tender documents including scope of works, drawings and specification and raise technical
queries and clarifications.
• Prepares cost comparison sheets for all supply & Sub-contractor items and pricing for the complete
project.
• Evaluate quotations obtained from different suppliers & subcontractors, ensure quantities and
specifications are in line with tender and projects specifications.
• Provides preliminary estimation support to estimate quantities from drawings to determine project costs.
3. Position QS Engineer (June 2010 to September 2011)
BMK Project Engineers (Pvt) Ltd.
Maharagama, Sri Lanka.
Page 2 of 5
Involved Projects and Responsibilities. (QS Engineer).
Projects.
1. Kelani Right Bank Water Treatment Plant Project.-Phase 1.
2.Installation of Fuel Hydrant System in Hambantota International Airport Development Project.-Phase 1
Responsibilities.
• Take off quantities to prepare & submit the interim payment applications based on Bill of Quantity
• Identify, quantify and value Variations and negotiate on the same with clients and cost consultants.
• Check measurements, re-measurements which reported by the Sub-Contractor on quantities of the work
in line with the Contract Qualifications through the construction stages.
• Analyze as-built quantities against Tender quantities, estimate & submit the final accounts.
• Examine, control and evaluate sub-contractors invoices and preparing subcontractors payment
certificates.
• Work very close with the commercial team to ensure that measurements, variations and contractual
matters are properly recorded and notified.
• Giving required technical explanations to drafting team for preparation of working drawings and MEP-
coordination drawings.
• Involving in preparation of as built drawings.
Involved Duties and Responsibilities. ( Pre contract Estimation).
• Estimation on MEP installations in number of large scale water supply and building projects during my
stay in Head Office. Specially worked as a team leader in the MEP Section and achieved a sound estimation
experience in pre-contract works.
4. Position Mechanical Engineer (July 2009 to June 2010)
Rs Project (Pvt) Ltd.
Gampaha, Sri Lanka.
Involved Projects and Responsibilities. ( Site based Mechanical Engineer).
Projects.
1. South Kandy Water Treatment Plant Project.-Phase 1
2. Installation of new fuel line and removing existing line in Sapugaskanda oil refinery.
Responsibilities.
• Prepare & submit the interim payment applications based on pre-agreed unit rate & day rates.
• Guide the project team in order to maintain the quality requirement as specified.
• Participating for the meeting with client and finalize the quantities and new rates.
Computer Skills
• Microsoft Office - Very Good
• Internet & E-mail - Very Good
• Auto CAD - Very Good
• MS Project - Working knowledge.
• Solid Works - Very Good
Page 3 of 5
Professional Member Ships
• A Student member of the Institute of Engineers, Sri Lanka (IESL).
• A member of Sri Lankan Quantity Surveyors (SLQS) in Oman.
Methods of Measurement Familiar with
• POMI
• SMM7
• CESMM3
Conditions of Contract Familiar with
• FIDIC
• Oman Standard Document.
• Dubai Municipality Conditions of Contract.
Personal Details
Name in Full : Kaluwa Dewa Sanath Kumara.
Age : 31 Years.
Pass port No : N. 3242954
Sex : Male.
Civil Status : Married.
Nationality : Sri Lankan.
Availability : One Month.
Driving license : GCC Valid Driving License.
Referees
Page 4 of 5
P.N. Kasthuriarachchi ,MRICS.
Senior Quantity Surveyor,
Trans Gulf Electromechanical LLC.
Dubai,
Mob : +971 552630172
Email : pnkasturiarachchi@yahoo.com
Rasika Lasantha Vithanage.
Commercial Manager,
Mercury Mena,
Doha, Qatar.
Mobile: +971 77976052
Email: rasikavitharana@yahoo.com
I do hereby declare that all the particulars given above are true & correct.
K.D. Sanath Kumara. (01/10/2014)
Page 5 of 5
I do hereby declare that all the particulars given above are true & correct.
K.D. Sanath Kumara. (01/10/2014)
Page 5 of 5

CV - K.D.S.Kumara

  • 1.
    K.D. SANATH KUMARA Doha,Qatar. Mobile 1 : +94-717408017 Mobile 2 : +974- 33 920 946 E-mail: kumarakds@gmail.com Quantity Surveyor with 7 years of overall professional experience in High rise building, Insfrastructure, Oil and Gas, water supply, Sewerage, Air port projects with a detailed knowledge of construction methods & practices and having 5 years of experience in GCC countries, seeking a challenging position in the field of building construction, infrastructure or Oil & Gas. Professional Qualifications  Studying for M.Sc. Project Management in Construction (2016-2017). University of Salford, Manchester, UK.  B.Sc. (Honors) in Mechanical Engineering (2005-2009). University of Ruhuna, Galle, Sri Lanka. Key Skills • Fast learner in field of quantity surveying and engineering. • Sound knowledge & hands-on experience in Pre and Post Contract administration including preparation of Bill of Quantities; cost comparisons, Preliminary estimation, interim valuations and claims etc. • Sound knowledge on construction methods & practices in Mechanical, Electrical & Civil engineering installations of building, water supply and field of oil & gas. • Sound knowledge in FIDIC conditions of contracts and Oman Standard conditions of contracts. • Sound knowledge in Principles of Measurement International (POMI-1979). • Expert in communication and interpersonal skills. • Ability to manage time effectively. • Ability to work in pressurized and stressful situations. • Expert judgment and decision making skills. Professional Experience 1. Position Quantity Surveyor (September 2014 to Date) Trans Gulf International Electro-Mechanical W.L.L. P.O. Box. 47132, Doha, Qatar. Involved Projects and Responsibilities (Post contract Quantity Surveying). Projects. 1. Msheireb Down Town Doha. – Phase 2 (QAR 485 million). Responsibilities. • Identifying the variation for the works. • Guide the junior Quantity Surveyors in order to get measurements for the variations, and give the technical clarification required for the team. Page 1 of 5
  • 2.
    • Notify, Submitcost variations and Negotiation with cost consultants. • Assessment and settlement of Sub-Contract’s variations/claims. 2. Position Quantity Surveyor – CIVIL/MEP (September 2011 to September 2014) (Current Employment) Oman Shapoorji Construction Co. (OSCO) LLC. P.O. Box 1347, Post Code 112, Ruwi, Sultanate of Oman. (OSCO is building and infrastructure construction company commenced operations in Oman during 1975 and has over 39 years of experience in Civil contract and electro-mechanical contract works in the building construction in entire Oman). Involved Projects and Responsibilities (Post contract Quantity Surveying). Projects. 1. Residential Villa at Al Khoud for H.H Sayyid Shihab Bin Tariq Al Said. (R.O. 4 million). 2. Radisson Blu Hotel & Resort at Sohar.(R.O. 4 million). 3. Government Project at Sohar.(R.O. 0.5 million). Responsibilities. • Preparing monthly Interim Payment Applications. • Taking off quantities (For interim payment applications/ final valuations/ procurement) for electro- mechanical services. • Participating for the meeting with cost consultants. • Preparing cost implications/submissions for additional works/Variations. • Submitting monthly cost & sale statements. • Preparation of cash flow statements, anticipated final account, Cost to complete, Cost sale reconciliation statements. • Work very close with the project team to ensure that measurements, variations and contractual matters are properly recorded and notified. • Examine, control and evaluate sub-contractors invoices and preparing subcontractors and suppliers payment certificates. Involved Duties and Responsibilities (Pre contract Estimation). • Take off quantities for Electro-Mechanical & Civil services to prepare & submit the priced Bill of Quantity based on proposed drawings provided by the client. • Review of tender documents including scope of works, drawings and specification and raise technical queries and clarifications. • Prepares cost comparison sheets for all supply & Sub-contractor items and pricing for the complete project. • Evaluate quotations obtained from different suppliers & subcontractors, ensure quantities and specifications are in line with tender and projects specifications. • Provides preliminary estimation support to estimate quantities from drawings to determine project costs. 3. Position QS Engineer (June 2010 to September 2011) BMK Project Engineers (Pvt) Ltd. Maharagama, Sri Lanka. Page 2 of 5
  • 3.
    Involved Projects andResponsibilities. (QS Engineer). Projects. 1. Kelani Right Bank Water Treatment Plant Project.-Phase 1. 2.Installation of Fuel Hydrant System in Hambantota International Airport Development Project.-Phase 1 Responsibilities. • Take off quantities to prepare & submit the interim payment applications based on Bill of Quantity • Identify, quantify and value Variations and negotiate on the same with clients and cost consultants. • Check measurements, re-measurements which reported by the Sub-Contractor on quantities of the work in line with the Contract Qualifications through the construction stages. • Analyze as-built quantities against Tender quantities, estimate & submit the final accounts. • Examine, control and evaluate sub-contractors invoices and preparing subcontractors payment certificates. • Work very close with the commercial team to ensure that measurements, variations and contractual matters are properly recorded and notified. • Giving required technical explanations to drafting team for preparation of working drawings and MEP- coordination drawings. • Involving in preparation of as built drawings. Involved Duties and Responsibilities. ( Pre contract Estimation). • Estimation on MEP installations in number of large scale water supply and building projects during my stay in Head Office. Specially worked as a team leader in the MEP Section and achieved a sound estimation experience in pre-contract works. 4. Position Mechanical Engineer (July 2009 to June 2010) Rs Project (Pvt) Ltd. Gampaha, Sri Lanka. Involved Projects and Responsibilities. ( Site based Mechanical Engineer). Projects. 1. South Kandy Water Treatment Plant Project.-Phase 1 2. Installation of new fuel line and removing existing line in Sapugaskanda oil refinery. Responsibilities. • Prepare & submit the interim payment applications based on pre-agreed unit rate & day rates. • Guide the project team in order to maintain the quality requirement as specified. • Participating for the meeting with client and finalize the quantities and new rates. Computer Skills • Microsoft Office - Very Good • Internet & E-mail - Very Good • Auto CAD - Very Good • MS Project - Working knowledge. • Solid Works - Very Good Page 3 of 5
  • 4.
    Professional Member Ships •A Student member of the Institute of Engineers, Sri Lanka (IESL). • A member of Sri Lankan Quantity Surveyors (SLQS) in Oman. Methods of Measurement Familiar with • POMI • SMM7 • CESMM3 Conditions of Contract Familiar with • FIDIC • Oman Standard Document. • Dubai Municipality Conditions of Contract. Personal Details Name in Full : Kaluwa Dewa Sanath Kumara. Age : 31 Years. Pass port No : N. 3242954 Sex : Male. Civil Status : Married. Nationality : Sri Lankan. Availability : One Month. Driving license : GCC Valid Driving License. Referees Page 4 of 5 P.N. Kasthuriarachchi ,MRICS. Senior Quantity Surveyor, Trans Gulf Electromechanical LLC. Dubai, Mob : +971 552630172 Email : pnkasturiarachchi@yahoo.com Rasika Lasantha Vithanage. Commercial Manager, Mercury Mena, Doha, Qatar. Mobile: +971 77976052 Email: rasikavitharana@yahoo.com
  • 5.
    I do herebydeclare that all the particulars given above are true & correct. K.D. Sanath Kumara. (01/10/2014) Page 5 of 5
  • 6.
    I do herebydeclare that all the particulars given above are true & correct. K.D. Sanath Kumara. (01/10/2014) Page 5 of 5