SlideShare a Scribd company logo
1 of 6
Download to read offline
Jonathan B. Asis
Objective
Academic
Qualifications
Professional
Qualifications
Seeking a responsible position where I will be fit in to work that I can utilize my full potential
while providing maximumbenefit to my employer. Idea oriented, resourceful, with very good
follow through skills and able to work independently. With good communication skills, both
written and oral.
With 10+ years experience in construction and engineering industries providing project
management, quantity surveying, scheduling and cost control. Had been involved in major
projects in both Gulf Countries and Philippines and has experience in Hotels, Residential
Buildings, Civil Works, Earthworks, Structural Works, and Infrastructure.
Familiar with standard method of measurement including SMM7, CESSM3 and POMI. Had
sound knowledge about cost management, cost control, scheduling, FIDIC forms of contract.
Proficient in using AutoCAD 2D/3D, Primavera P6 and MS Office software.
Currentlystudying to gain RICS charteredmembership.
Bachelor of Science in Civil Engineering – Graduated Working Scholar
1996–2001 - University ofthe East - Caloocan City, Philippines
Registered Civil Engineer (PRC NO. 092792)
Member - Philippine Institute of Certified Quantity Surveyor, UAE Chapter
Trainings and
Certificates
Chicago Management Training Institute – Dubai, UAE
 CCE/CCC (Certified Cost Engineer/Consultant) (AACE International USA Certified)
 Primavera P6, Project Planning
Professional
Experience
SIMA BAGHDAD FOR GENERAL CONTRACTING
Dubai, U.A.E.
Quantity Surveyor / Civil Engineer / Planner/ Cost Estimator
November 2011 – Present
Projects Handled And Involved With Sima Baghdad – IRAQ PROJECTS
1. Earthwork for Appraisal Wells And IntrafieldRoads In West Qurna Field(Phase
- 2 Appraisals ( Excavation & Backfill, up to 250,000 m3)
- 7 Kmroad construction
- 8 bank pits for backfill production
- 2 Cellars construction
2. Earthwork for Cluster Wells andIntrafieldRoads in West Qurna field(phase 2)
- 6 clusters ( excavation &backfill, up to 1.1 million m3)
- 16 Kmroad construction
- 5 bank pits for backfill production
- 7 culvert road construction
3. Security Perimeter Fence – 36 km.
- Road and Security Fence
- Ditch and Rampart
- Concertina Wire
- Warning Signs
Flat 205 Al Zarooni Bldg. A, Al Nahda
Sharjah, United Arab Emirates
Mobile no.: +971 55 776 6854
+971 55 564 9380
E-mail Add: jasis2004@gmail.com
Skype Add: jon_ski
4. Cluster 12 andIntrafieldRoad Construction
- Earthworks
- Road construction
- Cellar constructions
- Piling works
- Concrete raft
5. EPC of Entry check points (3 main check points)
- Earthworks & Pits Construction
- Road construction
- Security complex
- Building facilities
- Electrical power generation
- Water/Sewer powergeneration
- IT & T supply and installation
6. Samsung Engineering
- Civil works within CPF, foundation for 78 light poles
- Concrete foundation work
- Asphalt Road construction within the CPF.
- Earthworks
- Channel crossings
- Contract based on prorate based on demand and call up.
7. Historical Well Pads of the Well Pads for wells 148, 14, 13, 11, 8 with Access Roads
- Earthworks
- Road construction
- Cellar constructions
- Fence Installation
8. Civil Construction Of Yamama Priority Well Pads & Roads (Package #1) At West
Qurna-2 – Involving Four (4) Well Pads (Y690, Y831, Y744, Y765) andOne (1) Well
Cluster Y10
- Earthworks & Pits Construction
- Road Construction and Pipe Culverts
- Cellar Construction
- Piling works
- Concrete raft / Concrete Pavement
9. Block 10 Project
- Earthworks & Pits Construction
- Road Construction and Pipe Culverts
- Cellar Construction
- Piling works
- Concrete raft / Concrete Pavement
Responsibilities:
 Prepares Bill of Quantities forprojects with the use ofspecial programs in excel I designed
and formulated for easy execution of the work
 Evaluates Progress Billing as per accomplishment basis with the use of progress
measurement procedures and template as required by the client.
 Updates project status during the execution and provides complete cost reports
(incoming/outgoing) to top administration of the company
 Estimates all the items for the works and makes costing of it for specified materials
 Ensures information about terms and conditions of contract
 Attends Clients/ Consultant meetings as required
 Reviews relevant information for cost control purposes
 Evaluates design drawings to be used in the construction and makes sure that it’s
according to project requirements and specifications.
 Provides appropriate design drawings for the projects on hand
 Schedules, plans and oversees the entire programof work
 Plans, organizes and coordinates planning activities
 Selects the most appropriate techniques and logical sequence of activities to complete
project scope
 Verifies critical path and interfaces between design/ engineering/ procurement / execution
 Updates the schedule based on inputs received fromproject team
 Estimates quantities and cost of materials, equipment, or labor to determine project
feasibility.
 Directs construction, operations,and maintenance activities at project site.
 Analyzes survey reports, maps,drawings, blueprints, aerial photography, and other
topographical or geologic data to plan projects.
M/S EXTRA CO. INDUSTRIES, LLC
Sharjah, U.A.E.
Senior Quantity Surveyor
August 2010 – October 2011
Projects Awarded under my supervision:
1) Salalah Independent Water & Power Plant – Muscat, Oman
2) Seeb Odour Control System – Muscat, Oman
3) FEWA, DEWA, DM Projects supplying Pipes, tanks, & Kiosks
4) Various Manholes, Drainage & Piping Projects in Abu Dhabi
5) Different type of projects inside & outside UAE for GRP Pipes & Fittings,
(Chemical, Fuel, Water, Sewerage) Tanks, Panel Tanks, Scrubbers, Sunshades,
GRP Kiosks, TSE Plants
Responsibilities:
 Reports directly to the CEO and Division Manager about the status of quotations
 Ensures measurements are executed by Quantity Surveyors in an accurate and timely
manner
 Provides overall direction and leadership & manages the workload of the Estimating
Department in an efficient manner
 Supervises all material takes-offs and Bills of Materials for various forms of contract
including unit rate, cost plus, & lump sumcontracts
 Ensures that the security and confidentiality procedures for estimates are consistently
enforced
 Modifications or Revisions of Estimation Program for the costing of materials to come up
with better price analysis
 Does Value Engineering to make alternative proposals without compromising the design
quality as required by the client
M/S CREATIS L.L.C. (INTERIOR ARCHITECTURE)
P.O. Box25148, Dubai, U.A.E.
Senior Quantity Surveyor
September 2007 – August 2010
Projects handled & involved with:
1) Sharjah International Airport, First & Business Class Lounge
2) Tameer Sales Office in Um-Al Quwain
3) ERUM Jewelry Store @ Dubai Mall
4) Sharjah International Airport Hotel, 16 units
5) Dubai Municipality @ Al Twar Branch
6) Sheikh Hamdan Awards Bldg @ Al Mina Road, Dubai
7) UmmAl Quwain Palace
8) Dubai Crown Plaza
9) and other small projects within the area of Dubai and Sharjah, United Arab Emirates
Responsibilities:
 Prepares Bill of Quantities for projects being tendered and taken, and all necessary
attachments required by the customer/client in Commercial and TechnicalAspects
 Requests quotations / procurement and executes comprehensive evaluation of the received
proposals from subcontractors/suppliers to see the compliances with regards to materials
and prices
 Evaluates Progress Billing duly tendered by the sub-contractor as per accomplishment
basis
 Updates project status during the execution and provides complete cost reports
(incoming/outgoing) to top administration of the company
 Estimates all the finishes and other items for interior design works and make costing of it
for specified and/or alternative materials
 Creates Cash Flowof a project to monitor the budget of the project
 Does Value Engineering to make alternative proposals as required by the client
 Issues log of interimvaluations to Project Manager as required
 Reviews and approves sub-contractor interimpayments prior to issue to Project Manager
 Monitors sub-contractorpayment log
 Ensures information about terms and conditions of contract
 Attends Clients/ Consultant meetings as required
 Attends internal meetings as required by the Project Manager
 Reviews measurements for material/ sub-contractororders and issues to Project Manager
 Reviews costs associated with variations and liaises with Project Manager for submission
to Client
 Maintains log ofvariations including price submission to Client/ Consultant and associated
budget costs
 Reviews relevant information for cost control purposes and issues to Projects Manager for
approval
 Maintains a filing systemas approved by the Project Manager
 Prepares and reviews Final Account for sub-contractors upon completion of their scope of
works with Project Manager
 Ensures familiarity with terms and conditions of contract
SKICONSTRUCTION GROUP, INC. (TRIPLE A CONSTRUCTION COMPANY)
Formerly Summa Kumagai, Inc.
17/F Philamlife Tower, 8767 Paseo de Roxas,Makati City, Philippines
Senior Quantity Surveyor
January 2006–September 2007
Projects Handled: (as QSIC)
1) Mayfair 39-Storey Tower UN Avenue, Manila
2) The Residence at Greenbelt 3 (TRAG-3) 49-Storey Residential/ Condominium
Greenbelt Park, Makati City
3) Lufthansa 1-Bay Wide Body Aircraft Hangar Villamor Airbase, Pasay City
4) Wyeth Philippines Expansion Project (Superstructure Package) Canlubang,
Laguna
Responsibilities:
 Prepares Bill of Quantities forprojects being tendered.
 Prepares and facilitates the completion of documents for Pre-qualification.
 Solicits quotations fromapproved suppliers/sub-contractors.
 Prepares bid attachments required by the customer.
 Participates in the implementation of the Organization’s Environmental, Occupational,
Health and Safety Program.
 Performs other duties that maybe assigned fromtime to time.
ASIAN ARCHITECTS–PROJECT MANAGEMENT GROUP
Pasig City
Project Engineer / Inspector (QA/QC)
February, 2004– December, 2005
Projects Handled: 1) NEW SARANGANI BUILDING
Sampaloc, Manila
November, 2004– December, 2005
CONTRACTOR – D. M. Consunji Inc.
2) FOUR–STOREYDLSU DORMITORY
Dasmariñas, Cavite
February, 2004–July, 2004
CONTRACTOR – Metropolis Construction Inc.
Responsibilities:
 Attends Clients/ Consultant meetings as required
 Attends internal meetings as required by the Project Manager
 Reviews measurements for material/ sub-contractororders and issue to Project Manager
 Liaises with Project Manager and Operations team to recognize variations about the
Project
 Reviews costs associated with variations and liaises with Project Manager for submission
to Client
 Coordinates with Project Manager to identify potential issues on site
 Coordinates with sub-contractors to ensure Invoices and claims are submitted within the
agreed period and with all relevant information attached
 Liaises with Project Manager for commercial/ contractual correspondence
 Ensures Site QS duties are properly coordinated and completed in a timely manner
 Renders appropriate inspection prior to execution of certain activity (e.g. Rebar
Installation, Concrete Pouring, Masonry Works, etc.)
 Evaluates Progress Billing duly tendered by the contractor as per accomplishment basis.
 Gives certain directives such as memorandum for construction implementation for the
benefit of the project.
 Does computer works needed for construction records and references.
 Performs costing and estimates using Microsoft Excel
 Monitors and records Owner Supplied Materials (OSM) for proper documentation.
J.J.SORIANO CONSTRUCTION COMPANY
Malabon City
Asst. Site Engineer
February, 2002–January, 2004
Projects Handled: 1. TAGAYTAYRETREAT HOUSE
Mendez, Cavite
(March, 2002–March, 2003)
Responsibilities:
 2nd Over-all In-charge in the project
 Prepares and makes pertinent documents and paper works necessary for the construction
records.
 Monitors construction activities.
 In-charge in the Drainage Loop System
Skills Trade Skill Level Years of Experience
Cost & Budget Control, Expert More than 8years
Contract & Vendor, Negotiation,
Quantity Survey & Cost Estimate
Estimating &TenderPreparation Expert More than 10years
(can be able to create a program
forthe easy executionof the work
forestimating and quantity surveying
purposes.)
Communication &Interpersonalskills, Expert More than 8years
Strong Analytical& ProblemSolving
Capabilities
Software Skills
- MSOffice Expert More than 10years
- MSProject / Primavera P6 Expert More than 8years
- AutoCAD Expert More than 8years
&other Construction
Computer Software)
Personal Information Born on the 15th
day of July 1979; Can speak English, Filipino andsome Arabic.
Religion is Christian

More Related Content

What's hot

CV- Faraz Yasin, Planning Engineer 28-Nov-2016
CV- Faraz Yasin,  Planning Engineer 28-Nov-2016CV- Faraz Yasin,  Planning Engineer 28-Nov-2016
CV- Faraz Yasin, Planning Engineer 28-Nov-2016Faraz Yasin
 
CV AMINUL 19-05-2015
CV AMINUL 19-05-2015CV AMINUL 19-05-2015
CV AMINUL 19-05-2015Aminul Haque
 
Curriculum Vitae (B. Pancho)2015
Curriculum Vitae (B. Pancho)2015Curriculum Vitae (B. Pancho)2015
Curriculum Vitae (B. Pancho)2015Bernard Pancho
 
Peter Morrison Resume Sept 2015
Peter Morrison Resume Sept 2015Peter Morrison Resume Sept 2015
Peter Morrison Resume Sept 2015Peter Morrison
 
Updated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKHUpdated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKHMusa Elsheikh
 
Mirasol Resume 10-14-14
Mirasol Resume 10-14-14Mirasol Resume 10-14-14
Mirasol Resume 10-14-14Mirasol Villa
 
anthony-j.-martini-resume 20161021
anthony-j.-martini-resume 20161021anthony-j.-martini-resume 20161021
anthony-j.-martini-resume 20161021Anthony Martini
 
Amar Rajendra Rahate Resume
Amar Rajendra Rahate ResumeAmar Rajendra Rahate Resume
Amar Rajendra Rahate ResumeAmarRahatePatil
 
Sainuddden alanthi
Sainuddden alanthiSainuddden alanthi
Sainuddden alanthisainu9740
 
Ashraf Yehia CV E01 1 (1)
Ashraf Yehia CV E01 1 (1)Ashraf Yehia CV E01 1 (1)
Ashraf Yehia CV E01 1 (1)Ashraf Yehia
 
Ayman_C.V. ( ass.contract manager.)
Ayman_C.V.           ( ass.contract manager.)Ayman_C.V.           ( ass.contract manager.)
Ayman_C.V. ( ass.contract manager.)ayman eloraby
 
Mohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CVMohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CVMohamed Azaad
 

What's hot (20)

AEC Controls SOQ
AEC Controls SOQAEC Controls SOQ
AEC Controls SOQ
 
CV- Faraz Yasin, Planning Engineer 28-Nov-2016
CV- Faraz Yasin,  Planning Engineer 28-Nov-2016CV- Faraz Yasin,  Planning Engineer 28-Nov-2016
CV- Faraz Yasin, Planning Engineer 28-Nov-2016
 
CV AMINUL 19-05-2015
CV AMINUL 19-05-2015CV AMINUL 19-05-2015
CV AMINUL 19-05-2015
 
bmc cv (2)
bmc cv (2)bmc cv (2)
bmc cv (2)
 
Sr. Estimation engineer
Sr. Estimation engineerSr. Estimation engineer
Sr. Estimation engineer
 
Roman Victor Santos
Roman Victor SantosRoman Victor Santos
Roman Victor Santos
 
Curriculum Vitae (B. Pancho)2015
Curriculum Vitae (B. Pancho)2015Curriculum Vitae (B. Pancho)2015
Curriculum Vitae (B. Pancho)2015
 
Peter Morrison Resume Sept 2015
Peter Morrison Resume Sept 2015Peter Morrison Resume Sept 2015
Peter Morrison Resume Sept 2015
 
2015 CV
2015 CV 2015 CV
2015 CV
 
CV_Civil_Engineer
CV_Civil_EngineerCV_Civil_Engineer
CV_Civil_Engineer
 
Updated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKHUpdated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKH
 
S.L Madlala May 2015
S.L Madlala May 2015S.L Madlala May 2015
S.L Madlala May 2015
 
Mirasol Resume 10-14-14
Mirasol Resume 10-14-14Mirasol Resume 10-14-14
Mirasol Resume 10-14-14
 
anthony-j.-martini-resume 20161021
anthony-j.-martini-resume 20161021anthony-j.-martini-resume 20161021
anthony-j.-martini-resume 20161021
 
Amar Rajendra Rahate Resume
Amar Rajendra Rahate ResumeAmar Rajendra Rahate Resume
Amar Rajendra Rahate Resume
 
Sainuddden alanthi
Sainuddden alanthiSainuddden alanthi
Sainuddden alanthi
 
Ashraf Yehia CV E01 1 (1)
Ashraf Yehia CV E01 1 (1)Ashraf Yehia CV E01 1 (1)
Ashraf Yehia CV E01 1 (1)
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
Ayman_C.V. ( ass.contract manager.)
Ayman_C.V.           ( ass.contract manager.)Ayman_C.V.           ( ass.contract manager.)
Ayman_C.V. ( ass.contract manager.)
 
Mohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CVMohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CV
 

Viewers also liked

Dak iud kit listrik dak BKKbN 2015 ( IUD KIT ) 2015
Dak iud kit listrik dak BKKbN 2015 ( IUD KIT ) 2015Dak iud kit listrik dak BKKbN 2015 ( IUD KIT ) 2015
Dak iud kit listrik dak BKKbN 2015 ( IUD KIT ) 2015Redis Manik
 
Scioglimento c.c. isola ordinanza imapstato madre assessore cutino n. 79
Scioglimento c.c. isola ordinanza imapstato madre assessore cutino  n. 79Scioglimento c.c. isola ordinanza imapstato madre assessore cutino  n. 79
Scioglimento c.c. isola ordinanza imapstato madre assessore cutino n. 79Pino Ciampolillo
 
Scioglimento consiglio comunale isola assessore paolo aiello servizi a rete a...
Scioglimento consiglio comunale isola assessore paolo aiello servizi a rete a...Scioglimento consiglio comunale isola assessore paolo aiello servizi a rete a...
Scioglimento consiglio comunale isola assessore paolo aiello servizi a rete a...Pino Ciampolillo
 
лечение в корее
лечение в кореелечение в корее
лечение в корее79276234548
 
อุทยานแห่งชาติเขาคิชฌกูฏ
อุทยานแห่งชาติเขาคิชฌกูฏอุทยานแห่งชาติเขาคิชฌกูฏ
อุทยานแห่งชาติเขาคิชฌกูฏnun2622
 
A Survey on Decision Support Systems in Social Media
A Survey on Decision Support Systems in Social MediaA Survey on Decision Support Systems in Social Media
A Survey on Decision Support Systems in Social MediaEditor IJCATR
 
Love grows as you give it away
Love grows as you give it awayLove grows as you give it away
Love grows as you give it awayJulio Banks
 
একটা কলমের আত্মকাহিনি
একটা কলমের আত্মকাহিনিএকটা কলমের আত্মকাহিনি
একটা কলমের আত্মকাহিনিMonirul islam
 

Viewers also liked (14)

VITAMINS
VITAMINSVITAMINS
VITAMINS
 
Dak iud kit listrik dak BKKbN 2015 ( IUD KIT ) 2015
Dak iud kit listrik dak BKKbN 2015 ( IUD KIT ) 2015Dak iud kit listrik dak BKKbN 2015 ( IUD KIT ) 2015
Dak iud kit listrik dak BKKbN 2015 ( IUD KIT ) 2015
 
Scioglimento c.c. isola ordinanza imapstato madre assessore cutino n. 79
Scioglimento c.c. isola ordinanza imapstato madre assessore cutino  n. 79Scioglimento c.c. isola ordinanza imapstato madre assessore cutino  n. 79
Scioglimento c.c. isola ordinanza imapstato madre assessore cutino n. 79
 
Scioglimento consiglio comunale isola assessore paolo aiello servizi a rete a...
Scioglimento consiglio comunale isola assessore paolo aiello servizi a rete a...Scioglimento consiglio comunale isola assessore paolo aiello servizi a rete a...
Scioglimento consiglio comunale isola assessore paolo aiello servizi a rete a...
 
Untitled Presentation
Untitled PresentationUntitled Presentation
Untitled Presentation
 
лечение в корее
лечение в кореелечение в корее
лечение в корее
 
อุทยานแห่งชาติเขาคิชฌกูฏ
อุทยานแห่งชาติเขาคิชฌกูฏอุทยานแห่งชาติเขาคิชฌกูฏ
อุทยานแห่งชาติเขาคิชฌกูฏ
 
Abstrak
AbstrakAbstrak
Abstrak
 
Silabus baru
Silabus baruSilabus baru
Silabus baru
 
A Survey on Decision Support Systems in Social Media
A Survey on Decision Support Systems in Social MediaA Survey on Decision Support Systems in Social Media
A Survey on Decision Support Systems in Social Media
 
Love grows as you give it away
Love grows as you give it awayLove grows as you give it away
Love grows as you give it away
 
একটা কলমের আত্মকাহিনি
একটা কলমের আত্মকাহিনিএকটা কলমের আত্মকাহিনি
একটা কলমের আত্মকাহিনি
 
Untitled Presentation
Untitled PresentationUntitled Presentation
Untitled Presentation
 
INVOLUNTARY MUSCLES
INVOLUNTARY MUSCLESINVOLUNTARY MUSCLES
INVOLUNTARY MUSCLES
 

Similar to JBA_CV_updated (20)

Final Resume Syed.compressed
Final Resume Syed.compressedFinal Resume Syed.compressed
Final Resume Syed.compressed
 
C.V
C.VC.V
C.V
 
Resume
ResumeResume
Resume
 
GERRY PANTIG MANICLANG
GERRY PANTIG MANICLANGGERRY PANTIG MANICLANG
GERRY PANTIG MANICLANG
 
Fadi abu kuwaik full cv,NEW
Fadi abu kuwaik full cv,NEWFadi abu kuwaik full cv,NEW
Fadi abu kuwaik full cv,NEW
 
Abdelrazek Mustafa Korshom C V
Abdelrazek Mustafa Korshom C VAbdelrazek Mustafa Korshom C V
Abdelrazek Mustafa Korshom C V
 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated Resume
 
CV of Raffy Feliciano
CV of Raffy FelicianoCV of Raffy Feliciano
CV of Raffy Feliciano
 
CV-Essam Saadeh
CV-Essam SaadehCV-Essam Saadeh
CV-Essam Saadeh
 
Adly CV111
Adly CV111Adly CV111
Adly CV111
 
MY PROFILE
MY PROFILEMY PROFILE
MY PROFILE
 
Project - Logistics & Operation
Project - Logistics & OperationProject - Logistics & Operation
Project - Logistics & Operation
 
CV_Ahmad_Eida final
CV_Ahmad_Eida finalCV_Ahmad_Eida final
CV_Ahmad_Eida final
 
CV-Rajkumar 23.11.2016
CV-Rajkumar 23.11.2016CV-Rajkumar 23.11.2016
CV-Rajkumar 23.11.2016
 
Erfan Farooqui CV- 17072016
Erfan Farooqui CV- 17072016Erfan Farooqui CV- 17072016
Erfan Farooqui CV- 17072016
 
khushbu cv
khushbu cvkhushbu cv
khushbu cv
 
Curriculum vitae
Curriculum vitaeCurriculum vitae
Curriculum vitae
 
karthik resume 2016-UAE
karthik resume 2016-UAEkarthik resume 2016-UAE
karthik resume 2016-UAE
 
Quantity Surveyor 5+ Yrs Exp
Quantity Surveyor 5+ Yrs ExpQuantity Surveyor 5+ Yrs Exp
Quantity Surveyor 5+ Yrs Exp
 
Sachin parab
Sachin parabSachin parab
Sachin parab
 

JBA_CV_updated

  • 1. Jonathan B. Asis Objective Academic Qualifications Professional Qualifications Seeking a responsible position where I will be fit in to work that I can utilize my full potential while providing maximumbenefit to my employer. Idea oriented, resourceful, with very good follow through skills and able to work independently. With good communication skills, both written and oral. With 10+ years experience in construction and engineering industries providing project management, quantity surveying, scheduling and cost control. Had been involved in major projects in both Gulf Countries and Philippines and has experience in Hotels, Residential Buildings, Civil Works, Earthworks, Structural Works, and Infrastructure. Familiar with standard method of measurement including SMM7, CESSM3 and POMI. Had sound knowledge about cost management, cost control, scheduling, FIDIC forms of contract. Proficient in using AutoCAD 2D/3D, Primavera P6 and MS Office software. Currentlystudying to gain RICS charteredmembership. Bachelor of Science in Civil Engineering – Graduated Working Scholar 1996–2001 - University ofthe East - Caloocan City, Philippines Registered Civil Engineer (PRC NO. 092792) Member - Philippine Institute of Certified Quantity Surveyor, UAE Chapter Trainings and Certificates Chicago Management Training Institute – Dubai, UAE  CCE/CCC (Certified Cost Engineer/Consultant) (AACE International USA Certified)  Primavera P6, Project Planning Professional Experience SIMA BAGHDAD FOR GENERAL CONTRACTING Dubai, U.A.E. Quantity Surveyor / Civil Engineer / Planner/ Cost Estimator November 2011 – Present Projects Handled And Involved With Sima Baghdad – IRAQ PROJECTS 1. Earthwork for Appraisal Wells And IntrafieldRoads In West Qurna Field(Phase - 2 Appraisals ( Excavation & Backfill, up to 250,000 m3) - 7 Kmroad construction - 8 bank pits for backfill production - 2 Cellars construction 2. Earthwork for Cluster Wells andIntrafieldRoads in West Qurna field(phase 2) - 6 clusters ( excavation &backfill, up to 1.1 million m3) - 16 Kmroad construction - 5 bank pits for backfill production - 7 culvert road construction 3. Security Perimeter Fence – 36 km. - Road and Security Fence - Ditch and Rampart - Concertina Wire - Warning Signs Flat 205 Al Zarooni Bldg. A, Al Nahda Sharjah, United Arab Emirates Mobile no.: +971 55 776 6854 +971 55 564 9380 E-mail Add: jasis2004@gmail.com Skype Add: jon_ski
  • 2. 4. Cluster 12 andIntrafieldRoad Construction - Earthworks - Road construction - Cellar constructions - Piling works - Concrete raft 5. EPC of Entry check points (3 main check points) - Earthworks & Pits Construction - Road construction - Security complex - Building facilities - Electrical power generation - Water/Sewer powergeneration - IT & T supply and installation 6. Samsung Engineering - Civil works within CPF, foundation for 78 light poles - Concrete foundation work - Asphalt Road construction within the CPF. - Earthworks - Channel crossings - Contract based on prorate based on demand and call up. 7. Historical Well Pads of the Well Pads for wells 148, 14, 13, 11, 8 with Access Roads - Earthworks - Road construction - Cellar constructions - Fence Installation 8. Civil Construction Of Yamama Priority Well Pads & Roads (Package #1) At West Qurna-2 – Involving Four (4) Well Pads (Y690, Y831, Y744, Y765) andOne (1) Well Cluster Y10 - Earthworks & Pits Construction - Road Construction and Pipe Culverts - Cellar Construction - Piling works - Concrete raft / Concrete Pavement 9. Block 10 Project - Earthworks & Pits Construction - Road Construction and Pipe Culverts - Cellar Construction - Piling works - Concrete raft / Concrete Pavement Responsibilities:  Prepares Bill of Quantities forprojects with the use ofspecial programs in excel I designed and formulated for easy execution of the work  Evaluates Progress Billing as per accomplishment basis with the use of progress measurement procedures and template as required by the client.  Updates project status during the execution and provides complete cost reports (incoming/outgoing) to top administration of the company  Estimates all the items for the works and makes costing of it for specified materials  Ensures information about terms and conditions of contract  Attends Clients/ Consultant meetings as required  Reviews relevant information for cost control purposes  Evaluates design drawings to be used in the construction and makes sure that it’s according to project requirements and specifications.
  • 3.  Provides appropriate design drawings for the projects on hand  Schedules, plans and oversees the entire programof work  Plans, organizes and coordinates planning activities  Selects the most appropriate techniques and logical sequence of activities to complete project scope  Verifies critical path and interfaces between design/ engineering/ procurement / execution  Updates the schedule based on inputs received fromproject team  Estimates quantities and cost of materials, equipment, or labor to determine project feasibility.  Directs construction, operations,and maintenance activities at project site.  Analyzes survey reports, maps,drawings, blueprints, aerial photography, and other topographical or geologic data to plan projects. M/S EXTRA CO. INDUSTRIES, LLC Sharjah, U.A.E. Senior Quantity Surveyor August 2010 – October 2011 Projects Awarded under my supervision: 1) Salalah Independent Water & Power Plant – Muscat, Oman 2) Seeb Odour Control System – Muscat, Oman 3) FEWA, DEWA, DM Projects supplying Pipes, tanks, & Kiosks 4) Various Manholes, Drainage & Piping Projects in Abu Dhabi 5) Different type of projects inside & outside UAE for GRP Pipes & Fittings, (Chemical, Fuel, Water, Sewerage) Tanks, Panel Tanks, Scrubbers, Sunshades, GRP Kiosks, TSE Plants Responsibilities:  Reports directly to the CEO and Division Manager about the status of quotations  Ensures measurements are executed by Quantity Surveyors in an accurate and timely manner  Provides overall direction and leadership & manages the workload of the Estimating Department in an efficient manner  Supervises all material takes-offs and Bills of Materials for various forms of contract including unit rate, cost plus, & lump sumcontracts  Ensures that the security and confidentiality procedures for estimates are consistently enforced  Modifications or Revisions of Estimation Program for the costing of materials to come up with better price analysis  Does Value Engineering to make alternative proposals without compromising the design quality as required by the client M/S CREATIS L.L.C. (INTERIOR ARCHITECTURE) P.O. Box25148, Dubai, U.A.E. Senior Quantity Surveyor September 2007 – August 2010 Projects handled & involved with: 1) Sharjah International Airport, First & Business Class Lounge 2) Tameer Sales Office in Um-Al Quwain 3) ERUM Jewelry Store @ Dubai Mall 4) Sharjah International Airport Hotel, 16 units
  • 4. 5) Dubai Municipality @ Al Twar Branch 6) Sheikh Hamdan Awards Bldg @ Al Mina Road, Dubai 7) UmmAl Quwain Palace 8) Dubai Crown Plaza 9) and other small projects within the area of Dubai and Sharjah, United Arab Emirates Responsibilities:  Prepares Bill of Quantities for projects being tendered and taken, and all necessary attachments required by the customer/client in Commercial and TechnicalAspects  Requests quotations / procurement and executes comprehensive evaluation of the received proposals from subcontractors/suppliers to see the compliances with regards to materials and prices  Evaluates Progress Billing duly tendered by the sub-contractor as per accomplishment basis  Updates project status during the execution and provides complete cost reports (incoming/outgoing) to top administration of the company  Estimates all the finishes and other items for interior design works and make costing of it for specified and/or alternative materials  Creates Cash Flowof a project to monitor the budget of the project  Does Value Engineering to make alternative proposals as required by the client  Issues log of interimvaluations to Project Manager as required  Reviews and approves sub-contractor interimpayments prior to issue to Project Manager  Monitors sub-contractorpayment log  Ensures information about terms and conditions of contract  Attends Clients/ Consultant meetings as required  Attends internal meetings as required by the Project Manager  Reviews measurements for material/ sub-contractororders and issues to Project Manager  Reviews costs associated with variations and liaises with Project Manager for submission to Client  Maintains log ofvariations including price submission to Client/ Consultant and associated budget costs  Reviews relevant information for cost control purposes and issues to Projects Manager for approval  Maintains a filing systemas approved by the Project Manager  Prepares and reviews Final Account for sub-contractors upon completion of their scope of works with Project Manager  Ensures familiarity with terms and conditions of contract SKICONSTRUCTION GROUP, INC. (TRIPLE A CONSTRUCTION COMPANY) Formerly Summa Kumagai, Inc. 17/F Philamlife Tower, 8767 Paseo de Roxas,Makati City, Philippines Senior Quantity Surveyor January 2006–September 2007 Projects Handled: (as QSIC) 1) Mayfair 39-Storey Tower UN Avenue, Manila 2) The Residence at Greenbelt 3 (TRAG-3) 49-Storey Residential/ Condominium Greenbelt Park, Makati City 3) Lufthansa 1-Bay Wide Body Aircraft Hangar Villamor Airbase, Pasay City 4) Wyeth Philippines Expansion Project (Superstructure Package) Canlubang, Laguna
  • 5. Responsibilities:  Prepares Bill of Quantities forprojects being tendered.  Prepares and facilitates the completion of documents for Pre-qualification.  Solicits quotations fromapproved suppliers/sub-contractors.  Prepares bid attachments required by the customer.  Participates in the implementation of the Organization’s Environmental, Occupational, Health and Safety Program.  Performs other duties that maybe assigned fromtime to time. ASIAN ARCHITECTS–PROJECT MANAGEMENT GROUP Pasig City Project Engineer / Inspector (QA/QC) February, 2004– December, 2005 Projects Handled: 1) NEW SARANGANI BUILDING Sampaloc, Manila November, 2004– December, 2005 CONTRACTOR – D. M. Consunji Inc. 2) FOUR–STOREYDLSU DORMITORY Dasmariñas, Cavite February, 2004–July, 2004 CONTRACTOR – Metropolis Construction Inc. Responsibilities:  Attends Clients/ Consultant meetings as required  Attends internal meetings as required by the Project Manager  Reviews measurements for material/ sub-contractororders and issue to Project Manager  Liaises with Project Manager and Operations team to recognize variations about the Project  Reviews costs associated with variations and liaises with Project Manager for submission to Client  Coordinates with Project Manager to identify potential issues on site  Coordinates with sub-contractors to ensure Invoices and claims are submitted within the agreed period and with all relevant information attached  Liaises with Project Manager for commercial/ contractual correspondence  Ensures Site QS duties are properly coordinated and completed in a timely manner  Renders appropriate inspection prior to execution of certain activity (e.g. Rebar Installation, Concrete Pouring, Masonry Works, etc.)  Evaluates Progress Billing duly tendered by the contractor as per accomplishment basis.  Gives certain directives such as memorandum for construction implementation for the benefit of the project.  Does computer works needed for construction records and references.  Performs costing and estimates using Microsoft Excel  Monitors and records Owner Supplied Materials (OSM) for proper documentation. J.J.SORIANO CONSTRUCTION COMPANY Malabon City Asst. Site Engineer February, 2002–January, 2004 Projects Handled: 1. TAGAYTAYRETREAT HOUSE
  • 6. Mendez, Cavite (March, 2002–March, 2003) Responsibilities:  2nd Over-all In-charge in the project  Prepares and makes pertinent documents and paper works necessary for the construction records.  Monitors construction activities.  In-charge in the Drainage Loop System Skills Trade Skill Level Years of Experience Cost & Budget Control, Expert More than 8years Contract & Vendor, Negotiation, Quantity Survey & Cost Estimate Estimating &TenderPreparation Expert More than 10years (can be able to create a program forthe easy executionof the work forestimating and quantity surveying purposes.) Communication &Interpersonalskills, Expert More than 8years Strong Analytical& ProblemSolving Capabilities Software Skills - MSOffice Expert More than 10years - MSProject / Primavera P6 Expert More than 8years - AutoCAD Expert More than 8years &other Construction Computer Software) Personal Information Born on the 15th day of July 1979; Can speak English, Filipino andsome Arabic. Religion is Christian