SlideShare a Scribd company logo
1 of 4
Download to read offline
QA Manager - Inpex BLD-1 Operations Buildings
I am currently employed as the Quality Assurance Manager and Workplace Health and
Safety Officer for a leading Electrical Contracting Company on prominent Oil and Gas project. I
have an engineering trade background with job planning, procurement and supervising
experience. My construction background and experience stems from over a decade in the
electrical industry with a key focus on Oil and Gas. I am motivated and thrive in challenging
areas of responsibility and have an ability to learn quickly and adapt to new and multiple roles.
Key Strengths:
Multi-skilling and Multitasking.
Reliable with an impeccable work ethic and attendance record.
Communication, relationship building, negotiation & interpersonal skills.
Team player with a great rapport with piers.
Proven ability to adapt & allocate resources to produce results.
Key Professional Assets:
Extensive experience in Oil and Gas projects.
Pre-commissioning, commissioning and completion processes.
Procedures and Policy documentation.
Project documentation and deliverables.
Experience with a great number of trades with an understanding of time
allocation and planning.
Understanding of construction drawings and the relevant processes
involved in the industry.
Strong Computer skills, Microsoft Word; Excel, Power point, Project, Visio,
Adobe Acrobat, Photoshop, Corel Draw, Auto Cad, Revit Design.
Key Areas of Competency
Quality assurance in accordance with 9001 accreditation.
Project Management and Contract Administration.
Workplace Health & Safety & industrial Relations.
Rehabilitation and Return to Work Coordination.
Internal Auditing.
Policy and procedure writing.
Management of small specialised teams.
Contact Details
Micheal Lovett
30 Clark Terrace
Sandstone Point
QLD 4511
Phone: (07) 5429 5265
Mobile: 0411 742 095
Email:
micheal.lovett@bigpond.com
Qualifications
• Trade Certificate
Electrical Fitter
• Certificate IV in OH&S
• Certificate IV in Frontline
Management
• Workplace Health and
Safety Officer
(Construction)
• Rehabilitation and &
Return to Work
Coordinator
• Internal Auditor
Referees
• Mark Warner
Project Manager.
AES
Mobile 0408 844 596
• Colin Lovett
Project Manger
UGL
Tel 0458 981 160
QA Manager - Inpex BLD-1 Operations Buildings
Recent Relevant Experience
November 2014 to
Present
Applied Electro Systems
Quality Manager
CPB Contractors (Formally Leightons Contractors) – Inpex BLD-1 Operations Buildings
• Design Review – Specification and Standard Compliance
• Development of commissioning documentation
• Management of deliverables – MDR, IOM’s, As Built Drawings
• Reviewing of Quality documentation and procedures
• Inspection Test Plans submissions and updates
• Management of Punch List Items
• Surveillance of commissioning processes
• HA Dossier compilation and submission
• FAT and SAT documentation and inspection processes
• Attendance to all off-site FAT by Switch Board Manufacturer
• Management of Equipment register
• Manager the compilation of the Project Commissioning Spares.
• Manager the compilation of the Operational Spares.
• Collate and prepare packs for ITR completion.
• Attend pre inspections
• Attend and facilitate inspections
• Safe Work Method Statements
September 2012 to
November 2014
Applied Electro Systems
Quality Manager
Supervisor
WHSO and Return to Work Coordinator
John Holland – Wheatstone construction Village Project
• Design Review – Specification and Standard Compliance
• RFI management
• Development of commissioning documentation
• Management of deliverables – MDR, IOM’s, As Built Drawings
• Reviewing of Quality documentation and procedures
• Inspection Test Plans submissions and updates
• Management of Punch List Items
• Surveillance of commissioning processes
• HA Dossier compilation and submission
• FAT and SAT documentation and inspection processes
• Attendance to all off-site FAT by Switch Board Manufacturer
• Management of Equipment register.
• Manager the compilation of the Project Commissioning Spares.
• Manager the compilation of the Operational Spares. Submit for approval and procure
• Collate and prepare packs for ITR completion.
• Attend pre inspections
• Attend and facilitate inspections
• Safe Work Method Statements
February 2012 to
September 2012;
Applied Electro Systems
Contracts Administrator
WHSO and Return to Work Coordinator
QA Officer
John Holland – Gorgon NPI Administration Buildings
• Claim Submissions, SI and CD reporting
• Contract Notices, submissions and monitoring
• Design Review – Specification and Standard Compliance
• RFI management
• Development of commissioning documentation
• Management of deliverables – MDR, IOM’s, As Built Drawings
• Reviewing of Quality documentation and procedures
• Inspection Test Plans submissions and updates
• Management of Punch List Items
• Surveillance of installation processes
• HA Dossier compilation and submission
QA Manager - Inpex BLD-1 Operations Buildings
• Collate and prepare packs for ITR completion.
• Attend pre inspections
• Attend and facilitate inspections
• Safe Work Method Statements submissions and approvals
May 2008 to 2012; Q Electrical Services
Safety Manager
WHSO and Return to Work Coordinator
QA Manager
Leighton Contractors – 111 Eagle St, QUT and ABC
Leighton Contractors - Green Square North Tower (6 Star Greenstar Office Design and As Built (First in
QLD))
Leighton Contractors - Green Square South Tower 5 Star Greenstar Office Design and As Built
Hutchinson Builders - North Bridge 6 Star Greenstar Office Design
Leighton Contractors - Leighton HQ 6 Star Greentsar Office Design, As Built and Integrated Fitout
FKP Property Group - Energex 6 Star Greenstar Office Design and As Built
Bovis Lend Lease – Santos Place 6 Star Office Design and As Built
Leighton Contractors – Amberley Air Base Super Hornets
⋅ Safety plans
⋅ Safe Work Method Statements
⋅ QA Manuals (Project Specific)
⋅ Commissioning Plans
⋅ Greenstar Coordination and management
⋅ Internal Auditing
⋅ Policy and Procedure implementation
⋅ Incident investigation
⋅ Rehabilitation Management
May 2008 to 2012; Applied Electro Systems
Safety Manager
WHSO and Return to Work Coordinator
QA Manager
John Holland – Amberley Air Base Fuel Farm 2A
Baulderstone Hornibrook – Amberley Waste Collection Tanks
BP Petroleum – Goodna, Nerang, Reliance Cairns
⋅ Safety plans
⋅ Safe Work Method Statements
⋅ QA Manuals (Project Specific)
⋅ Commissioning Plans
⋅ Greenstar Coordination and management
⋅ Internal Auditing
⋅ Policy and Procedure implementation
⋅ Incident investigation
⋅ Rehabilitation Management
May 2008 to 2012; Image EFX
WHSO and Return to Work Coordinator
QA Officer
Hutchinson Builders – Airlie F Building Boat House
Transfield – Air train Digital Signage
⋅ Safety plans
⋅ Safe Work Method Statements
⋅ QA Manuals (Project Specific)
⋅ Commissioning Plans
⋅ Greenstar Coordination and management
⋅ Internal Auditing
⋅ Policy and Procedure implementation
⋅ Incident investigation
⋅ Rehabilitation Management
QA Manager - Inpex BLD-1 Operations Buildings
Previous Career Roles
May 2007 to May
2008
Image EFX
Purchasing Officer and Estimator
Gaming Signage, Specialised Lighting, refurbishment and construction
⋅ Job costing/ quotations
⋅ Management of suppliers and subcontractors
⋅ Product design coordination
⋅ Research and development of new products and materials
⋅ Coordination of deliveries local, interstate and overseas
2000 – 2007 Image EFX
Site Foreman
Gaming Signage, Specialised Lighting, refurbishment and construction
⋅ Installation Foreman
⋅ Specialised lighting installation and maintenance
⋅ Signage installation and maintenance
⋅ Small building works and refurbishment
⋅ Signage construction, including aluminium welding and electrical wiring
1993 – 2000 Signtel
Workshop Foreman
Signage, Specialised Lighting, Structural Steel, Printing
⋅ Manufacturing and Installation Foreman
⋅ Procurement
⋅ Industrial Design
⋅ Specialised Trades
⋅ Electrical – signage
⋅ Led automation
⋅ Neon Lighting – installation and manufacturing
⋅ Aluminium welding – Tig and Mig
⋅ Structural Steel welding and fabrication
⋅ 2K Spray painting
⋅ Furniture manufacturing – wood and stainless steel
⋅ Screen Printing
⋅ Vacuum Forming
I am a firm believer in treating people how you would like to be treated. Common courtesy and decency are not
negotiable. Communication is the key to any relationship. Where possible, I like face to face interaction rather
than telephone or email. Clear, concise, unambiguous communication is the foundation to a healthy working
relationship between management and staff.

More Related Content

What's hot (20)

Dexter Adona Resume
Dexter Adona ResumeDexter Adona Resume
Dexter Adona Resume
 
MATHAVAN LATEST CV ON AUG 2015
MATHAVAN LATEST CV ON AUG 2015MATHAVAN LATEST CV ON AUG 2015
MATHAVAN LATEST CV ON AUG 2015
 
Resume Acc
Resume AccResume Acc
Resume Acc
 
Mike C LeBlanc REV3
Mike C LeBlanc REV3Mike C LeBlanc REV3
Mike C LeBlanc REV3
 
2.annexure mep
2.annexure mep2.annexure mep
2.annexure mep
 
Joe Harris' Resume 2016
Joe Harris' Resume 2016Joe Harris' Resume 2016
Joe Harris' Resume 2016
 
Joubert_Dianna_Resume
Joubert_Dianna_ResumeJoubert_Dianna_Resume
Joubert_Dianna_Resume
 
resume-ehlibongco_2015e
resume-ehlibongco_2015eresume-ehlibongco_2015e
resume-ehlibongco_2015e
 
Ryan Ministrelli Resume 2016
Ryan Ministrelli Resume 2016Ryan Ministrelli Resume 2016
Ryan Ministrelli Resume 2016
 
Updated NEW SECCC1
Updated  NEW SECCC1Updated  NEW SECCC1
Updated NEW SECCC1
 
nestor
nestornestor
nestor
 
CV - MEP Inspector Engineer Froilan Ramos Balanao
CV -  MEP Inspector Engineer  Froilan Ramos BalanaoCV -  MEP Inspector Engineer  Froilan Ramos Balanao
CV - MEP Inspector Engineer Froilan Ramos Balanao
 
Datoba Presentation 2015 22-04-15 REV 4 Eng
Datoba Presentation 2015 22-04-15 REV 4 EngDatoba Presentation 2015 22-04-15 REV 4 Eng
Datoba Presentation 2015 22-04-15 REV 4 Eng
 
Fady samir cv
Fady samir cvFady samir cv
Fady samir cv
 
UPDATED RESUME 2016
UPDATED RESUME 2016UPDATED RESUME 2016
UPDATED RESUME 2016
 
SHAMSHAD QAQC RESUME
SHAMSHAD QAQC RESUMESHAMSHAD QAQC RESUME
SHAMSHAD QAQC RESUME
 
jordan updated resume 2015
jordan updated resume 2015jordan updated resume 2015
jordan updated resume 2015
 
Mech_Eng. CV updated
Mech_Eng. CV updatedMech_Eng. CV updated
Mech_Eng. CV updated
 
Derek Paquette Resume
Derek Paquette ResumeDerek Paquette Resume
Derek Paquette Resume
 
ZAKI Michael_CV 042014
ZAKI Michael_CV 042014ZAKI Michael_CV 042014
ZAKI Michael_CV 042014
 

Viewers also liked

Ken Wagner QA-Safety Resume
Ken Wagner QA-Safety ResumeKen Wagner QA-Safety Resume
Ken Wagner QA-Safety Resume
Kenneth Wagner
 

Viewers also liked (15)

Căng da mặt | Cang da mat
Căng da mặt | Cang da matCăng da mặt | Cang da mat
Căng da mặt | Cang da mat
 
¿Cómo se financia el gradualismo fiscal en 2016/2017?
¿Cómo se financia el gradualismo fiscal en 2016/2017?¿Cómo se financia el gradualismo fiscal en 2016/2017?
¿Cómo se financia el gradualismo fiscal en 2016/2017?
 
Sistemas Operativos
Sistemas OperativosSistemas Operativos
Sistemas Operativos
 
Toast Summer 2014
Toast Summer 2014Toast Summer 2014
Toast Summer 2014
 
Educ virreinal
Educ virreinalEduc virreinal
Educ virreinal
 
Tạo má lúm đồng tiền | Tao ma lum dong tien
Tạo má lúm đồng tiền | Tao ma lum dong tienTạo má lúm đồng tiền | Tao ma lum dong tien
Tạo má lúm đồng tiền | Tao ma lum dong tien
 
Cap4
Cap4Cap4
Cap4
 
2 ai i_2_4wire_hf_manual_en-us
2 ai i_2_4wire_hf_manual_en-us2 ai i_2_4wire_hf_manual_en-us
2 ai i_2_4wire_hf_manual_en-us
 
Etapa indigena
Etapa indigenaEtapa indigena
Etapa indigena
 
Innovation Leadership in Education
Innovation Leadership in Education Innovation Leadership in Education
Innovation Leadership in Education
 
LOISTO-palvelu
LOISTO-palveluLOISTO-palvelu
LOISTO-palvelu
 
Resume retr 2015
Resume retr 2015Resume retr 2015
Resume retr 2015
 
Ken Wagner QA-Safety Resume
Ken Wagner QA-Safety ResumeKen Wagner QA-Safety Resume
Ken Wagner QA-Safety Resume
 
Saling Menasehati
Saling MenasehatiSaling Menasehati
Saling Menasehati
 
Contoh desain kartu nama kreatif
Contoh desain kartu nama kreatifContoh desain kartu nama kreatif
Contoh desain kartu nama kreatif
 

Similar to Mick Lovett Resume 2015

Similar to Mick Lovett Resume 2015 (20)

TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015
 
RESUME-Sijin
RESUME-SijinRESUME-Sijin
RESUME-Sijin
 
SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)
 
1.0 RESUME S SITTNER 2017
1.0 RESUME S SITTNER 20171.0 RESUME S SITTNER 2017
1.0 RESUME S SITTNER 2017
 
cv17 uk
cv17 ukcv17 uk
cv17 uk
 
Derek swift cv_2016
Derek swift cv_2016Derek swift cv_2016
Derek swift cv_2016
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEER
 
Resume shyamal kr sahu-
Resume shyamal kr sahu-Resume shyamal kr sahu-
Resume shyamal kr sahu-
 
Larry Finley Resume
Larry Finley ResumeLarry Finley Resume
Larry Finley Resume
 
CV_PARTHA_PRATIM_GORAIN_18th_dec_2015
CV_PARTHA_PRATIM_GORAIN_18th_dec_2015CV_PARTHA_PRATIM_GORAIN_18th_dec_2015
CV_PARTHA_PRATIM_GORAIN_18th_dec_2015
 
dean resume (1)
dean resume (1)dean resume (1)
dean resume (1)
 
Zakir cv (latest 1)
Zakir cv (latest 1)Zakir cv (latest 1)
Zakir cv (latest 1)
 
Raymond Guo 2016
Raymond Guo 2016Raymond Guo 2016
Raymond Guo 2016
 
Aneesh sidharthan QC Inspector civil with 9-years exp.. (1) (1)
Aneesh sidharthan QC Inspector civil with 9-years exp.. (1) (1)Aneesh sidharthan QC Inspector civil with 9-years exp.. (1) (1)
Aneesh sidharthan QC Inspector civil with 9-years exp.. (1) (1)
 
A P Rolfe CV March 2016
A P Rolfe  CV March 2016A P Rolfe  CV March 2016
A P Rolfe CV March 2016
 
Shailendra_Kumar_Resume_V01__1_
Shailendra_Kumar_Resume_V01__1_Shailendra_Kumar_Resume_V01__1_
Shailendra_Kumar_Resume_V01__1_
 
Curriculum Vitae lim
Curriculum Vitae limCurriculum Vitae lim
Curriculum Vitae lim
 
RESUME_25_09_16
RESUME_25_09_16RESUME_25_09_16
RESUME_25_09_16
 
Resume - Alden Onoya
Resume - Alden OnoyaResume - Alden Onoya
Resume - Alden Onoya
 
CV
CVCV
CV
 

Mick Lovett Resume 2015

  • 1. QA Manager - Inpex BLD-1 Operations Buildings I am currently employed as the Quality Assurance Manager and Workplace Health and Safety Officer for a leading Electrical Contracting Company on prominent Oil and Gas project. I have an engineering trade background with job planning, procurement and supervising experience. My construction background and experience stems from over a decade in the electrical industry with a key focus on Oil and Gas. I am motivated and thrive in challenging areas of responsibility and have an ability to learn quickly and adapt to new and multiple roles. Key Strengths: Multi-skilling and Multitasking. Reliable with an impeccable work ethic and attendance record. Communication, relationship building, negotiation & interpersonal skills. Team player with a great rapport with piers. Proven ability to adapt & allocate resources to produce results. Key Professional Assets: Extensive experience in Oil and Gas projects. Pre-commissioning, commissioning and completion processes. Procedures and Policy documentation. Project documentation and deliverables. Experience with a great number of trades with an understanding of time allocation and planning. Understanding of construction drawings and the relevant processes involved in the industry. Strong Computer skills, Microsoft Word; Excel, Power point, Project, Visio, Adobe Acrobat, Photoshop, Corel Draw, Auto Cad, Revit Design. Key Areas of Competency Quality assurance in accordance with 9001 accreditation. Project Management and Contract Administration. Workplace Health & Safety & industrial Relations. Rehabilitation and Return to Work Coordination. Internal Auditing. Policy and procedure writing. Management of small specialised teams. Contact Details Micheal Lovett 30 Clark Terrace Sandstone Point QLD 4511 Phone: (07) 5429 5265 Mobile: 0411 742 095 Email: micheal.lovett@bigpond.com Qualifications • Trade Certificate Electrical Fitter • Certificate IV in OH&S • Certificate IV in Frontline Management • Workplace Health and Safety Officer (Construction) • Rehabilitation and & Return to Work Coordinator • Internal Auditor Referees • Mark Warner Project Manager. AES Mobile 0408 844 596 • Colin Lovett Project Manger UGL Tel 0458 981 160
  • 2. QA Manager - Inpex BLD-1 Operations Buildings Recent Relevant Experience November 2014 to Present Applied Electro Systems Quality Manager CPB Contractors (Formally Leightons Contractors) – Inpex BLD-1 Operations Buildings • Design Review – Specification and Standard Compliance • Development of commissioning documentation • Management of deliverables – MDR, IOM’s, As Built Drawings • Reviewing of Quality documentation and procedures • Inspection Test Plans submissions and updates • Management of Punch List Items • Surveillance of commissioning processes • HA Dossier compilation and submission • FAT and SAT documentation and inspection processes • Attendance to all off-site FAT by Switch Board Manufacturer • Management of Equipment register • Manager the compilation of the Project Commissioning Spares. • Manager the compilation of the Operational Spares. • Collate and prepare packs for ITR completion. • Attend pre inspections • Attend and facilitate inspections • Safe Work Method Statements September 2012 to November 2014 Applied Electro Systems Quality Manager Supervisor WHSO and Return to Work Coordinator John Holland – Wheatstone construction Village Project • Design Review – Specification and Standard Compliance • RFI management • Development of commissioning documentation • Management of deliverables – MDR, IOM’s, As Built Drawings • Reviewing of Quality documentation and procedures • Inspection Test Plans submissions and updates • Management of Punch List Items • Surveillance of commissioning processes • HA Dossier compilation and submission • FAT and SAT documentation and inspection processes • Attendance to all off-site FAT by Switch Board Manufacturer • Management of Equipment register. • Manager the compilation of the Project Commissioning Spares. • Manager the compilation of the Operational Spares. Submit for approval and procure • Collate and prepare packs for ITR completion. • Attend pre inspections • Attend and facilitate inspections • Safe Work Method Statements February 2012 to September 2012; Applied Electro Systems Contracts Administrator WHSO and Return to Work Coordinator QA Officer John Holland – Gorgon NPI Administration Buildings • Claim Submissions, SI and CD reporting • Contract Notices, submissions and monitoring • Design Review – Specification and Standard Compliance • RFI management • Development of commissioning documentation • Management of deliverables – MDR, IOM’s, As Built Drawings • Reviewing of Quality documentation and procedures • Inspection Test Plans submissions and updates • Management of Punch List Items • Surveillance of installation processes • HA Dossier compilation and submission
  • 3. QA Manager - Inpex BLD-1 Operations Buildings • Collate and prepare packs for ITR completion. • Attend pre inspections • Attend and facilitate inspections • Safe Work Method Statements submissions and approvals May 2008 to 2012; Q Electrical Services Safety Manager WHSO and Return to Work Coordinator QA Manager Leighton Contractors – 111 Eagle St, QUT and ABC Leighton Contractors - Green Square North Tower (6 Star Greenstar Office Design and As Built (First in QLD)) Leighton Contractors - Green Square South Tower 5 Star Greenstar Office Design and As Built Hutchinson Builders - North Bridge 6 Star Greenstar Office Design Leighton Contractors - Leighton HQ 6 Star Greentsar Office Design, As Built and Integrated Fitout FKP Property Group - Energex 6 Star Greenstar Office Design and As Built Bovis Lend Lease – Santos Place 6 Star Office Design and As Built Leighton Contractors – Amberley Air Base Super Hornets ⋅ Safety plans ⋅ Safe Work Method Statements ⋅ QA Manuals (Project Specific) ⋅ Commissioning Plans ⋅ Greenstar Coordination and management ⋅ Internal Auditing ⋅ Policy and Procedure implementation ⋅ Incident investigation ⋅ Rehabilitation Management May 2008 to 2012; Applied Electro Systems Safety Manager WHSO and Return to Work Coordinator QA Manager John Holland – Amberley Air Base Fuel Farm 2A Baulderstone Hornibrook – Amberley Waste Collection Tanks BP Petroleum – Goodna, Nerang, Reliance Cairns ⋅ Safety plans ⋅ Safe Work Method Statements ⋅ QA Manuals (Project Specific) ⋅ Commissioning Plans ⋅ Greenstar Coordination and management ⋅ Internal Auditing ⋅ Policy and Procedure implementation ⋅ Incident investigation ⋅ Rehabilitation Management May 2008 to 2012; Image EFX WHSO and Return to Work Coordinator QA Officer Hutchinson Builders – Airlie F Building Boat House Transfield – Air train Digital Signage ⋅ Safety plans ⋅ Safe Work Method Statements ⋅ QA Manuals (Project Specific) ⋅ Commissioning Plans ⋅ Greenstar Coordination and management ⋅ Internal Auditing ⋅ Policy and Procedure implementation ⋅ Incident investigation ⋅ Rehabilitation Management
  • 4. QA Manager - Inpex BLD-1 Operations Buildings Previous Career Roles May 2007 to May 2008 Image EFX Purchasing Officer and Estimator Gaming Signage, Specialised Lighting, refurbishment and construction ⋅ Job costing/ quotations ⋅ Management of suppliers and subcontractors ⋅ Product design coordination ⋅ Research and development of new products and materials ⋅ Coordination of deliveries local, interstate and overseas 2000 – 2007 Image EFX Site Foreman Gaming Signage, Specialised Lighting, refurbishment and construction ⋅ Installation Foreman ⋅ Specialised lighting installation and maintenance ⋅ Signage installation and maintenance ⋅ Small building works and refurbishment ⋅ Signage construction, including aluminium welding and electrical wiring 1993 – 2000 Signtel Workshop Foreman Signage, Specialised Lighting, Structural Steel, Printing ⋅ Manufacturing and Installation Foreman ⋅ Procurement ⋅ Industrial Design ⋅ Specialised Trades ⋅ Electrical – signage ⋅ Led automation ⋅ Neon Lighting – installation and manufacturing ⋅ Aluminium welding – Tig and Mig ⋅ Structural Steel welding and fabrication ⋅ 2K Spray painting ⋅ Furniture manufacturing – wood and stainless steel ⋅ Screen Printing ⋅ Vacuum Forming I am a firm believer in treating people how you would like to be treated. Common courtesy and decency are not negotiable. Communication is the key to any relationship. Where possible, I like face to face interaction rather than telephone or email. Clear, concise, unambiguous communication is the foundation to a healthy working relationship between management and staff.