SlideShare a Scribd company logo
1 of 9
Download to read offline
 
Jose G. Ballesteros, Jr. 
Blk   9,   Lot   13   Betel   Palm   St.,   Whispering   Palms   Subd.   Novaliches,   Caloocan  
Date   of   Birth:   May   16,   1958 
Cellular   No.:   +639952444121  
 
Professional Proꝶ뚰le 
 
● A   professional   with   vast   knowledge   and   experience   in   Power   Plant   Operation   and 
Commissioning,   HVAC   and   Fire   Fighting   and   Suppression   System   Commissioning, 
seeking   a   challenging   position   in   an   organization   with   an   excellent   career   growth 
 
● Performance­driven   leader   with   extensive   Mechanical   Engineer   experience 
● Abstract   thinker,   capable   of   translating   complex   concepts   into   simple   ideas 
● Proactive   self­starter   with   a   proven   track   record   of   exceeding   work   expectations   and 
delivering   results 
 
[ 
Professional Experience 
 
Commissioning   Engineer,   Consultant   (MEP   Project)  
Energo   Projekt   Consortium. 
Qatar   Substations   Project. 
Feb   17,   2008   ­   present  
 
Scope   of   Work: 
●     Review   Tender   and   Technical   Specification   to   ensure   Contractors   compliance. 
● Safety   coordination   prior   to   commissioning   to   ensure   a   safe   working   condition 
●    Responsible   in   inspection   /   installation   of   ducting   to   ensure   that   materials   used   conforms 
to   technical   specs. 
● Liaise   with   contractors   on   the   schedule   of   Inspection   and   RFI   issuance. 
●    Direct   supervision   of   HVAC   installation   Pre­commissioning   and   commissioning   job,   like 
operation   interlocking   with   fire   fighting   system,   Air   Balancing,   Battery   Charger   exhaust 
system   and   controls   to   ensure   accurate   function   of   all   system. 
● In   charge      in   the   installation   inspection   and   load   test   of   EOT   cranes. 
● Ensure   that   all   mechanical   Jobs,   materials,   and   Installation,   Testing   and   Commissioning 
of   equipments   are   all   in   accordance   with   the   codes   and   standards   like,   ASHRAE,   CIBSE 
and   other   codes   and   standard. 
● Ensure   that   all   codes   and   standards   pertaining   to   erection   and   operation   are   strictly 
adhered   to. 
●    Supervise   in   the   Fastening   of   all   ducting   to   ensure   that   support   and   all   HVAC 
Jose   G.   Ballesteros,   Jr. 
ResumePage   1 
 
 
components   are   in   place. 
●    Ensure   that   commissioning   /   pre   commissioning   procedures   are   strictly   followed, 
functionality   check   and   operational   standard   is   ensured. 
●    Review   designs   and   make   modification   if   needed. 
● Ensure   that   the   contractors   adhere   to   the   contractual   specification   and   technical  
   Specification   as   well.  
●    Issue   Non   Conformance   letter,   if   necessary. 
●    Generate   punch   list   on   the   defects   in   construction   and   commissioning   and   ensure 
rectification   is   being   acted   upon   in   the   soonest   possible   time. 
● Review   As   Built   Drawings,   Materials   Submittals   and   Pre­qualification   documents.   Any 
out   of   specification   is   outright   corrected   to   avoid   time   wasted. 
● Conduct   regular   meeting   with   contractors   to   update   on   work   progress   of   the   project. 
● Making   report   and   update   of   work   progress   on   a   daily   basis   for   record   purposes   to   the 
Manager. 
 
Process   and   Utilities   Pre­Commissioning   and   Commissioning   Engineer 
National   Iranian   Oil   Company  
Consortium   of   JGC,   Chiyoda   and   Toyo 
South   Pars   Gas   Field   Development  
Phase   6,   7   and   8   Onshore   Facility.  
Assaluyeh      Site   Iran 
November   20,   2007   ­   Feb   2,   2008  
   (OFF   SITE) 
 
Duties   and   Responsibilities:  
●    Identify   Hazards   in   the   area   prior   to   commencement   of   work   like,   flammable         gas, 
presence   of   H2S   and   other   toxic   gases. 
● Supervise   all   the   activities   related   to   Pre   commissioning   and   commissioning   of   every   test 
block   like   water   flushing   and   air   blowing   of   Propane   Rundown,   Propane   Loading   Vapor 
Return,   and   Propane   Recirculation,   ensuring   that   all   blocks   are   ready   for   the   gas   in. 
● Direct   supervision   of   leak   checking   of   pipes   by   using   soap   solution   and   masking   tapes   to 
detect   the   point   of   leakage.  
● Leak   test   block   for   Propane   Rundown,   Propane   Loading   Vapor   return,   Propane 
Recirculation   and   any   leakage   detected   is   to   be   rectified   accordingly. 
● Leak   test   for   BOG   Compressors   Suction   and   Discharge   and   Exchangers   as   well. 
● Leak   check   for   Butane   Rundown,   Butane   Loading   and   Vent   Condenser   and   Butane 
Recirculation.  
● Leak   check   for   HP,   MP   and   LP   Propane   Refrigerant   System  
● Ensure   that   all   pipes   and   coolers   are   leak   free   prior   to   boxing   up.  
Jose   G.   Ballesteros,   Jr. 
ResumePage   2 
 
 
● Supervise   in   the   commissioning   of   the   flair   stacks. 
● Supervise   in   the   test   run   of   compressors   and   blowers   to   ensure   smooth   operation   and   all 
the   technical   data   is   meet   accordingly.  
● Supervise   in   the   inerting   of   the   system   piping   and   equipment   to   ensure   that   system   or   unit 
which   handles   hydrocarbon   or   combustible   materials   is   oxygen   or   air   free   prior   to 
introduction   of   combustible   material   into   a   system   or   unit. 
● Supervise   in   monitoring   the   introduction   of   hydrocarbon   from   platform   to   main   plant. 
● Making   progress   report   on   every   block   completed   to   monitor   daily   progress. 
● Organise   meeting   with   concerned   department   to   be   updated   on   project   development. 
 
 
 
 
Commissioning   Engineer    (CONSULTANT) 
Kuljian   Consulting   Engineers  
SEC­WR   Power   Project,   Shoaiba,   Jeddah   K.S.A  
October   18,   2005   ­   October   20,   2007  
6   X   400   mw   Alstom   Boilers   /   Alstom   Turbine   Generator   oil   fired  
2   X   129   t/h   @   90tbt   désaliénation   plant  
6   X   135   m3/h   @   9,700   A   Chlorination   house  
3   train   of   Demineralization   plant  
 
Duties   and   Responsibilities:  
● Proper   coordination   with   the   safety   officer   prior   to   commencement   of   commissioning 
to   ensure   a   safe   working   environment. 
● Coordinate   with   the   contractors   on   the   scheduled   inspection   and   issuance   of   RFI   to 
avoid   conflict   in   inspection   schedule. 
● Responsible   for   commissioning   of   boilers,turbines   and   auxiliaries   to   ensure   that   all 
equipment   are      operating   according   to   standard   parameters   requirement   and 
performance,   like   fans,   boiler   feed   pumps   and   compressors. 
● Responsible   in   the   commissioning   of   Steam   Turbines   like   controls,   alarms, 
interlocks,   trip   tests,   turbine   protections   to   ensure   that   the   operating   requirement   is 
being   followed. 
● Responsible   in   witnessing   in   the   functional   test,   valve   tightness   test   and   checking   on 
the   transducer   in   every   point   of   the   Steam   Turbine   to   ensure   that   accurate   signal   to 
the   main   control   room   is   received. 
● Responsible   in   all   testing   required   at   the   control   room   like,   run   back   test,   Load 
rejection,   Reverse   power,   Turbine   trip   etc. 
● Conduct   regular   meeting   with   contractor   to   ensure   that   Testing   and   commissioning   of 
all   equipment   is   on   time   and   inspection   of   all   construction   related   job   like   inspection 
of   wastewater   construction,Distillation   plant   erection   inspection   and   commissioning 
Jose   G.   Ballesteros,   Jr. 
ResumePage   3 
 
 
and   all   water   related   construction   job   to   ensure   a   perfect   completion   according   to 
required   specification   and   codes. 
● Generate   Punch   list   and   NCR’s   when   required. 
● Oversee   the   Flushing   of   all   the   pipes   associated   with   the   process. 
● Witness   and   Direct   the   Water   Flushing,   Steam   Blowing,   Hydro   Testing   and   air 
blowing   to   ensure   the   cleanliness   of   the   pipes   and   free   of   foreign   materials   prior   to 
boxing   up   or   inerting. 
● Responsible   for   commissioning   of   3x   129   t/h   @   90TBT   Desalination   plant   and 
Reliability   test   run   and   Performance   test   and   close   monitoring   on   distilled   outlet   for 
pure   distilled   water   result. 
● Conduct   inspection   of   completed   construction   of   wastewater   and      commissioning   of 
wastewater   treatment   plant   and   neutralization   system   to   ensure   that   the   effluent   is 
environmental   friendly   prior   to   effluent   disposal   to   be   environmentally   friendly.  
● Responsible   for   chlorination   plant   commissioning,   reliability   run   and   performance 
test   to   ensure   sufficient   supply   of   chlorinated   water   to   avoid   accumulation   of   algae   at 
the   intake.  
● Conduct   inspection   on   the   installation   and   commissioning   of   fire   fighting   and 
detection   system   /   dry   and   wet,   FM   200,   deluge   system,   preaction   sprinklers   and 
foam   system.  
                  Ensure   that   all   firefighting   equipment   are   U.L   listed   and   in   accordance   with   
                                                            the   N.F.P.A   codes   and   standards. 
● Responsible   for   commissioning   of   Demin   Plant   and   condensate   polishing   system   to 
ensure   an   acceptable   quality   of   boiler   water   thru   acceptable   PH,   conductivity,   and 
silica   measurement.  
● Responsible   for   witness   points   where   required   to   confirm   operational   status   of   all 
equipment   and   logic   are   strictly   followed.  
●    Responsible   for   commissioning   of   all   compressors.  
●    Responsible   for   all   equipment   heat   run   test,   sequence   test   and   ensure   that   all 
instrumentation   and   controls   are   working   to   the   desired   parameters.  
●    Responsible   for   protection   and   logic   testing   and   tuning   to   ensure   a   smooth   operation 
of   all   equipment.  
●     Responsible   for   function   group   tests,   open   and   close   loop   check,   and   burner   tuning 
witnessing   and   boiler   parts   function   witnessing   like   wind   box   dampers.  
●    Direct   supervision   of   the   installation   of   HVAC   ducting   to   ensure   that   support   and 
ducting   thickness   requirement   are   in   accordance   to   required   specs   as   per   standard   and 
codes.(ASHRAE) 
●    Ensure   that   diffusers,   grills   Motorized   and   manual         volume   control   dampers   are 
properly   adjusted   to   meet   the   air   volume   requirement. 
●    Direct   supervision   in   the   air   balancing   of   the   unit. 
● Direct   supervision   in   the   commissioning   of   the   unit   to   ensure   that   all   interlock   and 
operation   logic   are   perfectly   adhered. 
Jose   G.   Ballesteros,   Jr. 
ResumePage   4 
 
 
●    Responsible   for   commissioning   of   8X250   Tons   Chiller   type   HVAC   system   10   units 
of   50   Tons   Split   and   Package   type   Units   and   20   Units   of   Air   handling   (   Ventilating 
System   )   units   in   the   whole   power   plant   and   ROP   buildings.  
●    Responsible   for   turbine   protection   test,   tightness   test,   and   other   test   required.  
●    Coordinates   with   client   and   contractors   as   well   for   commissioning   schedules,   system 
walk   down   to   ensure   that   Plant   defects   and   other   requirement   as   per   codes   and 
standards   are   properly   addressed. 
 
Commissioning   Engineer   /   Operation   Staff  
Sembcorp   Utilities   and   Terminals  
Pulau   Sakra,   Singapore 
1997   ­   2004  
3   x   350mw   MHI   boilers   oil   fired  
 
Duties   and   Responsibilities:  
● Proper   coordination   with   safety   officer   to   ensure   that   hazards   are   eliminated   prior   to 
commencement   of   commissioning   of   boiler   (confined   space) 
● Responsible   for   commissioning   of   boilers   and   all   auxiliaries.  
● Responsible   in   the   start   up   and   commissioning   of   the   Turbine   like,   Turbine   protection, 
Turbine   trip   test,   interlocks   and   checking   all   Turbine   sensors   for   accurate   reading   at   the 
control   room. 
● Responsible   for   commissioning   of   chillers,   sea   water   pumps,   chlorination   package   and 
close   cooling   water   pumps   to   ensure   that   all   supply   requirements   of   customers   are   strictly 
adhered   to   as   per   protocol.  
● Direct   supervision   of   HVAC   erection   and   commissioning. 
● Responsible   for   commissioning   of   150   Tons   Chiller   type   HVAC,   Split   type   and   package 
type   units   and   Air   handling   unit   in   the   power   station.  
● incharge   startup   and   shutdown   of   boilers   and   auxiliaries   equipment.  
● Supervision   in   the   Natural   gas   receiving   terminal   and   operation   thru   nomination 
requested   by   end   user   thru   SCADA   to   determine   requested   gas   volume   in   BBtu.  
● In­charge   in   the   startup   of   water   bath   boilers   and   changeover   of   cyclone   filters,   to   ensure 
the   heat   requirement   by   the   end   user   is   met   and   hydro   carbon   is   eliminated   in   the   gas 
path.  
● Close   supervision   of   manpower   in   patrolling   all   gas   pipe   line   to   ensure   that   leak   is 
addressed   (if   any)   without   delay.  
● Direct   Supervision   in   the   operation   of   Ethylene   Plant   and   coordination   from   end   user   in 
receiving   the   Propane   gas.  
● Responsible   of   the   commissioning   of   Fire   fighting   system   like,   Deluge   system,   FM   200 
and   Foam   system   within   the   Power   station.  
● Manage   manpower   in   all   departments   of   the   utilities   like,   water,   waste   water,   steam, 
Jose   G.   Ballesteros,   Jr. 
ResumePage   5 
 
 
ethylene   plant   and   Natural   Gas   receiving   facility. 
 
 
● Incharge   in   the   operation   of   wastewater   system,   and   maintaining   effluent   discharge 
according   to   environmental   requirement   of   singapore   government. 
● Maintain   chemical   injection   on   the   wastewater   tank   to   keep   bacteria   according   to 
requirement. 
 
 
Commissioning   Engineer  
Ishikawa­Jima­Harima   (IHI)  
Pulau   Seraya,   Singapore 
Period   :   From   1996   to   1997  
6   x   400   mw   IHI   boilers   oil   fired  
 
Duties   and   Responsibilities: 
●    Check   that   all   rotating   equipment   is   properly   lubricated   prior   to   commissioning.  
●    Responsible   for   commissioning   of   boilers,   compressors,   pumps   and   other   related 
auxiliaries   to   ensure   a   reliable   and   efficient   operation.  
●    Test   all   auxiliaries   and   rotating   equipment   is   operating   according   to   standard,   like 
suction   and   discharge   pressure,   temperature   and   vibration   are   within   the   tolerance.  
● Responsible   in   the   commissioning   of   Boiler   and   Steam   Turbines. 
● Attend   to   all   testing   required   in   the   control   room      like   Runback   Test,   Fast   Cut   back,   load 
rejection   Reverse   Power   etc. 
 
  
Commissioning   /   Operation   Staff  
Cepatileman   Proj.   Mngt,   Corp.  
Pagbilao   Quezon,   Philippines  
Period   :   1992   to   1996  
3   x   375   mw   MHI   Boilers   Coal   Fired   Power   Plant  
Turbine   Generator:   Westinghouse  
 
Duties   and   Responsibilities:  
● Perform   the   startup   and   shutdown   and   all   commissioning   requirements   of   the   boilers   and 
Steam   Turbines   at   the   control   room. 
● Assist   in   the   inspection   of   erection   of   coal   conveyors   to   ensure   reliability   during   the 
transport   of   coal   from   coal   yard   to   silos. 
● Assist   in   the   inspection   of   precipitator   construction   and   all   BOP   equipment   installation. 
Jose   G.   Ballesteros,   Jr. 
ResumePage   6 
 
 
● Coordination   and   safety   and   efficient   process   of   commissioning   of   all   piping,   motors, 
pumps,   generators,   and   other   equipment   within   the   power   station.  
●    Maintain   the   oil   level   of   all   the   equipment,   which   is   under   commissioning.  
●    Monitoring   of   all   equipment   at   the   time   it   started   for   the   vibration,   noise   level, 
temperature   and   ensures   that   all   parameters   will   not   go   beyond   tolerable   limits.  
●    Ensure   that   bearing   cooling   water   has   a   continuous   flow   by   ensuring   that   all   valves   are 
normally   set.  
●    Install   gauges   on   pumps   and   motors   to   check   on   changes   on   temperature   for   provable 
misalignment.  
●    Cool   down   the   pump   or   equipment   to   re­check   and   confirm   the   shaft   eccentricity 
specially   the   steam   turbine.  
●    Responsible   for   hydro   testing,   steam   blowing,   water   and   air   flushing   of   various   lines   by 
setting   the   valves   to   a   prescribed   limit   of   opening   and   conducting   inspection   on   various 
lines   while   the   test   is   ongoing   to   ensure   a   safe   and   efficient   commissioning.  
●    Responsible   for   coal   yard   operation   and   other   related   equipment   like   reclaimer, 
pulveriser,   and   ball   mill. 
● Responsible   in   the   commissioning   of   all   Fire   Fighting   System   in   the   whole   Power 
Station,   like,   Deluge   system,   foam   system   and   Sprinklers   system.  
● Responsible   in   the   commissioning   of   200   ton   HVAC   Chilled   water   type,   5x100   ton   Split 
type   units   and   8x50   tons   of   package   type   units   and   all   Air   handling   units   (Ventilating 
units).  
 
 
 
 
 
 
 
 
 
 
Commissioning   /   Operation   Staff  
Resource   Sciences   Arabia   Limited  
Yanbu   Al­Sinaiyah   KSA 
Period   :   from   1990   to   1992  
3   x   150   mw   Steam   Turbine   and   MHI   boilers 
  
Duties   and   Responsibilities:  
● Coordination   and   safety   and   efficient   process   of   commissioning   of   all   piping,   motors, 
pumps,   generators,   and   other   equipment   with   n   the   power   station.  
Jose   G.   Ballesteros,   Jr. 
ResumePage   7 
 
 
● Responsible   for   boiler   start   up,   shut   down   and   monitoring   of   all   operating   equipment   with 
in   the   area   of   responsibility.  
●    Report   all   abnormalities   to   the   Shift­Charge   Engineer  
● Responsible   for   start   up   and   monitoring   of   desalination   plant   to   ensure   sufficient   flow 
requirement   to   the   customers.  
 
Operation   Staff  
Kafou   Corporation  
SCECO­SOUTH   POWER   PROJECT  
ABHA   KHAMIS   MUSHYAT,   KSA 
Period   :   1986   to   1987  
6   x   20   mw   MAN   Diesel   Gen   and   5   x   60mw   Gas   Turbine 
  
Duties   and   Responsibilities: 
●    Responsible   for   all   start   up   and   commissioning   of   the   plant  
●    Responsible   for   proper   isolation,   lubrication   of   all   equipment   and   other   related 
operational   function   outside   the   control   room.  
●    Assist   in   the   proper   inspection   of   all   equipment   and   auxiliaries,   lines   and   various 
systems   with   in   the   area   of   responsibility.  
 
Operation   Staff  
National   Power   Corporation  
Sucat   Thermal   Power   Plant,   Philippines  
Period   :   1978   to   1979  
Sucat   I   160mw   thermal   plant   Press:   1800psig  
Boiler:   Hitachi   Japan,   Turbine   Gen:   General   Electric  
Sucat   II:   200mw   Press:   2700psig  
Sucat   III   200mw   Press:   2700psig 
  
Duties   and   Responsibilities: 
●    Responsible   for   all   start   up   and   shut   down   of   the   plant   on   the   field  
●    Responsible   for   proper   isolation,   lubrication   of   all   equipment   and   other   related 
operational   function   outside   the   control   room.  
 
● Assist   in   the   proper   inspection   of   all   equipment   and   auxiliaries,   lines   and   various   systems 
within   the   area   of   responsibility. 
● Conduct   hourly   reading   of   all   equipment   parameters   to   ensure   a   smooth   operation  
 
 
 
Jose   G.   Ballesteros,   Jr. 
ResumePage   8 
 
 
Education 
 
Bachelor   of   Science,   Mechanical   Engineering 
Feati   University,   Philippines 
1978   ­   1984 
 
 
References 
 
Roy   Mascarenias 
Site   Engineer 
Energo   Projekt   Entel 
Doha,   Qatar 
(974)555­47184 
 
Gilbert   Magallon 
Site   Supervisor 
Energo   Projekt   Entel 
Doha,   Qatar 
(974)558­14438 
 
 
 
Jose   G.   Ballesteros,   Jr. 
ResumePage   9 
 

More Related Content

What's hot

What's hot (19)

William keane. 03.25.2016 final
William keane. 03.25.2016 finalWilliam keane. 03.25.2016 final
William keane. 03.25.2016 final
 
Nguyen Van Tuan - English
Nguyen Van Tuan - English Nguyen Van Tuan - English
Nguyen Van Tuan - English
 
DCP_RESUME
DCP_RESUMEDCP_RESUME
DCP_RESUME
 
BotelloR_Projects
BotelloR_ProjectsBotelloR_Projects
BotelloR_Projects
 
F. CV
F. CVF. CV
F. CV
 
CV - MEP Inspector Engineer Froilan Ramos Balanao
CV -  MEP Inspector Engineer  Froilan Ramos BalanaoCV -  MEP Inspector Engineer  Froilan Ramos Balanao
CV - MEP Inspector Engineer Froilan Ramos Balanao
 
Rick Stinnett Resume
Rick Stinnett ResumeRick Stinnett Resume
Rick Stinnett Resume
 
Syed C.V
Syed C.VSyed C.V
Syed C.V
 
Totie Laurel CV
Totie Laurel CVTotie Laurel CV
Totie Laurel CV
 
Resume 08--Earl Victor -
Resume 08--Earl Victor -Resume 08--Earl Victor -
Resume 08--Earl Victor -
 
CV ROBIN JACOB
CV ROBIN JACOBCV ROBIN JACOB
CV ROBIN JACOB
 
Tony resume 30 jan16
Tony resume 30 jan16Tony resume 30 jan16
Tony resume 30 jan16
 
Final_Resume Abdul Jameel
Final_Resume Abdul JameelFinal_Resume Abdul Jameel
Final_Resume Abdul Jameel
 
Eng Raeed Senior Security System Engineer
Eng Raeed Senior Security System EngineerEng Raeed Senior Security System Engineer
Eng Raeed Senior Security System Engineer
 
ANGELA LOPEZ - CV - Civil, Environmental & Sustainability Engineer
ANGELA LOPEZ - CV - Civil, Environmental  & Sustainability EngineerANGELA LOPEZ - CV - Civil, Environmental  & Sustainability Engineer
ANGELA LOPEZ - CV - Civil, Environmental & Sustainability Engineer
 
CV Update March 13 External final
CV Update March 13 External finalCV Update March 13 External final
CV Update March 13 External final
 
Zakir cv
Zakir cvZakir cv
Zakir cv
 
Zakir cv
Zakir cvZakir cv
Zakir cv
 
resume 2014
resume 2014resume 2014
resume 2014
 

Viewers also liked

Power futbol
Power futbolPower futbol
Power futboltorreman1
 
Decidamos en favor de los salvadoreños y el desarrollo del país
Decidamos en favor de los salvadoreños y el desarrollo del paísDecidamos en favor de los salvadoreños y el desarrollo del país
Decidamos en favor de los salvadoreños y el desarrollo del paísFUSADES
 
The Forgotten Majority: Mapping the Civilian Fatalities of the 1916 Rising
The Forgotten Majority: Mapping the Civilian Fatalities of the 1916 RisingThe Forgotten Majority: Mapping the Civilian Fatalities of the 1916 Rising
The Forgotten Majority: Mapping the Civilian Fatalities of the 1916 RisingHannah Smyth
 
Global Markets Presentation
Global Markets PresentationGlobal Markets Presentation
Global Markets PresentationLeah Vaughn
 
Power poin de practica docente ong.
Power poin de practica docente ong.Power poin de practica docente ong.
Power poin de practica docente ong.Moni Mendez
 
Fiesta nacional de la pachamama
Fiesta nacional de la pachamamaFiesta nacional de la pachamama
Fiesta nacional de la pachamamaNahuel Iunes
 
CV - RWS Updated Nov 2016
CV - RWS Updated Nov 2016CV - RWS Updated Nov 2016
CV - RWS Updated Nov 2016Rosalind Sutch
 
Magic premio innova s@lute2016 pubblica
Magic premio innova s@lute2016 pubblicaMagic premio innova s@lute2016 pubblica
Magic premio innova s@lute2016 pubblicaRoberto Penna
 
Red de computadoras
Red de computadorasRed de computadoras
Red de computadorasjjab97
 
Practica con CamStudio martha castrillon
Practica con CamStudio   martha castrillonPractica con CamStudio   martha castrillon
Practica con CamStudio martha castrillonMartha Castrillón
 
Profel Clima municipios
Profel Clima municipiosProfel Clima municipios
Profel Clima municipiosprofel
 
Señoritas 16
Señoritas 16Señoritas 16
Señoritas 16jossa20
 
Reg clase i y clase ii 2012
Reg clase i y clase ii 2012Reg clase i y clase ii 2012
Reg clase i y clase ii 2012pacho_rocha
 
PRESENTACION DE OFFICE
PRESENTACION DE OFFICEPRESENTACION DE OFFICE
PRESENTACION DE OFFICENorelhilary
 
9 28setiembre2016 proceso_cas_254_2016_un_profesional_administrativo_agebre
9 28setiembre2016 proceso_cas_254_2016_un_profesional_administrativo_agebre9 28setiembre2016 proceso_cas_254_2016_un_profesional_administrativo_agebre
9 28setiembre2016 proceso_cas_254_2016_un_profesional_administrativo_agebrevictorino aaa
 
26.10.2016_Pernod Ricard Rouss, Андрей Данилов & Мария Злобина
26.10.2016_Pernod Ricard Rouss, Андрей Данилов & Мария Злобина26.10.2016_Pernod Ricard Rouss, Андрей Данилов & Мария Злобина
26.10.2016_Pernod Ricard Rouss, Андрей Данилов & Мария ЗлобинаTraffic Isobar
 

Viewers also liked (20)

Power futbol
Power futbolPower futbol
Power futbol
 
Decidamos en favor de los salvadoreños y el desarrollo del país
Decidamos en favor de los salvadoreños y el desarrollo del paísDecidamos en favor de los salvadoreños y el desarrollo del país
Decidamos en favor de los salvadoreños y el desarrollo del país
 
The Forgotten Majority: Mapping the Civilian Fatalities of the 1916 Rising
The Forgotten Majority: Mapping the Civilian Fatalities of the 1916 RisingThe Forgotten Majority: Mapping the Civilian Fatalities of the 1916 Rising
The Forgotten Majority: Mapping the Civilian Fatalities of the 1916 Rising
 
Espacio contenido
Espacio contenidoEspacio contenido
Espacio contenido
 
Global Markets Presentation
Global Markets PresentationGlobal Markets Presentation
Global Markets Presentation
 
Power poin de practica docente ong.
Power poin de practica docente ong.Power poin de practica docente ong.
Power poin de practica docente ong.
 
Fiesta nacional de la pachamama
Fiesta nacional de la pachamamaFiesta nacional de la pachamama
Fiesta nacional de la pachamama
 
CV - RWS Updated Nov 2016
CV - RWS Updated Nov 2016CV - RWS Updated Nov 2016
CV - RWS Updated Nov 2016
 
Magic premio innova s@lute2016 pubblica
Magic premio innova s@lute2016 pubblicaMagic premio innova s@lute2016 pubblica
Magic premio innova s@lute2016 pubblica
 
Red de computadoras
Red de computadorasRed de computadoras
Red de computadoras
 
Netflixx
Netflixx Netflixx
Netflixx
 
Practica con CamStudio martha castrillon
Practica con CamStudio   martha castrillonPractica con CamStudio   martha castrillon
Practica con CamStudio martha castrillon
 
Lets buy a FLAT
Lets buy a FLATLets buy a FLAT
Lets buy a FLAT
 
Profel Clima municipios
Profel Clima municipiosProfel Clima municipios
Profel Clima municipios
 
Señoritas 16
Señoritas 16Señoritas 16
Señoritas 16
 
Reg clase i y clase ii 2012
Reg clase i y clase ii 2012Reg clase i y clase ii 2012
Reg clase i y clase ii 2012
 
PRESENTACION DE OFFICE
PRESENTACION DE OFFICEPRESENTACION DE OFFICE
PRESENTACION DE OFFICE
 
9 28setiembre2016 proceso_cas_254_2016_un_profesional_administrativo_agebre
9 28setiembre2016 proceso_cas_254_2016_un_profesional_administrativo_agebre9 28setiembre2016 proceso_cas_254_2016_un_profesional_administrativo_agebre
9 28setiembre2016 proceso_cas_254_2016_un_profesional_administrativo_agebre
 
26.10.2016_Pernod Ricard Rouss, Андрей Данилов & Мария Злобина
26.10.2016_Pernod Ricard Rouss, Андрей Данилов & Мария Злобина26.10.2016_Pernod Ricard Rouss, Андрей Данилов & Мария Злобина
26.10.2016_Pernod Ricard Rouss, Андрей Данилов & Мария Злобина
 
Tecnología celular (1)
Tecnología celular (1)Tecnología celular (1)
Tecnología celular (1)
 

Similar to UPDATED RESUME 2016 (20)

RESUME
RESUMERESUME
RESUME
 
CV 15 Sep2016
CV 15 Sep2016CV 15 Sep2016
CV 15 Sep2016
 
Cv 15 sep2016
Cv 15 sep2016Cv 15 sep2016
Cv 15 sep2016
 
Sayooj cv
Sayooj cvSayooj cv
Sayooj cv
 
Resume 2015 .doc 2
Resume 2015 .doc 2Resume 2015 .doc 2
Resume 2015 .doc 2
 
dovil jacildo cv
dovil jacildo cvdovil jacildo cv
dovil jacildo cv
 
Abdulmujeed Cv1
Abdulmujeed Cv1Abdulmujeed Cv1
Abdulmujeed Cv1
 
ronald coventry cv n5
ronald coventry cv n5ronald coventry cv n5
ronald coventry cv n5
 
Gorga Silalahi (CV)
Gorga Silalahi (CV)Gorga Silalahi (CV)
Gorga Silalahi (CV)
 
RhoveeFider-CV
RhoveeFider-CVRhoveeFider-CV
RhoveeFider-CV
 
Roman Victor Santos
Roman Victor SantosRoman Victor Santos
Roman Victor Santos
 
Roman victor santos
Roman victor santosRoman victor santos
Roman victor santos
 
Instrument Eng oil&gas
Instrument Eng oil&gasInstrument Eng oil&gas
Instrument Eng oil&gas
 
resume with daewoo
resume with daewooresume with daewoo
resume with daewoo
 
ADAMRIDZUANRESUME
ADAMRIDZUANRESUMEADAMRIDZUANRESUME
ADAMRIDZUANRESUME
 
RESUME
RESUMERESUME
RESUME
 
A P Rolfe CV March 2016
A P Rolfe  CV March 2016A P Rolfe  CV March 2016
A P Rolfe CV March 2016
 
Rozlan Ramli 2015
Rozlan Ramli 2015Rozlan Ramli 2015
Rozlan Ramli 2015
 
Mochamad Kholik - CV
Mochamad Kholik - CVMochamad Kholik - CV
Mochamad Kholik - CV
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 

UPDATED RESUME 2016

  • 1.   Jose G. Ballesteros, Jr.  Blk   9,   Lot   13   Betel   Palm   St.,   Whispering   Palms   Subd.   Novaliches,   Caloocan   Date   of   Birth:   May   16,   1958  Cellular   No.:   +639952444121     Professional Proꝶ뚰le    ● A   professional   with   vast   knowledge   and   experience   in   Power   Plant   Operation   and  Commissioning,   HVAC   and   Fire   Fighting   and   Suppression   System   Commissioning,  seeking   a   challenging   position   in   an   organization   with   an   excellent   career   growth    ● Performance­driven   leader   with   extensive   Mechanical   Engineer   experience  ● Abstract   thinker,   capable   of   translating   complex   concepts   into   simple   ideas  ● Proactive   self­starter   with   a   proven   track   record   of   exceeding   work   expectations   and  delivering   results    [  Professional Experience    Commissioning   Engineer,   Consultant   (MEP   Project)   Energo   Projekt   Consortium.  Qatar   Substations   Project.  Feb   17,   2008   ­   present     Scope   of   Work:  ●     Review   Tender   and   Technical   Specification   to   ensure   Contractors   compliance.  ● Safety   coordination   prior   to   commissioning   to   ensure   a   safe   working   condition  ●    Responsible   in   inspection   /   installation   of   ducting   to   ensure   that   materials   used   conforms  to   technical   specs.  ● Liaise   with   contractors   on   the   schedule   of   Inspection   and   RFI   issuance.  ●    Direct   supervision   of   HVAC   installation   Pre­commissioning   and   commissioning   job,   like  operation   interlocking   with   fire   fighting   system,   Air   Balancing,   Battery   Charger   exhaust  system   and   controls   to   ensure   accurate   function   of   all   system.  ● In   charge      in   the   installation   inspection   and   load   test   of   EOT   cranes.  ● Ensure   that   all   mechanical   Jobs,   materials,   and   Installation,   Testing   and   Commissioning  of   equipments   are   all   in   accordance   with   the   codes   and   standards   like,   ASHRAE,   CIBSE  and   other   codes   and   standard.  ● Ensure   that   all   codes   and   standards   pertaining   to   erection   and   operation   are   strictly  adhered   to.  ●    Supervise   in   the   Fastening   of   all   ducting   to   ensure   that   support   and   all   HVAC  Jose   G.   Ballesteros,   Jr.  ResumePage   1   
  • 2.   components   are   in   place.  ●    Ensure   that   commissioning   /   pre   commissioning   procedures   are   strictly   followed,  functionality   check   and   operational   standard   is   ensured.  ●    Review   designs   and   make   modification   if   needed.  ● Ensure   that   the   contractors   adhere   to   the   contractual   specification   and   technical      Specification   as   well.   ●    Issue   Non   Conformance   letter,   if   necessary.  ●    Generate   punch   list   on   the   defects   in   construction   and   commissioning   and   ensure  rectification   is   being   acted   upon   in   the   soonest   possible   time.  ● Review   As   Built   Drawings,   Materials   Submittals   and   Pre­qualification   documents.   Any  out   of   specification   is   outright   corrected   to   avoid   time   wasted.  ● Conduct   regular   meeting   with   contractors   to   update   on   work   progress   of   the   project.  ● Making   report   and   update   of   work   progress   on   a   daily   basis   for   record   purposes   to   the  Manager.    Process   and   Utilities   Pre­Commissioning   and   Commissioning   Engineer  National   Iranian   Oil   Company   Consortium   of   JGC,   Chiyoda   and   Toyo  South   Pars   Gas   Field   Development   Phase   6,   7   and   8   Onshore   Facility.   Assaluyeh      Site   Iran  November   20,   2007   ­   Feb   2,   2008      (OFF   SITE)    Duties   and   Responsibilities:   ●    Identify   Hazards   in   the   area   prior   to   commencement   of   work   like,   flammable         gas,  presence   of   H2S   and   other   toxic   gases.  ● Supervise   all   the   activities   related   to   Pre   commissioning   and   commissioning   of   every   test  block   like   water   flushing   and   air   blowing   of   Propane   Rundown,   Propane   Loading   Vapor  Return,   and   Propane   Recirculation,   ensuring   that   all   blocks   are   ready   for   the   gas   in.  ● Direct   supervision   of   leak   checking   of   pipes   by   using   soap   solution   and   masking   tapes   to  detect   the   point   of   leakage.   ● Leak   test   block   for   Propane   Rundown,   Propane   Loading   Vapor   return,   Propane  Recirculation   and   any   leakage   detected   is   to   be   rectified   accordingly.  ● Leak   test   for   BOG   Compressors   Suction   and   Discharge   and   Exchangers   as   well.  ● Leak   check   for   Butane   Rundown,   Butane   Loading   and   Vent   Condenser   and   Butane  Recirculation.   ● Leak   check   for   HP,   MP   and   LP   Propane   Refrigerant   System   ● Ensure   that   all   pipes   and   coolers   are   leak   free   prior   to   boxing   up.   Jose   G.   Ballesteros,   Jr.  ResumePage   2   
  • 3.   ● Supervise   in   the   commissioning   of   the   flair   stacks.  ● Supervise   in   the   test   run   of   compressors   and   blowers   to   ensure   smooth   operation   and   all  the   technical   data   is   meet   accordingly.   ● Supervise   in   the   inerting   of   the   system   piping   and   equipment   to   ensure   that   system   or   unit  which   handles   hydrocarbon   or   combustible   materials   is   oxygen   or   air   free   prior   to  introduction   of   combustible   material   into   a   system   or   unit.  ● Supervise   in   monitoring   the   introduction   of   hydrocarbon   from   platform   to   main   plant.  ● Making   progress   report   on   every   block   completed   to   monitor   daily   progress.  ● Organise   meeting   with   concerned   department   to   be   updated   on   project   development.          Commissioning   Engineer    (CONSULTANT)  Kuljian   Consulting   Engineers   SEC­WR   Power   Project,   Shoaiba,   Jeddah   K.S.A   October   18,   2005   ­   October   20,   2007   6   X   400   mw   Alstom   Boilers   /   Alstom   Turbine   Generator   oil   fired   2   X   129   t/h   @   90tbt   désaliénation   plant   6   X   135   m3/h   @   9,700   A   Chlorination   house   3   train   of   Demineralization   plant     Duties   and   Responsibilities:   ● Proper   coordination   with   the   safety   officer   prior   to   commencement   of   commissioning  to   ensure   a   safe   working   environment.  ● Coordinate   with   the   contractors   on   the   scheduled   inspection   and   issuance   of   RFI   to  avoid   conflict   in   inspection   schedule.  ● Responsible   for   commissioning   of   boilers,turbines   and   auxiliaries   to   ensure   that   all  equipment   are      operating   according   to   standard   parameters   requirement   and  performance,   like   fans,   boiler   feed   pumps   and   compressors.  ● Responsible   in   the   commissioning   of   Steam   Turbines   like   controls,   alarms,  interlocks,   trip   tests,   turbine   protections   to   ensure   that   the   operating   requirement   is  being   followed.  ● Responsible   in   witnessing   in   the   functional   test,   valve   tightness   test   and   checking   on  the   transducer   in   every   point   of   the   Steam   Turbine   to   ensure   that   accurate   signal   to  the   main   control   room   is   received.  ● Responsible   in   all   testing   required   at   the   control   room   like,   run   back   test,   Load  rejection,   Reverse   power,   Turbine   trip   etc.  ● Conduct   regular   meeting   with   contractor   to   ensure   that   Testing   and   commissioning   of  all   equipment   is   on   time   and   inspection   of   all   construction   related   job   like   inspection  of   wastewater   construction,Distillation   plant   erection   inspection   and   commissioning  Jose   G.   Ballesteros,   Jr.  ResumePage   3   
  • 4.   and   all   water   related   construction   job   to   ensure   a   perfect   completion   according   to  required   specification   and   codes.  ● Generate   Punch   list   and   NCR’s   when   required.  ● Oversee   the   Flushing   of   all   the   pipes   associated   with   the   process.  ● Witness   and   Direct   the   Water   Flushing,   Steam   Blowing,   Hydro   Testing   and   air  blowing   to   ensure   the   cleanliness   of   the   pipes   and   free   of   foreign   materials   prior   to  boxing   up   or   inerting.  ● Responsible   for   commissioning   of   3x   129   t/h   @   90TBT   Desalination   plant   and  Reliability   test   run   and   Performance   test   and   close   monitoring   on   distilled   outlet   for  pure   distilled   water   result.  ● Conduct   inspection   of   completed   construction   of   wastewater   and      commissioning   of  wastewater   treatment   plant   and   neutralization   system   to   ensure   that   the   effluent   is  environmental   friendly   prior   to   effluent   disposal   to   be   environmentally   friendly.   ● Responsible   for   chlorination   plant   commissioning,   reliability   run   and   performance  test   to   ensure   sufficient   supply   of   chlorinated   water   to   avoid   accumulation   of   algae   at  the   intake.   ● Conduct   inspection   on   the   installation   and   commissioning   of   fire   fighting   and  detection   system   /   dry   and   wet,   FM   200,   deluge   system,   preaction   sprinklers   and  foam   system.                     Ensure   that   all   firefighting   equipment   are   U.L   listed   and   in   accordance   with                                                                the   N.F.P.A   codes   and   standards.  ● Responsible   for   commissioning   of   Demin   Plant   and   condensate   polishing   system   to  ensure   an   acceptable   quality   of   boiler   water   thru   acceptable   PH,   conductivity,   and  silica   measurement.   ● Responsible   for   witness   points   where   required   to   confirm   operational   status   of   all  equipment   and   logic   are   strictly   followed.   ●    Responsible   for   commissioning   of   all   compressors.   ●    Responsible   for   all   equipment   heat   run   test,   sequence   test   and   ensure   that   all  instrumentation   and   controls   are   working   to   the   desired   parameters.   ●    Responsible   for   protection   and   logic   testing   and   tuning   to   ensure   a   smooth   operation  of   all   equipment.   ●     Responsible   for   function   group   tests,   open   and   close   loop   check,   and   burner   tuning  witnessing   and   boiler   parts   function   witnessing   like   wind   box   dampers.   ●    Direct   supervision   of   the   installation   of   HVAC   ducting   to   ensure   that   support   and  ducting   thickness   requirement   are   in   accordance   to   required   specs   as   per   standard   and  codes.(ASHRAE)  ●    Ensure   that   diffusers,   grills   Motorized   and   manual         volume   control   dampers   are  properly   adjusted   to   meet   the   air   volume   requirement.  ●    Direct   supervision   in   the   air   balancing   of   the   unit.  ● Direct   supervision   in   the   commissioning   of   the   unit   to   ensure   that   all   interlock   and  operation   logic   are   perfectly   adhered.  Jose   G.   Ballesteros,   Jr.  ResumePage   4   
  • 5.   ●    Responsible   for   commissioning   of   8X250   Tons   Chiller   type   HVAC   system   10   units  of   50   Tons   Split   and   Package   type   Units   and   20   Units   of   Air   handling   (   Ventilating  System   )   units   in   the   whole   power   plant   and   ROP   buildings.   ●    Responsible   for   turbine   protection   test,   tightness   test,   and   other   test   required.   ●    Coordinates   with   client   and   contractors   as   well   for   commissioning   schedules,   system  walk   down   to   ensure   that   Plant   defects   and   other   requirement   as   per   codes   and  standards   are   properly   addressed.    Commissioning   Engineer   /   Operation   Staff   Sembcorp   Utilities   and   Terminals   Pulau   Sakra,   Singapore  1997   ­   2004   3   x   350mw   MHI   boilers   oil   fired     Duties   and   Responsibilities:   ● Proper   coordination   with   safety   officer   to   ensure   that   hazards   are   eliminated   prior   to  commencement   of   commissioning   of   boiler   (confined   space)  ● Responsible   for   commissioning   of   boilers   and   all   auxiliaries.   ● Responsible   in   the   start   up   and   commissioning   of   the   Turbine   like,   Turbine   protection,  Turbine   trip   test,   interlocks   and   checking   all   Turbine   sensors   for   accurate   reading   at   the  control   room.  ● Responsible   for   commissioning   of   chillers,   sea   water   pumps,   chlorination   package   and  close   cooling   water   pumps   to   ensure   that   all   supply   requirements   of   customers   are   strictly  adhered   to   as   per   protocol.   ● Direct   supervision   of   HVAC   erection   and   commissioning.  ● Responsible   for   commissioning   of   150   Tons   Chiller   type   HVAC,   Split   type   and   package  type   units   and   Air   handling   unit   in   the   power   station.   ● incharge   startup   and   shutdown   of   boilers   and   auxiliaries   equipment.   ● Supervision   in   the   Natural   gas   receiving   terminal   and   operation   thru   nomination  requested   by   end   user   thru   SCADA   to   determine   requested   gas   volume   in   BBtu.   ● In­charge   in   the   startup   of   water   bath   boilers   and   changeover   of   cyclone   filters,   to   ensure  the   heat   requirement   by   the   end   user   is   met   and   hydro   carbon   is   eliminated   in   the   gas  path.   ● Close   supervision   of   manpower   in   patrolling   all   gas   pipe   line   to   ensure   that   leak   is  addressed   (if   any)   without   delay.   ● Direct   Supervision   in   the   operation   of   Ethylene   Plant   and   coordination   from   end   user   in  receiving   the   Propane   gas.   ● Responsible   of   the   commissioning   of   Fire   fighting   system   like,   Deluge   system,   FM   200  and   Foam   system   within   the   Power   station.   ● Manage   manpower   in   all   departments   of   the   utilities   like,   water,   waste   water,   steam,  Jose   G.   Ballesteros,   Jr.  ResumePage   5   
  • 6.   ethylene   plant   and   Natural   Gas   receiving   facility.      ● Incharge   in   the   operation   of   wastewater   system,   and   maintaining   effluent   discharge  according   to   environmental   requirement   of   singapore   government.  ● Maintain   chemical   injection   on   the   wastewater   tank   to   keep   bacteria   according   to  requirement.      Commissioning   Engineer   Ishikawa­Jima­Harima   (IHI)   Pulau   Seraya,   Singapore  Period   :   From   1996   to   1997   6   x   400   mw   IHI   boilers   oil   fired     Duties   and   Responsibilities:  ●    Check   that   all   rotating   equipment   is   properly   lubricated   prior   to   commissioning.   ●    Responsible   for   commissioning   of   boilers,   compressors,   pumps   and   other   related  auxiliaries   to   ensure   a   reliable   and   efficient   operation.   ●    Test   all   auxiliaries   and   rotating   equipment   is   operating   according   to   standard,   like  suction   and   discharge   pressure,   temperature   and   vibration   are   within   the   tolerance.   ● Responsible   in   the   commissioning   of   Boiler   and   Steam   Turbines.  ● Attend   to   all   testing   required   in   the   control   room      like   Runback   Test,   Fast   Cut   back,   load  rejection   Reverse   Power   etc.       Commissioning   /   Operation   Staff   Cepatileman   Proj.   Mngt,   Corp.   Pagbilao   Quezon,   Philippines   Period   :   1992   to   1996   3   x   375   mw   MHI   Boilers   Coal   Fired   Power   Plant   Turbine   Generator:   Westinghouse     Duties   and   Responsibilities:   ● Perform   the   startup   and   shutdown   and   all   commissioning   requirements   of   the   boilers   and  Steam   Turbines   at   the   control   room.  ● Assist   in   the   inspection   of   erection   of   coal   conveyors   to   ensure   reliability   during   the  transport   of   coal   from   coal   yard   to   silos.  ● Assist   in   the   inspection   of   precipitator   construction   and   all   BOP   equipment   installation.  Jose   G.   Ballesteros,   Jr.  ResumePage   6   
  • 7.   ● Coordination   and   safety   and   efficient   process   of   commissioning   of   all   piping,   motors,  pumps,   generators,   and   other   equipment   within   the   power   station.   ●    Maintain   the   oil   level   of   all   the   equipment,   which   is   under   commissioning.   ●    Monitoring   of   all   equipment   at   the   time   it   started   for   the   vibration,   noise   level,  temperature   and   ensures   that   all   parameters   will   not   go   beyond   tolerable   limits.   ●    Ensure   that   bearing   cooling   water   has   a   continuous   flow   by   ensuring   that   all   valves   are  normally   set.   ●    Install   gauges   on   pumps   and   motors   to   check   on   changes   on   temperature   for   provable  misalignment.   ●    Cool   down   the   pump   or   equipment   to   re­check   and   confirm   the   shaft   eccentricity  specially   the   steam   turbine.   ●    Responsible   for   hydro   testing,   steam   blowing,   water   and   air   flushing   of   various   lines   by  setting   the   valves   to   a   prescribed   limit   of   opening   and   conducting   inspection   on   various  lines   while   the   test   is   ongoing   to   ensure   a   safe   and   efficient   commissioning.   ●    Responsible   for   coal   yard   operation   and   other   related   equipment   like   reclaimer,  pulveriser,   and   ball   mill.  ● Responsible   in   the   commissioning   of   all   Fire   Fighting   System   in   the   whole   Power  Station,   like,   Deluge   system,   foam   system   and   Sprinklers   system.   ● Responsible   in   the   commissioning   of   200   ton   HVAC   Chilled   water   type,   5x100   ton   Split  type   units   and   8x50   tons   of   package   type   units   and   all   Air   handling   units   (Ventilating  units).                       Commissioning   /   Operation   Staff   Resource   Sciences   Arabia   Limited   Yanbu   Al­Sinaiyah   KSA  Period   :   from   1990   to   1992   3   x   150   mw   Steam   Turbine   and   MHI   boilers     Duties   and   Responsibilities:   ● Coordination   and   safety   and   efficient   process   of   commissioning   of   all   piping,   motors,  pumps,   generators,   and   other   equipment   with   n   the   power   station.   Jose   G.   Ballesteros,   Jr.  ResumePage   7   
  • 8.   ● Responsible   for   boiler   start   up,   shut   down   and   monitoring   of   all   operating   equipment   with  in   the   area   of   responsibility.   ●    Report   all   abnormalities   to   the   Shift­Charge   Engineer   ● Responsible   for   start   up   and   monitoring   of   desalination   plant   to   ensure   sufficient   flow  requirement   to   the   customers.     Operation   Staff   Kafou   Corporation   SCECO­SOUTH   POWER   PROJECT   ABHA   KHAMIS   MUSHYAT,   KSA  Period   :   1986   to   1987   6   x   20   mw   MAN   Diesel   Gen   and   5   x   60mw   Gas   Turbine     Duties   and   Responsibilities:  ●    Responsible   for   all   start   up   and   commissioning   of   the   plant   ●    Responsible   for   proper   isolation,   lubrication   of   all   equipment   and   other   related  operational   function   outside   the   control   room.   ●    Assist   in   the   proper   inspection   of   all   equipment   and   auxiliaries,   lines   and   various  systems   with   in   the   area   of   responsibility.     Operation   Staff   National   Power   Corporation   Sucat   Thermal   Power   Plant,   Philippines   Period   :   1978   to   1979   Sucat   I   160mw   thermal   plant   Press:   1800psig   Boiler:   Hitachi   Japan,   Turbine   Gen:   General   Electric   Sucat   II:   200mw   Press:   2700psig   Sucat   III   200mw   Press:   2700psig     Duties   and   Responsibilities:  ●    Responsible   for   all   start   up   and   shut   down   of   the   plant   on   the   field   ●    Responsible   for   proper   isolation,   lubrication   of   all   equipment   and   other   related  operational   function   outside   the   control   room.     ● Assist   in   the   proper   inspection   of   all   equipment   and   auxiliaries,   lines   and   various   systems  within   the   area   of   responsibility.  ● Conduct   hourly   reading   of   all   equipment   parameters   to   ensure   a   smooth   operation         Jose   G.   Ballesteros,   Jr.  ResumePage   8