SlideShare a Scribd company logo
1 of 29
Engineering DepartmentEngineering Department
VisionVision
ServiceService
Repair or ReplacementRepair or Replacement
&&
MaintenanceMaintenance
• The tasks of this department
include:
preventive maintenance
• Repairs
• Maintenance
• Deep cleaning
• Resource management
• Emergency preparedness
WHAT WE DO HEREWHAT WE DO HERE
Look after of plants and other equipmentsLook after of plants and other equipments
Maintenance & service of in any emergencyMaintenance & service of in any emergency
Project developing workProject developing work
Repairing of damage equipmentsRepairing of damage equipments
Emergency support to all departmentEmergency support to all department
Please See the Details Our ActivityPlease See the Details Our Activity
Present Organogram of EngineeringPresent Organogram of Engineering
DepartmentDepartment
Sr. Shift Engr
A.R. Mithu
Shift Engr
Shovan
Civil Eng
Water park 
Abu Sufian
Shift Supervisor
& Admin Mr.
Alamgir
Vehicle
Maintenance Team
Sr. Technician
Fire & Plumber
Sr. Technician
Electrical & HVAC
Technician &
Elite Team
Carpenter &
painter Civil
Mason
Manager- Engineering
Shahenur Muhammad Al-Amin
Introducing with Fire PlantIntroducing with Fire Plant
Our hotel is fully equipped with Fire
Protection & detection system. We have
Fire Hydrant System, Sprinkler, smoke
detector, Extinguisher, Room exit plan,
Emergency fire exit stair in each floor.
Capacities of Fire Hydrant System:
Fire water reserve tank: 345000 litter for
7.66 Hour fire hydrant ran.
Jockey Pump: 20 GPM.
Electrical Driven Pump: 750 GPM
Diesel Engine Driven Pump: 750 GPM
Capacities of Detection System:
Fire Alarm control panel: 3 No's
Smoke Detector :
Heat Detector :
Multi Detector :
Gas Detector :
Fire Hydrant Boxes: 57 Nos. in each floor 6 nos. (1, 2, 3, 4 & 5Fire Hydrant Boxes: 57 Nos. in each floor 6 nos. (1, 2, 3, 4 & 5
wing)wing)
Pillar Hydrant : 7 Nos. outside hotel building. Ramp 1no. 5th-wing 1Pillar Hydrant : 7 Nos. outside hotel building. Ramp 1no. 5th-wing 1
no., 1st-wing 1no.,4th-wing 1no. 2no., 1st-wing 1no.,4th-wing 1no. 2ndnd
& 3rd-wing 2nos each Fire& 3rd-wing 2nos each Fire
Complete Fire Protection System falls in three category Fire Detection SystemComplete Fire Protection System falls in three category Fire Detection System
 Fire detection system of automatic type.Fire detection system of automatic type.
 Heat detectors for kitchen areaHeat detectors for kitchen area
 Pull station on each floor at suitable locations,Pull station on each floor at suitable locations,
 Detection system of addressable typeDetection system of addressable type
 Detectors on ceiling,Detectors on ceiling,
 Each room at least one detector irrespective of size.Each room at least one detector irrespective of size.
Fire communication systemFire communication system
Origin of fire are very small and hence it is detected at the time of its origin canOrigin of fire are very small and hence it is detected at the time of its origin can
be communicated to proper person and damage reduced.be communicated to proper person and damage reduced.
Alarm bell, hooter, public address system, telephone system, fire exit indication,Alarm bell, hooter, public address system, telephone system, fire exit indication,
demarcation of exit path etc.demarcation of exit path etc.
Fire Fighting SystemFire Fighting System
Design of Fire Fighting & Fire detection system considered within class-l gradeDesign of Fire Fighting & Fire detection system considered within class-l grade
Works Ongoing for maintenance fire dictation system.Works Ongoing for maintenance fire dictation system.
Introducing with Substation PlantIntroducing with Substation Plant
We have special power express line from REB for non stop power supply.
The substation has equipped with HT panel, Transformer, VCB,LT panel, BBT
& ACB, PFI for smooth and safe power supply. We have 2 no’s of 2500 KVA
Transformers. Total 5000 KVA or 5 MW capacity. Right now we are running 1
no’s of 2500 KVA Transformer which enough our load. And another 2500
KVA Transformer has kept for back up in future.
Introducing with Generator PlantIntroducing with Generator Plant
We have 3 no’s of 1000 KVA
Generators for stand by power
supply. So, we have 3000KVA or 3
MW power capacity. The fuel
consumption is about 90 liter/hr for
each 1000KVA generator. These
generators are perfectly
synchronized with each other. These
are runs depends on required load.
Its automatically run each other
when load become high and shut
down automatically each other when
load become less. And we have
another small 150 KVA generator
for stand by support. The all
generators are from Perkins engine
UK brand. No AMC Agreement we
are works General Maintenance.
Introducing with HVAC PlantIntroducing with HVAC Plant
In our hotel we are using water
cooling type HVAC system. We
have 4 no’s of chiller in our HVAC
plant. Each chiller is 313 Ton. So,
Total: 1252 Tons of capacity we
have. As like generators, these
chillers are also start and shut down
according to the required load. If
there become less load then one by
one the chiller become shut down.
These chiller brought from Dunham
Bush , Malaysia. We can also
operate these chillers by BMS. BMS
Not update We are operate plant
Manually.
Introducing with Water TreatmentIntroducing with Water Treatment
PlantPlant We are collecting the raw water
from hill side lake for hotel
operation. Then we treat these water
using by reverse osmosis (RO) ,
sand filtration & chemical dosing
system. Besides we have rain
harvesting in rainy season.
Water consumption per day:
Lake Water: 32,00000 Liter/day
RO Fresh water: 1600000 Liter/day currently
out of service 12.10.17 till to date.
Gray water: 1,00000 Liter/day apx
Water cost:
Reverse Osmosis (RO): Out Of Service
58.75 taka / 1000 liter.
Lake water: 16.59 taka / 1000 liter.
Gray water: 14.75 taka / 1000 liter.
Introducing with pressure booster systemIntroducing with pressure booster system
We have water supply booster pump,
which can supply the fresh and Gray
water from here in individual wing.
Capacity of System :
The pressure kept on 4.5 KG.
These pumps are automatically run and
always keeping pressure on 4.5 KG.
Waste Water Treatment Plant (WWTP)Waste Water Treatment Plant (WWTP)
Wastewater treatment is a process
used to remove contaminants from
wastewater. Then this water supply for
using to commode flash gardening and
car wash.
Then we make the sludge in to the cake
by compressing in compactor room and
sludge water goes to the STP main tank
for re-cycle.
Introducing with Gas BankIntroducing with Gas Bank
We have 2 gas bank for hotel
operation. One is for front of the
hotel and another is behind of probal
shop.
The main gas bank can handle 40
cylinder. Each cylinder is about 45
kg.
Vaporizer Plant 20 Cylinder From
this gas bank we can supply gas to
main kitchen, kasbah kitchen, Pranzi
restaurant.
Introducing with BoilerIntroducing with Boiler
We have diesel driven boiler for
laundry steam 500 litter*2
numbers . It can produce steam
3000 liter / hr. And the fuel cost is
about 20/25 liter/hr.
This boiler model MEL500TL-100N
Resection Number BA.BO.8185
New one Resection one Proses
Introducing With the Maintenance TeamIntroducing With the Maintenance Team
Engineering is open and working 24 hours a day!
1. All Guest rooms to be service 3 times a
year (Quarterly).
2.All Guest room corridors to service as above.
3.All restaurant furnitures to be service 3
times a year.
1.All HVAC equipment‘s (FCU, Pumps, Chillers, Cooling Tower etc.)
2.All Electrical DB to be service 3 times a year (Quarterly)
3.All plumbing pumps (service 3 times a year (Quarterly)
4.Boilers & laundry Service 2 time yearly
5.Generators and BBT Service 2 time yearly
6.All kitchen equipment Service 3 time yearly
7.Sub-station Equipment maintenance service 2 time yearly
8.WTP ,STP WWTP, All Equipment Service 3 time yearly.
9. Fire protection & detection service 2 time yearly.
10. Building Maintenance Paint & other renovation works 1 times yearly.
Please see the
checklist
....
Engineering works very closely with housekeeping in maintaining the quality
of the physical guest room.
Housekeepers are required to report problems with a guest room to
engineering for repair.
Front desk staff is responsible for reporting problems in the public area and
lobby.
The banquet/event staff is responsible for reporting problem areas in the
banquet and event rooms.
Maintenance vs. Repair
Maintenance is the repair and upkeep of the internal and
external hotel structure and equipment.
Repairs can be costly, routine maintenance can prevent and
delay repairs.
Engr dept presentation

More Related Content

Similar to Engr dept presentation

KBUNL - NTPC KANTI MUZAFFARPUR BIHAR
KBUNL - NTPC KANTI MUZAFFARPUR BIHARKBUNL - NTPC KANTI MUZAFFARPUR BIHAR
KBUNL - NTPC KANTI MUZAFFARPUR BIHARVIMAL VAIBHAV
 
Environmental presentation from malthouse engineering
Environmental presentation from malthouse engineeringEnvironmental presentation from malthouse engineering
Environmental presentation from malthouse engineeringMalthouse Engineering Ltd.
 
Window Air Conditioners
Window Air ConditionersWindow Air Conditioners
Window Air Conditionersgreeonline
 
Luminous higher 2 kva inverter
Luminous higher 2 kva inverterLuminous higher 2 kva inverter
Luminous higher 2 kva inverterRaj verma
 
Hydrogen & Bio Gas Engines Generator sets150 kw to 1 mw 1000kw
Hydrogen & Bio Gas Engines Generator sets150 kw to 1 mw 1000kwHydrogen & Bio Gas Engines Generator sets150 kw to 1 mw 1000kw
Hydrogen & Bio Gas Engines Generator sets150 kw to 1 mw 1000kwDaniel Donatelli
 
PresentationGGSSTP_Atul
PresentationGGSSTP_AtulPresentationGGSSTP_Atul
PresentationGGSSTP_AtulAtul Kataria
 
A training seminar on induction furnace by stead fast engineers pvt ltd
A  training seminar on induction furnace by stead fast engineers pvt ltdA  training seminar on induction furnace by stead fast engineers pvt ltd
A training seminar on induction furnace by stead fast engineers pvt ltdsteadfast123
 
Bangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants OverviewBangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants OverviewRidwanul Hoque
 
STUDY of WRM Furnace in Vizag Steel plant
STUDY of WRM Furnace in Vizag Steel plantSTUDY of WRM Furnace in Vizag Steel plant
STUDY of WRM Furnace in Vizag Steel plantSiva Reddy
 
Fuji tu dong hoa catalog frenic-hvac-dienhathe.org
Fuji tu dong hoa catalog frenic-hvac-dienhathe.orgFuji tu dong hoa catalog frenic-hvac-dienhathe.org
Fuji tu dong hoa catalog frenic-hvac-dienhathe.orgDien Ha The
 
AIETT and ITCC seminar on Ener Con in Hospitality
AIETT and ITCC seminar on Ener Con in HospitalityAIETT and ITCC seminar on Ener Con in Hospitality
AIETT and ITCC seminar on Ener Con in HospitalityPSPSolutions.net
 
ONALAJA OLORUNTIMILEHIN EGBIN PRESENTATION SLIDE.pptx
ONALAJA OLORUNTIMILEHIN EGBIN PRESENTATION SLIDE.pptxONALAJA OLORUNTIMILEHIN EGBIN PRESENTATION SLIDE.pptx
ONALAJA OLORUNTIMILEHIN EGBIN PRESENTATION SLIDE.pptxTimilehinonalaja
 
Solutions Catalogue - Tecnoturbines
Solutions Catalogue - TecnoturbinesSolutions Catalogue - Tecnoturbines
Solutions Catalogue - TecnoturbinesTecnoturbines
 

Similar to Engr dept presentation (20)

KBUNL - NTPC KANTI MUZAFFARPUR BIHAR
KBUNL - NTPC KANTI MUZAFFARPUR BIHARKBUNL - NTPC KANTI MUZAFFARPUR BIHAR
KBUNL - NTPC KANTI MUZAFFARPUR BIHAR
 
Environmental presentation from malthouse engineering
Environmental presentation from malthouse engineeringEnvironmental presentation from malthouse engineering
Environmental presentation from malthouse engineering
 
Window Air Conditioners
Window Air ConditionersWindow Air Conditioners
Window Air Conditioners
 
Luminous higher 2 kva inverter
Luminous higher 2 kva inverterLuminous higher 2 kva inverter
Luminous higher 2 kva inverter
 
Manjung Brochure
Manjung BrochureManjung Brochure
Manjung Brochure
 
ntpc khalgaon
ntpc khalgaonntpc khalgaon
ntpc khalgaon
 
Engine Brochure.pdf
Engine Brochure.pdfEngine Brochure.pdf
Engine Brochure.pdf
 
Hydrogen & Bio Gas Engines Generator sets150 kw to 1 mw 1000kw
Hydrogen & Bio Gas Engines Generator sets150 kw to 1 mw 1000kwHydrogen & Bio Gas Engines Generator sets150 kw to 1 mw 1000kw
Hydrogen & Bio Gas Engines Generator sets150 kw to 1 mw 1000kw
 
PresentationGGSSTP_Atul
PresentationGGSSTP_AtulPresentationGGSSTP_Atul
PresentationGGSSTP_Atul
 
NTPC,muzaffarpur
NTPC,muzaffarpurNTPC,muzaffarpur
NTPC,muzaffarpur
 
A training seminar on induction furnace by stead fast engineers pvt ltd
A  training seminar on induction furnace by stead fast engineers pvt ltdA  training seminar on induction furnace by stead fast engineers pvt ltd
A training seminar on induction furnace by stead fast engineers pvt ltd
 
thermal power station
thermal power stationthermal power station
thermal power station
 
Servo Stabilizer
Servo StabilizerServo Stabilizer
Servo Stabilizer
 
Bangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants OverviewBangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants Overview
 
STUDY of WRM Furnace in Vizag Steel plant
STUDY of WRM Furnace in Vizag Steel plantSTUDY of WRM Furnace in Vizag Steel plant
STUDY of WRM Furnace in Vizag Steel plant
 
Fuji tu dong hoa catalog frenic-hvac-dienhathe.org
Fuji tu dong hoa catalog frenic-hvac-dienhathe.orgFuji tu dong hoa catalog frenic-hvac-dienhathe.org
Fuji tu dong hoa catalog frenic-hvac-dienhathe.org
 
AIETT and ITCC seminar on Ener Con in Hospitality
AIETT and ITCC seminar on Ener Con in HospitalityAIETT and ITCC seminar on Ener Con in Hospitality
AIETT and ITCC seminar on Ener Con in Hospitality
 
ONALAJA OLORUNTIMILEHIN EGBIN PRESENTATION SLIDE.pptx
ONALAJA OLORUNTIMILEHIN EGBIN PRESENTATION SLIDE.pptxONALAJA OLORUNTIMILEHIN EGBIN PRESENTATION SLIDE.pptx
ONALAJA OLORUNTIMILEHIN EGBIN PRESENTATION SLIDE.pptx
 
Solutions Catalogue - Tecnoturbines
Solutions Catalogue - TecnoturbinesSolutions Catalogue - Tecnoturbines
Solutions Catalogue - Tecnoturbines
 
Ripple Control Receiver
Ripple Control ReceiverRipple Control Receiver
Ripple Control Receiver
 

More from Md Abdur Rahaman

More from Md Abdur Rahaman (11)

Work methodology of roof waterproof treatment work with crown izonil 3
Work methodology of roof waterproof treatment work with crown izonil  3Work methodology of roof waterproof treatment work with crown izonil  3
Work methodology of roof waterproof treatment work with crown izonil 3
 
Water park area layout for environment model
Water park area layout for environment modelWater park area layout for environment model
Water park area layout for environment model
 
Tumprature log
Tumprature logTumprature log
Tumprature log
 
Schedule of rates_2018
Schedule of rates_2018Schedule of rates_2018
Schedule of rates_2018
 
Risk assessmenttemplate
Risk assessmenttemplateRisk assessmenttemplate
Risk assessmenttemplate
 
Price list cable brb
Price list cable brbPrice list cable brb
Price list cable brb
 
Notice 2019
Notice 2019Notice 2019
Notice 2019
 
Gate
GateGate
Gate
 
Kitchen inspection-cklst
Kitchen inspection-cklstKitchen inspection-cklst
Kitchen inspection-cklst
 
Boiler act bangla
Boiler act banglaBoiler act bangla
Boiler act bangla
 
Mrp application form[hard copy]
Mrp application form[hard copy]Mrp application form[hard copy]
Mrp application form[hard copy]
 

Recently uploaded

NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024EMMANUELLEFRANCEHELI
 
Dynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptxDynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptxMustafa Ahmed
 
Passive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptPassive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptamrabdallah9
 
Adsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) pptAdsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) pptjigup7320
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 
Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfKira Dess
 
engineering chemistry power point presentation
engineering chemistry  power point presentationengineering chemistry  power point presentation
engineering chemistry power point presentationsj9399037128
 
Databricks Generative AI FoundationCertified.pdf
Databricks Generative AI FoundationCertified.pdfDatabricks Generative AI FoundationCertified.pdf
Databricks Generative AI FoundationCertified.pdfVinayVadlagattu
 
Databricks Generative AI Fundamentals .pdf
Databricks Generative AI Fundamentals  .pdfDatabricks Generative AI Fundamentals  .pdf
Databricks Generative AI Fundamentals .pdfVinayVadlagattu
 
Circuit Breakers for Engineering Students
Circuit Breakers for Engineering StudentsCircuit Breakers for Engineering Students
Circuit Breakers for Engineering Studentskannan348865
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...josephjonse
 
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsMathias Magdowski
 
☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...
☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...
☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...mikehavy0
 
handbook on reinforce concrete and detailing
handbook on reinforce concrete and detailinghandbook on reinforce concrete and detailing
handbook on reinforce concrete and detailingAshishSingh1301
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...archanaece3
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...ronahami
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfJNTUA
 
Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelDrAjayKumarYadav4
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docxrahulmanepalli02
 

Recently uploaded (20)

NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
 
Dynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptxDynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptx
 
Passive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptPassive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.ppt
 
Adsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) pptAdsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) ppt
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdf
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
engineering chemistry power point presentation
engineering chemistry  power point presentationengineering chemistry  power point presentation
engineering chemistry power point presentation
 
Databricks Generative AI FoundationCertified.pdf
Databricks Generative AI FoundationCertified.pdfDatabricks Generative AI FoundationCertified.pdf
Databricks Generative AI FoundationCertified.pdf
 
Databricks Generative AI Fundamentals .pdf
Databricks Generative AI Fundamentals  .pdfDatabricks Generative AI Fundamentals  .pdf
Databricks Generative AI Fundamentals .pdf
 
Circuit Breakers for Engineering Students
Circuit Breakers for Engineering StudentsCircuit Breakers for Engineering Students
Circuit Breakers for Engineering Students
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility Applications
 
☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...
☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...
☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...
 
handbook on reinforce concrete and detailing
handbook on reinforce concrete and detailinghandbook on reinforce concrete and detailing
handbook on reinforce concrete and detailing
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
 
Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata Model
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
 

Engr dept presentation

  • 2. VisionVision ServiceService Repair or ReplacementRepair or Replacement && MaintenanceMaintenance
  • 3. • The tasks of this department include: preventive maintenance • Repairs • Maintenance • Deep cleaning • Resource management • Emergency preparedness
  • 4. WHAT WE DO HEREWHAT WE DO HERE Look after of plants and other equipmentsLook after of plants and other equipments Maintenance & service of in any emergencyMaintenance & service of in any emergency Project developing workProject developing work Repairing of damage equipmentsRepairing of damage equipments Emergency support to all departmentEmergency support to all department Please See the Details Our ActivityPlease See the Details Our Activity
  • 5. Present Organogram of EngineeringPresent Organogram of Engineering DepartmentDepartment Sr. Shift Engr A.R. Mithu Shift Engr Shovan Civil Eng Water park Abu Sufian Shift Supervisor & Admin Mr. Alamgir Vehicle Maintenance Team Sr. Technician Fire & Plumber Sr. Technician Electrical & HVAC Technician & Elite Team Carpenter & painter Civil Mason Manager- Engineering Shahenur Muhammad Al-Amin
  • 6. Introducing with Fire PlantIntroducing with Fire Plant Our hotel is fully equipped with Fire Protection & detection system. We have Fire Hydrant System, Sprinkler, smoke detector, Extinguisher, Room exit plan, Emergency fire exit stair in each floor. Capacities of Fire Hydrant System: Fire water reserve tank: 345000 litter for 7.66 Hour fire hydrant ran. Jockey Pump: 20 GPM. Electrical Driven Pump: 750 GPM Diesel Engine Driven Pump: 750 GPM Capacities of Detection System: Fire Alarm control panel: 3 No's Smoke Detector : Heat Detector : Multi Detector : Gas Detector :
  • 7. Fire Hydrant Boxes: 57 Nos. in each floor 6 nos. (1, 2, 3, 4 & 5Fire Hydrant Boxes: 57 Nos. in each floor 6 nos. (1, 2, 3, 4 & 5 wing)wing) Pillar Hydrant : 7 Nos. outside hotel building. Ramp 1no. 5th-wing 1Pillar Hydrant : 7 Nos. outside hotel building. Ramp 1no. 5th-wing 1 no., 1st-wing 1no.,4th-wing 1no. 2no., 1st-wing 1no.,4th-wing 1no. 2ndnd & 3rd-wing 2nos each Fire& 3rd-wing 2nos each Fire
  • 8. Complete Fire Protection System falls in three category Fire Detection SystemComplete Fire Protection System falls in three category Fire Detection System  Fire detection system of automatic type.Fire detection system of automatic type.  Heat detectors for kitchen areaHeat detectors for kitchen area  Pull station on each floor at suitable locations,Pull station on each floor at suitable locations,  Detection system of addressable typeDetection system of addressable type  Detectors on ceiling,Detectors on ceiling,  Each room at least one detector irrespective of size.Each room at least one detector irrespective of size. Fire communication systemFire communication system Origin of fire are very small and hence it is detected at the time of its origin canOrigin of fire are very small and hence it is detected at the time of its origin can be communicated to proper person and damage reduced.be communicated to proper person and damage reduced. Alarm bell, hooter, public address system, telephone system, fire exit indication,Alarm bell, hooter, public address system, telephone system, fire exit indication, demarcation of exit path etc.demarcation of exit path etc. Fire Fighting SystemFire Fighting System Design of Fire Fighting & Fire detection system considered within class-l gradeDesign of Fire Fighting & Fire detection system considered within class-l grade Works Ongoing for maintenance fire dictation system.Works Ongoing for maintenance fire dictation system.
  • 9. Introducing with Substation PlantIntroducing with Substation Plant We have special power express line from REB for non stop power supply. The substation has equipped with HT panel, Transformer, VCB,LT panel, BBT & ACB, PFI for smooth and safe power supply. We have 2 no’s of 2500 KVA Transformers. Total 5000 KVA or 5 MW capacity. Right now we are running 1 no’s of 2500 KVA Transformer which enough our load. And another 2500 KVA Transformer has kept for back up in future.
  • 10. Introducing with Generator PlantIntroducing with Generator Plant We have 3 no’s of 1000 KVA Generators for stand by power supply. So, we have 3000KVA or 3 MW power capacity. The fuel consumption is about 90 liter/hr for each 1000KVA generator. These generators are perfectly synchronized with each other. These are runs depends on required load. Its automatically run each other when load become high and shut down automatically each other when load become less. And we have another small 150 KVA generator for stand by support. The all generators are from Perkins engine UK brand. No AMC Agreement we are works General Maintenance.
  • 11. Introducing with HVAC PlantIntroducing with HVAC Plant In our hotel we are using water cooling type HVAC system. We have 4 no’s of chiller in our HVAC plant. Each chiller is 313 Ton. So, Total: 1252 Tons of capacity we have. As like generators, these chillers are also start and shut down according to the required load. If there become less load then one by one the chiller become shut down. These chiller brought from Dunham Bush , Malaysia. We can also operate these chillers by BMS. BMS Not update We are operate plant Manually.
  • 12. Introducing with Water TreatmentIntroducing with Water Treatment PlantPlant We are collecting the raw water from hill side lake for hotel operation. Then we treat these water using by reverse osmosis (RO) , sand filtration & chemical dosing system. Besides we have rain harvesting in rainy season. Water consumption per day: Lake Water: 32,00000 Liter/day RO Fresh water: 1600000 Liter/day currently out of service 12.10.17 till to date. Gray water: 1,00000 Liter/day apx Water cost: Reverse Osmosis (RO): Out Of Service 58.75 taka / 1000 liter. Lake water: 16.59 taka / 1000 liter. Gray water: 14.75 taka / 1000 liter.
  • 13.
  • 14. Introducing with pressure booster systemIntroducing with pressure booster system We have water supply booster pump, which can supply the fresh and Gray water from here in individual wing. Capacity of System : The pressure kept on 4.5 KG. These pumps are automatically run and always keeping pressure on 4.5 KG.
  • 15. Waste Water Treatment Plant (WWTP)Waste Water Treatment Plant (WWTP) Wastewater treatment is a process used to remove contaminants from wastewater. Then this water supply for using to commode flash gardening and car wash. Then we make the sludge in to the cake by compressing in compactor room and sludge water goes to the STP main tank for re-cycle.
  • 16.
  • 17. Introducing with Gas BankIntroducing with Gas Bank We have 2 gas bank for hotel operation. One is for front of the hotel and another is behind of probal shop. The main gas bank can handle 40 cylinder. Each cylinder is about 45 kg. Vaporizer Plant 20 Cylinder From this gas bank we can supply gas to main kitchen, kasbah kitchen, Pranzi restaurant.
  • 18. Introducing with BoilerIntroducing with Boiler We have diesel driven boiler for laundry steam 500 litter*2 numbers . It can produce steam 3000 liter / hr. And the fuel cost is about 20/25 liter/hr. This boiler model MEL500TL-100N Resection Number BA.BO.8185 New one Resection one Proses
  • 19.
  • 20.
  • 21.
  • 22. Introducing With the Maintenance TeamIntroducing With the Maintenance Team
  • 23. Engineering is open and working 24 hours a day!
  • 24. 1. All Guest rooms to be service 3 times a year (Quarterly). 2.All Guest room corridors to service as above. 3.All restaurant furnitures to be service 3 times a year.
  • 25. 1.All HVAC equipment‘s (FCU, Pumps, Chillers, Cooling Tower etc.) 2.All Electrical DB to be service 3 times a year (Quarterly) 3.All plumbing pumps (service 3 times a year (Quarterly) 4.Boilers & laundry Service 2 time yearly 5.Generators and BBT Service 2 time yearly 6.All kitchen equipment Service 3 time yearly 7.Sub-station Equipment maintenance service 2 time yearly 8.WTP ,STP WWTP, All Equipment Service 3 time yearly. 9. Fire protection & detection service 2 time yearly. 10. Building Maintenance Paint & other renovation works 1 times yearly.
  • 27. ....
  • 28. Engineering works very closely with housekeeping in maintaining the quality of the physical guest room. Housekeepers are required to report problems with a guest room to engineering for repair. Front desk staff is responsible for reporting problems in the public area and lobby. The banquet/event staff is responsible for reporting problem areas in the banquet and event rooms. Maintenance vs. Repair Maintenance is the repair and upkeep of the internal and external hotel structure and equipment. Repairs can be costly, routine maintenance can prevent and delay repairs.