Fire blight of apple; one of the viral plant bacterial disease
ย
AIETT and ITCC seminar on Ener Con in Hospitality
1. Typical Steam Utilization Areas in a
Hotel
BOILER
LAUNDRY
KITCHEN
HEALTH CLUB
HOT WATER FOR
ROOMS
AIETT and ITCC seminar on Ener Con in Hospitality Valentine Philips - +66 819020690June 9.2016
2. Steam Load Calculations
Thumb Rules for Calculations:-
Laundry
1.โฏ A 5 star hotel requires 11 kg/room of linen.
2.โฏ Steam required for Linen is 1.4 kg/kg of linen
3.โฏ Steam required for linen in other areas like restaurant,
bangquets, pubs, common areas will be additonal 5kg /
room /day
4.โฏ Additional steam required for laundry for employees will
be 4 Kg/room / day
Hot Water Generation: -
Hot water required for bath is 25 litres/ person /bath
AIETT and ITCC seminar on Ener Con in Hospitality Valentine Philips - +66 819020690June 9.2016
3. Steam Load Calculations for 100 room hotel
Laundry:
1.โฏ Steam load for rooms = 11 x 1.4 = 15.40 kg/room/day
2.โฏ Steam loads for common area = 4 kg/room/day
3.โฏ Steam load for laundry for equipment = 4 kg/day
4.โฏ Total steam for load = 23.4 kg/room/day say 24 kg/room.
5.โฏ For 100 rooms, total steam load = 24 x 100 = 2400 kg/room/day
6.โฏ Assuming 8 hours of peak operation. Steam reqd =2400/8 = 300 kg/h
Steam for Hot water: On double occupancy basis:
1.โฏ Hot water for shower = 100 x 2 x 25 = 5000 ltr
2.โฏ Assuming half of them will have shower in eve. So hot water
Requirement will be 2500 ltr.
3.โฏ Hot water for requirement in common areas = 7500 ltrs
(double the water for bath)
AIETT and ITCC seminar on Ener Con in Hospitality Valentine Philips - +66 819020690June 9.2016
4. Steam Load Calculations for 100 room hotel (Contd..)
Total Hot water requirement for the hotel = 5000 + 2500 + 7500
= 15,000 lt/day.
Hot water peak requirement will be between 5 to 9 in the morning and between 6 to 10
In the evening.
Hence the total hot water requirement per hour = 15000/8 = 1875 lph
Steam requirement = (1875 x 35) / 518 = 126 kg/hr
(Considering inlet of cold water is at 35 and hotwater at outlet is 65 Diff temp = 35)
Kitchen: Steam for kitchen will be 100 kg/hr.
Hence total steam load = 300 + 126+ 100 = 526 kg/hr.
Hence the boiler capacity recommended will be 2 nos x 750 kg/hr
boiler and 2 nos x 1.87 m3/hr Hot water generator (Heat Max).
AIETT and ITCC seminar on Ener Con in Hospitality Valentine Philips - +66 819020690June 9.2016
5. Steam Load Calculations for different room configurations
Nos. of
Rooms Laundry
Hot
Wate
rr
Steam for Hot
water Kitchen Total
Boiler &
Heat Max.
capacity
Kg/hr LPH Kg/hr Kg/hr Kg/hr
100 300 1875 126.69 100 526.69
2 Nos x 750 Kg/hr & 2 Nos
x 1.87 m3/hr
200 600 3750 253.38 100 953.38
2 Nos x 1100 Kg/hr & 2
Nos x 3.75 m3/hr
300 900 5625 380.07 150 1430.07
2 Nos x 2000 Kg/hr & 2
Nos x 5.62 m3/hr
400 1200 7500 506.76 175 1881.76
2 Nos x 2500 Kg/hr & 2
Nos x 7.5 m3/hr
AIETT and ITCC seminar on Ener Con in Hospitality Valentine Philips - +66 819020690June 9.2016
6. Typical P & I Diagrams for Hospitality
1 2 3
2 3 4 51
AIETT and ITCC seminar on Ener Con in Hospitality Valentine Philips - +66 819020690June 9.2016
7. WHAT NEEDS TO BE LOOKED FOR
IN your Industry
SPECIALIZED
CONSULTANCY
ENERGY AUDITS
BOILER
HOT WATER
GENERATOR HEAT MAX
CONDENSATE
RECOVERY SYSTEMS
AIETT and ITCC seminar on Ener Con in Hospitality Valentine Philips - +66 819020690June 9.2016
8. WHAT NEEDS TO BE LOOKED FOR
IN your Industry
SPECIALIZED
CONSULTANCY
ENERGY AUDITS
BOILER
HOT WATER
GENERATOR HEATMAX
CONDENSATE
RECOVERY SYSTEMS
AIETT and ITCC seminar on Ener Con in Hospitality Valentine Philips - +66 819020690June 9.2016
9. WHAT NEEDS TO BE LOOKED FOR
IN your Industry
SPECIALIZED
CONSULTANCY
ENERGY AUDITS
BOILER
HOT WATER
GENERATOR HEAT MAX
CONDENSATE
RECOVERY SYSTEMS
AIETT and ITCC seminar on Ener Con in Hospitality Valentine Philips - +66 819020690June 9.2016
10. WHAT NEEDS TO BE LOOKED FOR
IN your Industry
SPECIALISED
CONSULTANCY
ENERGY AUDITS
BOILER
HOT WATER
GENERATOR HEAT MAX
CONDENSATE
RECOVERY SYSTEMS
AIETT and ITCC seminar on Ener Con in Hospitality Valentine Philips - +66 819020690June 9.2016
11. WHAT NEEDS TO BE LOOKED FOR
IN your Industry
CONSULTANCY
ENERGY AUDITS
BOILER
HOT WATER
GENERATOR HEAT MAX
CONDENSATE
RECOVERY SYSTEMS
AIETT and ITCC seminar on Ener Con in Hospitality Valentine Philips - +66 819020690June 9.2016
12. How we add value to Any project:
v๏ถโฏCalculate the capacity of the boiler depending on the steam loads
and process load variations. Thereby ensuring that optimum boiler
capacity is chosen.
v๏ถโฏDesigning the system so as to ensure that maximum condensate is
recovered and hence make system economical to run
v๏ถโฏDesign the piping so as to reduce the pressure drops and ensure
that machines receive steam in optimum quantity and quality.
v๏ถโฏDesigning of hot water system to ensure that
v๏ถโฏTemperature fluctuations are kept to a minimum
v๏ถโฏThe temperature demands are met in the optimum
manner.
v๏ถโฏSystem on the whole reduces losses and is economical.
AIETT and ITCC seminar on Ener Con in Hospitality Valentine Philips - +66 819020690June 9.2016
13. ALSO CHECK
n๏ฎโฏ QUALITY OF STEAM
n๏ฎโฏ PRODUCING RIGHT QUALITY OF
STEAM
n๏ฎโฏ PRODUCING GOOD QUALITY HOT
WATER, AT THE RIGHT TEMP AND AT
RIGHT TIME.
n๏ฎโฏ RECLAIMING WASTE HEAT FROM
CONDENSATE, AND FLASH STEAM
n๏ฎโฏ Do regular Audits.
AIETT and ITCC seminar on Ener Con in Hospitality Valentine Philips - +66 819020690June 9.2016
14. Problems due to Wet steam in
Hospitality Industry
n๏ฎโฏ Increased batch timings
n๏ฎโฏ Rework of batches
n๏ฎโฏ Flooding of the heat exchange coils in dryers,
Presses, calendria m/c etc
n๏ฎโฏ Staining of garments
n๏ฎโฏ Corrosion of pipes
n๏ฎโฏ Damage to instruments on the steam line
AIETT and ITCC seminar on Ener Con in Hospitality Valentine Philips - +66 819020690June 9.2016
15. n๏ฎโฏSELECTION OF
RIGHT TYPE OF
BOILER
AIETT and ITCC seminar on Ener Con in Hospitality Valentine Philips - +66 819020690June 9.2016
17. SHELL TYPE BOILER:
THATโS HOW IT WORKS
AIETT and ITCC seminar on Ener Con in Hospitality Valentine Philips - +66 819020690June 9.2016
18. AIETT and ITCC seminar on Ener Con in Hospitality Valentine Philips - +66 819020690June 9.2016
19. THE DIFFERENCE BETWEEN ORDINARY AND
EXTRAORDINARY IS
COIL TYPE SHELL TYPE
v๏ถWET STEAM รป๏ป v๏ถDRY STEAM รผ๏ผ
v๏ถCOND. RETURN รป๏ป v๏ถCOND. RETURN รผ๏ผ
v๏ถLDO / HSD รป๏ป v๏ถFURNACE OIL รผ๏ผ
v๏ถMAINTENANCE รผ๏ผ v๏ถMAINTENANCE รป๏ป
v๏ถEFFICIENCY รป๏ป v๏ถEFFICIENCY รผ๏ผ
Guaranteed savings in operating cost to the tune of
20-40% of the annual fuel bill
AIETT and ITCC seminar on Ener Con in Hospitality Valentine Philips - +66 819020690June 9.2016
20. The Proofโฆโฆ..
Plant Industry Replacement Saving L/year Measure
Polybond. Pune Rubber 600 x 2 & 400 x
2 Replaced with
2 TPH IBR
12 1440 ltrs/day
of LDO- 1257
ltrs/day of FO
Dodhia
Synthetics.
Bhiwandi
Textile 600x2 NIBR
replaced with
2TPH IBR
8 30%
improvement in
fuel
consumption
MTZ India.
Dombivali.
Chemical 2x400 replaced
with 1 TPH
IBR
8 40%
improvement in
fuel
consumption
Sarla Polyester.
Vapi
Textile 2x600 replaced
with 1 TPH
IBR
10 300 lit. per day
Dr. Reddy's
Lab. Hyd.
Pharma 3x 600 replaced
with 3 TPH
IBR
28 230 lit/hr
Diesel- 164
lit/hr FO
Miami Pharma.
Pune.
Pharma 400 x 3 nos +
600 x 1no,
replaced with
1120 kg/hr x
1no IBR
11 300 ltrs/day of
FO with
additional
steam using
equipment
AIETT and ITCC seminar on Ener Con in Hospitality Valentine Philips - +66 819020690June 9.2016
21. Hot Water Systems โ HEAT MAX
AIETT and ITCC seminar on Ener Con in Hospitality Valentine Philips - +66 819020690June 9.2016
22. P&ID of Package Plant Room System
AIETT and ITCC seminar on Ener Con in Hospitality Valentine Philips - +66 819020690June 9.2016
23. Comparative Features
Parameter PHE Shell & Tube
Weight 1 6
Space 1 7
Hold up 1 10
AIETT and ITCC seminar on Ener Con in Hospitality Valentine Philips - +66 819020690June 9.2016
24. Salient Features of PPRS
โถโฏ Size
โถโฏ Accuracy of temperature control
โถโฏ Ability to meet demand fluctuations
โถโฏ Low initial cost due to basic design
โถโฏ Flexible design
โถโฏ Pre wired and skid mounted
โถโฏ High Quality design with SS316 plates, pumping trap
system to remove condensate , overheat protection loop
along with standard controls
AIETT and ITCC seminar on Ener Con in Hospitality Valentine Philips - +66 819020690June 9.2016
25. Condensate Recovery
Systems
Recover heat and Increase
your process Efficiency !!!
AIETT and ITCC seminar on Ener Con in Hospitality Valentine Philips - +66 819020690June 9.2016
26. Why Return Condensate ?
ร๏โฏCondensate is such a valuable resource that even recovery
of a small amount is economically justifiable.
ร๏โฏAny condensate not returned will have to be replaced with
make up water, hence increasing the water cost
ร๏โฏDraining of condensate is restricted in global std plants
ร๏โฏ No Boiler derating hence the output is maximized
ร๏โฏThe condensate being pure water the cost of treating the
feed water will reduce considerably.
ร๏โฏEvery 6 Deg rise in feed water temperature will reduce the
fuel bill by 1% AIETT and ITCC seminar on Ener Con in Hospitality Valentine Philips - +66 819020690June 9.2016
27. AIETT and ITCC seminar on Ener Con in Hospitality Valentine Philips - +66 819020690June 9.2016
28. AIETT and ITCC seminar on Ener Con in Hospitality Valentine Philips - +66 819020690June 9.2016
29. AIETT and ITCC seminar on Ener Con in Hospitality Valentine Philips - +66 819020690June 9.2016
30. AIETT and ITCC seminar on Ener Con in Hospitality Valentine Philips - +66 819020690June 9.2016
31. Mechanical Condensate recovery
pump system
n๏ฎโฏ The system uses steam/compressed air as a prime mover
to pump the condensate back to the feed water tank.
n๏ฎโฏ Minimum moving parts ensure that maintenance problems
are removed.
n๏ฎโฏ Flash steam which is recovered from the FV can be used
back into the system as LP steam
n๏ฎโฏ The energy consumed will be less than a centrifugal pump
and issues like cavitation will not be removed
AIETT and ITCC seminar on Ener Con in Hospitality Valentine Philips - +66 819020690June 9.2016
33. Modus Operandi
n๏ฎโฏ A detailed study of existing
n๏ฎโฏ Boilers including all accessories.
n๏ฎโฏ Steam distribution networks to point of consumption
n๏ฎโฏ All equipment using steam.
n๏ฎโฏ Condensate handling system
n๏ฎโฏ Study the various possibilities of
n๏ฎโฏ Process improvement
n๏ฎโฏ Maximum condensate recovery
n๏ฎโฏ Installation of devices to monitor process performance
n๏ฎโฏ Recommend
n๏ฎโฏ Energy savings proposals with little or minimum
investment
n๏ฎโฏ Investment proposals on different scenarios with pay
back calculations
AIETT and ITCC seminar on Ener Con in Hospitality Valentine Philips - +66 819020690June 9.2016
34. THANK YOU
AIETT and ITCC seminar on Ener Con in Hospitality Valentine Philips - +66 819020690June 9.2016