R.S.MAHESH NARAYANAN
PT.Saipem Indonesia,
Jangkrik Complex Project - FPU Mob: 0062-81364507832
Karimun, Indonesia Email: maheshsep15@gmail.com
PLANNING & PROJECT CONTROL ENGINEER / QUANTITY SURVEYOR
Responsible and hardworking individual who has great experience in project management
and project management software, previous academic qualification and experience guide
me to achieve the duties and responsibilities with the highest standards and effectively within
a team. Occupational strength follows:
 Scheduling activities in P6 software and managing activities as per schedule.
 Bid proposals, Project estimation, Quality control, Budget management, Client
relation & Problem resolution.
PROFESSIONAL EXPERIENCE
Saipem-Indonesia 2014 - Till Now
Project: Jangkrik Complex Project - FPU
Client: Eni
Designation: Planning Engineer
 Ensure Project Schedule, Planning and Project control systems are in compliance
with the projects work break down structures, company standard method of
construction and specification.
 Coordinate with other department personnel or leaders to ensure the activities, logic
and milestones are complied with their requirements.
 Ensure that the Project Baseline are well communicated with all the discipline
Head/Supervisors and Project Manager.
 Ensure that Project Schedule should complied with the Planning/Scheduling
procedure and Progress Measurement procedure, and issue to Project Control
Manager for verification.
 Verify Engineering and Procurement delivery should meet Project Schedule
requirement and finding deviation if any item delayed to the schedule activities.
 During project execution find the variance between baseline logic and actual logic,
and forecast the schedule accordingly.
 Make sure that the Progress Measurement procedure are complied with the Project
quantities and scope of work.
 Communicating progress status and forecast schedule to the team.
 The cause of delays and deviation from the contractual agreement will be clearly
identified and highlight to the contract team for their further action.
 Prepare 3 Months Look Ahead, highlight the variance and reason of variance
between 3 MLA and baseline to the Project Manager for necessary action.
 Attending Internal and Client weekly meeting.
 Comparing Production Look Ahead are complied with the project forecast schedule
and updated Engineering and Procurement plan.
HSL Constructor Pte Ltd, Singapore 2013 - 2014
Project: ECC Debottlenecking & Flare Project (Offshore Project)
Client: Toyo / Shell
Designation: Planning & Project Control Engineer
 Development of Baseline schedule by using Primavera P8 software.
 Preparation of Weekly; Monthly & Three Months look-ahead Schedule. Updating
actual Progress and all related information & comparison analysis.
 Finding reasons of delay in progress schedule.
 Calculation of resources for project which can not affect the cost of the project.
 Monitoring budget & cost impact of project.
 Preparation of Executive Progress Summary Report / Presentations to the Top
Management on Project Status for periodical review.
 Weekly progress meeting and construction sequence meetings to finalise the
sequence of critical activities or critical structures (such as cooling tower
constructions).
 Attending weekly internal meeting and explaining the variances in project, reasons of
delay to start activities and detailed 3 weeks look ahead to site in charges.
 Giving correct direction to project manager and construction manager to complete
the project on time.
 Preparing overall S curves and various projects S – curves to clients and
subcontractors.
Al – Khodari & Sons, Saudi Arabia 2011 – 2013
Project: Wasit Gas Processing Facilities
Client: Saudi Aramco & SK (E & C)
Designation: Construction Planning & Project Control Engineer
 Responsible for preparing weekly and daily activities in P6 software and comparing
plan and actual activities in site.
 Coordinating with Site engineer and supervisors and discuss negative variances in
master schedule.
 Providing safety instruction and guidelines to ensure safety in construction site.
 Responsible for monitoring and overseeing the activities of contractors.
 Attending Weekly progress meeting with clients and discussing to cover up the
negative variance.
 Manage project to finish within a timeframe.
 If any negative variance occurs, prepare project revised schedule to cover up
variances.
 Refer drawings to guide site engineers & supervisors.
 Management of Project cost from foundation to end of project.
 Quantities take off to analyze the discrepancies between budget Man-Hours and
Actual Man-Hours.
 Management and control measurements, statistics, and daily progress.
 Coordinating meeting with client and subcontractors and attending weekly internal
meeting..
Manarah Al-jubail Co.Ltd, Saudi Arabia 2007 – 2009
Project: Saudi Kayan Petrochemical Project
Client: Petro Steel Co. Ltd (Rotary Engineering Ltd of Singapore)
Designation: Scheduler & Project control engineer
 Develop schedules for various projects (Eg: Tank structures, pipe racks, pipe sleepers,
sulphur pits, sump pits, two storey buildings, maintenance building)
 Attending weekly progress meeting & preparing weekly progress reports in excel &
primavera.
 Coordinating with site engineers of various projects and discuss progress, variances.
 Maintaining project to finish within a time frame. Finding variances of tasks and
preparing revised schedule to finish the tasks.
 Controlling drawings of various projects and making change order.
 Evaluate all design of construction and prepare schedule of construction.
 Quantity takes off for billing and controlling cost of schedules.
 Report delays to project management team, project engineer & field staff so that
appropriate actions may be taken to mitigate delays.
 Preparing and updating progress S-Curves.
 Preparing and submitting weekly and monthly reports to clients.
 Prepare estimates for various projects.
 Prepare project BOQ and contracts, detailed quantity take-offs, progress payments, S-
curves, variation order, claims for extension of time.
 Coordinating with client quantity surveyor and reconcile regarding the comments on
the submitted change order cost estimates.
Sobha Developers Ltd 2006 – 2007
Project: Sobha Developers Ltd (High rise building & HR development center)
Designation: Planning Engineer
 My activity includes preparing progress report and sending to main office for review.
Preparing revised schedule, material and manpower status.
 Attending weekly progress meeting.
 Plan Engineering, Procurement & Construction & Plan risky factors before project
starts.
 Updating progress S curves and finding negative variances.
 Control documents of purchase orders and drawings.
 Arrange site meeting to discuss delay in project.
SNC Power Corporation Ltd 2005 – 2006
Project: Thermal Power Station & High Rise Building
Designation: Site Engineer & Planning Engineer.
 In-charge of Pre-treatment area includes Fire/clarified water storage tank, de-
mineralized water pump house, circular water tank (ϕ 15m).
 Worked with enthusiastic team members and guided by valuable superiors.
 Involved in preparation of structural detailing of steel and Quantity surveying.
 Preparation of site progress report and report daily programming to project manager.
 Preparing Project quantities in complied with Engineering Drawing.
 Organizing labor and materials.
 Responsibilities include executing the site as per planning and conducting meetings
with client.
 Training to workers to obey Health and Safety on the site activities.
ACADEMIC QUALIFICATION AND DISSERTATION
Master Degree - MSc – Civil Engineering
University of East London, London, UK
Graduated on Jun’2011
Grade Obtained 2:1
DISSERTATION (Construction Management Based)
Topic: The challenge of increasing the adoption rate of BIM in UK construction industry
Building information modeling is one of the important technologies that are gradually changing the
global construction industry. BIM is a technology which use design, construction and management.
BACHLOR OF ENGINEERING - Civil Engineering (2001 – 2005)
Annamalai University, India
Grade obtained 7.5 (OGPA)
DISSERTATION
Topic: Designing and Analyzing Twin Truss,
a team of two members, we have developed a twin truss model. Twin Shed is a Steel Structure
comprising of twin roof truss. It is modelled and Analysed by using STAAD Pro 2004 and Designed
by using MS Excel as per IS 800 and IS 456.
EXPERIENCE AND TRAINING
 Totally 9 years of overseas experience in Construction field.
 Feasibility study in the topic of Thames Gateway Crossing during first semester of Master
degree.
 Master diploma in Civil Cadd.
 Training (Primavera – 6) from construction organization during my work career.
ADDITIONAL SKILLS
 In-depth knowledge of project management, budget and estimation, resource and schedule
planning.
 Excellent knowledge in Quantity Survey & Estimation.
 Ample Knowledge in Surveying with Total Station and levelling instrument.
 Good experience in preparing bar bending schedule.
 Excellent Knowledge in Primavera and Archicadd Software.
 Good managing ability in site and office.
 Member of YOGA Centre.
 WSQ COURSE – Workforce skills qualification, supervise workplace safety and health in
process plant.
PERSONAL PROFILE
Profession : Planning Engineer / Project Control Engineer
DOB : 15/05/1983
Passport No : G1908111
Marital status : Single
Gender : Male
Nationality : Indian
Visa Status : Work Permit - Indonesia
Present Salary : $ 4000 + Allowance
Expected Salary : $ 7000 + Allowance
Known languages : English, Hindi, Tamil and Kanada.
DECLARATION
I do hereby declare that the above information provided by me is true and correct to the best of my
knowledge.
Place : Indonesia Yours faithfully,
Date : 12/07/2015 R.S.Mahesh Narayanan

More Related Content

What's hot

Pankaj Resume - Construction Project Manager
Pankaj Resume - Construction Project ManagerPankaj Resume - Construction Project Manager
Pankaj Resume - Construction Project ManagerPankaj Singh
 
Robert W Self Resume 2009
Robert W Self Resume 2009Robert W Self Resume 2009
Robert W Self Resume 2009guest3e8191
 
planning engineer resume of shahid akhtar siddiqui
planning engineer resume of shahid akhtar siddiquiplanning engineer resume of shahid akhtar siddiqui
planning engineer resume of shahid akhtar siddiquishahid siddiqui
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Amir Mohammed
 
Resume Built Using Primavera P6
Resume Built Using Primavera P6Resume Built Using Primavera P6
Resume Built Using Primavera P6Mujahid Ali Akhtar
 
Resume for Senior Manager - projects
Resume for  Senior Manager -  projectsResume for  Senior Manager -  projects
Resume for Senior Manager - projectspramod patel
 
Dale Buzzelli Resume
Dale Buzzelli ResumeDale Buzzelli Resume
Dale Buzzelli ResumeDale Buzzelli
 
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...Sanad samir Project Quality Control, Electrical, Instrumentation Construction...
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...Sanad Samir
 
Venkatesh- planning CV
Venkatesh- planning CVVenkatesh- planning CV
Venkatesh- planning CVVenkatesh -
 
Romy George civil site engineer.
Romy George civil site engineer.Romy George civil site engineer.
Romy George civil site engineer.Romy george
 
Saddam Gogi - CV - MECH
Saddam Gogi - CV - MECHSaddam Gogi - CV - MECH
Saddam Gogi - CV - MECHSaddam Gogi
 
Saddam Gogi - CV - MECH
Saddam Gogi - CV - MECHSaddam Gogi - CV - MECH
Saddam Gogi - CV - MECHSaddam Gogi
 

What's hot (20)

Pankaj Resume - Construction Project Manager
Pankaj Resume - Construction Project ManagerPankaj Resume - Construction Project Manager
Pankaj Resume - Construction Project Manager
 
Robert W Self Resume 2009
Robert W Self Resume 2009Robert W Self Resume 2009
Robert W Self Resume 2009
 
Steve Clark CV 2015
Steve Clark CV 2015Steve Clark CV 2015
Steve Clark CV 2015
 
planning engineer resume of shahid akhtar siddiqui
planning engineer resume of shahid akhtar siddiquiplanning engineer resume of shahid akhtar siddiqui
planning engineer resume of shahid akhtar siddiqui
 
K. Srinivas Rao- CV - QS
K. Srinivas Rao- CV - QSK. Srinivas Rao- CV - QS
K. Srinivas Rao- CV - QS
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...
 
cv_rajesh_kachhawah
cv_rajesh_kachhawahcv_rajesh_kachhawah
cv_rajesh_kachhawah
 
chandankumar
chandankumarchandankumar
chandankumar
 
Resume Built Using Primavera P6
Resume Built Using Primavera P6Resume Built Using Primavera P6
Resume Built Using Primavera P6
 
Resume
ResumeResume
Resume
 
Resume for Senior Manager - projects
Resume for  Senior Manager -  projectsResume for  Senior Manager -  projects
Resume for Senior Manager - projects
 
11 year Exp in Instrumentation Field.
11 year Exp in Instrumentation Field.11 year Exp in Instrumentation Field.
11 year Exp in Instrumentation Field.
 
Dale Buzzelli Resume
Dale Buzzelli ResumeDale Buzzelli Resume
Dale Buzzelli Resume
 
U pdated resume #7.pdf
U pdated resume #7.pdfU pdated resume #7.pdf
U pdated resume #7.pdf
 
Henry CV
Henry CVHenry CV
Henry CV
 
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...Sanad samir Project Quality Control, Electrical, Instrumentation Construction...
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...
 
Venkatesh- planning CV
Venkatesh- planning CVVenkatesh- planning CV
Venkatesh- planning CV
 
Romy George civil site engineer.
Romy George civil site engineer.Romy George civil site engineer.
Romy George civil site engineer.
 
Saddam Gogi - CV - MECH
Saddam Gogi - CV - MECHSaddam Gogi - CV - MECH
Saddam Gogi - CV - MECH
 
Saddam Gogi - CV - MECH
Saddam Gogi - CV - MECHSaddam Gogi - CV - MECH
Saddam Gogi - CV - MECH
 

Similar to Mahesh - Resume (3) (20)

Soumyajit Das
Soumyajit DasSoumyajit Das
Soumyajit Das
 
CV Khaja Raheemuddin Sr. Planning Engineer
CV Khaja Raheemuddin Sr. Planning EngineerCV Khaja Raheemuddin Sr. Planning Engineer
CV Khaja Raheemuddin Sr. Planning Engineer
 
kiran Planning sche engineer CV
kiran Planning sche engineer CVkiran Planning sche engineer CV
kiran Planning sche engineer CV
 
SASI NEW RESUME
SASI NEW RESUMESASI NEW RESUME
SASI NEW RESUME
 
Shehreyar planning & Costing Engr
Shehreyar planning & Costing EngrShehreyar planning & Costing Engr
Shehreyar planning & Costing Engr
 
Planning Engineer
Planning EngineerPlanning Engineer
Planning Engineer
 
Nawaz Eng-OCT
Nawaz Eng-OCTNawaz Eng-OCT
Nawaz Eng-OCT
 
Cv Anirudh
Cv AnirudhCv Anirudh
Cv Anirudh
 
Shakeel Sarwar CV Civil+QS.July-2015
Shakeel Sarwar CV Civil+QS.July-2015Shakeel Sarwar CV Civil+QS.July-2015
Shakeel Sarwar CV Civil+QS.July-2015
 
Ahmed EL Gamal CV
Ahmed EL Gamal CVAhmed EL Gamal CV
Ahmed EL Gamal CV
 
C.V
C.VC.V
C.V
 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated Resume
 
CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5
 
CV Shreenivash Chandra
CV Shreenivash ChandraCV Shreenivash Chandra
CV Shreenivash Chandra
 
Planning Engr Samar Abbas
Planning Engr Samar AbbasPlanning Engr Samar Abbas
Planning Engr Samar Abbas
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
New_Hissam_CV (3).PDF
New_Hissam_CV (3).PDFNew_Hissam_CV (3).PDF
New_Hissam_CV (3).PDF
 
ADARSH kUMAR
ADARSH kUMARADARSH kUMAR
ADARSH kUMAR
 
- CV Planning Engr - Clinton Chidi -Jan 2023.docx
- CV Planning Engr - Clinton Chidi -Jan 2023.docx- CV Planning Engr - Clinton Chidi -Jan 2023.docx
- CV Planning Engr - Clinton Chidi -Jan 2023.docx
 
Peter Khalil CV
Peter Khalil CVPeter Khalil CV
Peter Khalil CV
 

Mahesh - Resume (3)

  • 1. R.S.MAHESH NARAYANAN PT.Saipem Indonesia, Jangkrik Complex Project - FPU Mob: 0062-81364507832 Karimun, Indonesia Email: maheshsep15@gmail.com PLANNING & PROJECT CONTROL ENGINEER / QUANTITY SURVEYOR Responsible and hardworking individual who has great experience in project management and project management software, previous academic qualification and experience guide me to achieve the duties and responsibilities with the highest standards and effectively within a team. Occupational strength follows:  Scheduling activities in P6 software and managing activities as per schedule.  Bid proposals, Project estimation, Quality control, Budget management, Client relation & Problem resolution. PROFESSIONAL EXPERIENCE Saipem-Indonesia 2014 - Till Now Project: Jangkrik Complex Project - FPU Client: Eni Designation: Planning Engineer  Ensure Project Schedule, Planning and Project control systems are in compliance with the projects work break down structures, company standard method of construction and specification.  Coordinate with other department personnel or leaders to ensure the activities, logic and milestones are complied with their requirements.  Ensure that the Project Baseline are well communicated with all the discipline Head/Supervisors and Project Manager.  Ensure that Project Schedule should complied with the Planning/Scheduling procedure and Progress Measurement procedure, and issue to Project Control Manager for verification.  Verify Engineering and Procurement delivery should meet Project Schedule requirement and finding deviation if any item delayed to the schedule activities.  During project execution find the variance between baseline logic and actual logic, and forecast the schedule accordingly.  Make sure that the Progress Measurement procedure are complied with the Project quantities and scope of work.  Communicating progress status and forecast schedule to the team.  The cause of delays and deviation from the contractual agreement will be clearly identified and highlight to the contract team for their further action.
  • 2.  Prepare 3 Months Look Ahead, highlight the variance and reason of variance between 3 MLA and baseline to the Project Manager for necessary action.  Attending Internal and Client weekly meeting.  Comparing Production Look Ahead are complied with the project forecast schedule and updated Engineering and Procurement plan. HSL Constructor Pte Ltd, Singapore 2013 - 2014 Project: ECC Debottlenecking & Flare Project (Offshore Project) Client: Toyo / Shell Designation: Planning & Project Control Engineer  Development of Baseline schedule by using Primavera P8 software.  Preparation of Weekly; Monthly & Three Months look-ahead Schedule. Updating actual Progress and all related information & comparison analysis.  Finding reasons of delay in progress schedule.  Calculation of resources for project which can not affect the cost of the project.  Monitoring budget & cost impact of project.  Preparation of Executive Progress Summary Report / Presentations to the Top Management on Project Status for periodical review.  Weekly progress meeting and construction sequence meetings to finalise the sequence of critical activities or critical structures (such as cooling tower constructions).  Attending weekly internal meeting and explaining the variances in project, reasons of delay to start activities and detailed 3 weeks look ahead to site in charges.  Giving correct direction to project manager and construction manager to complete the project on time.  Preparing overall S curves and various projects S – curves to clients and subcontractors. Al – Khodari & Sons, Saudi Arabia 2011 – 2013 Project: Wasit Gas Processing Facilities Client: Saudi Aramco & SK (E & C) Designation: Construction Planning & Project Control Engineer  Responsible for preparing weekly and daily activities in P6 software and comparing plan and actual activities in site.  Coordinating with Site engineer and supervisors and discuss negative variances in master schedule.  Providing safety instruction and guidelines to ensure safety in construction site.  Responsible for monitoring and overseeing the activities of contractors.  Attending Weekly progress meeting with clients and discussing to cover up the negative variance.  Manage project to finish within a timeframe.  If any negative variance occurs, prepare project revised schedule to cover up variances.  Refer drawings to guide site engineers & supervisors.  Management of Project cost from foundation to end of project.
  • 3.  Quantities take off to analyze the discrepancies between budget Man-Hours and Actual Man-Hours.  Management and control measurements, statistics, and daily progress.  Coordinating meeting with client and subcontractors and attending weekly internal meeting.. Manarah Al-jubail Co.Ltd, Saudi Arabia 2007 – 2009 Project: Saudi Kayan Petrochemical Project Client: Petro Steel Co. Ltd (Rotary Engineering Ltd of Singapore) Designation: Scheduler & Project control engineer  Develop schedules for various projects (Eg: Tank structures, pipe racks, pipe sleepers, sulphur pits, sump pits, two storey buildings, maintenance building)  Attending weekly progress meeting & preparing weekly progress reports in excel & primavera.  Coordinating with site engineers of various projects and discuss progress, variances.  Maintaining project to finish within a time frame. Finding variances of tasks and preparing revised schedule to finish the tasks.  Controlling drawings of various projects and making change order.  Evaluate all design of construction and prepare schedule of construction.  Quantity takes off for billing and controlling cost of schedules.  Report delays to project management team, project engineer & field staff so that appropriate actions may be taken to mitigate delays.  Preparing and updating progress S-Curves.  Preparing and submitting weekly and monthly reports to clients.  Prepare estimates for various projects.  Prepare project BOQ and contracts, detailed quantity take-offs, progress payments, S- curves, variation order, claims for extension of time.  Coordinating with client quantity surveyor and reconcile regarding the comments on the submitted change order cost estimates. Sobha Developers Ltd 2006 – 2007 Project: Sobha Developers Ltd (High rise building & HR development center) Designation: Planning Engineer  My activity includes preparing progress report and sending to main office for review. Preparing revised schedule, material and manpower status.  Attending weekly progress meeting.  Plan Engineering, Procurement & Construction & Plan risky factors before project starts.  Updating progress S curves and finding negative variances.  Control documents of purchase orders and drawings.  Arrange site meeting to discuss delay in project.
  • 4. SNC Power Corporation Ltd 2005 – 2006 Project: Thermal Power Station & High Rise Building Designation: Site Engineer & Planning Engineer.  In-charge of Pre-treatment area includes Fire/clarified water storage tank, de- mineralized water pump house, circular water tank (ϕ 15m).  Worked with enthusiastic team members and guided by valuable superiors.  Involved in preparation of structural detailing of steel and Quantity surveying.  Preparation of site progress report and report daily programming to project manager.  Preparing Project quantities in complied with Engineering Drawing.  Organizing labor and materials.  Responsibilities include executing the site as per planning and conducting meetings with client.  Training to workers to obey Health and Safety on the site activities. ACADEMIC QUALIFICATION AND DISSERTATION Master Degree - MSc – Civil Engineering University of East London, London, UK Graduated on Jun’2011 Grade Obtained 2:1 DISSERTATION (Construction Management Based) Topic: The challenge of increasing the adoption rate of BIM in UK construction industry Building information modeling is one of the important technologies that are gradually changing the global construction industry. BIM is a technology which use design, construction and management. BACHLOR OF ENGINEERING - Civil Engineering (2001 – 2005) Annamalai University, India Grade obtained 7.5 (OGPA) DISSERTATION Topic: Designing and Analyzing Twin Truss, a team of two members, we have developed a twin truss model. Twin Shed is a Steel Structure comprising of twin roof truss. It is modelled and Analysed by using STAAD Pro 2004 and Designed by using MS Excel as per IS 800 and IS 456. EXPERIENCE AND TRAINING  Totally 9 years of overseas experience in Construction field.  Feasibility study in the topic of Thames Gateway Crossing during first semester of Master degree.  Master diploma in Civil Cadd.
  • 5.  Training (Primavera – 6) from construction organization during my work career. ADDITIONAL SKILLS  In-depth knowledge of project management, budget and estimation, resource and schedule planning.  Excellent knowledge in Quantity Survey & Estimation.  Ample Knowledge in Surveying with Total Station and levelling instrument.  Good experience in preparing bar bending schedule.  Excellent Knowledge in Primavera and Archicadd Software.  Good managing ability in site and office.  Member of YOGA Centre.  WSQ COURSE – Workforce skills qualification, supervise workplace safety and health in process plant. PERSONAL PROFILE Profession : Planning Engineer / Project Control Engineer DOB : 15/05/1983 Passport No : G1908111 Marital status : Single Gender : Male Nationality : Indian Visa Status : Work Permit - Indonesia Present Salary : $ 4000 + Allowance Expected Salary : $ 7000 + Allowance Known languages : English, Hindi, Tamil and Kanada. DECLARATION I do hereby declare that the above information provided by me is true and correct to the best of my knowledge. Place : Indonesia Yours faithfully, Date : 12/07/2015 R.S.Mahesh Narayanan