Stephen Clark is seeking employment as a Planner/P6 Scheduler, bringing over 25 years of construction experience. He has extensive experience developing schedules and coordinating projects to ensure they are completed safely, on time and under budget. He is proficient in Microsoft Office, Primavera P6, and coordinating materials, labor and subcontractors. Clark holds a degree from Stephen F. Austin University and has worked on projects across various industries both domestically and internationally.
Sr. Level Project Consultant with expertise in both EPC firms and as an Owner Representative Managed the E&I activities to meet the required project schedule from detailed design phase through project execution, completion and hand-over to Field Operations Group.
Sr. Level Project Consultant with expertise in both EPC firms and as an Owner Representative Managed the E&I activities to meet the required project schedule from detailed design phase through project execution, completion and hand-over to Field Operations Group.
I am submitting to express my keen interest in the position Sr. Electrical & Instrument Engineer
I am currently worked as Sr. Instrument Field Engineer at Egypt Khalda Petroleum Company (Apache) with 10+ years of overall experience at Construction, commissioning, start-up, planning and Engineering and I Expected Monthly Salary As project budget however my last total net salary 6300$
I worked as QA/QC E&I Engineer / Inspector at the world's largest gas to liquids (GTL) Pearl plant in Qatar, The plant a joint development by Qatar Petroleum and Shell, GTL feed about 15% of worldwide gas resources.
I worked as Sr. QA/QC E&I Engineer / Inspector client (SEPOC, SAFER Exploration & Production Operations Company) representative at the largest project at Yemen Central Processing Unit (CPU) LNG plant at Marib area with total and YLNG joint.
I worked as Sr. Electrical and Instrument Engineer /Supervisor at the largest project at Egypt, with Samsung Engineering.
I am a dedicated and driven professional with energy, commitment, integrity; good decision-making skills and the courage to take smart risks and to hold a position of responsibility commensurate with my experience and qualifications where I can best serve the interest of organization.
I would appreciate an opportunity to meet you to discuss how my experience that I have and will meet your needs.
Whitepaper: The ROI of Incentive Compensation ManagementIconixx
Learn how to make the business case for an Incentive Compensation Management system. Understand the ROI delivered by such solutions so that you can justify the ‘spend’ and feel confident that your organization will realize tangible and meaningful business results.
I am submitting to express my keen interest in the position Sr. Electrical & Instrument Engineer
I am currently worked as Sr. Instrument Field Engineer at Egypt Khalda Petroleum Company (Apache) with 10+ years of overall experience at Construction, commissioning, start-up, planning and Engineering and I Expected Monthly Salary As project budget however my last total net salary 6300$
I worked as QA/QC E&I Engineer / Inspector at the world's largest gas to liquids (GTL) Pearl plant in Qatar, The plant a joint development by Qatar Petroleum and Shell, GTL feed about 15% of worldwide gas resources.
I worked as Sr. QA/QC E&I Engineer / Inspector client (SEPOC, SAFER Exploration & Production Operations Company) representative at the largest project at Yemen Central Processing Unit (CPU) LNG plant at Marib area with total and YLNG joint.
I worked as Sr. Electrical and Instrument Engineer /Supervisor at the largest project at Egypt, with Samsung Engineering.
I am a dedicated and driven professional with energy, commitment, integrity; good decision-making skills and the courage to take smart risks and to hold a position of responsibility commensurate with my experience and qualifications where I can best serve the interest of organization.
I would appreciate an opportunity to meet you to discuss how my experience that I have and will meet your needs.
Whitepaper: The ROI of Incentive Compensation ManagementIconixx
Learn how to make the business case for an Incentive Compensation Management system. Understand the ROI delivered by such solutions so that you can justify the ‘spend’ and feel confident that your organization will realize tangible and meaningful business results.
There is a rule of thumb that applies to marketing in general and copywriting in particular. And here it is: If your product is complicated, makes it simple, and if it is simple then make it complicated.
The One Indispensable Factor of a Successful Marketing MessageRay Edwards
If it wags its tail, eats and barks like a dog, then it must be a dog. At least so goes common wisdom. Yet I’ve reviewed many a great pieces of copywriting with all the important elements–great headline, a great open, effective bullet points, remarkable close, guarantee and offer–and yet the copy fails to sell.
Pankaj Resume - Construction Project ManagerPankaj Singh
8+ years of Civil Engineering experience and 5.5 years of experience in Information Technology (Legacy Applications) with 5 years of onsite (USA) experience
SUMMARY OF SKILLS
Expertise in Estimation softwares like HIT Office etc.
MS Office Proficient
Excellent in Internet and email communication
Knowledge of AUTOCAD and Primavera - P6
Team Building & Leadership
Construction Planning & Scheduling
Quality Assurance (QA) & Quality Control (QC) eviews, using Root Cause Analysis
Communication management
Safety & Compliance Management
Vendor & Materials Management
HR management
Excellent Interpersonal skills
1. Stephen Lee Clark 726 Encino Dr.
New Braunfels, Texas 78130
Cell (830) 643-9499
E-Mail:roosterclark@gmail.com
Objective:
I am seeking employment, either in Planner/P6 Scheduler with a company where my proven leadership skills and
construction experience would be of great value.
Professional Profile:
I am a very self-motivated person who enjoys working as a team leader, but more importantly a team member, to
overcome any challenges that may arise while bringing projects in safely, on time and on budget. I have a wide
variety of experience pre staging and prioritizing projects, coordinating materials, and supervising labor to complete
projects safely, efficiently and on time. I am also quite proficient at communicating thoughts and plans verbally and
in writing to ensure the best outcome. I have been in the construction and fabrication field since 1975 and in that
time I have amassed a wide array of skills consisting of everything from Planning and Scheduling of work to actual
fabrication and installation of structural and piping components for routine maintenance, duty cycle planning and
new construction. Tracking and monitoring of Project progress including Engineering, Procurement, Construction,
Commissioning and Installation. I have worked in most construction and fabrication environments, from Pipelines to
Paper mills, Cogeneration Boilers to large Power Plants, Petroleum Refineries and Chemical Plants both inside and
outside the United States.
Relevant Experience:
Over 25 years of exposure with various companies locally and abroad.
Professionally Trained in P6. Well versed in Microsoft Office.
Build up, maintain and process Master Project Schedule by using Primavera.
Provide the necessary plans/schedules to ensure the development of proper estimates and studies
within a project stage and for sanction.
Recognize opportunities and resource optimizations to most efficiently execute the planned set of
activities.
Experience scheduling and pre staged tools and materials for literally hundreds of projects both large
and small including large system shut downs.
Ensure timing of deliverables by contractors are adequately defined and subsequently tracked to
avoid any delay or disruption to the Project
I am very fluent in reading, interpreting, and implementing all types of Piping and Instrumentation
Diagrams, and Drawings including Isometric and Ortho’s.
Extensive inspection and troubleshooting experience with piping specifications including physically
walking down each system to ensure that all valves, bolts, flanges, gaskets, and instrumentation had
been installed properly, to industry specifications and relevant safety codes and standards. Exposed
to RT, VT, MT and PT. Capable of new and used equipment evaluations.
Preformed hydro and nitrogen pressure tests on multiple systems and all types of piping configurations for
various applications.
World class fitter with years of training, and on the job experience in all methods of welding,
manufacturing and Installation.
Fluent in current industry standard in safety, construction, and piping and industrial design
codes and regulations.
2. Education
Name of School Location Degree Received Cruse Studies Dates Attended
Wichita Falls
High School
Wichita Falls, Texas Graduated General From: 9/69 To:5/72
Stephen F. Austin Nacogdoches Tx From: 9/1975
Employment History:
Company Name &
Address
Job Title Dates Employed Name Of
Supervisor
Reason For Leaving
Orascom E &C Senior
Planner/Field
Engineer
From:11-11-13
To: Present Date
Steven Gray From: Still Employed
Job duties:
Currently I am apart of a management team responsible for work scope development from operational requirements.
Provide site support answering scope questions from outside engineering during define and execute phases of
engineering work.
Build Preliminary Engineering Packages from outside engineering supplied IFA packages.
Build Final Engineering Packages from outside engineering supplied IFC packages.
Provides engineering support for Turnaround base work list.
Collect, review, and mark up equipment drawings, P&ID’s, and other relevant documents to detail engineering and
repair scopes.
Review and write scope statements to document and communicate the approved turnaround scope.
Document construction instructions based on Client’s engineering standards for various critical tasks such as
welding, NDE requirements, torqueing requirements, pressure testing, etc.
Assist in developing material lists for engineering and repair scope based on Client’s piping specifications.
Develop bid packages for various materials or services as requested.
Update various databases, folders, and SAP to track and communicate the status of the planning effort.
Assist in managing engineering type scope during the turnaround event by coordinating resources, reviewing
progress, identifying and mitigating risks to schedule and cost.
Assist in finding solutions to issues that arise during the turnaround event.
Company Name &
Address
Job Title Dates Employed Name Of
Supervisor
Reason For Leaving
Matrix Service
Company
P6
Scheduler/Planner
From:11-4-12
To: 11-10-13
Tom Williams From: Still Employed
Job duties:
Ensure the preparation and development of appropriate detail and summary plans/schedules; integrate contractor and
operator plans/schedules & earned values into the Master Project Schedule. Implement, and monitor schedules
within each project stage and for entire project until completion/close-out. .
Company Name &
Address
Job Title Dates Employed Name Of
Supervisor
Reason For Leaving
ITC TA Planner/Field
Engineer
From:2-6-11
To: 11-4-12
Vance Burns From: ROF
Job duties:
Responsible for work scope development from operational requirements, earned valves, inspection services and
mechanical integrity, development of detailed work packages, job walks, (piping and equipment) assembling
drawings, taking pictures, procurement of process equipment and materials, budget development and estimating.
Ensure the preparation and development of appropriate detail and summary plans/schedules; integrate contractor and
operator plans/schedules into the Master Project Schedule. Implement, and monitor schedules within each project
stage and for entire project until completion/close-out. Develop contractor bid packages and perform contractor job
walks. Ensure timing of deliverables by contractors are adequately defined and subsequently tracked to avoid any
3. delay or disruption to the Project. Inputting data in Access data base and P6, updating P6 schedules and daily
progress reporting during turnarounds as well as AWR planning, scheduling and purchasing of all materials. During
these activities responsible for field coordination of all work by general contractors, sub-contractors. Overseas the
planning elements of the change control procedure with capture of said changes within the project planning package.
Proficient in Maximo, Tab Ware, Excel, Word, Primavera P6
Company Name &
Address
Job Title Dates Employed Name Of
Supervisor
Reason For Leaving
Catsi Lead Primavera
Planner
Valero Aruba
From:8/2011
To: 1-15-2012
Terry Pitts Valero Aruba Plant
ShutDown
Job duties:
A team leader with strong work ethics, integrity, self-motivation, follow thru to develop and maintain team work
and lead by example to achieve team success. Experienced in turnaround development and execution. Review and
endorse contractor’s schedules and progress reporting systems to facilitate efficient summarization of project
reporting. Responsible for job plan package composition for turnarounds, unit outages, major capital projects and
extra ordinary maintenance, material procurement and directing of all turnaround activities. Overseas the planning
elements of the change control procedure with capture of said changes within the project planning package. During
these activities responsible for field coordination of all work by general contractors, sub contractors. Summary of
Turnarounds and Capital projects. Proficient in SAP, Tab Ware, Excel, Word, Primavera P5
Company Name &
Address
Job Title Dates Em loyed
Name Of
Supervisor
Reason For Leaving
ITC Senior Planner
BP Texas City
From:7/2010
To:8/2011
Brent Coleman From: ROF
Job Duties:
Responsible for work scope development from operational requirements, inspection services and mechanical
integrity, development of detailed work packages, job walks, (piping and equipment) assembling drawings, taking
pictures, procurement of process equipment and materials, budget development and estimating. Develop contractor
bid packages and perform contractor job walks. Ensure timing of deliverables by contractors are adequately defined
and subsequently tracked to avoid any delay or disruption to the Project Inputting data in Access data base and P6,
updating P6 schedules and daily progress reporting during turnarounds as well as AWR planning, scheduling and
purchasing of all materials.
Company Name &
Address
Job Title Dates Employed Name Of
Supervisor
Reason For Leaving
STS CONSTULATING Sr. Pipeline
Inspector
From: 12/09
To:6/2010
Greg
McDaniel
ROF
Job duties:
3rd
party Pipeline Inspector for Chesapeake Energy. From start to finish all aspects of a gas pipeline.
Evaluated and supervised clean-up for 18 – 80 miles of natural gas pipeline
on various projects
Inspected lower-in pipeline ranging 8 – 42 inches
Environmental foreman for projects including silt fence, curlex, staking hay bales, hydro-seeding, broadcast seeding
and hay mulching.
Ensured compliance with FERC requirements during projects.
Company Name &
Address
Job Title Dates Employed Name Of
Supervisor
Reason For Leaving
TTMC
Phone:281-461-9340
Senior/Lead
Planner/Scheduler
From:4/07
To: 12/09
Lee Umheres ROF
Job duties:
Working with ExxonMobil setting up a PSV program. For tracking purposes. Front end Load the scope of work. For
varies shutdowns Plant Wide
To estimate a budget & manpower for an up & coming plant wide shut down for 2010 at Valero ref. in Port Arthur
Texas.
Company Name & Job Title Dates Employed Name Of Reason For Leaving
4. Address Supervisor
IMTC
Mazeikiu, Lithuania
Project Piping
Manager
From: 10/06
To: 1/07
Jessie Doty ROF
Job Duties:
Consulted and managed a Polish contractor and a Lithuanian sub-contractor in the rebuild of a VDU and the start up
process of the unit.
Company Name &
Address
Job Title Dates Employed Name Of
Supervisor
Reason For Leaving
KAP Project Services
La Porte, Tx
Phone: 281-842-8333
Lead Planner/
Estimator
From: 6/05
To: 10/06
Steve Pipkin ROF
Job Duties:
Planned and estimated man hours & material take off for Chevron in El Segundo, CA; Valero in Dumas, TX. And
Valero in Port Arthur, TX. Coordinated and executed the schedule. Tracking and monitoring of Project progress
including Engineering, Procurement, Construction, Commissioning and Installation. Provide the necessary
plans/schedules to ensure the development of proper estimates. Understand the technical scope of the work and the
right sequence and duration of activities to create a viable project plan to achieve the business objectives.
Implement, and monitor schedules within each project stage and for entire project until completion/close-out.
Recognize opportunities and resource optimizations to most efficiently execute the planned set of activities. Review
and endorse contractor’s schedules and progress reporting systems to facilitate efficient summarization of project
reporting. Overseas the planning elements of the change control procedure with capture of said changes within the
project planning package. Ensure timing of deliverables by contractors are adequately defined and subsequently
tracked to avoid any delay or disruption to the Project
Company Name &
Address
Job Title Dates Employed Name Of
Supervisor
Reason For Leaving
Piping Engineering
Star Con
JV Piping
QA/QC Manager,
General Forman,
Piping
Superintendent
From: 1987
To: 2006
Ron
Artzburger
ROF
Job Duties:
Worked for the above contractors for over 20 years from a Piping Foreman to Project Manager in various locations
here and abroad. Including turnkey turnarounds in St. Croix, Honduras, Trinidad & Tobago, Argentina, Aruba and
China. Specializing in Gas Phase, Power Plants and Loop Reactors, Sulfur Recovery, Cokers, CCUs, Flue Gas
Coolers, Waste Heat Boilers and Furnaces. Duties included, but not limited to, pre-walking scope of work;
maintaining a quality control program; reading, interpreting, and implementing all types of piping and
instrumentation diagrams, and drawings including isometric and ortho’s; setting up fabrication shops; overseeing
certification testing; payroll time sheets; interacting with various personnel to ensure that the job is completed in a
safe, professional and timely manner; drawing up ISO plans; performing specialty welding (pressure parts).
Working and performing on and around hazardous materials including blinding and pressure testing of various
piping systems and final inspection of project before startup begins.
Personal References
Name Occupation Address Phone
Number
Years Known
Steve Alves Qa/Qc manager Colorado 8
Philip Frazier Human
Resource
Manager
Deer Park, TX. (713) 542-
3066
5
Michael Boswell Kaman Tx (936-727-
0248)
15
Additional References And Full Work History Available On Request