6. Our Modular Steel Bridging Products
• Modular
• Reconfigurable and
versatile
• Pre-engineered
• Containerised ‘out of the
box’
• Up to 100m span
• Multi-span structures
• Highway and construction
vehicle loading
• Temporary or permanent
7. Compact 200
• 15.m to 61m spans, generally
• 3.048m (10ft) modules
• Durbar finish or anti-skid surfacing
• With or without parapets
• Cantilever footwalks available
• Simple to erect (crane-in or launch)
• Emergency and contingency bridging
• Highly flexible, excellent value
• Mabey’s best seller
8. Berbice River Bridge, Guyana – Basic Facts
• 6th longest floating bridge in the world at 1,570m
• Complex build, delivered in partnership with Bosch
Rexroth B.V.
• Two lane carriageway in Compact 200
• Superstructure of 37 spans of bridging
• Constructed on 39 pontoons
• Bridge had to allow for a tidal range of 3 metres
• Bridge Retractor System installed for large shipping
• High span clearance section installed for small shipping
9. Berbice River Bridge, Guyana
Client: Ministry of Public Works and Communication
Solution: Mabey Compact 200, delivered in partnership with Bosch Rexroth B.V.
10. Client: Ministry of Public Works and Communication
Solution: Mabey Compact 200, delivered in partnership with Bosch Rexroth B.V.
Berbice River Bridge, Guyana
11. Client: Ministry of Public Works and Communication
Solution: Mabey Compact 200, delivered in partnership with Bosch Rexroth B.V.
Berbice River Bridge, Guyana
12. Chaglla Dam - Peru
• Part of 203m high Chaglla Hydroelectric Dam project
• 6 bridges, the largest free-span bridge 54.8m long and
capable of supporting a 50 tonne load
• Standardised, interchangeable components required to
provide flexibility and versatility
• Site traffic largely heavy construction vehicles and
machinery
• Remote area and challenging mountainous topography
• Rocky ravine with steep banks alongside the launch
planes added complexity
13. Client: Empresa de Generación Huallaga SA
Solution: Mabey Compact 200
Chaglla Dam, Peru
16. Client: Mota-Engil Central Europe
Solution: Two Compact 200 bridges used to maintain a highway and railway
line open whilst a new concrete bridge was built.
Detour bridge, Poland
17. Mabey Universal
• 40m to 81m spans
• 4.5m/ 2.25m modules
• Durbar finish or anti-skid surfacing
• With or without parapets
• Cantilever footwalks available
• Simple to erect (crane-in or launch)
• Large span rural applications
• Robust, durable, high fatigue life
• Heavy axle capabilities
• Contractor’s use and hire fleet
bridging
18. LNG Project, Papua New Guinea – Basic Facts
• Extensive pipework needed to carry 6.6 million tonnes
per annum of LNG
• Major supporting infrastructure work necessitating a
heavy-duty solution
• 5 bridges,
• 20 local staff used to assemble first bridge in 3 weeks
• All 5 bridges built with seismic restraints
• Expected operational life of 30 years
21. Client: Balfour Beatty
Solution: Mabey Universal bridge used to keep the road open whilst
excavation work was done underneath.
Limehouse Link temporary bridge, England
22. Client: Unioil Corporation
Solution: Mabey Universal bridge used as jetty to accommodate up to six
oil tankers. 524m long in multiple spans with a 4.2m wide deck
Crude oil transfer jetty, Philippines
23. Crude oil transfer jetty, Philippines
Client: Unioil Corporation
Solution: Mabey Universal bridge used as jetty to accommodate up to six
oil tankers. 524m long in multiple spans with a 4.2m wide deck
24. Crude oil transfer jetty
Crude oil transfer jetty, Philippines
Client: Unioil Corporation
Solution: Mabey Universal bridge used as jetty to accommodate up to six
oil tankers. 524m long in multiple spans with a 4.2m wide deck
25. Client: NPRA, Norwegian Rail Authority
Solution: Mabey Universal bridge required to provide the agency with the capability of dual
use (road/railway) for spans of up to 50m and 2 lanes of vehicular traffic
Temporary railway bridge, Norway
26. Longannet power plant, Scotland
Client: Scottish Power
Solution: A combination of bridging and tower units used to support a coal conveyor
27. Client: Scottish Power
Solution: A combination of bridging and tower units used to support a coal conveyor
Longannet power plant, Scotland
28. Client: Walter Bau AG
Solution: Mabey Universal bridge used to access a shaft 1km underground during
the construction of the Goldisthal Pumped Storage Station
Bridge access for underground turbine, Germany
29. • 45m to 90m Spans
• 4.5m modules
• Easily assembled & launched
• Long clear spans
• Pre-cambered and HSFG bolted
decks
• Fully galvanised
• Cantilever walkways available
• Durbar finish or anti-skid surfacing
• Transported in 40ft containers
3 - Delta Bridge
32. Client: Frontier Works Organisation
Solution: A multispan Mabey Delta bridge 328m long and 7.35m wide
His Highness Sheikh Khalifa Bin Zayed Al Nahyan Bridge, Pakistan
33. Client: Frontier Works Organisation
Solution: A multispan Mabey Delta bridge 328m long and 7.35m wide
His Highness Sheikh Khalifa Bin Zayed Al Nahyan Bridge, Pakistan
34. Client: Frontier Works Organisation
Solution: A multispan Mabey Delta bridge 328m long and 7.35m wide
His Highness Sheikh Khalifa Bin Zayed Al Nahyan Bridge, Pakistan
35. Client: Ministry of Works & Transport
Solution: Mabey Delta Bridge
Caroni Delta Bridge, Trinidad & Tobago
36. • Two main beams spanning
between supports, connected by
transoms.
• Parapets sit on top flange of main
beams.
• Supplied in 3.048m increments with
EW or 2LANE road widths.
• Can be supplied with internal
walkways
4 - Atlas/Flyovers
37. Client: Ministry of Highways, Ports and Shipping
Solution: Atlas bridge
Sangupiddy Bridge, Sri Lanka
50. Why us?
1) World-Class Global Steelwork Experts
2) Practical and creative solutions
3) 1st Company to receive BS10500 – Ethical Compliance
4) Leader in Safety, Health, Environment and Quality
– OHSAS 18001 Occupational Health and Safety Management
– ISO 14001Environmental Management
– BS EN ISO 9001
– BS EN 1090:1
– NHSS 20 & NHSS 19A through the Steel Construction Certification
Scheme (SCCS), together with Welding Control to BSEN ISO 3834,
through The Welding Institute (TWI).
4) Through-life support services offered including; Design, Erection,
Training and Maintenance