Answer this following question of Six sigma and lean 1. Which of the following are NOT among the principles of Lean thinking? Value Waste Pull Flow 2. (T/F) The DMADV DFSS methodology is comprised of a 7-step phase-gate process. 3. (T/F) Lean is a systematic approach to the identification and elimination of all forms of waste. 4. (T/F) Customers base their decisions about the value of a product/service on the perceived quantity they receive. 5. (T/F) Waste includes cycle time, direct labor, materials, and energy. 6. Which of the following are Lean tools? [Mark all that apply] Poka-yoke Pugh matrix One piece flow Just-in-time manufacturing All of the above None of the above 7. (T/F) Process maps are used to provide a low level detailed view of the process for the purpose of understanding value v. non-value. 8. (T/F) The successful application of the QFD process derived from the Voice of the Customer maximizes customer perception. 9. (T/F) There are 8 types of waste that will erode operating and profit margin. 10. Remember the acronym DOWNTIME? Which of the following is the W? Waste Work Workstation Waiting Washing 11. Which of the following is NOT one of the 6Ses? Sort Safety Shine Storage All of the above None of the above 12. (T/F) in DMADV, the first D is for Design. 13. (T/F) A value stream map is a map of the part flow through the manufacturing facility. 14. (T/F) There are 7 variables that a production system manipulates to produce value for customers. 15. Which of the following are among the variables manipulated by a production system? [Mark all that apply] Money Machines Mother Nature Maintenance All of the above None of the above 16. (T/F) A process map is a graphical representation of the steps, events, operations and activities in time sequence involved in an entire process or sub-process. 17. Once a business process has been properly mapped and the defects defined, the team can see which of the following can be achieved. Improving on time delivery Reducing cycle times (OTR) Increasing First Time Yield (FTY) Increasing Rolling Thruput Yield (RTY) Eliminating / Mitigating variation All of the above None of the above 18. (T/F) The S in SIPOC stands for Suppliers. 19. (T/F) The P in COPIS stands for Project. 20. (T/F) A Deployment Flow Diagram is a type of process flow diagram. 21. (T/F) A Spaghetti Chart shows the number of moves involved in the process to go from an input to an output. 22. (T/F) The Value Stream is the entire set of activities designed to transform the products or services into what is required by Management. 23. Value Stream Mapping determines which of the following? What it actually is What it should be What you think it is All of the above None of the above 24. In DMADV, the Design phase includes which of the following? Selecting the best of the best Process variation analysis Process design Failure mode and effects analysis All of the above None of the above 25. In DMADV, the Define phase includes which of the f.