Pre-Design
Phase
Group 1
Arevalo, Jury
Balababa, Marcelo Jr.
Baldo, Hannah
Barrameda, Dainty
Salamero, Yvonne
IMPORTANCE OF PRE-DESIGN PHASE
• Extend pre-design as long as possible.
• It is a defense mechanism against those "hot ideas" that will come up midway
through the project.
• Invent ways to force yourself not to dive into design immediately
• Find ways of getting the client involved in this discovery phase
• Look for ways - writing, diagrams, mass models, etc. - for describing both the
minimum and requirements and your highest aspirations for the project.
• Ask yourself: How will you know later that you succeeded?
• Describe - again without designing the building - the strongest, best formal
concepts to be explored in the design.
• Involve the client in the program, budget, and expectations.
INTRODUCTION
The Pre- Design Services cover a broad line of architectural services ranging from initial problem
identification to activities that would allow the Architect to initially conceptualize an array of
architectural and allied solutions.
The Pre-Design Services nominally include the following:
• consultation
• pre-feasibility studies
• feasibility studies
• site selection and analysis
• site utilization and land-use studies
• architectural research
• architectural programming
• space planning
• space management studies
• value management
• design brief preparation
• promotional services, and other related activities
CONSULTATION
When a Client calls upon the Architect to give oral or written advice and
direction, to attend conferences, to make evaluations and appraisals regarding a
contemplated project and similar activities, the Architect renders valuable inputs
whether or not the Client pursues the project.
PRE-FEASIBILITY STUDIES
These preliminary studies involve the procurement, analysis, and use of
secondary information gathered for the project to aid the Client in early decision-
making. They represent the Architect’s initial assessment of a project’s
soundness, allowing the Client to promptly explore available/ readily identifiable
directions/options. Researched/processed/validated secondary data are
generally used for such studies e.g., electronic, print, etc.
FEASIBILITY STUDIES
Detailed analysis of the project based on pre-feasibility studies will determine the
viability of a proposed development. The studies will set the project against present
and future trends to forecast how it will perform over time. This requires primary data
gathering and analysis.
SITE SELECTION AND ANALYSIS
This entails the formulation of site criteria, assistance to the Client in site
evaluation as well as analysis to determine the most appropriate site/s for a
proposed project or building program.
• Site analysis includes site selection, geotechnical reports, and review of existing structures.
• Programming defines the project needs of the user. Programming includes cataloging the spaces and equipment needed, and functional relationships.
• The construction cost analysis provides a construction budget amount for the capital improvement budget (CIB) and a cost plan to assist in explaining the budget and in guiding project management.
• Value engineering in the pre-design phase scrutinizes the program, site selection, and project budget

Recommended

research methodologies in architecture
research methodologies in architectureresearch methodologies in architecture
research methodologies in architectureSamanth kumar
 
What's different between urban planning, urban design, architecture, AADI
What's different between urban planning, urban design, architecture, AADIWhat's different between urban planning, urban design, architecture, AADI
What's different between urban planning, urban design, architecture, AADIaalliance
 

More Related Content

What's hot

Urban Design at different levels of Planning
Urban Design at different levels of PlanningUrban Design at different levels of Planning
Urban Design at different levels of PlanningYajush Sonar
 
Architecture Professional practice
Architecture Professional  practice Architecture Professional  practice
Architecture Professional practice Ar. Mukunda K.S
 
Urban design
Urban designUrban design
Urban designAyaz Khan
 
Site Analysis Edward t. white
Site Analysis Edward t. whiteSite Analysis Edward t. white
Site Analysis Edward t. whiteDania Abdel-aziz
 
Services in High Rise Building
Services in High Rise Building  Services in High Rise Building
Services in High Rise Building ShrushtiAhirrao1
 
Architectural design-process
Architectural design-processArchitectural design-process
Architectural design-processHakim Danish
 
Image of the city
Image of the cityImage of the city
Image of the cityCoEP
 
Architectural Design 1 Lectures by Dr. Yasser Mahgoub - Process
Architectural Design 1 Lectures by Dr. Yasser Mahgoub - ProcessArchitectural Design 1 Lectures by Dr. Yasser Mahgoub - Process
Architectural Design 1 Lectures by Dr. Yasser Mahgoub - ProcessGalala University
 
Site Planning- Principles and Considerations
Site Planning- Principles and Considerations Site Planning- Principles and Considerations
Site Planning- Principles and Considerations ameed inam
 
Definitions of Urban Planning, Urban Design & Architecture
Definitions of Urban Planning, Urban Design & ArchitectureDefinitions of Urban Planning, Urban Design & Architecture
Definitions of Urban Planning, Urban Design & ArchitectureIbtehal Ammar
 
Design Studio 5: Site Analysis Presentation Boards
Design Studio 5: Site Analysis Presentation BoardsDesign Studio 5: Site Analysis Presentation Boards
Design Studio 5: Site Analysis Presentation BoardsIvy Yee
 
Standards for bus terminals
Standards for bus terminalsStandards for bus terminals
Standards for bus terminalsIndrajit Koner
 
Spp 203-specialized archl services
Spp 203-specialized archl servicesSpp 203-specialized archl services
Spp 203-specialized archl servicesMelvin Patawaran
 
kevin lynch theory five elements - urban design
kevin lynch theory five elements - urban designkevin lynch theory five elements - urban design
kevin lynch theory five elements - urban designkayalvizhibharathi
 
Site analysis and documentation
Site analysis and documentation Site analysis and documentation
Site analysis and documentation Lawin Langat
 
Environmental & sustainable issue of high rise building
Environmental & sustainable issue of high rise buildingEnvironmental & sustainable issue of high rise building
Environmental & sustainable issue of high rise buildingkhulna university
 
Introduction to interior design
Introduction to interior designIntroduction to interior design
Introduction to interior designVirtu Institute
 
Post modern architecture
Post modern architecturePost modern architecture
Post modern architectureAlex Waktola
 

What's hot (20)

Urban Design at different levels of Planning
Urban Design at different levels of PlanningUrban Design at different levels of Planning
Urban Design at different levels of Planning
 
Architecture Professional practice
Architecture Professional  practice Architecture Professional  practice
Architecture Professional practice
 
Urban design
Urban designUrban design
Urban design
 
Site Analysis Edward t. white
Site Analysis Edward t. whiteSite Analysis Edward t. white
Site Analysis Edward t. white
 
Services in High Rise Building
Services in High Rise Building  Services in High Rise Building
Services in High Rise Building
 
Architectural design-process
Architectural design-processArchitectural design-process
Architectural design-process
 
Image of the city
Image of the cityImage of the city
Image of the city
 
Architectural Design 1 Lectures by Dr. Yasser Mahgoub - Process
Architectural Design 1 Lectures by Dr. Yasser Mahgoub - ProcessArchitectural Design 1 Lectures by Dr. Yasser Mahgoub - Process
Architectural Design 1 Lectures by Dr. Yasser Mahgoub - Process
 
Site Planning- Principles and Considerations
Site Planning- Principles and Considerations Site Planning- Principles and Considerations
Site Planning- Principles and Considerations
 
Definitions of Urban Planning, Urban Design & Architecture
Definitions of Urban Planning, Urban Design & ArchitectureDefinitions of Urban Planning, Urban Design & Architecture
Definitions of Urban Planning, Urban Design & Architecture
 
Design Studio 5: Site Analysis Presentation Boards
Design Studio 5: Site Analysis Presentation BoardsDesign Studio 5: Site Analysis Presentation Boards
Design Studio 5: Site Analysis Presentation Boards
 
Standards for bus terminals
Standards for bus terminalsStandards for bus terminals
Standards for bus terminals
 
Spp 203-specialized archl services
Spp 203-specialized archl servicesSpp 203-specialized archl services
Spp 203-specialized archl services
 
Site planing
Site planingSite planing
Site planing
 
kevin lynch theory five elements - urban design
kevin lynch theory five elements - urban designkevin lynch theory five elements - urban design
kevin lynch theory five elements - urban design
 
Site analysis and documentation
Site analysis and documentation Site analysis and documentation
Site analysis and documentation
 
Environmental & sustainable issue of high rise building
Environmental & sustainable issue of high rise buildingEnvironmental & sustainable issue of high rise building
Environmental & sustainable issue of high rise building
 
Introduction to interior design
Introduction to interior designIntroduction to interior design
Introduction to interior design
 
EKISTICS
EKISTICSEKISTICS
EKISTICS
 
Post modern architecture
Post modern architecturePost modern architecture
Post modern architecture
 

Similar to pre-design phase

Lecture 3 - Research & Design Process - Commercial-Institutional Interiors VD...
Lecture 3 - Research & Design Process - Commercial-Institutional Interiors VD...Lecture 3 - Research & Design Process - Commercial-Institutional Interiors VD...
Lecture 3 - Research & Design Process - Commercial-Institutional Interiors VD...Virtu Institute
 
Advanced project management mod 3
Advanced project management mod 3Advanced project management mod 3
Advanced project management mod 3POOJA UDAYAN
 
Stakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryStakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryAkshika Mahanama
 
Scope and Time Management
Scope and Time ManagementScope and Time Management
Scope and Time ManagementSabrinaScott22
 
Technical report writing skills for civil engineers pdf
Technical report writing skills for civil engineers pdfTechnical report writing skills for civil engineers pdf
Technical report writing skills for civil engineers pdfSaqib Imran
 
Construction Planing & Schedule
Construction Planing & ScheduleConstruction Planing & Schedule
Construction Planing & ScheduleVîñõđ Kůmåř
 
Project management
Project managementProject management
Project managementBenjamin Tan
 
Keshava Murthy K Architect & Urban Designer Resume LATEST2
Keshava Murthy K Architect & Urban Designer Resume LATEST2Keshava Murthy K Architect & Urban Designer Resume LATEST2
Keshava Murthy K Architect & Urban Designer Resume LATEST2keshava murthy
 
Project Planning and Scheduling
Project Planning and SchedulingProject Planning and Scheduling
Project Planning and Schedulingijtsrd
 
Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01samansari22
 
Project life cycle
Project life cycleProject life cycle
Project life cycleAbhishek Raj
 
10.3_Construction Management_Day 8.pptx
10.3_Construction Management_Day 8.pptx10.3_Construction Management_Day 8.pptx
10.3_Construction Management_Day 8.pptxJanak82
 
1.1b Construction (Project) Planning.ppt
1.1b Construction (Project) Planning.ppt1.1b Construction (Project) Planning.ppt
1.1b Construction (Project) Planning.pptravi590686
 
2. Project identification.ppt
2. Project identification.ppt2. Project identification.ppt
2. Project identification.pptPedadaSaikumar
 
1. Construction Methods and Project Management Introduction.pdf
1. Construction Methods and Project Management Introduction.pdf1. Construction Methods and Project Management Introduction.pdf
1. Construction Methods and Project Management Introduction.pdfAikaterineSmith
 

Similar to pre-design phase (20)

CEM unit -I ppt.pptx
CEM unit -I ppt.pptxCEM unit -I ppt.pptx
CEM unit -I ppt.pptx
 
Lecture 3 - Research & Design Process - Commercial-Institutional Interiors VD...
Lecture 3 - Research & Design Process - Commercial-Institutional Interiors VD...Lecture 3 - Research & Design Process - Commercial-Institutional Interiors VD...
Lecture 3 - Research & Design Process - Commercial-Institutional Interiors VD...
 
PME UNIT-3.pptx
PME UNIT-3.pptxPME UNIT-3.pptx
PME UNIT-3.pptx
 
Advanced project management mod 3
Advanced project management mod 3Advanced project management mod 3
Advanced project management mod 3
 
MODULE III - M.ARCH.pptx
MODULE III - M.ARCH.pptxMODULE III - M.ARCH.pptx
MODULE III - M.ARCH.pptx
 
Stakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryStakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction Industry
 
Scope and Time Management
Scope and Time ManagementScope and Time Management
Scope and Time Management
 
Technical report writing skills for civil engineers pdf
Technical report writing skills for civil engineers pdfTechnical report writing skills for civil engineers pdf
Technical report writing skills for civil engineers pdf
 
Construction Planing & Schedule
Construction Planing & ScheduleConstruction Planing & Schedule
Construction Planing & Schedule
 
Project management
Project managementProject management
Project management
 
Project Management Introduction
Project Management IntroductionProject Management Introduction
Project Management Introduction
 
Keshava Murthy K Architect & Urban Designer Resume LATEST2
Keshava Murthy K Architect & Urban Designer Resume LATEST2Keshava Murthy K Architect & Urban Designer Resume LATEST2
Keshava Murthy K Architect & Urban Designer Resume LATEST2
 
Project Planning and Scheduling
Project Planning and SchedulingProject Planning and Scheduling
Project Planning and Scheduling
 
Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01
 
Project life cycle
Project life cycleProject life cycle
Project life cycle
 
10.3_Construction Management_Day 8.pptx
10.3_Construction Management_Day 8.pptx10.3_Construction Management_Day 8.pptx
10.3_Construction Management_Day 8.pptx
 
1.1b Construction (Project) Planning.ppt
1.1b Construction (Project) Planning.ppt1.1b Construction (Project) Planning.ppt
1.1b Construction (Project) Planning.ppt
 
2. Project identification.ppt
2. Project identification.ppt2. Project identification.ppt
2. Project identification.ppt
 
1. Construction Methods and Project Management Introduction.pdf
1. Construction Methods and Project Management Introduction.pdf1. Construction Methods and Project Management Introduction.pdf
1. Construction Methods and Project Management Introduction.pdf
 
Project management
Project managementProject management
Project management
 

Recently uploaded

Laser And its Application's - Engineering Physics
Laser And its Application's - Engineering PhysicsLaser And its Application's - Engineering Physics
Laser And its Application's - Engineering PhysicsPurva Nikam
 
MAXIMUM POWER POINT TRACKING ALGORITHMS APPLIED TO WIND-SOLAR HYBRID SYSTEM
MAXIMUM POWER POINT TRACKING ALGORITHMS APPLIED TO WIND-SOLAR HYBRID SYSTEMMAXIMUM POWER POINT TRACKING ALGORITHMS APPLIED TO WIND-SOLAR HYBRID SYSTEM
MAXIMUM POWER POINT TRACKING ALGORITHMS APPLIED TO WIND-SOLAR HYBRID SYSTEMArunkumar Tulasi
 
CHAPTER 1_ HTML and CSS Introduction Module
CHAPTER 1_ HTML and CSS Introduction ModuleCHAPTER 1_ HTML and CSS Introduction Module
CHAPTER 1_ HTML and CSS Introduction Modulessusera4f8281
 
MedTech R&D - Tamer Emara - resume @2024
MedTech R&D - Tamer Emara - resume @2024MedTech R&D - Tamer Emara - resume @2024
MedTech R&D - Tamer Emara - resume @2024Tamer Emara
 
Introduction to Binary Tree and Conersion of General tree to Binary Tree
Introduction to Binary Tree  and Conersion of General tree to Binary TreeIntroduction to Binary Tree  and Conersion of General tree to Binary Tree
Introduction to Binary Tree and Conersion of General tree to Binary TreeSwarupaDeshpande4
 
Center Enamel is the leading bolted steel tanks manufacturer in China.docx
Center Enamel is the leading bolted steel tanks manufacturer in China.docxCenter Enamel is the leading bolted steel tanks manufacturer in China.docx
Center Enamel is the leading bolted steel tanks manufacturer in China.docxsjzzztc
 
Gate-Level Simulation Methodology Improving Gate-Level Simulation Performance
Gate-Level Simulation Methodology Improving Gate-Level Simulation PerformanceGate-Level Simulation Methodology Improving Gate-Level Simulation Performance
Gate-Level Simulation Methodology Improving Gate-Level Simulation Performancesuddentrike2
 
chap. 3. lipid deterioration oil and fat processign
chap. 3. lipid deterioration oil and fat processignchap. 3. lipid deterioration oil and fat processign
chap. 3. lipid deterioration oil and fat processignteddymebratie
 
GDSC solution challenge Android ppt.pptx
GDSC solution challenge Android ppt.pptxGDSC solution challenge Android ppt.pptx
GDSC solution challenge Android ppt.pptxAnandMenon54
 
biofilm fouling of the membrane present in aquaculture
biofilm fouling of the membrane present in aquaculturebiofilm fouling of the membrane present in aquaculture
biofilm fouling of the membrane present in aquacultureVINETUBE2
 
Deluck Technical Works Company Profile.pdf
Deluck Technical Works Company Profile.pdfDeluck Technical Works Company Profile.pdf
Deluck Technical Works Company Profile.pdfartpoa9
 
Bresenham line-drawing-algorithm By S L Sonawane.pdf
Bresenham line-drawing-algorithm By S L Sonawane.pdfBresenham line-drawing-algorithm By S L Sonawane.pdf
Bresenham line-drawing-algorithm By S L Sonawane.pdfSujataSonawane11
 
S. Kim, NeurIPS 2023, MLILAB, KAISTAI
S. Kim,  NeurIPS 2023,  MLILAB,  KAISTAIS. Kim,  NeurIPS 2023,  MLILAB,  KAISTAI
S. Kim, NeurIPS 2023, MLILAB, KAISTAIMLILAB
 
self introduction sri balaji
self introduction sri balajiself introduction sri balaji
self introduction sri balajiSriBalaji891607
 
Eversendai - HSE Performance Management Systems-R1.pptx
Eversendai - HSE Performance Management Systems-R1.pptxEversendai - HSE Performance Management Systems-R1.pptx
Eversendai - HSE Performance Management Systems-R1.pptxADILRASHID54
 
ROBOT PERCEPTION FOR AGRICULTURE AND GOOD PRODUCTION1.1.pdf
ROBOT PERCEPTION FOR AGRICULTURE AND GOOD PRODUCTION1.1.pdfROBOT PERCEPTION FOR AGRICULTURE AND GOOD PRODUCTION1.1.pdf
ROBOT PERCEPTION FOR AGRICULTURE AND GOOD PRODUCTION1.1.pdfRudraPratapSingh871925
 
ExtraordinAIre Monthly Newsletter Jan 2024
ExtraordinAIre Monthly Newsletter Jan 2024ExtraordinAIre Monthly Newsletter Jan 2024
ExtraordinAIre Monthly Newsletter Jan 2024Savipriya Raghavendra
 
Center Enamel is the leading fire water tanks manufacturer in China.docx
Center Enamel is the leading fire water tanks manufacturer in China.docxCenter Enamel is the leading fire water tanks manufacturer in China.docx
Center Enamel is the leading fire water tanks manufacturer in China.docxsjzzztc
 
SR Globals Profile - Building Vision, Exceeding Expectations.
SR Globals Profile -  Building Vision, Exceeding Expectations.SR Globals Profile -  Building Vision, Exceeding Expectations.
SR Globals Profile - Building Vision, Exceeding Expectations.srglobalsenterprises
 

Recently uploaded (20)

Laser And its Application's - Engineering Physics
Laser And its Application's - Engineering PhysicsLaser And its Application's - Engineering Physics
Laser And its Application's - Engineering Physics
 
MAXIMUM POWER POINT TRACKING ALGORITHMS APPLIED TO WIND-SOLAR HYBRID SYSTEM
MAXIMUM POWER POINT TRACKING ALGORITHMS APPLIED TO WIND-SOLAR HYBRID SYSTEMMAXIMUM POWER POINT TRACKING ALGORITHMS APPLIED TO WIND-SOLAR HYBRID SYSTEM
MAXIMUM POWER POINT TRACKING ALGORITHMS APPLIED TO WIND-SOLAR HYBRID SYSTEM
 
CHAPTER 1_ HTML and CSS Introduction Module
CHAPTER 1_ HTML and CSS Introduction ModuleCHAPTER 1_ HTML and CSS Introduction Module
CHAPTER 1_ HTML and CSS Introduction Module
 
MedTech R&D - Tamer Emara - resume @2024
MedTech R&D - Tamer Emara - resume @2024MedTech R&D - Tamer Emara - resume @2024
MedTech R&D - Tamer Emara - resume @2024
 
Introduction to Binary Tree and Conersion of General tree to Binary Tree
Introduction to Binary Tree  and Conersion of General tree to Binary TreeIntroduction to Binary Tree  and Conersion of General tree to Binary Tree
Introduction to Binary Tree and Conersion of General tree to Binary Tree
 
Center Enamel is the leading bolted steel tanks manufacturer in China.docx
Center Enamel is the leading bolted steel tanks manufacturer in China.docxCenter Enamel is the leading bolted steel tanks manufacturer in China.docx
Center Enamel is the leading bolted steel tanks manufacturer in China.docx
 
Gate-Level Simulation Methodology Improving Gate-Level Simulation Performance
Gate-Level Simulation Methodology Improving Gate-Level Simulation PerformanceGate-Level Simulation Methodology Improving Gate-Level Simulation Performance
Gate-Level Simulation Methodology Improving Gate-Level Simulation Performance
 
chap. 3. lipid deterioration oil and fat processign
chap. 3. lipid deterioration oil and fat processignchap. 3. lipid deterioration oil and fat processign
chap. 3. lipid deterioration oil and fat processign
 
GDSC solution challenge Android ppt.pptx
GDSC solution challenge Android ppt.pptxGDSC solution challenge Android ppt.pptx
GDSC solution challenge Android ppt.pptx
 
AC DISTRIBUTION - ELECTRICAL POWER SYSTEM
AC DISTRIBUTION - ELECTRICAL POWER SYSTEMAC DISTRIBUTION - ELECTRICAL POWER SYSTEM
AC DISTRIBUTION - ELECTRICAL POWER SYSTEM
 
biofilm fouling of the membrane present in aquaculture
biofilm fouling of the membrane present in aquaculturebiofilm fouling of the membrane present in aquaculture
biofilm fouling of the membrane present in aquaculture
 
Deluck Technical Works Company Profile.pdf
Deluck Technical Works Company Profile.pdfDeluck Technical Works Company Profile.pdf
Deluck Technical Works Company Profile.pdf
 
Bresenham line-drawing-algorithm By S L Sonawane.pdf
Bresenham line-drawing-algorithm By S L Sonawane.pdfBresenham line-drawing-algorithm By S L Sonawane.pdf
Bresenham line-drawing-algorithm By S L Sonawane.pdf
 
S. Kim, NeurIPS 2023, MLILAB, KAISTAI
S. Kim,  NeurIPS 2023,  MLILAB,  KAISTAIS. Kim,  NeurIPS 2023,  MLILAB,  KAISTAI
S. Kim, NeurIPS 2023, MLILAB, KAISTAI
 
self introduction sri balaji
self introduction sri balajiself introduction sri balaji
self introduction sri balaji
 
Eversendai - HSE Performance Management Systems-R1.pptx
Eversendai - HSE Performance Management Systems-R1.pptxEversendai - HSE Performance Management Systems-R1.pptx
Eversendai - HSE Performance Management Systems-R1.pptx
 
ROBOT PERCEPTION FOR AGRICULTURE AND GOOD PRODUCTION1.1.pdf
ROBOT PERCEPTION FOR AGRICULTURE AND GOOD PRODUCTION1.1.pdfROBOT PERCEPTION FOR AGRICULTURE AND GOOD PRODUCTION1.1.pdf
ROBOT PERCEPTION FOR AGRICULTURE AND GOOD PRODUCTION1.1.pdf
 
ExtraordinAIre Monthly Newsletter Jan 2024
ExtraordinAIre Monthly Newsletter Jan 2024ExtraordinAIre Monthly Newsletter Jan 2024
ExtraordinAIre Monthly Newsletter Jan 2024
 
Center Enamel is the leading fire water tanks manufacturer in China.docx
Center Enamel is the leading fire water tanks manufacturer in China.docxCenter Enamel is the leading fire water tanks manufacturer in China.docx
Center Enamel is the leading fire water tanks manufacturer in China.docx
 
SR Globals Profile - Building Vision, Exceeding Expectations.
SR Globals Profile -  Building Vision, Exceeding Expectations.SR Globals Profile -  Building Vision, Exceeding Expectations.
SR Globals Profile - Building Vision, Exceeding Expectations.
 

pre-design phase

  • 1. Pre-Design Phase Group 1 Arevalo, Jury Balababa, Marcelo Jr. Baldo, Hannah Barrameda, Dainty Salamero, Yvonne
  • 2. IMPORTANCE OF PRE-DESIGN PHASE • Extend pre-design as long as possible. • It is a defense mechanism against those "hot ideas" that will come up midway through the project. • Invent ways to force yourself not to dive into design immediately • Find ways of getting the client involved in this discovery phase • Look for ways - writing, diagrams, mass models, etc. - for describing both the minimum and requirements and your highest aspirations for the project. • Ask yourself: How will you know later that you succeeded? • Describe - again without designing the building - the strongest, best formal concepts to be explored in the design. • Involve the client in the program, budget, and expectations.
  • 3. INTRODUCTION The Pre- Design Services cover a broad line of architectural services ranging from initial problem identification to activities that would allow the Architect to initially conceptualize an array of architectural and allied solutions. The Pre-Design Services nominally include the following: • consultation • pre-feasibility studies • feasibility studies • site selection and analysis • site utilization and land-use studies • architectural research • architectural programming • space planning • space management studies • value management • design brief preparation • promotional services, and other related activities
  • 4. CONSULTATION When a Client calls upon the Architect to give oral or written advice and direction, to attend conferences, to make evaluations and appraisals regarding a contemplated project and similar activities, the Architect renders valuable inputs whether or not the Client pursues the project. PRE-FEASIBILITY STUDIES These preliminary studies involve the procurement, analysis, and use of secondary information gathered for the project to aid the Client in early decision- making. They represent the Architect’s initial assessment of a project’s soundness, allowing the Client to promptly explore available/ readily identifiable directions/options. Researched/processed/validated secondary data are generally used for such studies e.g., electronic, print, etc.
  • 5. FEASIBILITY STUDIES Detailed analysis of the project based on pre-feasibility studies will determine the viability of a proposed development. The studies will set the project against present and future trends to forecast how it will perform over time. This requires primary data gathering and analysis.
  • 6. SITE SELECTION AND ANALYSIS This entails the formulation of site criteria, assistance to the Client in site evaluation as well as analysis to determine the most appropriate site/s for a proposed project or building program. • Site analysis includes site selection, geotechnical reports, and review of existing structures. • Programming defines the project needs of the user. Programming includes cataloging the spaces and equipment needed, and functional relationships. • The construction cost analysis provides a construction budget amount for the capital improvement budget (CIB) and a cost plan to assist in explaining the budget and in guiding project management. • Value engineering in the pre-design phase scrutinizes the program, site selection, and project budget
  • 7. SITE UTILIZATION AND LAND-USE STUDIES The detailed analysis of the site involves the identification of a site’s development potentials through the proper utilization of land. The analysis covers the context of the site as well as that of its surrounding environment and the development controls that apply to the site and its environs. ARCHITECTURAL RESEARCH Architectural research entails the conduct of primary and secondary researches and assembled facts used as basis for conclusion.
  • 8. ARCHITECTURAL PROGRAMMING This analytical problem-seeking process will lead to the statement and identification of both horizontal and vertical requirements in offering a solution. It incorporates a space program with characterizations of the envisioned spaces such as ambiance, cost range, etc. SPACE PLANNING The Architect determines the adequate size and appropriate configuration and assemblage for a proposed project in consideration of the use, allocation, and interface of spaces for given activities. Space planning is done mainly through primary data gathering such as interviews, consultations, interfaces, focus group discussions (FGDs), space planning surveys, space audits, etc., and subsequent analyses i.e. spatial layouts with stacking concepts, particularly for multi-story structures.
  • 9. SPACE MANAGEMENT STUDIES An analysis of the space requirements of the project based on organizational structure and functional set-up pinpoints linkages and interaction of spaces. The formulation of the space program will serve as the basis for the development of the architectural plan / design. VALUE MANAGEMENT This technique is applied in the cost management process to minimize the negative effect of simplified operations associated with many cost-reduction programs. The goal of value management is to achieve an unimpaired program at minimum cost. Thus, a plan, design or system that has been successfully value- managed will still satisfy the same performance criteria as the costlier alternatives.
  • 10. DESIGN BRIEF PREPARATION Under design brief preparation, the Architect states the project terms of reference (ToR) including the concept, objectives, and other necessary requirements to bid out architectural services (whether public or private). PROMOTIONAL SERVICES Projects may require promotional activities in order to develop and generate financial support and acceptance from governing agencies or from the general public. In such cases, the Architect can act as the agent of the Owner by producing and coordinating the additional activities necessary to complete the services. In all such activities, the Architect must maintain his professional status as the representative of the Owner.
  • 11. After the initial meeting/conversation/correspondence with the Client, the Architect must submit his proposal for pre- design services, stating the following: • Scope of Work • Manner of Payment • Owner’s Responsibilities • Other Conditions of Services • The Architect can render services in any of the following ways: - As an individual Architect he must have special training and be knowledgeable in different fields to supplement his skills. - Architect’s Own Staff It is possible for Architects (as natural persons) working in a single firm to specialize in a variety of ways. Many Architects and firms (juridical persons) specialize without losing the generalist approach of the Architect or firm. - By Association, Consultation, or Networking Another common practice is consultation between an Architect and a firm of other disciplines, under the extended terms of the Owner-Architect Agreement. MANNER OF PROVIDING SERVICES
  • 12. METHODS OF COMPENSATION Lump-Sum or Fixed Fee A lump sum or fixed fee is an amount negotiated with the Client for professional services that can be sufficiently defined at the outset of the project. This arrangement is only suitable if the scope of the project, the schedule for design and approvals, and the construction schedule and other variables can be determined with reasonable accuracy by the Architect.
  • 13. Time basis -Time basis fees are fees that are charged on an agreed-to hourly or daily (per diem) rate. This method of compensation is useful when the services are difficult to determine in advance or they are interim in nature and often short in duration. -Time-basis fees are typically used for the following: o services which are not well defined; o pre-design services; o partial services; o additional services; o conceptual design; o for a particular phase of the project; o for services as an expert witness; o renovation projects; o preparation of record drawings o specialist expertise or services. The hourly or per diem (daily) rates for Architects and their staff should be agreed upon at the outset and, additionally, the Client and Architect should agree upon a time period for review and adjustment of the hourly rates (perhaps annually) in order to adjust for inflation and other factors.
  • 14. Percentage-based Fee A percentage-based fee is a method of compensation which links the fee for the Architect’s services to a percentage of the construction cost of the project. The percentage will vary depending on the type of building, the construction value, and the type of construction contract, and of course, the other variables (fee adjustments)