SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN
Bachelor of Quantity Surveying (Honours)
PROFESSIONAL PRACTICE [QSB 3614]
COURSEWORK NO.2 - PREPARATION OF FINAL ACCOUNT
LECTURER: EDDIE LIM SIK CHEON
SUBMISSION DATE: 29th
OCTOBER 2018
Name : Student ID :
Adele Lu Khai Syn 0323151
Sim Si Kai 0318609
Zachary Ooi Cheng En 0323120
Choo Zhi Kang 0327586
Tey Cheng Fern 0323912
Michelle Tung Man Kaye 0324175
Lee Lin Hui 0322797
Heng Chun Hui 0329804
You are appointed as the consulting Quantity Surveyor for a apartment project based on PAM
Form of Contract 2006 (With Quantities). The summary of the Contract Sum is as follows :
Bill No. 1 - Preliminaries RM 4,250,000.00
Bill No. 2 - Building Works RM 62,850,000.00
Bill No. 3 - Local Infrastructure Works RM 4,500,000.00
Bill No. 4 - P.C and Provisional Sums RM 9,600,000.00
Contract Sums RM 81,200,000.00
Question 1
The Letter of Award for the above works was issued for RM 81,200,000.00 based on the tender
sum submitted by the Contractor. As you were preparing the contract documents for binding and
signature, you found some errors in the rates for aluminium windows works submitted by the
Contractor, which were very low. Kindly advise the actions that you will take.
(10 marks)
Answer for Question 1
Based on Clause 13.1, contract sum shall not be adjusted or altered in any way or
whatsoever other than in accordance with the express provision of the contract. Any errors in rate
and price shall be rationalized by the Architect without changing the contract sum figure before
signing the contract.
For this case, Letter of Award had been issued hence there is a contract form between
both parties. But the contract document has not been signed due to errors found in rates for
aluminium window works is very low. Architect or Consultant will have to rationalized the rate
based on the market rate but subject to agreement by Contractor as well.
In some cases, the Contractor might attempt ‘front loading’ when pricing to allow a more
profitable price. Based on the case law, Sist Construction v State Electricity Commision of
Victoria [1982] VR 597 of 606, the Contractor priced lower rate on items which they believe the
actual quantities are likely to be less than the quantity stated in the BQ. This may be the reason
why the rates for aluminium window works were very low. The Court held that the Contractor
has to act reasonably in pricing the BQ and it is necessary for the Consultant to rationalize the
BQ.
Question 2a
In accordance with clause 30.10 of the contract, the contractor duly submitted his Final Accounts
within 6 months after the issuance of the Certificate of Practical Completion. You are then
required to assess this application and prepare the Final Account for the apartment project based
of the following valuations and adjustments made to the Contract Sum.
(30 marks)
Information provided are as follows:-
The Architect had granted the Contractor’s first application for extension of time and approved
additional insurance premium amounting to RM 30,000.00 in accordance with clause 24 of the
contract due to the delay in the completion of the works caused by the Employer’s late decision
on the toilet design.
In his second application for extension of time, the Contractor submitted an application for
extension of time due to exceptionally inclement weather and a loss and expense claim for RM
120,000.00 in his Final Accounts to you. The Architect approved the extension of time as per
Clause 23.8.
Question 2b
The following are the nominated sub-contractor’s accounts:-
Original P.C &
Provisional Sums NSC’s final account
i. Lift Services: RM 1,300,000.00 RM 1,600,000.00
Profit @ 2% RM 26,000.00
Attendance as item RM 20,000.00
ii. Air Conditioning
Services:
RM 2,300,000.00 RM 2,200,000.00
Profit @ 2% RM 46,000.00
Attendance as item RM 40,000.00
iii. Electrical Services: RM 2,700,000.00 RM 2,600,000.00
Profit @ 2% RM 54,000.00
Attendance as item RM 50,000.00
iv. Provisional Sums:
Guard House
RM 1,000,000.00 RM 1,250,000.00
v. Contingency Sum RM 2,064,000.00
RM 9,600,000.00
Answer for Question 2a and 2b
According to PAM 2006 with Quantities stated that final account is the financial
documents showing the adjustments of the contract sum issued under clause 30.10. It is the
process of calculating and agreeing the adjustments of contract sum to determine the final
payment to the contractor. The contractor need to submit all necessary document within 6 months
after the issuance of the Certificate of Practical Completion for the preparation of final account.
Quantity Surveyor and Architect shall complete the final account within 6 months from the
receipt of all document from the contractor.
The contractor’s first application for extension of time and approved additional insurance
premium amounting to RM30,000.00 is granted for both extension of time and loss and expenses
claim according to relevant clauses 23.8(g) and 24.3(a) respectively.
Under clause 23.8(g), delay due to compliance with the Architect’s instruction issued by
the Architect under clauses 1.4, 11.2 and 21.4. In this case, the extension of time is granted under
variation clause 11.2 since there are changes in toilet design by the employer.
Under clause 24.3(a), there is a late issuance of Architect’s instruction due to the delay of
employer in deciding the toilet design which is clearly employer’s default. With this supporting
clause, the contractor is granted loss and expenses which is RM30,000.00 and therefore, included
in final account.
The contractor’s second application for extension of time due to exceptionally inclement
weather and loss and expenses claim for RM120,000.00. With supporting clause 23.8(b),
extension of time is granted to contractor due to exceptionally inclement weather. However, there
is no relevant clause to support the loss and expenses claim under clause 24.3. According to
principle natural of justice, the contractor and employer shall bear their own losses suffered due
to exceptionally inclement weather is a neutral event which it is no either contractor’s or
employer’s default.
Nominated sub-contractor’s final account such as lift services, air conditioning services
and electrical services, the nominated sub-contractor’s final account sum will be added into the
final account and the profit will be 2% of the final sum while the attendance will be remain the
same as to the original amount.
Besides that, provisional sums for guard house are awarded to the nominated sub-
contractor therefore RM 1,250,000.00 of the nominated sub-contractor final account sum will be
added into the final account and profit and attendance are included as well. For the amount of
profit and attendance of the guard house will be 2% each of the final sum.
Question 2c (i)
You have to evaluate the following variations for final account:-
The Contractor had priced RM 130,000.00 for the Contractor All Risk Insurance policy in the
Preliminaries Bills. The Contractor failed to purchase this insurance when the works commence.
The Employer, then, bought and paid for the said insurance for RM 180,000.00 on the behalf of
the Contractor, for which the Contractor agreed. The Employer wants to recover this cost.
(15 marks)
Answer for Question 2c (i)
In Article 7 of PAM Contract 2006, Contractor All Risk Insurance (CAR Insurance) is a
comprehensive insurance policy that covers any physical loss or damage to work executed or
material and goods under a standard CAR Insurance policy. It offers protection for any parties
involved in construction work against any unforeseen accidents that might lead to financial
losses.
This question stated that the Contractor had priced RM 130,000.00 for CAR Insurances in
Preliminaries Bills. However, he failed to purchase the insurance when the works commence.
When Contractor failed to purchase the insurance, his action has caused a breach of his own
obligation since it is a requirement stated in the PAM Contract. According to Clause 20.A.3 in
PAM 2006, if Contractor makes default in insuring works for new building, Employer may
insure against any risks in respect of which the default has occurred. Employer could but is not
obligated to purchase those insurances for the Contractor. The amount of premiums and any
other cost incurred and paid by the Employer shall be set-off by the Employer under Clauses
30.4.
The total cost of CAR Insurance paid by Employer is RM 180,000.00, include RM
130,000.00 which is the premium of CAR Insurance priced in the Preliminaries Bills and the
extra cost of RM 50,000.00. This amount has been agreed by Contractor before Employer
purchase the insurance. Employer is allowed to recover the total cost of RM 180,000.00 through
set-off but should divided into 2 steps.
First step is to recover the CAR Insurance premium of RM 130,000.00. Clause 20.A.1
stated purchasing CAR Insurance is Contractor’s obligation for the parties in the contract. In this
clause also mentioned that Contractor shall ensure the CAR Insurance is accordingly extended
for the same period of delay and ensure the policy is valid shall be valid up to the Completion
Date and the extended maintenance cover shall be fore the Defects Liability Period plus a further
3 months. In this condition, the default caused by Contractor which gives Employer rights to set-
off the amount from Contractor.
Secondly is the additional cost of CAR Insurance premium, RM 50,000.00 can be set-off
by the Employer. When Employer intends to set-off the extra cost, Contractor has no rights to
dispute that amount. Additionally, the breach of his action would trigger the set-off entitlement
by the Employer.
There are several precedent conditions when Employer intends to set-off the amount from
Contractor. Architect or Quantity Surveyor shall submit detailed assessment such as an official
receipt of the insurance and a written notice of set-off to Contractor. It lacks clarity and is open to
dispute by the Contractor if without explaining and defining those “complete details”. In the
written notice shall include the intention of Employer to set-off the sum and grounds and reasons
on which set-off is made. The notice shall deliver by hand or registered post within 28 days
before the set-off is deducted.
When Contractor receives the written notice from Employer, he has 2 options, either
accepts or disputes the amount. In this situation, Contractor only can agree and accept the amount
that Employer wish to recover within 28 days of notices of setting off. There are several ways
where set-off can be recovered from Contractor. First, Contractor can recover the set-off directly
as a debt through a cheque. Second, the set-off can deduct from any monies due to or to become
due to the Contractor through Interim Certificate. Third, Employer may call the exact sum from
performance bond but not the total bond.
The easiest way to deduct set-off amount is through Interim Certificate. However, the
amount that is going to counter-claim will not reflect on Interim Certificate. Interim Certificate
only included work done of the construction work and percentage of materials and goods on site.
Employer can deduct the amount that he intends to set-off on the interim payment when he issues
a cheque payment to Contractor.
Question 2c (ii)
Under the Preliminaries, the Contractor is required to provide a black and white photocopier
machine on site for the Resident Engineer’s use but this item was left un-priced, i.e. BQ item was
left blank in the rate/amount column in the contract document. During the progress, the Architect
instructed the Contractor to provide a colour photocopier machine costing RM 8,000.00 instead
of the black and white one as specified. Contractor submitted a variation claim for RM 8,000.00.
(15 marks)
Answer for Question 2c (ii)
In this scenario above, it falls under the categories of variation which stated in PAM
Contract 2006 Clause 11.1. This clause defined variation as the alteration or modification of the
design, quality or quantity of the works. The photocopier machine is considered as the alternative
materials and goods to be used in the Works which under Clause 11.1(b). From the scenario, the
Contractor is required to provide a black and white photocopier machine under the preliminaries,
but he left to price for the item. Then, he was instructed by the Architect to provide a colour
photocopier machine which involve the addition or omission of work to be carried out stated
under Clause 11.1(a).
Based on PAM Contract 2006, rules for valuation under Clause 11.6 stated of valuation
of Variations and work executed by the Contractor shall be made in the according with the
following rules in Clause 11.6(a) to (f). According to the rule of variation, Clause 11.6(e) stated
the rates and prices in the Contract Documents shall be determine the valuation of items omitted.
The omissions that substantially vary the conditions of work are carried out, shall be valued
under Clause 11.6(a), (b) or (c). In this case, Clause 11.6(e) can be further explained under
Clause 11.6(c).
Clause 11.6(c) stated where work is not of a similar character to work as set out in the
Contract Documents, the valuation shall be at fair market rates and prices determined by the
Quantity Surveyor. The scenario stated where the Architect instructed the Contractor for a colour
photocopier machine which is different from the Preliminaries where Contractor need to provide
for a black and white photocopier machine. This is where work is not similar character, a black
and white to a colour photocopier machine as set out in the contract documents. This valuation
can be claimed by the Contractor under Clause 11.6(c) and the valuation shall be at the fair
market rates and prices.
As conclusion, the Quantity Surveyor has to omit the black and white photocopier
machine and add in the colour photocopier machine as valuation based on fair market rates and
prices provided by the Contractor which is RM8,000.00. The quantity surveyor has to determine
the fair market rates and prices based on the any previous contract documents or get quotation
from the suppliers on the similar photocopies machine. The Quantity Surveyor has to carry out
the pricing professionally. If the Contractor satisfied to the valuation prices prepared by the
Quantity Surveyor and both parties will come to an agreement in the claim for the colour
photocopier machine.
Question 2c (iii)
The Contractor had delivered to site all marble floor tiles needed for the lift lobbies as specified
in the contract and construction drawings. However, the Architect decided to use granite floor
instead and instructed the Contractor to remove all the marble tiles from site. The Contractor paid
RM 50,000.00 for the marble tiles,. The Contractor returned the marble tiles to the supplier but
only managed a refund of RM 30,000.00. The Contractor submitted a claim for the loss of RM
20,000.00 that he suffered.
(15 marks)
Answer for Question 2c (iii)
Based on PAM Form Contract 2006, Clauses 11.1(b) states that variation occurs when
there is changes in materials or goods which are used in the Works. In this case, it is a change
that the contractor has instructed to remove all the marble tiles from site and replaced with
granite floor by Architect.
Since the alteration of material in the Works occurs, the marble tiles will be omitted
which falls under Clause 11.6(e) based on PAM Form Contract 2006. This clause states that the
rates and prices in the Contract Documents shall identify the valuation of item omitted. If
omissions substantially vary the conditions under which any remaining item of work are carried
out, the prices of such remaining items shall be valued under Clause 11.6(a), (b) or (c). Which
the new price of the granite will based on Clause 11.6(c) stated where work is not of a similar
character to work as set out in the Contract Document, the valuation shall be at fair market rates
and prices determined by the Quantity Surveyor. Hence, the marble tiles with amount RM50,000
will be omitted in Final Account under this clause.
Due to the marble tiles which cost RM50,000 to Contractor has returned to the supplier
but the Contractor only get refund of RM30,000, the Contractor is entitled to make a claim for
the RM20,000 that he suffered. This is because Clause 11.7 in PAM Form Contract 2006 states
that when there is variation cause the Contractor to incur additional expenses which the
Contractor is not being paid under Clause 11.6, the Contractor is entitled to make a claim for the
additional expenses.
To make a claim for the expenses, clause 11.7(a) in PAM Form Contract 2006 states that
the Contractor is required to submit a written notice to the Architect with an initial estimate of his
claim duly supported with all necessary calculations. Besides, the notice should be submitted
within 28 days from the date of the AI or CAI for the Contractor’s claim.
Based on clause 11.7(b) in PAM Form Contract 2006, the Contractor has to send
complete particulars of his claim to Architect and Quantity Surveyor for additional expenses with
all necessary calculation to support his claim. The particular should be submitted within 28 days
of completing the Variations. If the Contractor did not submit the particulars within 28 days, it
shall be deemed that the Contractor has waived his right to the additional expenses.
As a result, the marble tiles price which costs RM50,000 will be put under Omissions in
final account based on Clause 11.9 in PAM Form Contract 2006 and the Contractor’s claim
which costs RM20,000 will be put under Additional Expenses in final account based on Clause
30.11(a) in PAM Form Contract 2006.
Question 2c (iv)
Mistake was made in the price for excavation through rocks at RM 50 per m3. Item was not
rationalised during contract documentation. However, original quantity in BQ is 10 m3 but re-
measured as-built quantity was 100 m3. The Contractor submitted a claim for RM 55,000.00
based on a revised rates of RM 550 per m3 for the total quantity of 100 m3.
(15 marks)
Answer for Question 2c (iv)
Based on the situation, rock excavation that was priced wrongly for RM 50 per m3 and
the revised rate is RM 550 per m3. The quantity for rock excavation is measured wrongly in 10
m3 in original Bills of Quantities instead of 100 m3 after re-measured. The Contractor is facing a
big lost due to the irrationalised priced in contract documentation and the quantity measured
initially. Therefore, the Contractor has the right to claim his loss and expenses on the outstanding
work for revised rate and quantity.
Referring the PAM Contract 2006 under Clause 11.6(a) state where the work have the
similar character, executed under similar conditions and there is no significantly change of
quantity of works as set out in the contract documents. The rates RM 50 per m3 and quantity 10
m3 have been agreed in Bills of Quantity and this is not allow for changed and amended.
Therefore, the first 10 m3 excavation claimed by Contractor shall be based on RM 50 per m3
although he had made mistake and the excavation rates had been agreed in BQ and it is not allow
for amended.
In addition, the PAM Contract 2006 under Clause 11.6(b) stated where work is of a
similar character to work as set out in the contract documents but is not executed under similar
conditions or is executed under similar conditions but there is significant change in the quantity
of work carried out, the rates and prices in the Contract Documents shall be the basis for
determining the valuation which shall include a far adjustment in the rates to take into account
such difference. This means the Contractor can claim for the work with the pre-conditions of
that: (a) the work in similar character but is not executed under similar conditions; or (b) the
work under similar conditions but significant change in the quantity of work carried out. Hence,
the remeasured quantity 100 m3 is the change in the quantity of work which can be claimed by
Contractor based on the contract rates, RM 50 per m3. The Contractor cannot claim based on the
revised rate RM 550 per m3 for the remeasured quantity because the excavation rates had been
agreed in BQ which is not allow for changed and amended stated under Clause 11.6(a).
The recommended revised amount has been adjusted and to be claimed by Contractor is
RM 4,500.00 by following the calculation below.
Calculation:
1. Original quantity and rates: 10 m3 x RM 50 per m3 = RM 500.00
2. Re-measured quantity and Original BQ rates: 100 m3 x RM 50 per m3 = RM 5,000.00
Total Revised Amount:
Remeasured - Original = RM 5,000.00 - RM 500.00
= RM 4,500.00

More Related Content

What's hot

Sectional completion and partial possession by employer PP2 Coursework 1
Sectional completion and partial possession by employer PP2 Coursework 1Sectional completion and partial possession by employer PP2 Coursework 1
Sectional completion and partial possession by employer PP2 Coursework 1Arissa Loh
 
Cl compilation
Cl compilationCl compilation
Cl compilationJessyca Than
 
Seminar - Partial Possession by Employer
Seminar - Partial Possession by EmployerSeminar - Partial Possession by Employer
Seminar - Partial Possession by EmployerKai Yun Pang
 
Works Contract
Works ContractWorks Contract
Works ContractSadat Faruque
 
Service tax on Works Contract (Post Negative List)
Service tax on Works Contract (Post Negative List)Service tax on Works Contract (Post Negative List)
Service tax on Works Contract (Post Negative List)sandesh mundra
 
Partial possession-by-employer-29052017-finalized (1)
Partial possession-by-employer-29052017-finalized (1)Partial possession-by-employer-29052017-finalized (1)
Partial possession-by-employer-29052017-finalized (1)Tee Joanne
 
Payments provisions in CPWD CONTRACT
Payments provisions in CPWD CONTRACTPayments provisions in CPWD CONTRACT
Payments provisions in CPWD CONTRACTAvinash Kumar Gupta
 
PP2 Seminar - Determination of Contractor's Employment by Employer
PP2 Seminar - Determination of Contractor's Employment by EmployerPP2 Seminar - Determination of Contractor's Employment by Employer
PP2 Seminar - Determination of Contractor's Employment by EmployerTrace96
 
Suspensions and Delays in Construction Contract
Suspensions and Delays in Construction ContractSuspensions and Delays in Construction Contract
Suspensions and Delays in Construction ContractAvinash Kumar Gupta
 
Real infra - june 2016
Real infra - june 2016Real infra - june 2016
Real infra - june 2016oswinfo
 
DEFECTS LIABILITY AND TAKING OVER CLAUSES
DEFECTS LIABILITY AND TAKING OVER CLAUSESDEFECTS LIABILITY AND TAKING OVER CLAUSES
DEFECTS LIABILITY AND TAKING OVER CLAUSESShivam Sood
 
Works contract
Works contractWorks contract
Works contractAnand2
 
Fidic 99 ppt by dr karim
Fidic 99 ppt by dr karimFidic 99 ppt by dr karim
Fidic 99 ppt by dr karimSalama Shurrab
 
Works contract under MVAT Act
Works contract under MVAT ActWorks contract under MVAT Act
Works contract under MVAT Actdc23Pune
 
Bcd4 standard building_contract_(without_quantities)_and_schedule_of_contract...
Bcd4 standard building_contract_(without_quantities)_and_schedule_of_contract...Bcd4 standard building_contract_(without_quantities)_and_schedule_of_contract...
Bcd4 standard building_contract_(without_quantities)_and_schedule_of_contract...tdartnell
 
PP2 presentation
PP2 presentationPP2 presentation
PP2 presentationYong Sy
 
Taxmann's Daily Tax Digest | 24th July 2020
Taxmann's Daily Tax Digest | 24th July 2020Taxmann's Daily Tax Digest | 24th July 2020
Taxmann's Daily Tax Digest | 24th July 2020Taxmann
 

What's hot (20)

Seminar p8x
Seminar p8xSeminar p8x
Seminar p8x
 
Sectional completion and partial possession by employer PP2 Coursework 1
Sectional completion and partial possession by employer PP2 Coursework 1Sectional completion and partial possession by employer PP2 Coursework 1
Sectional completion and partial possession by employer PP2 Coursework 1
 
Cl compilation
Cl compilationCl compilation
Cl compilation
 
Seminar - Partial Possession by Employer
Seminar - Partial Possession by EmployerSeminar - Partial Possession by Employer
Seminar - Partial Possession by Employer
 
Works Contract
Works ContractWorks Contract
Works Contract
 
Service tax on Works Contract (Post Negative List)
Service tax on Works Contract (Post Negative List)Service tax on Works Contract (Post Negative List)
Service tax on Works Contract (Post Negative List)
 
Partial possession-by-employer-29052017-finalized (1)
Partial possession-by-employer-29052017-finalized (1)Partial possession-by-employer-29052017-finalized (1)
Partial possession-by-employer-29052017-finalized (1)
 
Payments provisions in CPWD CONTRACT
Payments provisions in CPWD CONTRACTPayments provisions in CPWD CONTRACT
Payments provisions in CPWD CONTRACT
 
GST on works contract
GST on  works contractGST on  works contract
GST on works contract
 
PP2 Seminar - Determination of Contractor's Employment by Employer
PP2 Seminar - Determination of Contractor's Employment by EmployerPP2 Seminar - Determination of Contractor's Employment by Employer
PP2 Seminar - Determination of Contractor's Employment by Employer
 
Budget updates 2019
Budget updates  2019Budget updates  2019
Budget updates 2019
 
Suspensions and Delays in Construction Contract
Suspensions and Delays in Construction ContractSuspensions and Delays in Construction Contract
Suspensions and Delays in Construction Contract
 
Real infra - june 2016
Real infra - june 2016Real infra - june 2016
Real infra - june 2016
 
DEFECTS LIABILITY AND TAKING OVER CLAUSES
DEFECTS LIABILITY AND TAKING OVER CLAUSESDEFECTS LIABILITY AND TAKING OVER CLAUSES
DEFECTS LIABILITY AND TAKING OVER CLAUSES
 
Works contract
Works contractWorks contract
Works contract
 
Fidic 99 ppt by dr karim
Fidic 99 ppt by dr karimFidic 99 ppt by dr karim
Fidic 99 ppt by dr karim
 
Works contract under MVAT Act
Works contract under MVAT ActWorks contract under MVAT Act
Works contract under MVAT Act
 
Bcd4 standard building_contract_(without_quantities)_and_schedule_of_contract...
Bcd4 standard building_contract_(without_quantities)_and_schedule_of_contract...Bcd4 standard building_contract_(without_quantities)_and_schedule_of_contract...
Bcd4 standard building_contract_(without_quantities)_and_schedule_of_contract...
 
PP2 presentation
PP2 presentationPP2 presentation
PP2 presentation
 
Taxmann's Daily Tax Digest | 24th July 2020
Taxmann's Daily Tax Digest | 24th July 2020Taxmann's Daily Tax Digest | 24th July 2020
Taxmann's Daily Tax Digest | 24th July 2020
 

Similar to PP2 - Group Assignment

PP2 - Assignment
PP2 - AssignmentPP2 - Assignment
PP2 - AssignmentQuo Ming
 
Pp2 assignment-final
Pp2 assignment-finalPp2 assignment-final
Pp2 assignment-finalashleyyeap
 
Pp2 assignment-final
Pp2 assignment-finalPp2 assignment-final
Pp2 assignment-finalashleyyeap
 
Assignmenr for pp2 final account
Assignmenr for pp2 final accountAssignmenr for pp2 final account
Assignmenr for pp2 final accountahmong4
 
Pp2 final report
Pp2 final reportPp2 final report
Pp2 final reportPui Chun Shian
 
PP2 final report
PP2 final reportPP2 final report
PP2 final reportArissa Loh
 
Pp2 group assignment
Pp2 group assignmentPp2 group assignment
Pp2 group assignmentlohwenjun
 
Assignment - Report
Assignment - ReportAssignment - Report
Assignment - ReportKai Yun Pang
 
Assignment - Final Account
Assignment - Final AccountAssignment - Final Account
Assignment - Final AccountKai Yun Pang
 
PP2 - Assignment
PP2 - Assignment PP2 - Assignment
PP2 - Assignment lucaschinsheng
 
Pp2 coursework 2 201808
Pp2 coursework 2   201808Pp2 coursework 2   201808
Pp2 coursework 2 201808Arissa Loh
 
Pp2 coursework 2 201808
Pp2 coursework 2   201808Pp2 coursework 2   201808
Pp2 coursework 2 201808ashleyyeap
 
Pp2 coursework 2 brief
Pp2 coursework 2  briefPp2 coursework 2  brief
Pp2 coursework 2 briefDoreen Yeo
 
Pp2 coursework 2 BRIEF 201708
Pp2 coursework 2  BRIEF  201708Pp2 coursework 2  BRIEF  201708
Pp2 coursework 2 BRIEF 201708Pang Khai Shuen
 
Pp2 coursework 2
Pp2 coursework  2Pp2 coursework  2
Pp2 coursework 2tfkc1212
 
Professional Practice II
Professional Practice IIProfessional Practice II
Professional Practice IIseenyeeyong
 
PP Seminar Tutorial 7
PP Seminar Tutorial 7PP Seminar Tutorial 7
PP Seminar Tutorial 7Farah Sham
 
Professional practice 2
Professional practice 2Professional practice 2
Professional practice 2Shze Hwa Lee
 
Pp2 coursework 1 p10
Pp2 coursework 1 p10 Pp2 coursework 1 p10
Pp2 coursework 1 p10 Farah Sham
 

Similar to PP2 - Group Assignment (20)

PP2 - Assignment
PP2 - AssignmentPP2 - Assignment
PP2 - Assignment
 
Pp2 assignment-final
Pp2 assignment-finalPp2 assignment-final
Pp2 assignment-final
 
Pp2 assignment-final
Pp2 assignment-finalPp2 assignment-final
Pp2 assignment-final
 
Assignmenr for pp2 final account
Assignmenr for pp2 final accountAssignmenr for pp2 final account
Assignmenr for pp2 final account
 
Pp2 final report
Pp2 final reportPp2 final report
Pp2 final report
 
PP2 final report
PP2 final reportPP2 final report
PP2 final report
 
Pp2 group assignment
Pp2 group assignmentPp2 group assignment
Pp2 group assignment
 
Assignment - Report
Assignment - ReportAssignment - Report
Assignment - Report
 
Assignment - Final Account
Assignment - Final AccountAssignment - Final Account
Assignment - Final Account
 
PP2 - Assignment
PP2 - Assignment PP2 - Assignment
PP2 - Assignment
 
Pp2 coursework 2 201808
Pp2 coursework 2   201808Pp2 coursework 2   201808
Pp2 coursework 2 201808
 
Pp2 coursework 2 201808
Pp2 coursework 2   201808Pp2 coursework 2   201808
Pp2 coursework 2 201808
 
Pp2 coursework 2 brief
Pp2 coursework 2  briefPp2 coursework 2  brief
Pp2 coursework 2 brief
 
Pp2 coursework 2 BRIEF 201708
Pp2 coursework 2  BRIEF  201708Pp2 coursework 2  BRIEF  201708
Pp2 coursework 2 BRIEF 201708
 
Pp2 coursework 2
Pp2 coursework  2Pp2 coursework  2
Pp2 coursework 2
 
Professional Practice II
Professional Practice IIProfessional Practice II
Professional Practice II
 
PP Seminar Tutorial 7
PP Seminar Tutorial 7PP Seminar Tutorial 7
PP Seminar Tutorial 7
 
Cm mitemrate ver270206
Cm mitemrate ver270206Cm mitemrate ver270206
Cm mitemrate ver270206
 
Professional practice 2
Professional practice 2Professional practice 2
Professional practice 2
 
Pp2 coursework 1 p10
Pp2 coursework 1 p10 Pp2 coursework 1 p10
Pp2 coursework 1 p10
 

More from Lin Hui

Financial Management
Financial ManagementFinancial Management
Financial ManagementLin Hui
 
Building Economics Presentation
Building Economics PresentationBuilding Economics Presentation
Building Economics PresentationLin Hui
 
Building Economics Report
Building Economics Report Building Economics Report
Building Economics Report Lin Hui
 
PP2 - Seminar Presentation
PP2 - Seminar Presentation PP2 - Seminar Presentation
PP2 - Seminar Presentation Lin Hui
 
Measurement 4 presentation
Measurement 4 presentationMeasurement 4 presentation
Measurement 4 presentationLin Hui
 
Assignment - software application for qs
Assignment - software application for qs Assignment - software application for qs
Assignment - software application for qs Lin Hui
 
Software application report
Software application report Software application report
Software application report Lin Hui
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1Lin Hui
 
Estimating
Estimating Estimating
Estimating Lin Hui
 
Management science
Management scienceManagement science
Management scienceLin Hui
 
Biodiversity Presentation - Conservation on Tapir
Biodiversity Presentation - Conservation on Tapir  Biodiversity Presentation - Conservation on Tapir
Biodiversity Presentation - Conservation on Tapir Lin Hui
 
Building Services 2
Building Services 2 Building Services 2
Building Services 2 Lin Hui
 
Prefabricated timber framing systems
Prefabricated timber framing  systemsPrefabricated timber framing  systems
Prefabricated timber framing systemsLin Hui
 
Water treatment-for-domestic-water-supply - Report
Water treatment-for-domestic-water-supply - ReportWater treatment-for-domestic-water-supply - Report
Water treatment-for-domestic-water-supply - ReportLin Hui
 
Bs1 assignment semester 2016 august
Bs1 assignment   semester 2016 augustBs1 assignment   semester 2016 august
Bs1 assignment semester 2016 augustLin Hui
 
Water treatment-for-domestic-water-supply - Slides
Water treatment-for-domestic-water-supply - Slides Water treatment-for-domestic-water-supply - Slides
Water treatment-for-domestic-water-supply - Slides Lin Hui
 
M2 project assignment aug 2016
M2 project assignment aug 2016M2 project assignment aug 2016
M2 project assignment aug 2016Lin Hui
 
Ipoh railway station - Scientific Poster
Ipoh railway station - Scientific Poster Ipoh railway station - Scientific Poster
Ipoh railway station - Scientific Poster Lin Hui
 
Ms ct-bm
Ms ct-bmMs ct-bm
Ms ct-bmLin Hui
 
Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Lin Hui
 

More from Lin Hui (20)

Financial Management
Financial ManagementFinancial Management
Financial Management
 
Building Economics Presentation
Building Economics PresentationBuilding Economics Presentation
Building Economics Presentation
 
Building Economics Report
Building Economics Report Building Economics Report
Building Economics Report
 
PP2 - Seminar Presentation
PP2 - Seminar Presentation PP2 - Seminar Presentation
PP2 - Seminar Presentation
 
Measurement 4 presentation
Measurement 4 presentationMeasurement 4 presentation
Measurement 4 presentation
 
Assignment - software application for qs
Assignment - software application for qs Assignment - software application for qs
Assignment - software application for qs
 
Software application report
Software application report Software application report
Software application report
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
 
Estimating
Estimating Estimating
Estimating
 
Management science
Management scienceManagement science
Management science
 
Biodiversity Presentation - Conservation on Tapir
Biodiversity Presentation - Conservation on Tapir  Biodiversity Presentation - Conservation on Tapir
Biodiversity Presentation - Conservation on Tapir
 
Building Services 2
Building Services 2 Building Services 2
Building Services 2
 
Prefabricated timber framing systems
Prefabricated timber framing  systemsPrefabricated timber framing  systems
Prefabricated timber framing systems
 
Water treatment-for-domestic-water-supply - Report
Water treatment-for-domestic-water-supply - ReportWater treatment-for-domestic-water-supply - Report
Water treatment-for-domestic-water-supply - Report
 
Bs1 assignment semester 2016 august
Bs1 assignment   semester 2016 augustBs1 assignment   semester 2016 august
Bs1 assignment semester 2016 august
 
Water treatment-for-domestic-water-supply - Slides
Water treatment-for-domestic-water-supply - Slides Water treatment-for-domestic-water-supply - Slides
Water treatment-for-domestic-water-supply - Slides
 
M2 project assignment aug 2016
M2 project assignment aug 2016M2 project assignment aug 2016
M2 project assignment aug 2016
 
Ipoh railway station - Scientific Poster
Ipoh railway station - Scientific Poster Ipoh railway station - Scientific Poster
Ipoh railway station - Scientific Poster
 
Ms ct-bm
Ms ct-bmMs ct-bm
Ms ct-bm
 
Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016
 

Recently uploaded

Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Pooja Nehwal
 
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur fĂźr Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur fĂźr Container und Kubern...OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur fĂźr Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur fĂźr Container und Kubern...NETWAYS
 
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxGenesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxFamilyWorshipCenterD
 
George Lever - eCommerce Day Chile 2024
George Lever -  eCommerce Day Chile 2024George Lever -  eCommerce Day Chile 2024
George Lever - eCommerce Day Chile 2024eCommerce Institute
 
SaaStr Workshop Wednesday w: Jason Lemkin, SaaStr
SaaStr Workshop Wednesday w: Jason Lemkin, SaaStrSaaStr Workshop Wednesday w: Jason Lemkin, SaaStr
SaaStr Workshop Wednesday w: Jason Lemkin, SaaStrsaastr
 
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...Salam Al-Karadaghi
 
Russian Call Girls in Kolkata Vaishnavi 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Vaishnavi 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls in Kolkata Vaishnavi 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Vaishnavi 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...NETWAYS
 
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝soniya singh
 
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Kayode Fayemi
 
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...henrik385807
 
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Krijn Poppe
 
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfOpen Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfhenrik385807
 
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesVVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesPooja Nehwal
 
Philippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptPhilippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptssuser319dad
 
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Delhi Call girls
 
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )Pooja Nehwal
 
call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@vikas rana
 
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxNikitaBankoti2
 
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...NETWAYS
 

Recently uploaded (20)

Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
 
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur fĂźr Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur fĂźr Container und Kubern...OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur fĂźr Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur fĂźr Container und Kubern...
 
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxGenesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
 
George Lever - eCommerce Day Chile 2024
George Lever -  eCommerce Day Chile 2024George Lever -  eCommerce Day Chile 2024
George Lever - eCommerce Day Chile 2024
 
SaaStr Workshop Wednesday w: Jason Lemkin, SaaStr
SaaStr Workshop Wednesday w: Jason Lemkin, SaaStrSaaStr Workshop Wednesday w: Jason Lemkin, SaaStr
SaaStr Workshop Wednesday w: Jason Lemkin, SaaStr
 
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
 
Russian Call Girls in Kolkata Vaishnavi 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Vaishnavi 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls in Kolkata Vaishnavi 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Vaishnavi 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
 
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
 
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
 
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
 
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
 
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfOpen Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
 
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesVVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
 
Philippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptPhilippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.ppt
 
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
 
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
 
call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@
 
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
 
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
 

PP2 - Group Assignment

  • 1. SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN Bachelor of Quantity Surveying (Honours) PROFESSIONAL PRACTICE [QSB 3614] COURSEWORK NO.2 - PREPARATION OF FINAL ACCOUNT LECTURER: EDDIE LIM SIK CHEON SUBMISSION DATE: 29th OCTOBER 2018 Name : Student ID : Adele Lu Khai Syn 0323151 Sim Si Kai 0318609 Zachary Ooi Cheng En 0323120 Choo Zhi Kang 0327586 Tey Cheng Fern 0323912 Michelle Tung Man Kaye 0324175 Lee Lin Hui 0322797 Heng Chun Hui 0329804
  • 2. You are appointed as the consulting Quantity Surveyor for a apartment project based on PAM Form of Contract 2006 (With Quantities). The summary of the Contract Sum is as follows : Bill No. 1 - Preliminaries RM 4,250,000.00 Bill No. 2 - Building Works RM 62,850,000.00 Bill No. 3 - Local Infrastructure Works RM 4,500,000.00 Bill No. 4 - P.C and Provisional Sums RM 9,600,000.00 Contract Sums RM 81,200,000.00 Question 1 The Letter of Award for the above works was issued for RM 81,200,000.00 based on the tender sum submitted by the Contractor. As you were preparing the contract documents for binding and signature, you found some errors in the rates for aluminium windows works submitted by the Contractor, which were very low. Kindly advise the actions that you will take. (10 marks) Answer for Question 1 Based on Clause 13.1, contract sum shall not be adjusted or altered in any way or whatsoever other than in accordance with the express provision of the contract. Any errors in rate and price shall be rationalized by the Architect without changing the contract sum figure before signing the contract. For this case, Letter of Award had been issued hence there is a contract form between both parties. But the contract document has not been signed due to errors found in rates for aluminium window works is very low. Architect or Consultant will have to rationalized the rate based on the market rate but subject to agreement by Contractor as well.
  • 3. In some cases, the Contractor might attempt ‘front loading’ when pricing to allow a more profitable price. Based on the case law, Sist Construction v State Electricity Commision of Victoria [1982] VR 597 of 606, the Contractor priced lower rate on items which they believe the actual quantities are likely to be less than the quantity stated in the BQ. This may be the reason why the rates for aluminium window works were very low. The Court held that the Contractor has to act reasonably in pricing the BQ and it is necessary for the Consultant to rationalize the BQ. Question 2a In accordance with clause 30.10 of the contract, the contractor duly submitted his Final Accounts within 6 months after the issuance of the Certificate of Practical Completion. You are then required to assess this application and prepare the Final Account for the apartment project based of the following valuations and adjustments made to the Contract Sum. (30 marks) Information provided are as follows:- The Architect had granted the Contractor’s first application for extension of time and approved additional insurance premium amounting to RM 30,000.00 in accordance with clause 24 of the contract due to the delay in the completion of the works caused by the Employer’s late decision on the toilet design. In his second application for extension of time, the Contractor submitted an application for extension of time due to exceptionally inclement weather and a loss and expense claim for RM 120,000.00 in his Final Accounts to you. The Architect approved the extension of time as per Clause 23.8.
  • 4. Question 2b The following are the nominated sub-contractor’s accounts:- Original P.C & Provisional Sums NSC’s final account i. Lift Services: RM 1,300,000.00 RM 1,600,000.00 Profit @ 2% RM 26,000.00 Attendance as item RM 20,000.00 ii. Air Conditioning Services: RM 2,300,000.00 RM 2,200,000.00 Profit @ 2% RM 46,000.00 Attendance as item RM 40,000.00 iii. Electrical Services: RM 2,700,000.00 RM 2,600,000.00 Profit @ 2% RM 54,000.00 Attendance as item RM 50,000.00 iv. Provisional Sums: Guard House RM 1,000,000.00 RM 1,250,000.00 v. Contingency Sum RM 2,064,000.00 RM 9,600,000.00
  • 5. Answer for Question 2a and 2b According to PAM 2006 with Quantities stated that final account is the financial documents showing the adjustments of the contract sum issued under clause 30.10. It is the process of calculating and agreeing the adjustments of contract sum to determine the final payment to the contractor. The contractor need to submit all necessary document within 6 months after the issuance of the Certificate of Practical Completion for the preparation of final account. Quantity Surveyor and Architect shall complete the final account within 6 months from the receipt of all document from the contractor. The contractor’s first application for extension of time and approved additional insurance premium amounting to RM30,000.00 is granted for both extension of time and loss and expenses claim according to relevant clauses 23.8(g) and 24.3(a) respectively. Under clause 23.8(g), delay due to compliance with the Architect’s instruction issued by the Architect under clauses 1.4, 11.2 and 21.4. In this case, the extension of time is granted under variation clause 11.2 since there are changes in toilet design by the employer. Under clause 24.3(a), there is a late issuance of Architect’s instruction due to the delay of employer in deciding the toilet design which is clearly employer’s default. With this supporting clause, the contractor is granted loss and expenses which is RM30,000.00 and therefore, included in final account. The contractor’s second application for extension of time due to exceptionally inclement weather and loss and expenses claim for RM120,000.00. With supporting clause 23.8(b), extension of time is granted to contractor due to exceptionally inclement weather. However, there is no relevant clause to support the loss and expenses claim under clause 24.3. According to principle natural of justice, the contractor and employer shall bear their own losses suffered due
  • 6. to exceptionally inclement weather is a neutral event which it is no either contractor’s or employer’s default. Nominated sub-contractor’s final account such as lift services, air conditioning services and electrical services, the nominated sub-contractor’s final account sum will be added into the final account and the profit will be 2% of the final sum while the attendance will be remain the same as to the original amount. Besides that, provisional sums for guard house are awarded to the nominated sub- contractor therefore RM 1,250,000.00 of the nominated sub-contractor final account sum will be added into the final account and profit and attendance are included as well. For the amount of profit and attendance of the guard house will be 2% each of the final sum. Question 2c (i) You have to evaluate the following variations for final account:- The Contractor had priced RM 130,000.00 for the Contractor All Risk Insurance policy in the Preliminaries Bills. The Contractor failed to purchase this insurance when the works commence. The Employer, then, bought and paid for the said insurance for RM 180,000.00 on the behalf of the Contractor, for which the Contractor agreed. The Employer wants to recover this cost. (15 marks)
  • 7. Answer for Question 2c (i) In Article 7 of PAM Contract 2006, Contractor All Risk Insurance (CAR Insurance) is a comprehensive insurance policy that covers any physical loss or damage to work executed or material and goods under a standard CAR Insurance policy. It offers protection for any parties involved in construction work against any unforeseen accidents that might lead to financial losses. This question stated that the Contractor had priced RM 130,000.00 for CAR Insurances in Preliminaries Bills. However, he failed to purchase the insurance when the works commence. When Contractor failed to purchase the insurance, his action has caused a breach of his own obligation since it is a requirement stated in the PAM Contract. According to Clause 20.A.3 in PAM 2006, if Contractor makes default in insuring works for new building, Employer may insure against any risks in respect of which the default has occurred. Employer could but is not obligated to purchase those insurances for the Contractor. The amount of premiums and any other cost incurred and paid by the Employer shall be set-off by the Employer under Clauses 30.4. The total cost of CAR Insurance paid by Employer is RM 180,000.00, include RM 130,000.00 which is the premium of CAR Insurance priced in the Preliminaries Bills and the extra cost of RM 50,000.00. This amount has been agreed by Contractor before Employer purchase the insurance. Employer is allowed to recover the total cost of RM 180,000.00 through set-off but should divided into 2 steps. First step is to recover the CAR Insurance premium of RM 130,000.00. Clause 20.A.1 stated purchasing CAR Insurance is Contractor’s obligation for the parties in the contract. In this clause also mentioned that Contractor shall ensure the CAR Insurance is accordingly extended for the same period of delay and ensure the policy is valid shall be valid up to the Completion Date and the extended maintenance cover shall be fore the Defects Liability Period plus a further 3 months. In this condition, the default caused by Contractor which gives Employer rights to set- off the amount from Contractor.
  • 8. Secondly is the additional cost of CAR Insurance premium, RM 50,000.00 can be set-off by the Employer. When Employer intends to set-off the extra cost, Contractor has no rights to dispute that amount. Additionally, the breach of his action would trigger the set-off entitlement by the Employer. There are several precedent conditions when Employer intends to set-off the amount from Contractor. Architect or Quantity Surveyor shall submit detailed assessment such as an official receipt of the insurance and a written notice of set-off to Contractor. It lacks clarity and is open to dispute by the Contractor if without explaining and defining those “complete details”. In the written notice shall include the intention of Employer to set-off the sum and grounds and reasons on which set-off is made. The notice shall deliver by hand or registered post within 28 days before the set-off is deducted. When Contractor receives the written notice from Employer, he has 2 options, either accepts or disputes the amount. In this situation, Contractor only can agree and accept the amount that Employer wish to recover within 28 days of notices of setting off. There are several ways where set-off can be recovered from Contractor. First, Contractor can recover the set-off directly as a debt through a cheque. Second, the set-off can deduct from any monies due to or to become due to the Contractor through Interim Certificate. Third, Employer may call the exact sum from performance bond but not the total bond. The easiest way to deduct set-off amount is through Interim Certificate. However, the amount that is going to counter-claim will not reflect on Interim Certificate. Interim Certificate only included work done of the construction work and percentage of materials and goods on site. Employer can deduct the amount that he intends to set-off on the interim payment when he issues a cheque payment to Contractor.
  • 9. Question 2c (ii) Under the Preliminaries, the Contractor is required to provide a black and white photocopier machine on site for the Resident Engineer’s use but this item was left un-priced, i.e. BQ item was left blank in the rate/amount column in the contract document. During the progress, the Architect instructed the Contractor to provide a colour photocopier machine costing RM 8,000.00 instead of the black and white one as specified. Contractor submitted a variation claim for RM 8,000.00. (15 marks) Answer for Question 2c (ii) In this scenario above, it falls under the categories of variation which stated in PAM Contract 2006 Clause 11.1. This clause defined variation as the alteration or modification of the design, quality or quantity of the works. The photocopier machine is considered as the alternative materials and goods to be used in the Works which under Clause 11.1(b). From the scenario, the Contractor is required to provide a black and white photocopier machine under the preliminaries, but he left to price for the item. Then, he was instructed by the Architect to provide a colour photocopier machine which involve the addition or omission of work to be carried out stated under Clause 11.1(a). Based on PAM Contract 2006, rules for valuation under Clause 11.6 stated of valuation of Variations and work executed by the Contractor shall be made in the according with the following rules in Clause 11.6(a) to (f). According to the rule of variation, Clause 11.6(e) stated the rates and prices in the Contract Documents shall be determine the valuation of items omitted. The omissions that substantially vary the conditions of work are carried out, shall be valued under Clause 11.6(a), (b) or (c). In this case, Clause 11.6(e) can be further explained under Clause 11.6(c). Clause 11.6(c) stated where work is not of a similar character to work as set out in the Contract Documents, the valuation shall be at fair market rates and prices determined by the Quantity Surveyor. The scenario stated where the Architect instructed the Contractor for a colour
  • 10. photocopier machine which is different from the Preliminaries where Contractor need to provide for a black and white photocopier machine. This is where work is not similar character, a black and white to a colour photocopier machine as set out in the contract documents. This valuation can be claimed by the Contractor under Clause 11.6(c) and the valuation shall be at the fair market rates and prices. As conclusion, the Quantity Surveyor has to omit the black and white photocopier machine and add in the colour photocopier machine as valuation based on fair market rates and prices provided by the Contractor which is RM8,000.00. The quantity surveyor has to determine the fair market rates and prices based on the any previous contract documents or get quotation from the suppliers on the similar photocopies machine. The Quantity Surveyor has to carry out the pricing professionally. If the Contractor satisfied to the valuation prices prepared by the Quantity Surveyor and both parties will come to an agreement in the claim for the colour photocopier machine. Question 2c (iii) The Contractor had delivered to site all marble floor tiles needed for the lift lobbies as specified in the contract and construction drawings. However, the Architect decided to use granite floor instead and instructed the Contractor to remove all the marble tiles from site. The Contractor paid RM 50,000.00 for the marble tiles,. The Contractor returned the marble tiles to the supplier but only managed a refund of RM 30,000.00. The Contractor submitted a claim for the loss of RM 20,000.00 that he suffered. (15 marks)
  • 11. Answer for Question 2c (iii) Based on PAM Form Contract 2006, Clauses 11.1(b) states that variation occurs when there is changes in materials or goods which are used in the Works. In this case, it is a change that the contractor has instructed to remove all the marble tiles from site and replaced with granite floor by Architect. Since the alteration of material in the Works occurs, the marble tiles will be omitted which falls under Clause 11.6(e) based on PAM Form Contract 2006. This clause states that the rates and prices in the Contract Documents shall identify the valuation of item omitted. If omissions substantially vary the conditions under which any remaining item of work are carried out, the prices of such remaining items shall be valued under Clause 11.6(a), (b) or (c). Which the new price of the granite will based on Clause 11.6(c) stated where work is not of a similar character to work as set out in the Contract Document, the valuation shall be at fair market rates and prices determined by the Quantity Surveyor. Hence, the marble tiles with amount RM50,000 will be omitted in Final Account under this clause. Due to the marble tiles which cost RM50,000 to Contractor has returned to the supplier but the Contractor only get refund of RM30,000, the Contractor is entitled to make a claim for the RM20,000 that he suffered. This is because Clause 11.7 in PAM Form Contract 2006 states that when there is variation cause the Contractor to incur additional expenses which the Contractor is not being paid under Clause 11.6, the Contractor is entitled to make a claim for the additional expenses. To make a claim for the expenses, clause 11.7(a) in PAM Form Contract 2006 states that the Contractor is required to submit a written notice to the Architect with an initial estimate of his claim duly supported with all necessary calculations. Besides, the notice should be submitted within 28 days from the date of the AI or CAI for the Contractor’s claim. Based on clause 11.7(b) in PAM Form Contract 2006, the Contractor has to send complete particulars of his claim to Architect and Quantity Surveyor for additional expenses with
  • 12. all necessary calculation to support his claim. The particular should be submitted within 28 days of completing the Variations. If the Contractor did not submit the particulars within 28 days, it shall be deemed that the Contractor has waived his right to the additional expenses. As a result, the marble tiles price which costs RM50,000 will be put under Omissions in final account based on Clause 11.9 in PAM Form Contract 2006 and the Contractor’s claim which costs RM20,000 will be put under Additional Expenses in final account based on Clause 30.11(a) in PAM Form Contract 2006. Question 2c (iv) Mistake was made in the price for excavation through rocks at RM 50 per m3. Item was not rationalised during contract documentation. However, original quantity in BQ is 10 m3 but re- measured as-built quantity was 100 m3. The Contractor submitted a claim for RM 55,000.00 based on a revised rates of RM 550 per m3 for the total quantity of 100 m3. (15 marks) Answer for Question 2c (iv) Based on the situation, rock excavation that was priced wrongly for RM 50 per m3 and the revised rate is RM 550 per m3. The quantity for rock excavation is measured wrongly in 10 m3 in original Bills of Quantities instead of 100 m3 after re-measured. The Contractor is facing a big lost due to the irrationalised priced in contract documentation and the quantity measured initially. Therefore, the Contractor has the right to claim his loss and expenses on the outstanding work for revised rate and quantity.
  • 13. Referring the PAM Contract 2006 under Clause 11.6(a) state where the work have the similar character, executed under similar conditions and there is no significantly change of quantity of works as set out in the contract documents. The rates RM 50 per m3 and quantity 10 m3 have been agreed in Bills of Quantity and this is not allow for changed and amended. Therefore, the first 10 m3 excavation claimed by Contractor shall be based on RM 50 per m3 although he had made mistake and the excavation rates had been agreed in BQ and it is not allow for amended. In addition, the PAM Contract 2006 under Clause 11.6(b) stated where work is of a similar character to work as set out in the contract documents but is not executed under similar conditions or is executed under similar conditions but there is significant change in the quantity of work carried out, the rates and prices in the Contract Documents shall be the basis for determining the valuation which shall include a far adjustment in the rates to take into account such difference. This means the Contractor can claim for the work with the pre-conditions of that: (a) the work in similar character but is not executed under similar conditions; or (b) the work under similar conditions but significant change in the quantity of work carried out. Hence, the remeasured quantity 100 m3 is the change in the quantity of work which can be claimed by Contractor based on the contract rates, RM 50 per m3. The Contractor cannot claim based on the revised rate RM 550 per m3 for the remeasured quantity because the excavation rates had been agreed in BQ which is not allow for changed and amended stated under Clause 11.6(a). The recommended revised amount has been adjusted and to be claimed by Contractor is RM 4,500.00 by following the calculation below. Calculation: 1. Original quantity and rates: 10 m3 x RM 50 per m3 = RM 500.00 2. Re-measured quantity and Original BQ rates: 100 m3 x RM 50 per m3 = RM 5,000.00 Total Revised Amount: Remeasured - Original = RM 5,000.00 - RM 500.00 = RM 4,500.00