SlideShare a Scribd company logo
1 of 1
Ken Williams
2110 Pecan T rail Dr, Richmond, T X 77406
(713) 927 -0416 ken_a_wms@yahoo.com
____________________________________________________________________________________________________
Core Competency –Leveraging my exceptional analytical skills and extensive business
consulting experience to maximize profitability
EMPLOYMENT HISTORY
Acorn Systems Inc.
Houston,TX 2001- Present
Consulting Services EngagementManager –Pre-Sales Engineer –Database Developer
 Managed all phases ofEnterprise Profitability projects including pre-sales engagements, contract
development, project planning, project status reporting, profitability model design, technical
integration, model validation, training and implementation
 Expertise in profitability and cost modeling across a wide variety ofvertical industries with Fortune 500
clients including financial services (Aon,Bank of Oklahoma), sports management (NCAA), he althcare
(MD Anderson, UCSF), logistics (FedEx, UPS), Food Services (SuperValu, Safeway), manufacturing
(Timberline, Tampa Bay Steel), chemicals (Canada Colors) and many more.
 Designed and developed Acorn Advanced Analytics product enabling users to define, create and process
an OLAP reporting cube
Digitech Systems LLC
Round Rock,T X 1998 - 2001
Founding Partner –Application Designer –Database Design/Development
 Designed, developed and implemented shopfloor management systems including production
scheduling and tracking all elements ofthe manufacturing process
 Implemented graphical user interfaces to monitor and control powergeneration SCADA systems
 Implemented wireless warehouse inventory management system utilizing hand held devices
and integration into corporate ERP
ALCOA (Aluminum Company ofAmerica)
Rockdale,T X 1991 - 1998
Staff Industrial Engineer –Power & Mining,Ingot
 Developedfinancial and operational tracking/reporting systems and responsible for developing annual
operational and capital budgets
 Identified departmental Key Performance Metrics established Pay For Performance thresholds
 Reduced production costs significantly by increasing re-use of scrap metal
Cooper Industries Inc.
Belden Wire & Cable,T ompkinsville,KY and Brewer-T ichener,Cortland,NY 1987 - 1991
Cost Reduction Coordinator –Manufacturing Engineer
 Completed 2 yearManufacturing Engineering Training program including roles as Industrial Engineer,
Tool Room Supervisor, Production Control Supervisor and Quality Control Engineer
 Managed capital budgetincluding project identification,financial analysis, RFA development, vendor
selection, workplacedesign, installation and training
 Achieved significant increases in CNC machine utilization and reduced inventory levels by implementing
Just In Time management practices
EDUCAT ION
Ohio University,Athens,OH
BS in Industrial and Systems Engineering –GPA 3.8 (Summa Cum Laude)
 President ofTau Beta Pi (national engineering honor society)
 Extra-Curricularactivities included varsity Cheerleader and Ohio University Marching Band

More Related Content

What's hot

Steve Carolus Functional Resume
Steve Carolus Functional ResumeSteve Carolus Functional Resume
Steve Carolus Functional ResumeSteven Carolus
 
Curriculum Ulises Tonix Gil Eng
Curriculum Ulises Tonix Gil EngCurriculum Ulises Tonix Gil Eng
Curriculum Ulises Tonix Gil EngUlises Tonix
 
Mark Mazanec resume
Mark Mazanec resumeMark Mazanec resume
Mark Mazanec resumeMark Mazanec
 
Joseph Reznicek - Management 2016
Joseph Reznicek - Management 2016Joseph Reznicek - Management 2016
Joseph Reznicek - Management 2016Joseph Reznicek
 
Denise Calow Resume 11_09_2015
Denise Calow Resume 11_09_2015Denise Calow Resume 11_09_2015
Denise Calow Resume 11_09_2015Denise Calow
 
Refayet Amin
Refayet AminRefayet Amin
Refayet Aminrefayet
 
Mark Williams_Res_Final_V2
Mark Williams_Res_Final_V2Mark Williams_Res_Final_V2
Mark Williams_Res_Final_V2Mark Williams
 
ProjectManagerResume_TiffanyChatman
ProjectManagerResume_TiffanyChatmanProjectManagerResume_TiffanyChatman
ProjectManagerResume_TiffanyChatmanTiffany Chatman
 
Sam Miller resume REV3.2
Sam Miller resume REV3.2Sam Miller resume REV3.2
Sam Miller resume REV3.2Samuel Miller
 
Technical Program Manager
Technical Program ManagerTechnical Program Manager
Technical Program ManagerAlisa Hart
 
PROFILE- ENCON EMSPL
PROFILE- ENCON EMSPLPROFILE- ENCON EMSPL
PROFILE- ENCON EMSPLCdr S Kumar
 
M. Obeidat- IPP3 Sr.Performance & Efficiency engineer
M. Obeidat- IPP3 Sr.Performance &  Efficiency engineerM. Obeidat- IPP3 Sr.Performance &  Efficiency engineer
M. Obeidat- IPP3 Sr.Performance & Efficiency engineerMohammed Obeidat, I.A
 
Kens resume 7-19-2016
Kens resume 7-19-2016Kens resume 7-19-2016
Kens resume 7-19-2016Ken wilson
 
Fred Fallanca Resume' 2
Fred Fallanca Resume' 2Fred Fallanca Resume' 2
Fred Fallanca Resume' 2Fred Fallanca
 

What's hot (20)

Steve Carolus Functional Resume
Steve Carolus Functional ResumeSteve Carolus Functional Resume
Steve Carolus Functional Resume
 
Curriculum Ulises Tonix Gil Eng
Curriculum Ulises Tonix Gil EngCurriculum Ulises Tonix Gil Eng
Curriculum Ulises Tonix Gil Eng
 
Mark Mazanec resume
Mark Mazanec resumeMark Mazanec resume
Mark Mazanec resume
 
Joseph Reznicek - Management 2016
Joseph Reznicek - Management 2016Joseph Reznicek - Management 2016
Joseph Reznicek - Management 2016
 
Viresh Jugali CV
Viresh Jugali CVViresh Jugali CV
Viresh Jugali CV
 
Denise Calow Resume 11_09_2015
Denise Calow Resume 11_09_2015Denise Calow Resume 11_09_2015
Denise Calow Resume 11_09_2015
 
Amanda_Enos_Resume_2016
Amanda_Enos_Resume_2016Amanda_Enos_Resume_2016
Amanda_Enos_Resume_2016
 
Refayet Amin
Refayet AminRefayet Amin
Refayet Amin
 
Gary Resume SUM
Gary Resume SUMGary Resume SUM
Gary Resume SUM
 
Mark Williams_Res_Final_V2
Mark Williams_Res_Final_V2Mark Williams_Res_Final_V2
Mark Williams_Res_Final_V2
 
ProjectManagerResume_TiffanyChatman
ProjectManagerResume_TiffanyChatmanProjectManagerResume_TiffanyChatman
ProjectManagerResume_TiffanyChatman
 
Luis Moreno _ Resume
Luis Moreno _ ResumeLuis Moreno _ Resume
Luis Moreno _ Resume
 
Sam Miller resume REV3.2
Sam Miller resume REV3.2Sam Miller resume REV3.2
Sam Miller resume REV3.2
 
Technical Program Manager
Technical Program ManagerTechnical Program Manager
Technical Program Manager
 
Pramod Chand Chaturvedi
Pramod Chand ChaturvediPramod Chand Chaturvedi
Pramod Chand Chaturvedi
 
PROFILE- ENCON EMSPL
PROFILE- ENCON EMSPLPROFILE- ENCON EMSPL
PROFILE- ENCON EMSPL
 
M. Obeidat- IPP3 Sr.Performance & Efficiency engineer
M. Obeidat- IPP3 Sr.Performance &  Efficiency engineerM. Obeidat- IPP3 Sr.Performance &  Efficiency engineer
M. Obeidat- IPP3 Sr.Performance & Efficiency engineer
 
Michael Martin
Michael MartinMichael Martin
Michael Martin
 
Kens resume 7-19-2016
Kens resume 7-19-2016Kens resume 7-19-2016
Kens resume 7-19-2016
 
Fred Fallanca Resume' 2
Fred Fallanca Resume' 2Fred Fallanca Resume' 2
Fred Fallanca Resume' 2
 

Viewers also liked

Viewers also liked (14)

Resume Sourabh Joshi
Resume Sourabh JoshiResume Sourabh Joshi
Resume Sourabh Joshi
 
Bill Resume Retired
Bill Resume RetiredBill Resume Retired
Bill Resume Retired
 
nandha resume final
nandha resume finalnandha resume final
nandha resume final
 
Resume
ResumeResume
Resume
 
JyotilResumeCtrl
JyotilResumeCtrlJyotilResumeCtrl
JyotilResumeCtrl
 
Basha_ETL_Developer
Basha_ETL_DeveloperBasha_ETL_Developer
Basha_ETL_Developer
 
Jiban_Resume
Jiban_ResumeJiban_Resume
Jiban_Resume
 
Larry_Somers_Resume
Larry_Somers_ResumeLarry_Somers_Resume
Larry_Somers_Resume
 
Chris Fulgham - Ministry Resume
Chris Fulgham - Ministry ResumeChris Fulgham - Ministry Resume
Chris Fulgham - Ministry Resume
 
M. Leonard Resume
M. Leonard ResumeM. Leonard Resume
M. Leonard Resume
 
Mohammed_Ibrash_C.V
Mohammed_Ibrash_C.VMohammed_Ibrash_C.V
Mohammed_Ibrash_C.V
 
Social Media Disclaimer Terms Of Use
Social Media Disclaimer Terms Of UseSocial Media Disclaimer Terms Of Use
Social Media Disclaimer Terms Of Use
 
Rahul resume
Rahul resumeRahul resume
Rahul resume
 
Jodi moll resume 2016
Jodi moll resume 2016Jodi moll resume 2016
Jodi moll resume 2016
 

Similar to KW Resume

Similar to KW Resume (20)

John smith 7.22.2015 1
John smith 7.22.2015 1John smith 7.22.2015 1
John smith 7.22.2015 1
 
Anthony Arnold Summary Resume
Anthony Arnold Summary ResumeAnthony Arnold Summary Resume
Anthony Arnold Summary Resume
 
Presentation_Resume.p164007.f1586933
Presentation_Resume.p164007.f1586933Presentation_Resume.p164007.f1586933
Presentation_Resume.p164007.f1586933
 
Resume Rac
Resume RacResume Rac
Resume Rac
 
JKliethermesResume20171 (1)
JKliethermesResume20171 (1)JKliethermesResume20171 (1)
JKliethermesResume20171 (1)
 
Resume_Mech Sourcing Enterprise Lead-R1
Resume_Mech Sourcing Enterprise Lead-R1Resume_Mech Sourcing Enterprise Lead-R1
Resume_Mech Sourcing Enterprise Lead-R1
 
John Day Resume
John Day ResumeJohn Day Resume
John Day Resume
 
Resume Motonaga 10.20.16
Resume Motonaga 10.20.16Resume Motonaga 10.20.16
Resume Motonaga 10.20.16
 
Merrill_Resume_2015
Merrill_Resume_2015Merrill_Resume_2015
Merrill_Resume_2015
 
9 May 2022 Tito Camps Resume (1) (4) (1).doc
9 May 2022 Tito Camps Resume (1) (4) (1).doc9 May 2022 Tito Camps Resume (1) (4) (1).doc
9 May 2022 Tito Camps Resume (1) (4) (1).doc
 
J. Simkins Resume 10.1a
J. Simkins Resume 10.1aJ. Simkins Resume 10.1a
J. Simkins Resume 10.1a
 
Marco resume.(3)
Marco resume.(3)Marco resume.(3)
Marco resume.(3)
 
S Perkins 8 22-2021
S Perkins 8 22-2021S Perkins 8 22-2021
S Perkins 8 22-2021
 
Kate Crandell_01282016_v1
Kate Crandell_01282016_v1Kate Crandell_01282016_v1
Kate Crandell_01282016_v1
 
Engineering & Project Management
Engineering & Project ManagementEngineering & Project Management
Engineering & Project Management
 
Chris Kuntz Resume LinkedIn
Chris Kuntz Resume LinkedIn Chris Kuntz Resume LinkedIn
Chris Kuntz Resume LinkedIn
 
RAJ PATIL
RAJ PATILRAJ PATIL
RAJ PATIL
 
Chris Kuntz Resume LinkedIn
Chris Kuntz Resume LinkedIn Chris Kuntz Resume LinkedIn
Chris Kuntz Resume LinkedIn
 
Chris Kuntz Resume LinkedIn
Chris Kuntz Resume LinkedIn Chris Kuntz Resume LinkedIn
Chris Kuntz Resume LinkedIn
 
Cv Dab 2009a
Cv Dab 2009aCv Dab 2009a
Cv Dab 2009a
 

KW Resume

  • 1. Ken Williams 2110 Pecan T rail Dr, Richmond, T X 77406 (713) 927 -0416 ken_a_wms@yahoo.com ____________________________________________________________________________________________________ Core Competency –Leveraging my exceptional analytical skills and extensive business consulting experience to maximize profitability EMPLOYMENT HISTORY Acorn Systems Inc. Houston,TX 2001- Present Consulting Services EngagementManager –Pre-Sales Engineer –Database Developer  Managed all phases ofEnterprise Profitability projects including pre-sales engagements, contract development, project planning, project status reporting, profitability model design, technical integration, model validation, training and implementation  Expertise in profitability and cost modeling across a wide variety ofvertical industries with Fortune 500 clients including financial services (Aon,Bank of Oklahoma), sports management (NCAA), he althcare (MD Anderson, UCSF), logistics (FedEx, UPS), Food Services (SuperValu, Safeway), manufacturing (Timberline, Tampa Bay Steel), chemicals (Canada Colors) and many more.  Designed and developed Acorn Advanced Analytics product enabling users to define, create and process an OLAP reporting cube Digitech Systems LLC Round Rock,T X 1998 - 2001 Founding Partner –Application Designer –Database Design/Development  Designed, developed and implemented shopfloor management systems including production scheduling and tracking all elements ofthe manufacturing process  Implemented graphical user interfaces to monitor and control powergeneration SCADA systems  Implemented wireless warehouse inventory management system utilizing hand held devices and integration into corporate ERP ALCOA (Aluminum Company ofAmerica) Rockdale,T X 1991 - 1998 Staff Industrial Engineer –Power & Mining,Ingot  Developedfinancial and operational tracking/reporting systems and responsible for developing annual operational and capital budgets  Identified departmental Key Performance Metrics established Pay For Performance thresholds  Reduced production costs significantly by increasing re-use of scrap metal Cooper Industries Inc. Belden Wire & Cable,T ompkinsville,KY and Brewer-T ichener,Cortland,NY 1987 - 1991 Cost Reduction Coordinator –Manufacturing Engineer  Completed 2 yearManufacturing Engineering Training program including roles as Industrial Engineer, Tool Room Supervisor, Production Control Supervisor and Quality Control Engineer  Managed capital budgetincluding project identification,financial analysis, RFA development, vendor selection, workplacedesign, installation and training  Achieved significant increases in CNC machine utilization and reduced inventory levels by implementing Just In Time management practices EDUCAT ION Ohio University,Athens,OH BS in Industrial and Systems Engineering –GPA 3.8 (Summa Cum Laude)  President ofTau Beta Pi (national engineering honor society)  Extra-Curricularactivities included varsity Cheerleader and Ohio University Marching Band