SlideShare a Scribd company logo
1 of 3
ROBERT A. CARCIERI
                                             226 Colonial Dr. Athol, MA, 01331
                                                  Cell: 617-780-4781
                                            Email: rac1234567@yahoo.com

SUMMARY: Result oriented, aggressive and successful Engineering Manager with over 20 years of increasingly responsible
Engineering/Technical Management positions encompassing Configuration Management/Document Control, PLM Systems,
Mechanical, Electrical, Manufacturing Engineering disciplines in both domestic and International businesses. Have
demonstrated sound business judgment, decisiveness, excellent project planning, and communication skills at a consistently
high level of performance in a variety of challenging and technically oriented assignments.

SKILL SETS:

Configuration Management/Document Control                     MS Office – Word, Excel, PowerPoint, Outlook
PLM/PDM Systems – Agile and Windchill                         Compliance Engineering- UL, CE, FCC, Reach and RoHS
Excellent Technical Written and Verbal Communication          Component Engineering
ERP Systems – Oracle EBS and SAP                              ISO 9001/9002, TS16949, APQP
Policy and Procedures                                         Project Management



WORK EXPERIENCE:

Senior Engineering Documentation Manager, A123 Systems, Waltham Ma 2007-Present - Developer and Manufacturer
of new generation Lithium-Ion batteries for the Automotive, Grid and Commercial businesses 3000 employees worldwide.

Reporting to Senior Director of Sustaining Engineering, manage staff of 4-5 Configuration Analysts manager is responsible for
implementation and support of companywide documentation system used by R&D, product engineering, manufacturing,
supply chain, marketing and sales, and quality. Successfully integrated of a processed based, standardized documentation
system across multiple projects and product lines and involving multiple manufacturing and R&D facilities located in North
America and Asia:

Responsibilities Include:

    1.   Responsible for implementation, administration and support of Agile PLM system versions AA2006 through 9.3.1.2 including
         project management, roll out, training, policies and procedures, maintenance, continuous improvements, helpdesk support
         for 1000 users. Modules implemented include PC, EC, PQM, PG&C, M-CAD, E-CAD connectors, ACS adapter to Oracle
         EBS. Support Compliance and Quality processes per TS16949, ISO9001, APQP requirements.
    2.   Manage and grow document control department. Create procedures and coordinate training in document control
         tools and practices
    3.   Standardize documentation practices at 10 manufacturing, R&D, and Product Engineering locations.
    4.   Collaborate with all interested parties to develop documentation and Change process workflows to serve product
         development and mass production activities in a rapidly growing company.
    5.   Interface PLM system with ERP system (Oracle EBS) to ensure engineering data (Bill of materials, Design changes,
         etc.) is properly integrated within business practices of company.
    6.   Maintain and adapt system for improved effectiveness and speed.


Product Configuration Manager, Bose Corporation, Framingham, Ma – 2004-2007 - Electronics Design and Manufacturer
of high end audio equipment, for Auto Industry, Military and Home Entertainment 7-8000 employees worldwide.

Reporting to Senior Manager of Product Data and Process Management supervise staff of 10-14 Configuration Analysts with
principal responsibility for Managing Bose Engineering Documentation System including processing all Engineering Changes,
New Product Releases for bills of material, drawings, part numbers and deviations. Chair weekly multi-facility status meetings
involving US and International manufacturing locations. Satisfy standard management responsibilities for employee
motivation, reviews, training and budgets.

Responsibilities include

    1.   Manage the processing of over 2000 Engineering Change Notices per year, maintenance and release of all product
         part numbers, BOMs, documents and Workflows using Windchill 8.0 Product Data Management system. Interface
         with Manufacturing to implement ECNs.
    2.   Created and/or maintained department and corporate policies and procedures relating to job function. Hire, train and
         develop employees.

    3.   Participated in implementation of SAP 5.0 ERP system, transitioning from older ManMan ERP system, including data
         base cleansing, interface strategy between Windchill and SAP, training Engineers on SAP ECM, MM and BOM
         modules.

                                                             Page 1 of 3
4.    Responsible for department metrics performance, product release and ECN status reporting and process auditing to
          assure quality and accuracy of engineering documentation.
    5.    Key member of various company initiatives relating to new product introductions and releases, system
          upgrades/testing and continuous improvement programs.


Engineering/Information Services Manager, Vibren Technologies, Boxborough, MA, - 1998 to 2003 Start-up company, 75
–100 employees, providing Engineering Services including H/W Support, Software testing, BIOS and Driver Development,
Microsoft Certifications, Information Technology and Network Services for Mid to Large sized companies with annual Sales of
$15 million.

         Reporting to the Vice President of Development, supervising staff of 8-10 professional and administrative staff with
primary responsibility for Corporate Engineering and Information Services including N/W Infrastructure, CM, Change
Management system, S/W & H/W Product Releases, part numbers, bills of material, Engineering drawings, specifications and
revision control. Also directed activities for Mechanical Engineering/Drafting, Compliance and Component Engineering, CAD
Administration, Packaging and Product costing for Personal Computer business. Chair weekly new product introduction and
ECO meetings. Work with Engineering Design, Outside Vendors, Marketing and PPM groups to define complex computer
solutions for home and business.

Major accomplishments include:

          1.   Researched, justified and implemented on-line PDM system (Product Data Management) System (Agile), to
               improve corporate wide and Outsourced Manufacturing access to Engineering Documentation. Results:
               Reduced ECO and Release process from 2 weeks to 3 days, improved information flow to over 300 internal and
               external employees. Approximate savings to company $150K/yr.

          2.   Manage overall product release process including Mechanical and Electrical Engineers to successfully introduce
               personal computer product lines. Provided Design support services for chassis assemblies, motherboards, sub-
               assemblies, BOM coordination and Design reviews. Results: Satisfied major responsibility to provide
               deliverables to all affected organizations including Manufacturing and Customer Service.

          3.   Supported PCB and “Box” Manufacturers (Jabil, Solectron and ACT) with Engineering Documentation
               deliverables including PCB assembly Drawings, BOMs, AVL (approved vendor listings), ECO process,
               component specifications, and file transfers. Results: Successfully released over 100 computer motherboards
               on schedule to achieve First Customer Ship requirements.

          4.   Managed and Improved Compliance Testing processes for FCC, CE and UL certifications by doing more “in
               house” troubleshooting. Responsible for review and approval of product DRL (Device Rating Label) which
               includes all Regulatory Compliance Certifications. Results: saved company approximately $50 – 60K in outside
               lab costs.

          5.   Managed IS department and N/W infrastructure which included application support, help desk and network
               administration functions, procurement and implementation of all client and server hardware/software for
               company, WAN issues, and virus protection. Managed project execution/changeover of Vibren’s corporate
               network from MCI (UUNET) circuit to Sprint circuit, managed UNIX environment in support of Engineering design
               application; Pro-Engineer and worked with software and hardware vendors to find most economic solutions
               including Microsoft licensing for both client and server. Yearly budget of $.5 million. Results: Implemented
               several infrastructure improvements including standardizing clients on Windows 2000. Reduced costs by $160K
               for Application, Network administration and Help Desk support by outsourcing.

         Manufacturing Engineering Supervisor, NEC/Packard Bell Inc., Sacramento CA - 1988 to 1998 Global manufacturer and
         distributor of personal computers, monitors. Annual sales of over one billion

        Progressively promoted, reporting to Director of Manufacturing, supervising staff of 8-10 Engineers, Administrators
and clerks with primary responsibility for Documentation Control function at the plant level, Industrial, Manufacturing,
Component Engineering and Quality Control support for production lines.

          Major accomplishments include:

          1.       Managed Document Control for Personal Computer and Printer business units including New Product
               Introduction and ECO coordination. Researched, justified and lead cross-functional team to establish first PDM
               system “Keyfile” Released hundreds of personal computer products and options on schedule and within budget.
               Successfully integrated Keyfile and SAP functionality to provide excellent Engineering documentation flow.
               Results: Reduced ECO and Release process from three weeks down to one week, improved information flow to
               over 500 employees, 75% reduction in space required for paper based filing systems. Approximate savings to
               company $150k/yr. Grew business from $200 million to $500 million in revenue

          2.   Major contributor to the implementation/conversion to new corporate ERP system, SAP. Participated in Business
               Process Re-Engineering of Manufacturing and created “as is/to be” workflows. Trained staff, worked with
               Anderson, SAP consultants and cross functional teams to transition FI - Costing and PP - Item Master, Bill of
                                                             Page 2 of 3
Material and Engineering Change Control functions from older mainframe legacy system to new system.
             Results: SAP conversion at NEC accomplished in record time for industry (8-10 months).

        3.   Started up Component Engineering group and implemented AVL (Approved Vendor Listing) system by working
             with Hardware Design and Purchasing to establish approval and release process for all electronic components
             used on NEC Printed Circuit Boards. Results: increased quality on PCB components used by third party vendors
             by documenting requirements and creating responsive component change process.


          Senior Industrial Engineer, NEC Information Systems Inc., Northboro, Ma, 1983 to 1988 Global manufacturer and
          distributor of personal computers, monitors, CD-ROM readers, printers and disk drives. Annual sales of over two billion

Reporting to the Manager of Engineering, hired to start up West Coast Distribution Operations including supervision of 2
Industrial Engineers with primary focus on capital equipment, plant layout, policies and procedures for Printer business.

        Major accomplishments include:

        1.   Coordinated start-up of manufacturing lines including plant layouts, capital equipment justification, procedures,
             and labor reporting systems. Included start up of outsourcing effort on certain high volume lower cost PCs to
             SCI, Alabama. Results: grew business from $10 to $200 million dollars in revenue successfully opened
             Distribution plant on schedule within 6 months.

        2.   Recommended improvements in existing Engineering documentation systems, including ECO and Release
             systems. Appointed to revamp and enhance Documentation Control group, including procurement of capital
             equipment, staffing, creating policies and procedures Results: started up Corporate Engineering Services,
             eliminated multiple data bases, centralized part numbers and Engineering documentation. Satisfied ISO9002
             requirements.

PROFESSIONAL SOCIETIES :

Senior member of IIE (Institute of Industrial Engineers),
AIIM (Association for Information and Image Management)
DMA (Document Management Association)

PROFESSIONAL DEVELOPMENT :

        1.   Agile 9.3 User, Admin, PG&C and QMS
        2.   Employer sponsored Management training Seminars and programs
        3.   R. D. Garwood MRP II Atlanta Georgia, workshop/seminar on successful Bill of Material structuring
        4.   SAP, In house course-on MM, PP, FI, Bill of Material Master and ECM Management
        5.   A+ Certification
        6.   WindChill 8.0
        7.   SAP 5.0
        8.   ManMan
        9.   CM II Certified – Arizona State University

EDUCATION: Worcester Polytechnic Institute -- BS. Industrial Engineering 3.2 GPA




                                                            Page 3 of 3

More Related Content

What's hot

Project Manager - PMP [Resume]
Project Manager - PMP [Resume]Project Manager - PMP [Resume]
Project Manager - PMP [Resume]jkern1993
 
Martin Gramlich Resume - Latest Feb 2016
Martin Gramlich Resume - Latest Feb 2016Martin Gramlich Resume - Latest Feb 2016
Martin Gramlich Resume - Latest Feb 2016Martin Gramlich
 
MarianFieldsResume5-5-2016
MarianFieldsResume5-5-2016MarianFieldsResume5-5-2016
MarianFieldsResume5-5-2016Marian Fields
 
Ocken Resume2
Ocken Resume2Ocken Resume2
Ocken Resume2RobOcken
 
James Cochran 2016
James Cochran 2016James Cochran 2016
James Cochran 2016Jim Cochran
 
Resume G Bisanz Presentation Format
Resume G Bisanz Presentation FormatResume G Bisanz Presentation Format
Resume G Bisanz Presentation FormatGregory Bisanz
 
Senior Project Manager Rafael Marrero Aug2010 Linkedin Miami Fl
Senior Project Manager Rafael Marrero Aug2010 Linkedin Miami FlSenior Project Manager Rafael Marrero Aug2010 Linkedin Miami Fl
Senior Project Manager Rafael Marrero Aug2010 Linkedin Miami Flrafaelmarrero
 
RCLIFFE.resume
RCLIFFE.resumeRCLIFFE.resume
RCLIFFE.resumeBob Cliffe
 
Resume Biju Alex
Resume Biju AlexResume Biju Alex
Resume Biju AlexBiju Alex
 
Daniel_Roa_Resume
Daniel_Roa_ResumeDaniel_Roa_Resume
Daniel_Roa_ResumeDANIEL ROA
 
Shirley kivi bsa june 2017
Shirley kivi bsa june 2017Shirley kivi bsa june 2017
Shirley kivi bsa june 2017Shirley Kivi
 

What's hot (20)

Chris Kuntz Resume LinkedIn
Chris Kuntz Resume LinkedIn Chris Kuntz Resume LinkedIn
Chris Kuntz Resume LinkedIn
 
Chris Kuntz Resume Google
Chris Kuntz Resume GoogleChris Kuntz Resume Google
Chris Kuntz Resume Google
 
Chris Kuntz Resume Generic
Chris Kuntz Resume GenericChris Kuntz Resume Generic
Chris Kuntz Resume Generic
 
Chris Kuntz Resume Clorox SM
Chris Kuntz Resume Clorox SMChris Kuntz Resume Clorox SM
Chris Kuntz Resume Clorox SM
 
Project Manager - PMP [Resume]
Project Manager - PMP [Resume]Project Manager - PMP [Resume]
Project Manager - PMP [Resume]
 
Juan Caballero Resume -Final-22
Juan Caballero Resume -Final-22Juan Caballero Resume -Final-22
Juan Caballero Resume -Final-22
 
Martin Gramlich Resume - Latest Feb 2016
Martin Gramlich Resume - Latest Feb 2016Martin Gramlich Resume - Latest Feb 2016
Martin Gramlich Resume - Latest Feb 2016
 
MarianFieldsResume5-5-2016
MarianFieldsResume5-5-2016MarianFieldsResume5-5-2016
MarianFieldsResume5-5-2016
 
Ocken Resume2
Ocken Resume2Ocken Resume2
Ocken Resume2
 
James Cochran 2016
James Cochran 2016James Cochran 2016
James Cochran 2016
 
Resume G Bisanz Presentation Format
Resume G Bisanz Presentation FormatResume G Bisanz Presentation Format
Resume G Bisanz Presentation Format
 
Resume (MES) Online
Resume (MES) OnlineResume (MES) Online
Resume (MES) Online
 
Senior Project Manager Rafael Marrero Aug2010 Linkedin Miami Fl
Senior Project Manager Rafael Marrero Aug2010 Linkedin Miami FlSenior Project Manager Rafael Marrero Aug2010 Linkedin Miami Fl
Senior Project Manager Rafael Marrero Aug2010 Linkedin Miami Fl
 
RCLIFFE.resume
RCLIFFE.resumeRCLIFFE.resume
RCLIFFE.resume
 
Resume' DWDobbs 2016a
Resume' DWDobbs 2016aResume' DWDobbs 2016a
Resume' DWDobbs 2016a
 
Sap
SapSap
Sap
 
RESUME98[1]. (1)
RESUME98[1]. (1)RESUME98[1]. (1)
RESUME98[1]. (1)
 
Resume Biju Alex
Resume Biju AlexResume Biju Alex
Resume Biju Alex
 
Daniel_Roa_Resume
Daniel_Roa_ResumeDaniel_Roa_Resume
Daniel_Roa_Resume
 
Shirley kivi bsa june 2017
Shirley kivi bsa june 2017Shirley kivi bsa june 2017
Shirley kivi bsa june 2017
 

Similar to Resume Rac

Similar to Resume Rac (20)

JCC RESUME 12.15.2015
JCC RESUME 12.15.2015JCC RESUME 12.15.2015
JCC RESUME 12.15.2015
 
Bob Mellesmoen Resume
Bob Mellesmoen ResumeBob Mellesmoen Resume
Bob Mellesmoen Resume
 
Resume_QXL5
Resume_QXL5Resume_QXL5
Resume_QXL5
 
Resume_LI
Resume_LIResume_LI
Resume_LI
 
Resume - James R Booth 2016 03 04
Resume - James R Booth 2016 03 04Resume - James R Booth 2016 03 04
Resume - James R Booth 2016 03 04
 
Ruben Renteria - Resume Nov. 11. 2015
Ruben Renteria - Resume Nov. 11. 2015Ruben Renteria - Resume Nov. 11. 2015
Ruben Renteria - Resume Nov. 11. 2015
 
Chris Kuntz Resume LinkedIn
Chris Kuntz Resume LinkedIn Chris Kuntz Resume LinkedIn
Chris Kuntz Resume LinkedIn
 
James Butler - Resume 2018
James Butler - Resume 2018James Butler - Resume 2018
James Butler - Resume 2018
 
Ashok bhandari
Ashok bhandariAshok bhandari
Ashok bhandari
 
John Blatt_ Resume 070615
John Blatt_ Resume 070615John Blatt_ Resume 070615
John Blatt_ Resume 070615
 
MarianFieldsResume 7-25-2016
MarianFieldsResume 7-25-2016MarianFieldsResume 7-25-2016
MarianFieldsResume 7-25-2016
 
Marian fieldsresume 7 25-2016
Marian fieldsresume 7 25-2016Marian fieldsresume 7 25-2016
Marian fieldsresume 7 25-2016
 
John smith 7.22.2015 1
John smith 7.22.2015 1John smith 7.22.2015 1
John smith 7.22.2015 1
 
Kate Resume-7Page
Kate Resume-7PageKate Resume-7Page
Kate Resume-7Page
 
Kate Crandell_01282016_v1
Kate Crandell_01282016_v1Kate Crandell_01282016_v1
Kate Crandell_01282016_v1
 
SRN_11
SRN_11SRN_11
SRN_11
 
Res012913p
Res012913pRes012913p
Res012913p
 
Mike-Romolino10[2]
Mike-Romolino10[2]Mike-Romolino10[2]
Mike-Romolino10[2]
 
Bill Delano Resume
Bill Delano ResumeBill Delano Resume
Bill Delano Resume
 
9 May 2022 Tito Camps Resume (1) (4) (1).doc
9 May 2022 Tito Camps Resume (1) (4) (1).doc9 May 2022 Tito Camps Resume (1) (4) (1).doc
9 May 2022 Tito Camps Resume (1) (4) (1).doc
 

Resume Rac

  • 1. ROBERT A. CARCIERI 226 Colonial Dr. Athol, MA, 01331 Cell: 617-780-4781 Email: rac1234567@yahoo.com SUMMARY: Result oriented, aggressive and successful Engineering Manager with over 20 years of increasingly responsible Engineering/Technical Management positions encompassing Configuration Management/Document Control, PLM Systems, Mechanical, Electrical, Manufacturing Engineering disciplines in both domestic and International businesses. Have demonstrated sound business judgment, decisiveness, excellent project planning, and communication skills at a consistently high level of performance in a variety of challenging and technically oriented assignments. SKILL SETS: Configuration Management/Document Control MS Office – Word, Excel, PowerPoint, Outlook PLM/PDM Systems – Agile and Windchill Compliance Engineering- UL, CE, FCC, Reach and RoHS Excellent Technical Written and Verbal Communication Component Engineering ERP Systems – Oracle EBS and SAP ISO 9001/9002, TS16949, APQP Policy and Procedures Project Management WORK EXPERIENCE: Senior Engineering Documentation Manager, A123 Systems, Waltham Ma 2007-Present - Developer and Manufacturer of new generation Lithium-Ion batteries for the Automotive, Grid and Commercial businesses 3000 employees worldwide. Reporting to Senior Director of Sustaining Engineering, manage staff of 4-5 Configuration Analysts manager is responsible for implementation and support of companywide documentation system used by R&D, product engineering, manufacturing, supply chain, marketing and sales, and quality. Successfully integrated of a processed based, standardized documentation system across multiple projects and product lines and involving multiple manufacturing and R&D facilities located in North America and Asia: Responsibilities Include: 1. Responsible for implementation, administration and support of Agile PLM system versions AA2006 through 9.3.1.2 including project management, roll out, training, policies and procedures, maintenance, continuous improvements, helpdesk support for 1000 users. Modules implemented include PC, EC, PQM, PG&C, M-CAD, E-CAD connectors, ACS adapter to Oracle EBS. Support Compliance and Quality processes per TS16949, ISO9001, APQP requirements. 2. Manage and grow document control department. Create procedures and coordinate training in document control tools and practices 3. Standardize documentation practices at 10 manufacturing, R&D, and Product Engineering locations. 4. Collaborate with all interested parties to develop documentation and Change process workflows to serve product development and mass production activities in a rapidly growing company. 5. Interface PLM system with ERP system (Oracle EBS) to ensure engineering data (Bill of materials, Design changes, etc.) is properly integrated within business practices of company. 6. Maintain and adapt system for improved effectiveness and speed. Product Configuration Manager, Bose Corporation, Framingham, Ma – 2004-2007 - Electronics Design and Manufacturer of high end audio equipment, for Auto Industry, Military and Home Entertainment 7-8000 employees worldwide. Reporting to Senior Manager of Product Data and Process Management supervise staff of 10-14 Configuration Analysts with principal responsibility for Managing Bose Engineering Documentation System including processing all Engineering Changes, New Product Releases for bills of material, drawings, part numbers and deviations. Chair weekly multi-facility status meetings involving US and International manufacturing locations. Satisfy standard management responsibilities for employee motivation, reviews, training and budgets. Responsibilities include 1. Manage the processing of over 2000 Engineering Change Notices per year, maintenance and release of all product part numbers, BOMs, documents and Workflows using Windchill 8.0 Product Data Management system. Interface with Manufacturing to implement ECNs. 2. Created and/or maintained department and corporate policies and procedures relating to job function. Hire, train and develop employees. 3. Participated in implementation of SAP 5.0 ERP system, transitioning from older ManMan ERP system, including data base cleansing, interface strategy between Windchill and SAP, training Engineers on SAP ECM, MM and BOM modules. Page 1 of 3
  • 2. 4. Responsible for department metrics performance, product release and ECN status reporting and process auditing to assure quality and accuracy of engineering documentation. 5. Key member of various company initiatives relating to new product introductions and releases, system upgrades/testing and continuous improvement programs. Engineering/Information Services Manager, Vibren Technologies, Boxborough, MA, - 1998 to 2003 Start-up company, 75 –100 employees, providing Engineering Services including H/W Support, Software testing, BIOS and Driver Development, Microsoft Certifications, Information Technology and Network Services for Mid to Large sized companies with annual Sales of $15 million. Reporting to the Vice President of Development, supervising staff of 8-10 professional and administrative staff with primary responsibility for Corporate Engineering and Information Services including N/W Infrastructure, CM, Change Management system, S/W & H/W Product Releases, part numbers, bills of material, Engineering drawings, specifications and revision control. Also directed activities for Mechanical Engineering/Drafting, Compliance and Component Engineering, CAD Administration, Packaging and Product costing for Personal Computer business. Chair weekly new product introduction and ECO meetings. Work with Engineering Design, Outside Vendors, Marketing and PPM groups to define complex computer solutions for home and business. Major accomplishments include: 1. Researched, justified and implemented on-line PDM system (Product Data Management) System (Agile), to improve corporate wide and Outsourced Manufacturing access to Engineering Documentation. Results: Reduced ECO and Release process from 2 weeks to 3 days, improved information flow to over 300 internal and external employees. Approximate savings to company $150K/yr. 2. Manage overall product release process including Mechanical and Electrical Engineers to successfully introduce personal computer product lines. Provided Design support services for chassis assemblies, motherboards, sub- assemblies, BOM coordination and Design reviews. Results: Satisfied major responsibility to provide deliverables to all affected organizations including Manufacturing and Customer Service. 3. Supported PCB and “Box” Manufacturers (Jabil, Solectron and ACT) with Engineering Documentation deliverables including PCB assembly Drawings, BOMs, AVL (approved vendor listings), ECO process, component specifications, and file transfers. Results: Successfully released over 100 computer motherboards on schedule to achieve First Customer Ship requirements. 4. Managed and Improved Compliance Testing processes for FCC, CE and UL certifications by doing more “in house” troubleshooting. Responsible for review and approval of product DRL (Device Rating Label) which includes all Regulatory Compliance Certifications. Results: saved company approximately $50 – 60K in outside lab costs. 5. Managed IS department and N/W infrastructure which included application support, help desk and network administration functions, procurement and implementation of all client and server hardware/software for company, WAN issues, and virus protection. Managed project execution/changeover of Vibren’s corporate network from MCI (UUNET) circuit to Sprint circuit, managed UNIX environment in support of Engineering design application; Pro-Engineer and worked with software and hardware vendors to find most economic solutions including Microsoft licensing for both client and server. Yearly budget of $.5 million. Results: Implemented several infrastructure improvements including standardizing clients on Windows 2000. Reduced costs by $160K for Application, Network administration and Help Desk support by outsourcing. Manufacturing Engineering Supervisor, NEC/Packard Bell Inc., Sacramento CA - 1988 to 1998 Global manufacturer and distributor of personal computers, monitors. Annual sales of over one billion Progressively promoted, reporting to Director of Manufacturing, supervising staff of 8-10 Engineers, Administrators and clerks with primary responsibility for Documentation Control function at the plant level, Industrial, Manufacturing, Component Engineering and Quality Control support for production lines. Major accomplishments include: 1. Managed Document Control for Personal Computer and Printer business units including New Product Introduction and ECO coordination. Researched, justified and lead cross-functional team to establish first PDM system “Keyfile” Released hundreds of personal computer products and options on schedule and within budget. Successfully integrated Keyfile and SAP functionality to provide excellent Engineering documentation flow. Results: Reduced ECO and Release process from three weeks down to one week, improved information flow to over 500 employees, 75% reduction in space required for paper based filing systems. Approximate savings to company $150k/yr. Grew business from $200 million to $500 million in revenue 2. Major contributor to the implementation/conversion to new corporate ERP system, SAP. Participated in Business Process Re-Engineering of Manufacturing and created “as is/to be” workflows. Trained staff, worked with Anderson, SAP consultants and cross functional teams to transition FI - Costing and PP - Item Master, Bill of Page 2 of 3
  • 3. Material and Engineering Change Control functions from older mainframe legacy system to new system. Results: SAP conversion at NEC accomplished in record time for industry (8-10 months). 3. Started up Component Engineering group and implemented AVL (Approved Vendor Listing) system by working with Hardware Design and Purchasing to establish approval and release process for all electronic components used on NEC Printed Circuit Boards. Results: increased quality on PCB components used by third party vendors by documenting requirements and creating responsive component change process. Senior Industrial Engineer, NEC Information Systems Inc., Northboro, Ma, 1983 to 1988 Global manufacturer and distributor of personal computers, monitors, CD-ROM readers, printers and disk drives. Annual sales of over two billion Reporting to the Manager of Engineering, hired to start up West Coast Distribution Operations including supervision of 2 Industrial Engineers with primary focus on capital equipment, plant layout, policies and procedures for Printer business. Major accomplishments include: 1. Coordinated start-up of manufacturing lines including plant layouts, capital equipment justification, procedures, and labor reporting systems. Included start up of outsourcing effort on certain high volume lower cost PCs to SCI, Alabama. Results: grew business from $10 to $200 million dollars in revenue successfully opened Distribution plant on schedule within 6 months. 2. Recommended improvements in existing Engineering documentation systems, including ECO and Release systems. Appointed to revamp and enhance Documentation Control group, including procurement of capital equipment, staffing, creating policies and procedures Results: started up Corporate Engineering Services, eliminated multiple data bases, centralized part numbers and Engineering documentation. Satisfied ISO9002 requirements. PROFESSIONAL SOCIETIES : Senior member of IIE (Institute of Industrial Engineers), AIIM (Association for Information and Image Management) DMA (Document Management Association) PROFESSIONAL DEVELOPMENT : 1. Agile 9.3 User, Admin, PG&C and QMS 2. Employer sponsored Management training Seminars and programs 3. R. D. Garwood MRP II Atlanta Georgia, workshop/seminar on successful Bill of Material structuring 4. SAP, In house course-on MM, PP, FI, Bill of Material Master and ECM Management 5. A+ Certification 6. WindChill 8.0 7. SAP 5.0 8. ManMan 9. CM II Certified – Arizona State University EDUCATION: Worcester Polytechnic Institute -- BS. Industrial Engineering 3.2 GPA Page 3 of 3